Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

Similar documents
Environmental Governance in Myanmar. U Than Aye Director Environmental Conservation Department

Overview of Environmental Impact Assessment (EIA) Procedure SEA and Sustainable Development Goals in Myanmar

Activities of Water Environment Management by Yangon Regional ECD. Daw Khin Thida Tin Director Environmental Conservation Department Yangon Region

Mining Environmental Impact Assessment Guidelines. May 2018

Information on the focal point for the Convention. Information on the point of contact for the Convention

Environment and Climate Change Adaptation and Mitigation in Myanmar. SAN WIN Assistant Director Environmental Conservation Department 23 August, 2014

FOR DISCUSSION ONLY. (A) ADB Safeguard Policy Statement. (C) Extent of Equivalence 2

Public Participation in EIA Process in Myanmar

DRAFT GUIDELINE ON PUBLIC PARTICIPATION IN MYANMAR S EIA PROCESSES CONSULTATION DRAFT

Comparative Analysis of Cambodia Legal Framework and ADB Safeguard Policy Statement: ENVIRONMENT

Development of Environment Statistic Under the National Statistical System (NSS) in Myanmar

Evaluation and future development of the EIA system in Albania

The State Peace and Development Council hereby enacts the following Law: - Chapter I Title and Definition

The Republic of the Union of Myanmar Ministry of Agriculture and Irrigation Notification No. 1/2012 August 31, 2012

EUROPEAN PARLIAMENT AND COUNCIL

STANDARD OPERATING PROCEDURE

Practice Notes For Construction Managers PNCM 5: Environmental Management - First Issue, April 2004 (Index under: Environmental Management)

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section Compliance Reporting

Ministry of Environment & Forests NOTIFICATION. New Delhi, the 6 th January, 2000.

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities

THE ORDER OF THE PRESIDENT OF THE STATE On the Proclamation of Law THE PRESIDENT OF THE SOCIALIST REPUBLIC OF VIET NAM

Outline of the presentation

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

Emergency Government Ordinance No. 195/2005 on environmental protection, as further amended and supplemented ( GO No. 195/2005 );

Law of the Republic of Kazakhstan dated July 15, 1997 N on Environmental Protection (amended)

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

Spills to the Environment and Reporting Policy

Lessons from experience with Integrating environmental concerns into Strategies and plans in Myanmar

AMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)

LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDECE DEMOCRACY UNITY PROSPERITY WATER SUPPLY LAW


KANSUI (Ver. 2)

Environmental Impact Assessment (EIA) Owen Struthers Development Management Branch Welsh Government

Terms of Reference Environmental Law, EIA/IEE Guideline Package, Sectoral environmental Checklist & Regulations

REPUBLIC OF LITHUANIA

LAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES

Checklist of Authorization for handling Hazardous and Other Wastes

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process


WHICH PROJECTS REQUIRE EIA?

Wistron NeWeb Corporation Corporate Social Responsibility Best-Practice Principles

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

Environment Conservation Rules (ECR), 1997 Taufiq Akhter

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE. 2018/UNDP-MMR/PN/139 Date: 13 November Management Fund Regulations Drafter

Reproduced by Sabinet Online in terms of Government Printer s Copyright Authority No dated 02 February 1998

RFP No: WB/MOF/MINIS/CS/CQS/1.1.9 (d)/2014. A. Background

NAIROBI CONVENTION. Draft Protocol on Integrated Coastal Zone Management (ICZM) in the Western Indian Ocean Region:

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Part 148. CAA Consolidation. 10 March Aircraft Manufacturing Organisations - Certification

1 Environmental and Social Action Plan

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Drivers of Change Affecting Myanmar Forests: Towards formulation of GMS action plans

31. POLLUTION CONTROL COMMITTEE

GUIDELINES FOR PREPARATION OF MINE CLOSURE PLAN

SUBJECT : Chemical Control Order for Cyanide and Cyanide Compounds

Licensing Nuclear Power Plants in Canada. Ensuring Safe and Environmentally Acceptable Operations

SUGGESTED SOLUTIONS Audit and Assurance. Certificate in Accounting and Business II Examination March 2014

WHAT IS SUSTAINABLE DEVELOPMENT FRAMEWORK?

.in Dated 9th August, Sharma ;

RFP No: WB/MOF/MINIS/CS/CQS/1.1.14/2014

By: Joselito R. Bacani

2010 EIA Regulations GNR 543 of 18 June 2010, effective 2 August 2010

21 November 1995 No.170-FZ RUSSIAN FEDERATION FEDERAL LAW ON ATOMIC ENERGY USE

Environmental Bill of Rights Draft Version DRAFT - For Consultation Purposes Only Ministry of the Environment

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT

SQF 2000 Code. 6th Edition AUGUST A HACCP-Based Supplier Assurance Code for the Food Manufacturing and Distributing Industries

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)

Europe and Central Asia Region Capacity Development Trust Fund

SUBJECT : Chemical Control Order for Mercury and Mercury Compounds

Environmental Permitting Guidance Note Activity C.3

UNEP NAIROBI CONVENTION

Working for Better Water Quality The State of Water Quality Management in WEPA Partner Countries

AUSTRALIA. Submission under the Cancun Agreements February 2011

Cana a. Licence Conditions Handbook Effective date: July 01, 2010 (LCU-SRBT-ROOO)

REVIEW OF TEN YEAR PROGRAMME OF WORK ON SUSTAINABLE CONSUMPTION AND PRODUCTION PATTERNS

Safeguard Requirements And the Framework Process

Re-use of waste Recycling of waste Recovery of waste Use of waste as source of energy Incineration without energy recovery

TANZANIA PETROLEUM DEVELOPMENT CORPORATION TENDER NO. PA/031/ /C/10 FOR

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND HEALTH IMPACT ASSESSMENT (HA)

Summary of Preparatory Study

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated

Title: Environmental Management Tools Issued by: Environment Department

Corporate Social Responsibility Policy

CHAPTER 8 of ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT HOME FIRST SCHEDULE ARRANGEMENT OF REGULATIONS PART I - PRELIMINARY

LAW OF THE PEOPLE'S REPUBLIC OF CHINA ON PREVENTION AND CONTROL OF RADIOACTIVE POLLUTION

Environmental Performance Report Guideline EPB 453

EUROPEAN COMMISSION HEALTH AND CONSUMERS DIRECTORATE-GENERAL. EudraLex. The Rules Governing Medicinal Products in the European Union

NATIONAL ENVIRONMENTAL MANAGEMENT AUTHORITY (NEMA)

INTEGRATED POLLUTION CONTROL LICENCE

PEDO PAKHTUNKHWA ENERGY DEVELOPMENT ORGANIZATON. Government of Khyber Pakhtunkhwa, PAKISTAN

REPUBLIC OF ARMENIA LAW ON PLANT PROTECTION AND PLANT QUARANTINE

Employment Contract. U Thet Hnin Aung Central Executive Committee Members Myanmar Industry Craft & Services Trade Unions Federation (MICS TUsF)

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND HEALTH IMPACT ASSESSMENT (HA)

Environmental Management Plan Introduction Environmental Management Objectives Structure, Implementation and Review

Environmental Policy Statement:

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

9.0 Environmental Protection Program

ENVIRONMENTAL AUDITING GUIDE TD 16/16/E

Transcription:

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 1

Ministry of Environmental Conservation and Forestry (MOECAF) Environmental Conservation Committee at National Level Ministry of Environmental Conservation and Forestry Environmental Conservation Department (156 + 247) Administration (12 + 36) Policy, Planning, Int. Relation, Res. and Ext. (13 + 11) Pollution Control (12+9) Natural Resources & EIA (12+9) State & Region (14) (107+182)

Sustainable Development: Economic, Social and Environment Economic Social Sustainable Development Environment

Constitution 2008 Sec. 45 The Union shall protect and conserve natural environment Sec. 390 (b) Every citizen has the duty to assist the Union carrying out the environmental conservation 4

National Environment Policy (1994) To achieve harmony and balance between socioeconomic, natural resources and environment through the integration of environmental considerations into the development process enhancing the quality of the life of all its citizens Environmental protection should always be the primary objective in seeking development

Initiating to set EIA systems in Myanmar Legal Framework - Environmental Conservation Law, 2012 - Environmental Conservation Rules, 2014 - EIA Procedures (final draft) - In connection with Investment Law and Rules which is main entrance of proposal for Large scale project or business or activity 6

Environmental Conservation Law, 2012 Objectives Section 3 (c) to enable to emerge a healthy and clean environment and to enable to conserve natural and cultural heritage for the benefit of present and future generations; (d) to reclaim ecosystems as may be possible which are starting to degenerate and disappear; (e) to enable to manage and implement for decrease and loss of natural resources and for enabling the sustainable use beneficially; 7

Environmental Conservation Law (Continued) The following provisions of Duties and Powers relating to the Env. Cons. of the Ministry are stipulated in EC Law Section 7 (a) To specify categories and classes of hazardous wastes generated from the production and use of chemicals or other hazardous substances in carrying out industry, agriculture, mineral production, sanitation and other activities; (b) To prescribe categories of hazardous substances that may affect significantly at present or in the long run on the environment; (c) To promote and carry out the establishment of necessary factories and stations for the treatment of solid wastes, effluents and emissions which contain toxic and hazardous substances; 8

Environmental Conservation Law (Continued) (j) To prescribe the terms and conditions relating to effluent treatment in industrial estates and other necessary places and buildings and emissions of machines, vehicles and mechanisms; (m) To lay down and carry out a system of EIA and SIA as to whether or not a project or activity to be undertaken by any Government department, organization or person may cause a significant impact on the environment; (o) To manage to cause the polluter to compensate for environmental impact, cause to contribute fund by the organizations which obtain benefit from the natural environmental service system, cause to contribute a part of the benefit from the businesses which explore, trade and use the natural resources in environmental conservation works; 9

Monitoring Section 13. Environmental Conservation Law (Continued) The Ministry shall, under the guidance of the Committee, maintain a comprehensive monitoring system and implement by itself or in co-ordination with relevant Government departments and organizations in the following matters: (a) the use of agro-chemicals which cause to impact on the environment significantly; (b) transport, storage, use, treatment and disposal of pollutants and hazardous substances in industries; (c) disposal of wastes which come out from exploration, production and treatment of minerals, industrial mineral raw materials and gems; (d) carrying out waste disposal and sanitation works; (e) carrying out development and constructions; (f) carrying out other necessary matters relating to environmental pollution. 10

Environmental Conservation Law (Continued) Responsibilities of project proponent/ business owner for reducing environmental impact Section 14. A person causing a point source of pollution shall treat, emit, discharge and deposit the substances which cause pollution in the environment in accord with stipulated environmental quality standards. Section 15. The owner or occupier of any business, material or place which causes a point source of pollution shall install or use an on-site facility or controlling equipment in order to monitor, control, manage, reduce or eliminate environmental pollution. If it is impracticable, it shall be arranged to dispose the wastes in accord with environmentally sound methods. 11

Environmental Conservation Law (Continued) Responsibilities of project proponent/ business owner for reducing environmental impact Section 16. A person or organization operating business in the industrial estate or business in the SEZ or category of business stipulated by the Ministry: (a) is responsible to carry out by contributing the stipulated cash or kind in the relevant combined scheme for the environmental conservation including the management and treatment of waste; (b) shall contribute the stipulated users charges or management fees for the environmental conservation according to the relevant industrial estate, SEZ and business organization; (c) shall comply with the directives issued for environmental conservation according to the relevant industrial estate, SEZ or business. 12

IEE / EIA Process Screening IEE or EIA or No EIA/IEE IEE Process IEE preparation and Review IEE Approval EIA Process Scoping for EIA EIA preparation and Review EIA Approval Appeal

Screening Project Proponent 1.1 Prepare Project Proposal submit The Ministry 1.2 Screening Investment License Process No IEE/EIA Required 15 Days 1.3 Decide EIA, IEE or none IEE Type Project EIA Type Project Char t3.0 Scoping Char t2.0 IEE Preparation and Review Char t3.1 EIA Preparation and Review Char t2.1 IEE Approval Char t3.2 EIA Approval

IEE Preparation and Review Project Proponent Chart 2.0 The Ministry 2.1 Select IEE Experts submit 2.2 Check registration of IEE Experts 2.4 Conduct IEE Investigations IEE Experts not registered IEE Experts Registered 2.3 Decision on IEE Experts 2.6 Review IEE Report 7 Days Disclose information about the Project Undertake environmental and social assessment studies and investigations Conduct consultations with PAPs, LCs, LAs, CS, CBOs 2.5.1 Public disclosure of IEE Report 2.5 Prepare/Revise IEE Report submit IEE Report not satisfactory Disclose IEE Report on website Call for comments from government, PAPs, CS and other stakeholders Arrange Public Consultations at local level Collect and review all comments 2.7 IEE Report Approval 60 Days Go to Chart 2.1 Action 2.7 Continues

IEE Approval Chart 2.1 Project Proponent The Ministry Go to Chart 3.0 Action 3.1 EIA Process Investment License Process Investment license obtained Project implementation in compliance with ECC, ECC Conditions and IEE Report including EMP Inform EIA is required EIA Required 2.7.1 Public Disclosure 2.7 IEE Report Approval IEE Report Approved 2.8 Issue ECC with conditions 2.8.1 Public Disclosure of ECC

Scoping Project Proponent Chart 3.0 The Ministry 3.1 Select EIA Experts submit 3.2 Check registration of EIA Experts EIA Experts not registered EIA Experts Registered 3.3 Decision on EIA Experts 7 Days 3.4 Conduct Scoping Disclose information about the Project Undertake scoping studies Conduct consultations with the Ministry, PAPs, LAs, CBOs, CS 3.6 Review Scoping Report and TOR 3.5 Prepare/revise Scoping Report and Terms of References (TOR) for the EIA investigations submit Scoping Report/TOR not satisfactory 3.7 Approval 15 Days Go to Chart 3.1 Action 3.8 Continues Approved

Content of Scoping Report Executive Summary Context of the Project Overview of the Policy, Legal and Institutional Framework Project Description and Alternatives Description of the Environment together with maps in proper scale indicating all relevant features Key Potential Environmental Impacts and Mitigation Measures Public Consultation and Disclosure Conclusions and Recommendations 18

EIA Preparation and Review Chart 3.1 Project Proponent The Ministry 3.8 Conduct EIA Investigations Disclose information about the Project Undertake environmental and social assessment studies and investigations Conduct consultations at national, state and local level with PAPs, authorities, CS, CBOs, the Ministry, sector ministries, regional government organizations 3.9 Prepare/Revise EIA Report submit 3.10 Review EIA Report 3.10.1 Submit EIA Report to EIA Report Review Body 3.10.2 EIA Report Review Body prepares comments Disclose EIA Report on website Call for comments from government, PAPs, CS and other stakeholders Arrange Public Consultations at local level Collect and review all comments 3.9.1 Public disclosure of EIA Report Go to Chart 3.2 Action 3.11 EIA Report not satisfactory Continues Approved 3.11 EIA Report Approval Rejected 90 Days

Content of EIA Report: Executive Summary Introduction Policy, Legal and Institutional Framework Project Description and Alternative Selection Description of the Surrounding Environment Impact and Risk Assessment and Mitigation Measures Cumulative Impact Assessment Environmental Management Plan Public Consultation and Disclosure 20

EIA Approval Chart 3.2 Project Proponent The Ministry No 3.11.2 File Appeal EIA Report Rejected 3.11 EIA Report Approval Termination Yes Go to Chart 3.3 Action 3.13 Investment License Process Investment license obtained 3.11.1 Public Disclosure of rejection Inform EIA Report Approved 3.12 Issue ECC with conditions 3.12.1 Public Disclosure of ECC Project implementation in compliance with ECC, ECC Conditions and EIA Report including EMP Go to Chart 4.0 Action 4.0 Yes No File Appeal

The conditions of an ECC. Such conditions may encompass any or all of: General management: (i) procedures and management systems to identify, control, prevent or minimize all Adverse Impacts, (ii) procedures to ensure compliance with all environmental commitments, (iii) procedures to implement the measures described in the EMP, Construction Phase EMP, and/or Operational Phase EMP, as the case may be, (iv) procedures to improve the environmental performance of the Project, (v) organization with qualified environmental personnel, v) Documentation and reporting procedures; Emissions: (i) Emissions not allowed, (ii) Emission Limit Values in terms of types, substances, loads, concentrations, rates, timing, duration, frequency, seasons, Project phase, (iii) Emission points, (iv) form and media, (v) recipients, (vi) contribution to Environmental Quality Standards, (vii) statistical methods for determining compliance; Use of energy and natural resources: amounts, type, origin of resource, rates, effectiveness of use, waste generation; Pollution Prevention: Effectiveness of production or construction methods or waste storage and treatment facilities to (i) prevent or, where this is not practicable, to minimize pollution, and to (ii) prevent or minimize the risk of pollution; Nature conservation and management: (i) sites, environments or species, (ii) effectiveness of environmental measures to prevent or minimize Adverse Impacts on certain environments or species; Hazardous or toxic materials including waste: (i) limits to the types, categories, and amounts, (ii) methods and systems of collection, storage, handling, transport, treatment and disposal; 22

Waste management: (i) limits to the types, categories, and amounts of waste (liquid, solid, atmospheric) generated, (ii) methods and systems of collection, storage, handling, transport, treatment and disposal, iii) recycling or reuse of wastes; Transport and access: (i) access points, (ii) means of transport of materials and people to and from the Project, (iii) transport routes for products, materials or waste, (iv) access control measures; Decommissioning, rehabilitation, clean-up and closure: (i) sites, areas / environments and facilities, (ii) objectives and standards, (iii) site conditions and after use, (iv) timing, (v) controls and monitoring; Control measures: (i) prevention of accidents, (ii) measures and procedures in case of accidents, incidents, and operational Irregularities, (iii) control and maintenance of pollution prevention / minimization measures, (iv) safety zones; Monitoring: i) parameters, ii) methods, iii) sampling and analyses, iv) point of monitoring, v) frequency, vi) timing, vii) data management, viii) maintenance and control of monitoring equipment, ix) documentation and reporting; Documentation and reporting: (i) parameters and issues that must be documented and reported, (ii) types and methods, (iii) frequency and timing, (iv) quality controls, (v) recipients; Financial guarantee: (i) type of guarantee, (ii) amount, (iii) timing, (iv) application, (v) type and financial capacity of guarantor; Funding of inspection by the Ministry: (i) amounts, (ii) payment procedure, (iii) timing and frequency. 23

Appeal Chart 4.0 Appellant 4.0 File Appeal The Ministry 4.1 Forward Appeal Environmental Conservation Committee Require revised EIA Report Revert Decision on EIA Approval/Rejection 4.4 Receive instructions from the Environmental Conservation Committee 4.5 Final Decision on EIA Report Approval 4.3.1 Uphold the Ministry s Decision 4.3.2 Require revised EIA 4.3.3 Require the Ministry s Decision to be revised 4.2 Review Appeal 4.3 Decision on Appeal Go to Chart 3.1 Action 3.9 Go to Chart 3.2 Action 3.11 4.5.1 Public Disclosure of result of appeal 4.3.4 Inform: Appellant, Project Proponent The Ministry

Policy guidelines : Guidelines of Investment by MIC To protect our Nationals Interests To protect Natural Environme nt To safeguard our Nation s Dignity To protect National Sovereignty

Foreign Investment Rules: 34. In submitting the proposal for the capital intensive investment projects designated by the Commission and designated businesses which need to assess the environmental impact by the Ministry of Environmental Conservation and Forestry, the environmental impact assessment and social impact assessment reports shall be attached together with the investment proposal. 26

Time frame (EIA Process and MIC permission process) EIA Process Duration MIC Permission duration Screening Procposal (IEE/EIA/NON) 15 days Screening Proposal 15 days MIC Permission 90 days IEE Process IEE expert approval (Third party or not) 7 days Preparing IEE Report? IEE Report approval 60 days EIA Process EIA expert approval (Third party or not) 7 days Developing Scoping Report and TOR? Scoping report & TOR approval 15 days Investigation & Developing EIA Report? EIA report approval 90 days 27

Constraints - To set time frame of EIA/IEE process harmonizing with the MIC permission process - To clarify that the Project Proposals shall have to be submitted which to MIC or to MOECAF at first - According to the FI Rule 34, the EIA and SIA reports shall be attached together with the investment proposal In this context, all Projects which requiring to conduct IEE or EIA stipulated in notification 1/2013 and 50/2014 by MIC need to obtain an Environmental Compliance Certificate issued by the MOECAF before proceeding to MIC, any ministry, or any other competent authority for permit to implement the projects 28

Hydropower Project No. Categories of investment project IEE EIA 1 Hydropower Plants Installed capacity > 1 MW But <15 MW > 15 MW 2 Hydropower Plants Reservoir volume (full supply level) < 20,000,000 m3 Reservoir volume (full supply level) > 20,000,000 m3 3 Hydropower Plants Reservoir area (full supply level) < 400 ha > 400 ha 29

Towards Strategic Environmental Assessment (SEA) EIA systems - initiated in first stage Environmental Protection measures - mainstreaming in National Development Planning international cooperation is promoted EIA only covers to each development project which the measures to be taken for avoiding, preventing, mitigating, monitoring and compensating all Adverse Impacts resulting from the design, construction, implementation, operation, maintenance, decommissioning, closure and post closure or other aspects of the proposed Project or business or activity. 30

Towards Strategic Environmental Assessment (SEA)(Continued) to ensure Sustainable Development in Myanmar, SEA needed to develop in the primary stage of decision-making process for national development planning, to develop environmentally sector wide / region wide / nation wide Therefore, we intend to improve EIA system and also set SEA in cooperation/ collaboration with national, regional and international organizations. 31

Thank you For your attention 32