Determination of Corrosion rates and remaining life of piping using API and ASME standards in oil and gas industries

Similar documents
Corrosion Management Methods of High TAN Crude. Case study: (Fula Crude Oil-Sudan)

Corrosion Monitoring Solutions for Hydroprocessing Units

Overview. Challenges in Opportunity Crude Processing 16 th April 2012

Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries

Integrating Risk-Based Inspection Recommendations with Inspection Programs and Integrity Operating Windows

Detection of In-service Wet H 2 S Cracking at Reboiler Shell Weldment using Phased Array Ultrasonic Testing (PAUT)

New Developments in Measuring Low Silicon in Process Piping Using Handheld X-ray Fluorescence (XRF)

Stephen M. Patera, Sales Manager, LHI Metals. October 6-9, 2013 Caesars Palace, Las Vegas, Nevada, USA

Memoranda On Front-end Crude Fractionation.

SECTION 2.0 REFERENCES

Sridhar Srinivasan June 20, 2017 REAL TIME PREDICTIVE ANALYTICS AND CORROSION MANAGEMENT WITH PREDICT -RT

MATERIALS OF CONSTRUCTION FOR PROCESS EQUIPMENT AND PIPING SYSTEMS

NEW GC-16 IN WEST KUWAIT MATERIAL REQUISITION FOR LEVEL GAUGE TABLE OF CONTENTS

The naphtha hydrotreater

Section 11. API 7500lb Mud Gate Valves

Available online at ScienceDirect. Procedia Engineering 86 (2014 )

PURASPEC JM. CLEAR Chloride guards

Standard Recommended Practice

A106 Gr.B Pipes & Tubes

Heat Exchanger: Conical shell and Nozzle Reinforcement Effectiveness: Case Study

REAL-TIME PREDICTIVE ANALYTICS AND CORROSION MONITORING WITH PREDICT -RT

Corrosion and Materials Selection for Bitumen with Heavy Naphthenic Acid in Canadian Oil Sands

FOULING MANAGEMENT IN CRUDE OIL PREHEAT TRAINS/DHP UNITS

PRESSURE VESSELS Part III: Design Loads, Wind & Seismic, Skirts, Legs, Saddles, Nonstandard

From the desk of G. A. Aaker, Jr., PE.

Asset Integrity Management. Enhance Process Safety

th Avenue NE, Calgary, Alberta T1Y 4T corrosion.com

Downsizing a Claus Sulfur Recovery Unit

Updated December Pembina. Engin. Submitted to: Prepared by: Prepared: September Updated:

Abstract. 1. Introduction

THE INFLUENCE OF NAPHTHENIC ACID AND SULFUR COMPOUND STRUCTURE ON GLOBAL CRUDE CORROSIVITY UNDER VACUUM DISTILLATION CONDITIONS

Crude Oil Quality Group (COQG)

Corrosion in GASCO Habshan CBA Units and its mitigation

Estimation of Boil-off-Gas BOG from Refrigerated Vessels in Liquefied Natural Gas Plant

Proven Flow Measurement Solutions for the Oil and Gas Industry

Crude Oil Entrainment of Settled Water in Arabian Light/Medium/Heavy Pipelines

Manual. Standards WOC HSE WOC LP. 1 tel) ( W. McIntosh. WO Executive Vice President Operations DOCUMENT NO: WOC-HSE-ST Section H003 Hot Tapping

Requirements for bending and flaring of piping Objective, target group and warrant...3 Requirements...3 Cold Bending...4 Induction Bending...

White Paper. Impact of Opportunity Crudes on Fouling in Preheat, distillation, and furnace systems

Minimize the Risk of Fire During Distillation Column Maintenance

DETERMINATION OF THE ROOT CAUSES OF THE PREMATURE DEGRADATION OF A REBOILER

Addressing the Challenges Associated with Canadian Crudes

The Life Assessment of API 5L Grade B Geothermal Pipeline in Correlation with Corrosion under Insulation

SURFACE PRODUCTION OPERATIONS

Applications of Aqueous Process Modeling to Petroleum Refinery Corrosion Control

ZERON 100 FOR DOWNSTREAM PROCESSING IN ACID LEACH MINING. Park Works Manchester M40 2BA UK (*Corresponding author:

Cathodic protection system for internal surfaces of piping/pipeline. Gitesh Jha Reliance Industry Limited, Mumbai, India

Process & Mechanical Engineering Essentials

State-of-the-art Treatment Technology for Challenging Wastewaters Generated from Processing Opportunity Crudes

UNEXPECTED MECHANISM OF CRUDE OIL HEATER CONVECTION SECTION FAILURES

EFFECTS OF FLOW VELOCITY ON RBI ANALYSIS OF COOLING WATER HEAT EXCHANGERS

WYATT Orifice flow PrOducTs

Stop bleeding caustic: Parameters for Designing and Operating an efficient LPG treating unit

Nominal Composition. Weight %

AMERICAN PETROLEUM INSTITUTE API RP 581 RISK BASED INSPECTION METHODOLOGY BALLOT COVER PAGE. Title: MODIFICATION OF API 581 CARBONATE CRACKING

Corrosion monitoring solution for sour water stripping units

Paper Number:

2012 Pipeline Performance and Activity Report. BC Oil and Gas Commission

AFPM 2018 Operations & Process Technology Summit

CALVERT GROUP SEAMLESS PIPE

API 571 CORROSION & MATERIALS PROFESSIONAL CERTIFICATION PREPARATION PROGRAM

API 571 CORROSION & MATERIALS PROFESSIONAL CERTIFICATION PREPARATION PROGRAM

CCPS ASIA PACIFIC REGIONAL MEET ON PROCESS SAFETY

Exhibit D Measurement & Regulation Facilities Records Required for DETI Operational Responsibilities

BORSIG SYNTHESIS GAS COOLER DOWNSTREAM OF PARTIAL OXIDATION OF OIL OR NATURAL GAS PROCESS HEAT EXCHANGER. A Member of KNM Group Berhad

NEW CONTROL SYSTEM DETECTS DESALTER PROBLEMS BEFORE UPSETS OCCUR Gary Fransen Agar Corporation Prepared for presentation at The AICHE 2004 Spring

Gas Transmission and Distribution Piping Systems

Correlation between Neutral Salt Spray (NSS) Test and Potentiostat Dynamic Test for Corrosion on Zinc Plated Steel

Code. 1) Code. Standard or Specification. Bolting

Filtration Applications for the Refining & Petrochemical Industries

Pulsed Eddy Current Corrosion Monitoring in Refineries and Oil Production Facilities Experience at Shell

HTHP - A Deepwater Perspective

BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION

CHAPTER 1 INTRODUCTION TO PIPING SYSTEM

Facilities Cost Estimates Drivers in the Oil and Gas Field Development. By Ruby Aka. Independent Oil and Gas Consultant

GAIL (India) Limited (A Govt. of India Undertaking) NEW DELHI, INDIA

Unit 5. Crude Oil Desalting

Pipe Line Coatings- A review on epoxy based coating

Atmospheric distillation of crude oil

Client Corrosion, NameErosion, and Wetted Parts

Hot Rolled Flat Products

Non-Intrusive Corrosion and Erosion Monitoring Solutions and Case Studies. Dr. Jake Davies, ICorr Aberdeen meeting, 28th Feb 2017

HYSYS WORKBOOK By: Eng. Ahmed Deyab Fares.

DOUBLE WALLED PIPING SYSTEMS

GPA GCC (Corrosion in Gas Plants) 28 November 2007 (Bahrain)

Structural Channels A-36:20-40 LG. Standard Beams

Development of Corrosion Inhibitors for Prevention of Top of the Line Corrosion (TLC)

Internal Pipeline Corrosion

Eastham Oil Refinery, UK. All photos: Dan Mobbs. By Dan Mobbs

Delayed Coking Process Design, Operations and Optimization. Canada Coking Conference October 22-26, 2012 Fort McMurray, Alberta

ASME BPVC SECTION 1 - RULE FOR CONSTRUCTION OF POWER BOILERS

Results are presented in Table 1. The tube was fabricated from a Type 347 and no unusual conditions were noted.

Vogt Valves The Connection Bulletin for Sour Service Valve Applications CB 17

WWT Two-Stage Sour Water Stripping

CONTOUR BODIED FLANGE BRANCH FITTINGS Incorporating the design and manufacture of specialised piping products

A COMPREHENSIVE STUDY ON NAPHTHENIC ACID CORROSION

Taravosh Jam Design & Engineering Co.

Heavy Oil and Bitumen Analytical. Understanding Their Capabilities

Janice T. DeVelasco, P.E.

Inspection and Welding Repairs of Pressure Vessels

Transcription:

Determination of Corrosion rates and remaining life of using API and ASME standards in oil and gas industries Nibin V Baby 1, Mr. Bibhudatta Paricha 2, Dr. Shailendra J. Naik 3 1ME 2 nd year, Department of Petroleum Engineering, Maharashtra Institute of Technology, Pune, India 2Assistant Inspection Manager at BPCL, Mumbai 3Associate Professor, Department of Petroleum Engineering, Maharashtra Institute of Technology, Pune, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract Process play an extremely important role in Petroleum refineries throughout the world as a means for carrying Hydrocarbons from one location to other. These process are subjected to Corrosion over a period of operational time, which is the destructive attack of material by reaction with its service fluids containing corrodents such as Sulphur, H 2S, HCl, CO 2, organic and inorganic acids and external environments thus causing a natural potential hazard associated with oil and gas transportation facilities. Various potential damage mechanisms are identified for preheated crude inlet to atmospheric distillation column using American Petroleum Institute standards such as API 581 and API 571. These damage mechanisms consist mainly of High Temperature Sulfidic and Naphthenic acid corrosion. Corrosion rates for this damage mechanism is identified for two crudes namely Kuwait crude and Arab Extra Light Crude using API 581. Retirement thickness for this is calculated using ASME B 31.3. Further remaining life of this is estimated using corrosion rate, present thickness and retirement thickness of the. Key Words: Process, Corrosion rate, Retirement thickness, remaining life estimation, API standards, ASME standards. 1. INTRODUCTION The transportation of oil and gas from the reservoir to the processing facilities by pipelines and has played a vital part in the growth of petroleum industry. Over a period of operational time, it is quite natural that these pipelines and are subjected to Corrosion, which is the destructive attack of material by reaction with its service fluids containing corrodents such as Sulphur, H 2S, HCl, CO 2, organic and inorganic acids and external environments, causing a potential hazard associated with oil and gas transportation facilities. This is one of the primary factors affecting the longevity and reliability of the pipelines and that transport crudes. Several measures were taken to reduce the presence of these corrodents in order to reduce the corrosion effects on these, pipelines. It is not possible to completely remove the effects of corrosion as it is a continuous process, but by adopting proper control and mitigation measures, its impact could be reduced to a great extent thereby saving a lot of revenue. [1] On 30 th June, 2014 there was an explosion of the gas pipeline at Nagaram village in East Godavari district of Andra Pradesh, India. The Gas Authority of India (GAIL) alleged that the presence of sulphur, carbon dioxide and water in the pipeline indicates that the petroleum products supplied by the oil companies were not properly refined and has resulted in corrosion of the pipeline used by Oil and Natural Gas Corporation (ONGC), Reliance Industries Limited (RIL) and Cairn Energy. According to the Petroleum and Explosives Safety Organisation (PESO), there was "no evidence of any efforts" by the organisation to enforce the utilisation of a Gas Dehydration Unit to remove water and liquids that lead to the pipeline corrosion. This caused a huge loss in life and property. These incidents reflect the importance of corrosion prevention and the measures that should be taken to reduce the rate of corrosion. [2] 2. PROJECT WORK DESCRIPTION The expected corrosion rate and remaining life of preheated crude inlet to the atmospheric distillation column of a refinery is estimated using the API 581 and API 571 standards. These examinations are carried out for two different crudes namely Kuwait crude (sour crude) and Arab Extra Light (sweet crude). The results, comparison and conclusion are given at the end of the case study. 2.1 Pathway of crude in a refinery After the crude is received at the refinery, it is stored in large tanks in tank farm. This is then mixed with water inline upstream with desalter vessel to dissolve the salts contained in the crude oil, as these have to be removed from the crude oil to mitigate vessel and fouling and corrosion as well as poisoning of downstream catalysts. The desalted crude is then preheated by several heat exchangers and by a fired heater. The preheating raises the crude temperature to 340-380 o C. This preheated crude is then transferred via preheated crude inlet to the atmospheric distillation column. Here various components such as Heavy Naphtha, Light kero, Heavy kero etc are 2016, IRJET ISO 9001:2008 Certified Journal Page 772

separated based on their boiling points and are distributed for further downstream processing and conversion. Piping: Preheated crude inlet to ADU Material of construction: A335 GradeP5, 5% Cr-0.5Mo Alloy Steel Max. Operating Temperature: 327 o C Fig -2.1a: Atmospheric distillation Unit (ADU) with the operational personnel lead to the confirmation of the type of corrosion being the same. High temperature Sulfidic corrosion is a type of uniform corrosion which occurs when the given operating conditions are above 204 o C followed by the presence of sulphur in the crude. This corrosion often occurs with naphthenic acid corrosion and is localized. Total Acid Number (TAN) is a measurement of acidity that is determined by the amount of potassium hydroxide in milligrams that is needed to neutralize the acids in one gram of oil Table -1: Requirements to determine High temperature Sulfidic/naphthenic acid corrosion Basic Data Comments Material of construction Maximum Temperature ( o C) Sulphur content of the stream Total Acid Number (TAN)= mg KOH/g oil sample Identify the material Determine the maximum temperature of process stream Determine the sulphur content of the stream. If not known consult process engineer for an estimate Determine the TAN of the stream. If not known consult process engineer for an estimate Above data are obtained from test run reports and by consulting a knowledgeable process engineer. These data varies from crude to crude, operational plant conditions etc. Flowchart -1: Step by step procedure for determining corrosion rate START Fig -2.1b: ADU connected (Picture courtesy: BPCL) 2.2 Determination of probable damage mechanism and estimation of the corrosion rate [4, 5] The probable damage mechanism for the preheated crude inlet is determined using the risk-based resource document API 581. Screening questions for High temperature Sulfidic/Naphthenic acid corrosion matches with given conditions. The presence of sulphur compounds in the crude, the operating condition of 327 o C for the preheated crude inlet and further discussions Material of DETERMINE Sulphur conc. CORROSION Max Temp RATE TAN Corrosion rate from table Velocity <100FPS Corrosion rate from table x 5 2016, IRJET ISO 9001:2008 Certified Journal Page 773

2.3 Determination of retiring thickness Retiring thickness is defined as the minimum thickness up to which the can be operated. The retiring thickness for pipelines is calculated as the higher of Pressure design thickness and minimum structural thickness plus the future corrosion allowance. 2.3.1 Pressure design thickness Pressure design thickness is calculated using the formula, t = PD/2(SEW + PY) Where, t is the pressure design thickness for internal pressure, in millimeters. P is the internal design pressure of the pipe, in kilopascals D is the outside diameter of the pipe in millimeters S is the allowable unit stress at the design temperature, in kilopascals E is the longitudinal quality factor (1) W is the weld joint strength reduction factor (1) Y is the coefficient whose value if 0.4 for temp < 492 o C 2.3.2 Minimum structural thickness Based on API 574, Minimum structural thickness for all the lines are summarized as follows Table -2: Minimum structural thickness NPS(inch) ½ to 1 1.8 1 ½ 1.8 2 1.8 3 2.0 4 2.3 6 to 18 2.8 21 to 24 3.1 2.3.3 Retiring thickness Default Minimum structural thickness for temp < 205 o C in mm Retiring thickness T required is the thickness maximum of computed by the Design formulas (Pressure, Structural) before corrosion allowance and manufactures tolerances are added. 2.4 Remaining life calculation of Remaining Life of the pipeline is estimated using the data s such as Corrosion Rate, Present thickness and retirement thickness. Actual thickness of the pipeline is directly obtained using Ultra Sonic Technique. We have the formula to calculate the remaining life as L r = (T actual T required) / C r Where, L r is the remaining life of the pipeline in years T actual is the actual thickness measured at the time of inspection for a given location T required is the required thickness of the pipeline at the same location which is the maximum of thickness computed by the design formulas (i.e. pressure and structural) and including manufacturing tolerance (12.5%) C r is the corrosion rate of pipeline in mm/y 3. Calculations 3.1 Corrosion rate calculation Corrosion in crude inlet feed line is mainly due to the high temperature Sulfidic and naphthenic acid corrosion. Various data required to determine the corrosion rate due to high temperature Sulfidic and naphthenic acid are, Material of Construction = Alloy steel Crude type considered = (i) 100% Kuwait Crude (ii) 100% Arab Extra Light Crude Max Operating temp ( o C) = 372 o C Sulphur Content of the Stream = (i) 2.487 wt% (ii) 1.33 wt% Total Acid Number (TAN) = < 0.2 mg/g (TAN = mg KOH/g oil sample) Velocity = <100FPS a) High Temperature Sulfidic and Naphthenic corrosion (i) For 100% Kuwait Crude with 2.487 wt% Sulphur Table -3: High Temperature Sulfidic and Naphthenic Acid Corrosion Estimated Corrosion Rates for 5Cr-0.5Mo (mm/y) for Kuwait Crude in Pre heated Crude Inlet Sulphur (wt %) TAN (mg/g) Corrosion Rate (C r) mm/y at various Temp ( o C) 357 o C 372 o C 385 o C 1.5 (X 1) >0.2 0.51 (Y 1) 0.76 (Z 1) 2.487 (X) >0.2 Y -- Z 2.5 (X 2) >0.2 0.51 (Y 2) 0.89 (Z 2) We have the general interpolation formula as Y= Y 1+ (X-X 1)*(Y 2-Y 1)/(X 2-X 1), Applying these to get the values of Y and Z Y = 0.51+ (2.487-1.5)*(0.51-0.51)/(2.5-1.5) = 0.51 mm/y 2016, IRJET ISO 9001:2008 Certified Journal Page 774

Z = 0.76+ (2.487-1.5)*(0.89-0.76)/(2.5-1.5) = 0.88 mm/y Table -4: General interpolation results for Kuwait crude in Pre heated Crude Inlet Corrosion rates (C r) mm/y at various Sulphur (wt Temperature o C %) 357 o C (M 1) 372 o C (M) 385 o C (M 2) 1.5 0.51 0.76 2.487 0.51 (N 1) N 0.88 (N 2) 2.5 0.51 0.89 Once again using the general interpolation formula, N = N 1 + (M-M 1) *(N 2-N 1)/ (M 2-M 1) N = 0.51 + (372-357)(0.88-0.51)/(385-357) = 0.7082 mm/y Corrosion rate is estimated to be 0.7082 mm/y from interpolating the values in the table. (ii) For 100% Arab Extra Light with 1.33 wt% Sulphur Table -5: High Temperature Sulfidic and Naphthenic Acid Corrosion Estimated Corrosion Rates for 5Cr-0.5Mo (mm/y) for Arab Extra Light Crude in Pre heated Crude Inlet Sulphur (wt %) TAN (mg/g) Corrosion Rate (C r) mm/y at various Temperature ( o C) 357 o C 372 o C 385 o C 0.75 (X 1) >0.2 0.38 (Y 1) 1.33 (X) >0.2 Y -- Z 1.5 (X 2) >0.2 0.51 (Y 1) We have the general interpolation formula as Y= Y 1+ (X-X 1)*(Y 2-Y 1)/(X 2-X 1), Applying these to get the values of Y and Z Y = 0.38+ (1.33-0.75)*(0.51-0.38)/(1.5-0.75) = 0.48 mm/y Z = 0.58+ (1.33-0.75)*(0.76-0.58)/(1.5-0.75) = 0.719 mm/y 0.58 (Z 1) 0.76 (Z 1) Table -6: General interpolation results for Arab Extra Light Crude in Preheated Crude Inlet Corrosion rates (C r) mm/y at various Sulphur (wt Temperature o C %) 357 o C (M) 372 o C (M) 385 o C (M) 0.75 0.38 0.58 1.33 0.48 (N) N 0.719 (N) 1.5 0.51 0.76 Once again using the general interpolation formula, N = N 1 + (M-M 1) *(N 2-N 1)/ (M 2-M 1) N = 0.48 + (372-357)(0.719-0.48)/(385-357) = 0.608 mm/y Corrosion rate is estimated to be 0.608 mm/y from interpolating the values in the table. 3.2 RETIREMENT THICKNESS CALCULATION 3.2.1 Pressure design thickness To determine the required thickness of straight pipe subjected to internal pressure. We have the formula, t = PD/2(SEW + PY) Where, t = Pressure design thickness for internal pressure, in millimeters P = Internal design gauge pressure of the pipe, in kilopascals D = Outside diameter of the pipe, in millimeters S = Allowable unit stress at the design temperature, in kilopascals E = Longitudinal quality factor (1) W = Weld Joint strength reduction factor (1) Y = Coefficient whose value is 0.4 for Temp< 492 C The Allowable unit stress at the design temperature is obtained by referring the ASME B 31.3-2012 Edition. The readings are as follows Table -7: Summary of Line Internal Design Gauge Pressure P (KPa), Out Diameter D (mm) and Allowable Unit Stress S at Design Temperature*1000 (KPa)* (*ref 5.2.1) Line Prehea ted Crude inlet Internal Design Gauge Pressure P (KPa) Outer Dia D (mm) Design Temp o C 588.399 864 390 110 Allowable Unit Stress S*1000 (KPa) Appling these values to the formula, 1) Preheated Crude Inlet Line t = PD/ 2 (SEW + PY) = 588.399*864/2*(110.2*1000+ 588.399*0.4) = 2.30 mm 3.2.2 Minimum structural thickness Based on API 574, Minimum structural thickness for all the inlets and outlets having NPS in the range 6-18 and 20-24 are taken as 2.8 and 3.1 respectively 2016, IRJET ISO 9001:2008 Certified Journal Page 775

3.2.3 Retiring thickness of the Maximum thickness on comparison with Design Pressure thickness and Minimum Structural Thickness along with added manufactures tolerance is taken into consideration while estimating the Remaining Life Calculation. Table -8: Summary of Retiring Thickness (T required) Line Retiring Thickness (T required) Preheated Crude Inlet 3.487 3.3 REMAINING LIFE CALCULATION Retiring Life of the pipeline is estimated using the data s such as Corrosion Rate, Present thickness and retirement thickness. Actual thickness of the pipeline is directly obtained using Ultra Sonic Technique. We have the formula to calculate the remaining life as L r =( T actual T required ) / C r (i) For Kuwait Crude Oil Table -9: Review of Corrosion rate C r (mm), Actual thickness T a (mm) And Retiring thickness T r(mm) Line C r (mm) T actual (mm) T required (mm) Preheated Crude inlet 0.7082 12 3.487 Applying the formula, we get the estimated life in years as 1) Preheated Crude Inlet L r = T actual T required ) / C r = (12-3.487)/0.7082 = 12.02 years (ii) For Arab Extra Light Table -10: Review of Corrosion rate C r (mm), Actual thickness T a (mm) And Retiring thickness T r(mm) Line C r (mm) T a (mm) T r (mm) Preheated Crude inlet 0.608 12 3.487 Applying the formula, we get the estimated life in years as 1) Preheated Crude Inlet L r = (T actual T require ) / C r = (12-3.487)/0.608 = 14.49 years 4. RESULTS AND CONCLUSION Table- 11: Results and conclusion Probab Line Material Of const le damag e mech. Preheated Crude inlet A335 GradeP 5, 5% Cr- 0.5Mo Alloy Steel High temp sulphidi c and naphthe nic acid corrosio n C r (mm/y) L r (years) C 1 C 2 C 1 C 2 0.7 0.6 12 14.4 This project clearly identifies the variation of corrosion with the difference in sulphur in the two types of crude namely Kuwait and Arab extra light crude. From the table above it can be identified that corrosion would be more for of the crude used is 100% Kuwait crude in comparison with Arab Extra Light crude. However in refineries in order to tackle this issue, blend crudes are used. Corrosion and its effects cannot be completely taken care of but proper adoption of design, selection of material, Mitigation and control measures, corrosion allowances can reduce the adverse impacts to a great extent. Coating the words of Trevor Place- A simplifed analogy for pipe corrosion is tooth decay If you brush regularly; you probably won t have many problems with your teeth. Similarly, if you sweep your pipeline clean of potential corrodents, you won t have many problems with corrosion. ACKNOWLEDGEMENT I, Nibin V Baby would like to thank all my faculties, staff and friends of Petroleum Department of MIT, Pune for all the help and aid they have given me for the completion of my work I would also like to that the officials and staff of Learning and Inspection Department of BPCL, Mahul for their inspiration and helping hands towards the contribution of this work. REFERENCES [1] Nile D. Coble, Corrosion Philosophy: Treat the source, not the symptom, Paper No. 02480, NACE International, 2002 [2] The Hindu Newspaper report on Pipeline Gas explosion on 30 th June, 2014 at Nagaram village in East Godavari district of Andra Pradesh, India. 2016, IRJET ISO 9001:2008 Certified Journal Page 776

[3] Saadedine Tebbal, Russell D. Kane, Review of critical factors effecting crude corrosivity, Paper No. 601, NACE International, 1996 [4] American Petroleum Institute API 581 hand book on Risk-based Inspection Base Resource Document, First Edition, May, 2000, API Publication [5] American Petroleum Institute API 571 hand book on Damage Mechanisms affecting fxed quipment in the refinery Industry, First Edition, December 2003, API Publications. [6] Federal Study Report on Corrosive costs and preventive strategies in the United States, 2002 intiated by Nace international. BIOGRAPHIES Nibin V Baby is a second year master of engineering (ME) student in Department of Petroleum Engineering at Maharashtra Institute of Technology, Pune, Maharashtra 2 nd Author Mr. Bibhudatta Paricha is Assistant Inspection Manager at BPCL, Mumbai 3 rd Author Prof. Dr. Shailendra J. Naik is Associate Professor in Department of Petroleum Engineering at Maharashtra Institute of Technology, Pune, Maharashtra 2016, IRJET ISO 9001:2008 Certified Journal Page 777