AND SITE LICENSING OF THE EPR FOR THE HINKLEY POINT C PROJECT

Similar documents
Responsibilities of the operating organization during construction and how to discharge them

ONR-NR-PAR Revision 1. Construction of Hinkley Point C. Hinkley Point C. LI 518 (Consent)

Office for Nuclear Regulation

Regulation of UK Nuclear New Build

NOT PROTECTIVELY MARKED. REDACTED PUBLIC VERSION HPC PCSR3 Sub-chapter 17.4 Conclusions of the HPC ALARP Assessment NNB GENERATION COMPANY (HPC) LTD

STEP 3 MANAGEMENT OF SAFETY AND QUALITY ASSURANCE ASSESSMENT OF THE EDF AND AREVA UK EPR DIVISION 6 ASSESSMENT REPORT NO.

JOINT PROGRAMME OFFICE

Stations in the UK: Current Approach, Future Perspectives & Nuclear Research Needs

How to fast track nuclear new build projects through strategic partnership and localization

Office for Nuclear Regulation

Regulation of the UK Nuclear Industry

Effective planning and engagement: mitigating construction risk of the UK s first EPR. Samarth Sharma Strategy Manager Thursday 30th January 2014

EDF Training in Support of a New Nuclear Project

Our Contribution to the Forum

Industry and Government working together to deliver Nuclear New Build Programme in UK. Dr Glen Little Industrial Adviser March 2017

FRENCH NUCLEAR KNOWLEDGE MANAGEMENT EXPERIENCE. EDF SA. All rights reserved. EDF Nuclear Performance Model

UK Nuclear New Build. Challenges and Solutions for Chinese Supply Chain Companies. Courtesy of EDF Energy

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History

Office for Nuclear Regulation

Experiences with the construction of EPR at Flamanville and Taishan

Welsh Nuclear Forum EDF Energy plc 6 July 2018 All rights reserved

AREVA NP INAC October 23 rd André Salgado Brazil and South America

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History

ROLE OF NEPIO IN DEVELOPING A NATIONAL ROADMAP

UKEPR Issue 02

Office for Nuclear Regulation

Water Chemistry Requirements for a New Generation of Nuclear Power Plants

LIMITED COMPARISON OF EVOLUTIONARY POWER REACTOR PROBABILISTIC SAFETY ASSESSMENTS

Office for Nuclear Regulation

Global Supply Chain & Localization, Issues and Opportunities: UK Programme Experience

The UK new build programme status and lessons learned Dr Ron Cameron

Olkiluoto Infrastructure

EDF & the nuclear renewal : the Flamanville 3 model. Jean-Claude Prenez Director for International Projects EDF Nuclear Engineering Division

Office for Nuclear Regulation (ONR) Site Report for Sizewell B Power Station

NOT PROTECTIVELY MARKED REGULATORY ISSUE REGULATOR TO COMPLETE

CGN's Nuclear Energy Capabilities

UKEPR Issue 06

Office for Nuclear Regulation

Office for Nuclear Regulation (ONR) Quarterly Site Report for Berkeley nuclear licensed site

Chief Nuclear Inspector s Summary Programme Plan

DISTRIBUTION LIST. Preliminary Safety Report Chapter 1 Introduction UK HPR1000 GDA. GNS Executive GNS all staff. GNS and BRB all staff

Nuclear Power. SPSE Reading & Writing Test

Public Report on the Generic Design Assessment of New Nuclear Reactor Designs

From the Safety Approach of a Nuclear Power Plant, to the Manufacturing and Welding of Mechanical Components in line with RCC-M Code

ASSYSTEM NUCLEAR 2020 POSITION & PERSPECTIVE

Bradwell Power Station Plans. Proposals for a new Pressurised Water Reactor Nuclear Power Station At Bradwell in Essex

Bradwell Power Station Planning

LC19: Construction or Installation of New Plant

Office for Nuclear Regulation

Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT. Primary Sampling Systems

Licensee Design Authority Capability

A canter around the nuclear jumps..

during Normal Operations

Nuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level

Nuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level

NPP Safety in the aftermath of the Fukushima Accident. UK Response August 2013

UKEPR Issue 00

EDF International Nuclear Developments. Xavier Rouland Consejero Delegado EDF Peninsula Iberica

Nuclear Site Licence Application Summary Forward Work Plan

MDEP Common Position CP-EPRWG-05

Office for Nuclear Regulation

Office for Nuclear Regulation

Office for Nuclear Regulation

Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT Resolution Plan for GI-AP1000-RC-01 Accident Source Terms. Protection, PSA and Fault Studies

Nuclear New Build in the UK: EDF Energy s programme

PRESS CONFERENCE. 3 September Jean-Bernard LÉVY Chairman and CEO. Xavier URSAT Group Senior Executive VP - New Nuclear Projects and Engineering

Step 2 Assessment of the Radiological Protection Aspects of Hitachi GE s UK Advanced Boiling Water Reactor (UK ABWR)

Alliance for success IN THE NUCLEAR INDUSTRY

UFRJ Semana de Engenharia Nuclear

Office for Nuclear Regulation

ONR-HYB-PAR Revision 1. LI 582 Approval

AWE Burghfield Site: Project Mensa. Modification to the Mensa Roof Structure to Accommodate the PCSR3 Stack Design.

AREVA AND ATMEA NEW PROJECTS

Office for Nuclear Regulation

Assessing new nuclear reactor designs. Generic Design Assessment Quarterly Report February 2016 April 2016

Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT. Resolution Plan for GI-AP1000-SI-05

F e b Des Muller Chairman for NIASA Supply Chain Development Subcommittee

New Plants Update November 2008

UKEPR Issue 04

Office for Nuclear Regulation

Kevin Allars. New Nuclear Build The UK Generic Design Assessment and New Build Challenges

Dose reduction initiatives at the Koeberg Nuclear Power Station ISOE ALARA Symposium. Marc Maree Corporate Specialist (Radiation Protection)

UKEPR Issue 02

ONR-SZB-PAR Revision 0

Office for Nuclear Regulation (ONR) Quarterly Site Report for Hinkley Point B

Office for Nuclear Regulation

Nuclear New Build. Shaping the future of nuclear energy

STEP 3 MANAGEMENT OF SAFETY AND QUALITY ASSURANCE ASSESSMENT OF THE WESTINGHOUSE AP1000 DIVISION 6 ASSESSMENT REPORT NO.

AREVA s Vision of Global Nuclear Market

Preparing For Deployment. Reactor By An insights report from the Energy Technologies Institute

IAEA Workshop on Construction Technologies for Nuclear Power Plants: A Comprehensive Approach

Chief Nuclear Inspector s Annual Report 2013

LC 16 SITE PLANS, DESIGNS AND SPECIFICATIONS

Introduction 2 The World Nuclear Market 5 Nuclear Energy in the UK.6 A New Generation of Nuclear Power..8

DESIGN AUTHORITY ADVICE NOTE

UK ABWR Generic Design Assessment Generic PCSR Chapter 27 : Human Factors

Office for Nuclear Regulation

NAVITUS BAY WIND PARK SUPPLY CHAIN ENGAGEMENT. Dan Bainbridge. 28 November 2014

Nuclear Energy in France : Status, prospects and R&D strategy

Low Carbon Energy Technology Roadmap and Nuclear New Build

Transcription:

DESIGN ASSESSMENT AND SITE LICENSING OF THE EPR FOR THE HINKLEY POINT C PROJECT 10/2016 Stephen J Walls, EDF Energy Nuclear New Build 1 Olivier Bard, EDF

HINKLEY POINT C (HPC) 2

HPC Financial Investment Decision Shareholder agreements signed between all parties last week - EDF SA Board resolution to proceed with HPC passed in July 2016 - UK Government agreed to proceed with HPC in September following examination of all aspects of the project Procurement - Contracts in place to allow progression of construction - 90% of contract value now preferred bidder status Leads the way to: - Develop 2 more EPR units in Sizewell C 3

A Long Journey which started in the 1970 s 1970 1980 1990 2000 2010 71 6 PWR 900 CPO 79 74 18 PWR 900 CP1 and 10 CP2 88 76 Koeberg 1&2 85 77 8 PWR 1300 P4 86 South Africa 12 PWR 1300 P 4 79 93 83 Ulchin 1&2 89 South Korea Owner s assistance for new nuclear build projects in the world 84 4 PWR 1500 N4 98 87 Daya Bay 1&2 94 China PWR: Pressurised Water Reactor CP0, CP1, CP2, P4, P 4, N4, EPR = technological series for French reactors EPR: European Pressurized water Reactor France EDF Architect Engineer Abroad EPR under construction UK: EPR Project 97 Ling Ao 1&2 02 05 Ling Ao 3&4 11 China 05 China EPR Olkiluoto 3 07 EPR Flamanville 3 09 EPR Taishan 1&2 France China Hinkley Point C 1&2 Sizewell Finland (Areva) 4 Worldwide Licensing Experience

The UK EPR TM Type Thermal Power Electrical Power Fuel Operating Temperature Operating Pressure Coolant Pumps Availability Service Life 5 4-Loop PWR 4500 MW 1650 MW (37% efficiency) Uranium oxide (up to 5% enrichment) 297 C Tcold 312 C Tav 327 C Thot 155 bar (primary) 78 bar (SG) 4x 10kV, 8.7MW, 28500m 3 /hr 91% - 14 day refuelling outage 60 years (+ extensions) Evolutionary design Improved efficiency and safety Single turbine 900 operational staff Experience gained from Flamanville and Taishan projects.

Hinkley Point C 2 EPR 1,650 MW units EPR design capable of generating 7% of the UK s electricity Will supply 5 million homes Avoids the emission of 9 million tonnes of CO 2 a year. At least 25,000 different job opportunities 200 million into the local economy each year during peak construction. Almost 4bn into regional economy over lifetime of the project 6 6

HPC Project Values & Disciplines The basis for construction excellence 7 7

Scale of the Construction Site 3 Million Tonnes of Concrete 5.6 MILLION M 3 of earth to be moved 4000 km electrical cabling UK businesses set to secure 64% of the total construction spend 4D Model illustrating part of the nuclear island 8

Readiness On-Site NI Civils Mock Up - Complete Batching Plant 1 - Complete Holford Culvert - Complete Earthworks - Mobilised 9 April 2016 EDF Energy plc. All rights Reserved

Our Journey So Far. Hinkley Point C will be the first nuclear power station to be built in the UK in a generation. JAN 2006 Government policy proposes nuclear as a significant part of our future energy mix. NOV 2009 Formal consultation begins with local communities over 2 years. NOV 2012 MAR 2013 Nuclear site licence granted. Secretary of State approves construction of HPC. Radioactive Substances Regulations Permit Granted FEB 2015 Opening of 1.5 million Construction Skills and Innovation Centre. OCT 2015 EDF and CGN agree joint investment in HPC. 2006 2009 2012 2013 2014 2015 2016 July 2016 Final OCT 2008 Early engagement begins with local residents. FEB 2012 DEC 2012 UK EPR reactor approved under GDA. Preparatory works begin on-site. OCT 2014 European Commission approves agreement between EDF Group and UK Government. JUL 2015 1.5 billion in contract values agreed - 225 million in value to the South West. Investment Decision (FID) by EDF Board 10 10

GENERIC DESIGN ASSESSMENT 11

GDA Process - Office for Nuclear Regulation (ONR) Step 1 Step 2 Step 3 Step 4 Discussions with requesting party Fundamental design, safety and security overview ONR Issues Statement Overall design, safety and security review ONR Issues Statement Detailed design, safety and security Assessment Design Acceptance Confirmation 12

The GDA Process Step 1 - initial discussions between the Requesting Parties (RP) and the Regulators where they agreed the requirements and how the process was applied Step 2 - was an overview of the fundamental acceptability of the proposed reactor design concept that identified design aspects or safety shortfalls that could prevent construction in the UK i.e. a review of the claims 13

The GDA Process Step 3 - was a safety and security review of the proposed reactor design. This included an examination of the design at system level and analysing supporting arguments made by the design companies i.e. a review of the arguments to support the claims in Step 2 Step 4 - was a thorough and detailed examination of the evidence, on a sampling basis, guided by the safety analysis and including inspection of security plans The Areas "sampled" were identified by the Regulators during Step 3 based on their perception of the topics that were most important to examine. 14

GDA The key documents of the UK EPR TM GDA Submission are: - A Safety, Security and Environment Report (SSER) - A Design Reference Configuration - A Submission Master List Public Involvement - Quarterly reports, with performance metrics published by ONR - Public comments via dedicated Regulator & RP websites Benefits from viewpoint of Requesting Party - Requested design changes identified before construction starts - Transparent process helps give public confidence in design - Informs RP of UK Regulatory framework and practices 15

GDA Facts and Figures The totality of GDA 56,000 man-days of effort over 5.5 years to deliver 32m of regulator assessment The overall submission consists of more than 4000 documents 2200 PCSR references 440 PCER references 1100 supporting references Posing and responding to 1765 technical queries More than 600 technical meetings across 17 technical areas 16

GDA Design Changes Throughout GDA, modifications were proposed to resolve issues identified during analysis and assessment The GDA Design Reference (DR) has been updated throughout the 4 step process and more latterly during the resolution of the GDA Issues The DR also recognises significant design changes introduced at FA3 that EDF/AREVA want to appear in the UKEPR design reference. 17

GDA At the end of Step 4 (2011), the Regulators provided their assessment reports plus GDA Issues and GDA Assessment Findings GDA Issues were concerns not satisfactorily addressed in Step 4 of GDA which required resolution before a full Design Acceptance Certificate was issued. GDA Issues were the responsibility of the RP (EDF/AREVA) GDA Assessment Findings GDA AF are the responsibility of the future licensees The GDA provided a total of 713 AFs, which are linked to specific HPC Project Milestones 18

GDA Conclusions GDA involved a thorough, wide ranging, exhaustive and challenging assessment against the ONR Safety Assessment Principles GDA is a robust process which has shown the UK EPR is safe, secure and environmentally acceptable for construction in the UK GDA achieved its intention to improve safety and reduce regulatory risk Significant UK context design changes have been identified GDA PCSR forms 70% of the initial HPC site specific PCSR EPR remains the only reactor design to complete GDA process 19

NUCLEAR SITE LICENCE 20

Site Licencing - Background Nuclear Installations Act 1965 (NIA 65) provides for regulation of Nuclear Sites Nuclear Site Licence (NSL) granted to corporate body for a unique site covering Construction, Operation and Decommissioning Office of Nuclear Regulation (ONR) regulates using a standard set of 36 Licence Conditions (LCs) that give powers to ONR to grant permission ( consent ) to undertake certain activities The conditions set out the general safety requirements to deal with the risks on a nuclear site. ONR uses its licensing powers by assessing safety cases and inspecting sites for licensing compliance. Law requires to reduce risks As Low As Reasonably Practicable (ALARP) Goal setting and generally non prescriptive approach Owner needs Licence in order for ONR to permission start of First Safety significant construction ONR will Grant a NSL after Assessment and Intervention 21

Key Licence Conditions Documents and records Incidents on site Training Emergency arrangements Suitable qualified and experienced persons Safety documentation Periodic review Management systems Radiological protection Construction or installation of new plant Commissioning Modifications on existing plant Control and supervision of operations Inspection, maintenance and testing Radioactive waste management Decommissioning Organisational capability 22

Overall expectations The Licensee will have to demonstrate that: It has the right organisational capability to lead and manage for safety The Site is suitable and it has adequate control over it It understands the hazards and risks of the activities it proposes to carry out It has a suitable schedule of safety submissions leading through to the Pre-Construction Safety Case 23

ONR s Role during Licensing Process Pre NSL application ONR is in advisory role From application ONR is moving towards regulatory role Intervention is ONR interaction to achieve a desired outcome in this case, judging if a company is capable of being a Nuclear Site Licensee 4 Strands of intervention: Organisational Capability Licence Condition Compliance Safety Report and substantiation Licensing and Legal Due Process 24

General approach Develop a Safety Management Prospectus Define the organisational structure and governance to achieve safety Define and implement core capability, Nuclear Skills Baseline and employment model Establish Design Authority, Internal Challenge function and Shadow Nuclear Safety Committee Identify and appoint Compliance Owners that will develop NSL Compliance arrangements Define and establish governance associated with Licence application 25

NSL Timeline for HPC Project Manager appointed & work started Sept 2009 Formal Application July 2011 NNB GenCo ready to receive an NSL Nov 2012 NSL Granted Nov 2012 NSL in Force Dec 2012 First new Licence granted for a generation Forward work programme in place for maintaining and developing the NSL arrangements supported by a schedule of Compliance Assessment. 26

NSL Summary NSL granted in 2012 and is in-force today ONR cost up to granting 9.2m (09/2009 11/2012) Benefits of early granting are: Confirmation of the capability of the Board and organisation to be a Licence Holder Increased regulatory confidence in NNB GenCo Confidence in the Integrated Management System Demonstrated capability to develop NSL arrangements Compliance with the NSL has been checked and confirmed as high Forward programme to maintain and develop NSL arrangements 27

28