M/S Overseas Min-Tech Consultants, Jaipur. Pre-Feasibility Report Index INDEX 1 EXECUTIVE SUMMARY... 1

Similar documents
INDEX 1 EXECUTIVE SUMMARY INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION PROJECT DESCRIPTION... 32

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

INDEX 1 EXECUTIVE SUMMARY INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION PROJECT DESCRIPTION... 9

EXECUTIVE SUMMARY. 1.1 Executive Summary

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXISTING PROJECT FOR ORDINARY SAND MINING

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

PRE- FEASIBILITY REPORT

PREFEASIBILITY REPORT

1/1, Index INDEX ANY, SHOULD

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT

PRE-FEASIBILTY REPORT

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

PRE-FEASIBILITY REPORT

PRE FEASIBILITY REPORT

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENT MANAGEMENT PLAN

Pre- Feasibility RepoRt

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

PRE FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT

Pramod S. Kambli. Page 1

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

ENVIRONMENT MANAGEMENT PLAN

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT OF SAND QUARRY

2. PRE-FEASIBILITY REPORT

PRE FEASIBILITY REPORT

1. PRE-FEASIBILITY REPORT

Pre- FEASIBILITY REPORT

(A govt. of Kerala Undertaking)

ENVIRONMENT MANAGMENT PLAN

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

ENVIRONMENT MANAGEMENT PLAN

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

S. No Parameter Details 1 Name & Address of the Applicant

PRE FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT

PRE-FEASIBILITY REPORT

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent

PRE- FEASIBILITY REPORT INDAWAR CHINA CLAY MINE

Table 1-1:- Salient Features of the Project

ME/JALORE/MM/ML/13/13/4059 Dated 13/01/2014.

Environment Management Plan

PRE FEASIBILITY REPORT For SILICA SAND MINE. At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh ha.

PRE-FEASIBILITY REPORT

Pre-Feasibility Report

PRE FEASIBILITY REPORT

Project Proponent: Shri Kuldeep Pratap Singh Bhati Page - 11

PRE-FEASIBILITY REPORT

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant

PRE-FEASIBILIY REPORT

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village,

ENVIRONMENT MANAGEMENT PLAN

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD

PREFEASIBILITY REPORT OF EXISTING BENTONITE PROJECT OF

BRIEF SUMMARY OF THE PROJECT

Riverbed Sand/Morrum Mining at Gata No. 747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P. Area: 22 Acres (8.

PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details:

M/S Overseas Min-Tech Consultants, Jaipur

INDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

PRE FEASIBILITY REPORT

MCDR INSPECTION REPORT

M/s. Bharat Clays Private Limited Pre-Feasibility Report

MCDR INSPECTION REPORT S/ No. 1 Name of the Mine Navalutti Iron Ore Mine 2 Total Lease Area (Ha) with breakup of Non-forest & forest land

INDEX S.NO ITEM PAGE NO 1. INTRODUCTION 3 2. DETAILS ABOUT THE MINE LEASE AREA 4 3. MINING ACTIVITY 5 4. ENVIRONMENTAL MANAGEMENT PLAN 8

PRE-FEASIBILITY REPORT

DHANWADA CRUSHER STONE QUARRY

Salient features of the Project. S. No. A. Mining Lease Details. iii Mining Lease Number M.L. No 20/2004. iv Mining Lease Area

PRE-FEASIBILITY REPORT. 5.0 Hectare sand mine under bhu-jal

RCCPL Private Limited (formerly known as Reliance Cement Company Private Limited) : Dithora, Sannehi Singti and Karaundi

APPENDIX- I FORM- 1. (I) Basic Information:

Scrutiny comments on examination of FMCP ( lease expiring on 31/03/2020 )of Teherai Iron and Manganese Mine of M/s Bonai Industrial Co.

Transcription:

White Clay/China Clay Mining Project (3,250 TPA), M.L. No.3/01, ML Area 4.80 ha, Index INDEX 1 EXECUTIVE SUMMARY... 1 2 INTRODUCTION OF THE OBJECT/ BACKGROUND INFORMATION... 4 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 4 2.2 NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY/ REGION... 4 2.3 DEMAND SUPPLY GAP... 5 2.4 IMPORTS VS. INDIGENOUS PRODUCTION... 5 2.5 EXPORT POSSIBILITY... 5 2.6 DOMESTIC/EXPORT MARKETS... 5 2.7 EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT... 5 3 PROJECT DESCRIPTION... 7 3.1 TYPE OF PROJECT... 7 3.2 LOCATION OF PROPOSED PROJECT;... 7 3.3 DETAILS OF ALTERNATE SITES CONSIDERED... 9 3.4 SIZE OR MAGNITUDE OF OPERATION... 9 3.4.1 REGIONAL GEOLOGY... 9 3.4.2 LOCAL GEOLOGY:-... 10 3.4.3 MINERAL RESERVES... 10 3.5 PROJECT DESCRIPTION... 11 3.5.1 YEARWISE PRODUCTION DETAILS... 11 3.5.2 PROPOSED METHOD OF MINING:... 11 3.5.3 EXTENT OF MECHANIZATION... 12 3.5.4 CONCEPTUAL MINING PLAN... 12 3.5.5 DRILLING... 13 3.5.6 BLASTING... 13 3.6 RAW MATERIAL REQUIRMNET... 14 3.7 RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED... 14

White Clay/China Clay Mining Project (3,250 TPA), M.L. No.3/01, ML Area 4.80 ha, Index 3.8 AVAILABILITY OF WATER& ITS SOURCE... 14 3.9 ENERGY /POWER REQUIREMENT:... 14 3.10 QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR MANAGEMENT/DISPOSAL... 14 4 SITE ANALYSIS... 16 4.1 CONNECTIVITY (Mine Site)... 16 4.2 LAND FORM, LAND USE AND LAND OWNERSHIP... 16 LAND OWNERSHIP... 16 4.3 TOPOGRAPHY... 17 4.4 EXISTING LAND USE PATTERN... 17 4.5 EXISTING INFRASTRUCTURE... 20 4.5.1 WATER... 20 4.5.2 BASIC AMENITIES... 20 4.6 SOIL CLASSIFICATION... 20 4.7 CLIMATE... 20 4.8 SOCIAL INFRASTRUCTURE AVAILABLE... 22 5 PLANNING BRIEF... 23 5.1 PLANNING CONCEPT... 23 5.2 PROJECTPOPULATION PROJECTION... 23 5.3 LAND USE PLANNING... 24 5.4 ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL AND SOCIAL)... 24 5.5 AMENITIES/FACILITIES... 24 6 PROPOSED INFRASTRUCTURE... 26 6.1 INDUSTRIAL AREA... 26 6.2 RESIDENTIAL AREA (NON PROCESSING AREA)... 26 6.3 GREEN BELT... 26 6.4 SOCIAL INFRASTRUCTURE... 26

White Clay/China Clay Mining Project (3,250 TPA), M.L. No.3/01, ML Area 4.80 ha, Index 6.5 CONNECTIVITY... 26 6.6 DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF WATER)... 26 6.7 SEWAGE SYSTEM... 26 6.8 INDUSTRIAL WASTE MANAGEMENT... 26 6.9 SOLID WASTE MANAGEMENT... 27 6.10 POWER REQUIREMENT & SUPPLY/SOURCE... 27 7 REHABILITATION AND RESETTLEMENT (R & R PLAN)... 28 7.1 POLICY TO BE ADOPTED... 28 8 PROJECT SCHEDULE AND COST ESTIMATES... 29 8.1 TIME SCHEDULE FOR THE PROJECT... 29 8.2 ESTIMATED PROJECT COST... 29 9 ANALYSIS OF PROPOSAL... 30 10 ENVIRONMENT MANAGEMENT PLAN... 31

White Clay/China Clay Mining Project (3,250 TPA), M.L. No.3/01, ML Area 4.80 ha, Index List of Tables TABLE 1-1: SALIENT FEATURES OF THE PROJECT SITE... 1 TABLE 2-1: MANPOWER REQUIREMENT... 5 TABLE 3-1: COORDINATES OF MINING LEASE... 7 TABLE 3-2: REGIONAL GEOLOGY... 9 TABLE 3-3: MINERAL RESERVES... 10 TABLE 3-4: YEAR WISE PRODUCTION OF QUARTZ & FELDSPAR FOR THE FIVE YEARS PERIOD... 11 TABLE 3-5: LIST OF MACHINERIES... 12 TABLE 3-6: STAGE WISE LAND USE AND RECLAMATION AREA (HA.)... 12 TABLE 3-7: POST MINING LAND USE OF CORE ZONE WITH ENVIRONMENT MANAGEMENT... 13 TABLE 3-8: THE BROAD BLASTING PARAMETERS WILL BE AS UNDER: -... 13 TABLE 3-9: WATER DEMAND... 14 TABLE 3-10: QUANTITY OF WASTE TO BE GENERATED... 14 TABLE 4-1: CONNECTIVITY... 16 TABLE 4-2: LAND USE PATTERN... 16 TABLE 4-3: EXISTING LAND USE PATTERN (IN HA.)... 17 TABLE 4-4: ENVIRONMENTAL SETTINGS... 17 TABLE 4-5: WIND DIRECTION AS PER CLIMATOLOGICAL TABLE OF IMD... 21 TABLE 4-6: SOCIAL INFRASTRUCTURE... 22 TABLE 5-1: DEMOGRAPHIC PROFILE... 23 TABLE 5-2: GREEN BELT PROGRAMME... 24 TABLE 8-1: PRODUCTION PLAN FOR 5 YEARS... ERROR! BOOKMARK NOT DEFINED. TABLE 10-1: ENVIRONMENT MANAGEMENT PLAN... 31 LIST OF FIGURES FIGURE 3-1 LOCATION MAP... 8 FIGURE 4-1: KEY PLAN... 19

1.0 Executive Summary 1 EXECUTIVE SUMMARY The proposed White Clay/ China Clay Mining project, Ml No. 3/2001 of Sh. Naval Singh Gurjar S/ o Sh. Durga Singh Gurjar Mining is situated Near Village Sewa, Tehsil & District Karauli, Rajasthan nover an area of 4.80 ha in Khasra No. 3989, 859 Government Land. The letter of intent has been issued in favour of Sh. Naval Singh Gurjar S/ o Sh. Durga Singh Gurjar for White Clay/ China Clay Mining vide letter no. DMG/KARAULI/CC-10/P.1 (1)3/01/13 dated 12.02.09 for 20 years. Copy of Letter of Intent is enclosed as ANNEXURE - I. The Mining Scheme with progressive mining plan has been approved by Department of Indian Bureau of Mines, Ajmer Department of Mines and Geology, Rajasthan, vide letter no. 584(6)(3)(584)/2014/RCM-AJM/7304 dated:17/11/14. Copy of approved Simplified Mining Scheme Letter is enclosed as ANNEXURE II. The mining will be carried out by open-cast semi - mechanized method as per the approved mining plan only. The entire mining area is government waste land. As per RMMCR 1986, validity of mining is 20 years from the date of registration. The proposed production is 3,250 TPA. The estimated cost of project will be Rs. 40 Lac China clay is one of the essential raw material for Ceramic Industries. China clay does not swell on adding water & Alumina present in clay do not form isomorphous series with any other metallic compound. China clay is a naturally hydrated Aluminum silicate. China clay is the heart of potteries tiles, ceramics and many other industries. The china clay produce from the mine will be sold in the various industrious i.e. ceramic rubber industries, crockery sanitary wares, glazed tiles at various units located at Gujarat Material will be dispatched in lumps form. China clay is used as extender and filler in paints, paper, detergents, Bakelite Powder and in rubber industries etc. China clay is heart of several industries like potteries tiles, ceramics, glass and others. Table 1-1: Salient Features of the project site S.No. Particulars Details A. Nature of the Project Proposed White Clay/ China Clay Mining Project, ML No. 3/2001 B. Size of the Project 1. Mine Area 4.80 ha 2. Proposed Production capacity 3,250 TPA C Location Details 1. Village Sewa 1

1.0 Executive Summary 2. Tehsil Karauli 3. District Karauli 4. State Rajasthan 5. Latitude & Longitude Pillar Latitude (N) Longitude (E) A 26 30 11.57 76 51 52.62 B 26 30 17.64 76 51 55.19 C 26 30 14.87 76 51 3.29 D 26 30 08.8 76 51 0.72 6. Toposheet No. 54B/14 & 54B/15 D Environmental Settings of the Area 1. Ecological Sensitive Areas No ecologically sensitive area such as wildlife sanctuary, bio reserve, Etc. Present within 15 Km of the mining lease area. One Reserve forest are present within the 15 Km of the mining lease. Name Distance Directions Paitoli P.F 5.77K.M. South-East Gauneshra P.F 8.10 K.M. South-East Karauli P.F 12.60 K.M. South-East Kohri P.F 13.75 K.M. South-East 2. River / water body Water bodies and rivers which falls within 15 Km radius Buffer zone are as follows: NAME DISTANCE DIRECTIONS Chandpura Talav 11.0 K.M. North-West Bhambalka Talav 5.75 K.M. South Panchal Nadi 14.42 K.M. South-East Namai Nadi 9.66 K.M. South-East 3. Nearest Town / City Karauli at distance of ~15 km in NE direction from Mining Lease area 4. Nearest Railway Station Choti Udai Railway Station at a distance of ~8 km. in NW direction from Mining Lease area. 5. Nearest Airport Jaipur at a distance of around ~111 km. in North-West direction from Mining Lease area. 6. State Boundary No state boundary is located within 15 km radius. 2

1.0 Executive Summary 7. Seismic Zone Zone II [as per IS 1893 (Part-I): 2002] D Cost Details 1. Total Project Cost The proposed project cost will be Rs 40 Lac/Annum Capital Cost: Rs. 28.0 Lac/Annum Recurring Cost: Rs12.0Lac/Annum E Requirements of The Project 1. Proposed Water Requirement 6.32 KLD 2. Fuel requirement 100 LPD 3. Man Power Requirement 15(skilled, semi-skilled, unskilled & technical persons ) 3

2.0 Introduction of The Object 2 INTRODUCTION OF THE OBJECT/ BACKGROUND INFORMATION 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT The proposed White Clay/China Clay Mining Project, Ml No. 03/2001 of Sh. Naval Gurjar S/o Sh. Durga Singh Gurjar Mining is situated Near Village Sewa, Tehsil & District: Karauli, Rajasthan over an area of 4.80 ha in Khasra No. 3989,859 Govt. land. The letter of intent has been issued in favour of Sh. Naval, White Clay/ China Clay Mining vide letter no. DMG/KARAULI/CC-10/P.1 (1)3/01/13 dated 12.02.09 for 20 years. Copy of Letter of Intent is enclosed as ANNEXURE - I. 2.2 BRIEF DESCRIPTION OF THE NATURE OF PROJECT This is a proposed White Clay/China Clay Mining Project. As per EIA Notification dated 14.09.06 its subsequent amendments and as per S.O.2601 (E)- amendment notification dated 07.10.2014., the project falls under, Category B1. The total area including this lease & other mining leases, falling within 500 m of the periphery is 25 ha. It has been proposed to excavate approximately 3,250 TPA of White Clay/China Clay from M.L. No. 03/2001, by open - cast, semi - mechanized method. The lease area is 4.80 ha. Total mineable reserve available is 62111.2 MT of White Clay/China Clay mineral. The expected life of mine is 19 years. Waste (mineral reject) generated during the five year plan period will be 1382 TPA respectively. The minerals will be transported through dumpers. The mining lease area is 4.80 ha which Government waste land. At the end of life of mine, total excavated area will be 0.7800 ha out of which 0.5880 ha will be converted into reservoir, 0.1920 ha area will be backfilled and 0.6400 ha area will be planted around the periphery. The daily water demand during the operation phase will be 6.32 KLD. The daily water demand during operation phase will be 6.32 KLD water demand will be met from the nearby village pond (desolation and impoundment will be carried out by P.P.). On one hand this will recharge the ground water table on the other will act as a water source for nearby habitants. Only water for drinking purposes i.e. 0.07 KLD will be brought from nearby dug well/phed. However, rain water stored in the pit during the rainy season will be used for plantation and dust suppression. The depth of water table is 55 m (Pre-Monsoon) to 50 m (Post-Monsoon) below the general ground level. Thus ground water table will not be encountered during working in the mine. 2.2 NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY/ REGION China clay is one of the essential raw materials for Ceramic Industries. China clay is used as extender and filler in paints, paper, detergents, Bakelite Powder and in rubber industries etc. 4

2.0 Introduction of The Object China clay is heart of several industries like potteries tiles, ceramics, glass and others. Thus, keeping in mind this requirement, mining of China clay is necessary for durability and beauty of ceramic industry.the mining and associated activities in the mineral rich areas increase the gains in gross domestic product (Gross Domestic Product).Total of 15 people will be employed for the mining activity which will create direct & indirect opportunity for employment to local people. By mineral production the applicant will pay royalty & other taxes which will be an additional source of revenue for the government. The proposed China clay mining project will cater the need of requirement for individual and market. Besides this, the project will prove beneficial in terms of socio economic development. 2.3 DEMAND SUPPLY GAP 2.4 RTS VS. INDIGENOUS PRODUCTION China clay is a constituent for Ceramic Industries. It has high demand in region due to increase in industrial and other infrastructural activities. 2.5 EXPORT POSSIBILITY In the current China clay business scenario, import of China clay is not envisaged. It is for. Captive use only no import is done. 2.6 DOMESTIC/EXPORT MARKETS Domestic demand is one of the chief reasons for the rapid growth of China clay business in India. Thus, domestic market for China clay for Ceramic Industries is well established. China clay is used as extender and filler in paints, paper, detergents, Bakelite Powder and in rubber industries etc. China clay is heart of several industries like potteries tiles, ceramics, glass and others. No export will be done. 2.7 EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT The total manpower requirement for the mining activity is 15. Priority for employment will be given to local workers. Following staff & workers are proposed to be employed:- Table 2-1: Manpower requirement S. No. Particulars Number(s) 1. Mines Manager 1 2. Geologist 1 2. Permit Manager 1 5

Skilled Workers 3 3. Semi Skilled Workers 2 4. Laborers 6 Total 15 2.0 Introduction of The Object 6

3.0 Project Description 3 PROJECT DESCRIPTION 3.1 TYPE OF PROJECT The mining of White Clay/China Clay is carried out by open-cast semi - mechanized method. This is an independent project. No interlinked project is proposed. 3.2 LOCATION OF PROPOSED PROJECT; The proposed White Clay/China Clay mine area falls in M.L. No. 03/2001 of, Village- Sewa, Tehsil & District -Karauli, in the State of Rajasthan over an area of 4.80 ha. The project site falls in Survey of India Toposheet No54B/14 & 54B/15. The geographical location with respect to boundary pillars of the proposed White Clay/China Clay area are:- The location map is given below as Figure 1the coordinated of proposed mining lease are given in Table 3-1: Coordinates of Mining Lease Pillar Latitude (N) Longitude (E) A 26 30 11.57 76 51 52.62 B 26 30 17.64 76 51 55.19 C 26 30 14.87 76 51 3.29 D 26 30 08.8 76 51 0.72 7

3.0 Project Description Figure 3-1 Location Map 8

3.0 Project Description 3.3 DETAILS OF ALTERNATE SITES CONSIDERED Mining activity is site specific hence no alternative sites examined. 3.4 SIZE OR MAGNITUDE OF OPERATION Proposed White Clay/ China Clay mine is 4.80 ha and proposed production capacity is 3,250 TPA. 3.4.1 REGIONAL GEOLOGY The rain water will be flowing towards its natural slope i.e. Northwest. Drainage in the mining lease area within 5.0 kms periphery in almost north westerly by perennial seasonal nala. There is no any habitation located in and around the lease area within 5 kms. The lease area covers govt. waste land. the forestland does not fall under the mining lease area and same does not observed in 5 kms periphery of the area. No PWD road passes through the area. Regional Geology: As per geological and mineral atlas of india sheet No 54 B /14, miscellaneous bulletin no 30 and mineral resources map of the district, the rocks of the area belongs to Ranthambhor Group of Bhilwara Supergroup overlain by sand group from Lower Vindhyan of Vindhyam Group. The Stratigraphic succession of rocks as follows. Table 3-2: REGIONAL GEOLOGY Recent Soil Bhander Group Rewa Group Kaimur Group Upper Bhander ( Maihar) Lower Bhander (Bhundi Hill) Upper Rewa ( Govindgarh) Lower Rawa ( Indergarh) Sandstone, Shale Sandstone Sandstone Shale, Jhiri Shale Sandstone Kaimur Sandstone Sand Group Tirohan Breccia with pocellanite 9

3.0 Project Description Ranthambhor Mandakgarh Quartzite, Clay, Impur Silicifies Limestone with shale and slate. 3.4.2 LOCAL GEOLOGY:- The deposit of White Clay/ China Clay belongs to Mandalgarh Quartzite of Ranthambhor Group. The mineral White Clay/ China Clay is outcropping as well as there in pits located due north side in adjacent lease area at a distance of 200 m from M.L area. The White Clay/ China Clay is exposed in the pit put at the location 14 N-95 E of the lease area whereas the remaining area is covered with scree and tirohan breccia. China Clay is occurring as associate mineral with white clay. The general strike of the deposite is NE-SW with di[ of 75 degree due easterly. Recent Sand Group Ranthambhor Group Soil Tirohan Breccia with porcellanite Mandalgarh Quartzite,Clay 3.4.3 MINERAL RESERVES Table 3-3: MINERAL RESERVES Reserve UNFC Quantity in Tonnes Proved 111 5625 Probable 121 35561.2 Possible 23250 20825 Total 62111 Life of Mine Mineable reserve/ annual production 62111/3250 =19 Years 10

3.0 Project Description 3.5 PROJECT DESCRIPTION 3.5.1 YEARWISE PRODUCTION DETAILS 3.5.2 YEAR WISE PRODUCTION DETAILS In this area the mining of China clays involves the use just to loosen the rocks China clay working for a period of 19.0 years with a production of 3,250 TPA as per the mine plan. The details of year wise production for the five years period are given below. Table 3-4: Year wise Production of White Clay/China Clay for the five years period Year Recovery of Mineral (90%) 1 st Year 2130 2 nd Year 2250 3 rd Year 2250 4 th Year 2350 5 th Year 3250 Total 12230 3.5.3 PROPOSED METHOD OF MINING: The proposed White Clay/China Clay Mine shall be developed by semi - mechanized open cast mining which includes drilling, blasting, loading, transport and dispatch of mineral to end users. 3.5.4 OPEN CAST MINING The mining will be done by open- cast, semi - mechanized method of mining. The bench width will be maintained at 3m and the height will be not less the width of the bench. The ultimate depth of the workings is estimated to reach up to 43 m from the highest level. 3.5.5 SALIENT FEATURES OF MINING METHOD The salient features of proposed mining method are:- 1. The height of the bench will be not less than the width of the bench. 2. The width of the bench will be maintained at more than 3.0m. 11

3.0 Project Description 3. Considering the stability of rocks the final slope or say ultimate pit slope is proposed 60 0 from vertical. 4. Blasting will be done to loosen the mineral body only. 5. Transportation of the mineral from mine to end users will be done by Dumpers. 3.5.6 EXTENT OF MECHANIZATION The mining machineries to be used in proposed mining operation are as below:- Table 3-5: List of Machineries S. No. Machine Type No. of Size/Capacity Items 1. JCB/Small capacity excavator 1 0.3cum/0.9 cum 2. Trucks / Dumpers 4 20 tonnes 3. Water Sprinkler 1 4 KL 4. Tractor trolley 2 5 Tons each 3.5.7 CONCEPTUAL MINING PLAN The White Clay/China Clay occurs throughout the area. The mineable reserves are estimated to be 62111 T. The annual Production is proposed to be 3,250 TPA. Life of the mine is 19 Years. 3.5.8 LAND USE PATTERN The land use for mining and allied purposes is given below:- Table 3-6: STAGE WISE LAND USE AND RECLAMATION AREA (Ha.) S. No. Particulates Present Land - Use 12 After 5 th year land- Use At the end of life of mine land- Use 1. Top soil --- --- -- 2. Excavated area & Road 0.0106 0.1500 0.78 (Total excavated area 0.5880Ha will be Converted into water Reservoir & 0.1920 ha will be backfilled area ) 3. Dumps Nil 0.122 Nil 4 Minerals Stack Yard Nil Nil Nil 5. Road ------ 0.029 0.029

3.0 Project Description 6. Building ------ 0.008 0.008 7. Plantation Nil 0.15 0.64 9. Reclaimed Land ------ Nil -- (Backfilled) 8. Undisturbed area 4.29 4.27 3.343 Total 4.80 4.80 4.80 *Out of total plantation of 1.584 hect, 0.6400 hectare will be planted on statuary barrier & 0.1920 ha area will be backfilled, rest area 0.7520 ha will be Undisturbed area. Table 3-7: POST MINING LAND USE OF CORE ZONE WITH ENVIRONMENT MANAGEMENT S. Description Land Use (In Ha.) Plantation Water Body Public Use Undisturbed Total 1 Top Soil Dump Nil Nil Nil Nil Nil 2 External Waste Dump Nil Nil Nil Nil Nil 3 (a)excavation (Voids) Nil 0.78 Nil Nil 0.78 (b)excavation(backfilled) Nil Nil Nil 0.75 0.75 4 Road Nil Nil Nil Nil Nil 5 Built Up Area Nil Nil Nil Nil Nil 6 Township Area Nil Nil 0.02 Nil 0.02 7 Afforestation 1.58 Nil Nil Nil 1.58 8 Mineral Storage Nil Nil Nil Nil Nil 9 Undisturbed Area Nil Nil Nil 2.33 2.33 Total 1.58 0.78 0.02 0.98 1.6074 *Out of total plantation of 1.584 hect, 0.6400 hectare will be planted on statuary barrier & 0.1920 ha area will be backfilled, rest area 0.7520 ha will be Undisturbed area. The conceptual plan is enclosed as Plate No. II. 3.5.9 DRILLING The excavation of mineral is proposed by excavators. No blasting will only be done to remove OB as unconsolidated & friable sandy soil, grit & kankar & ferruginous sandstone which can be easily removed by excavator. So, no drilling is required. 3.5.10 BLASTING No blasting will only be done to remove OB as the unconsolidated & friable sandy soil, grit & kankar & ferruginous sandstone which can be easily removed by excavator. 13

3.0 Project Description 3.6 RAW MATERIAL REQUIRMNET No raw material will be required. The final product will be sent to consumer industries based on their demand. The mode of transportation of final product will be road. Dumpers will be used for transportation of White Clay/China Clay. 3.7 RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED The China clay will be mined in the form of lump so there will be no recycling and reuse envisaged. 3.8 AVAILABILITY OF WATER& ITS SOURCE The daily water demand for the proposed project is 6.32 KLD. It will be procured from the PHED supply source of Village- Sewa. The detailed breakup of the water requirement is given below. Table 3-8: Water Demand S. No. Particulars Quantity (KLD) 1. Domestic Purpose 0.52 2. Dust Suppression / Water 2.0 Sprinkling 3. Green belt / Plantation 3.8 Total 6.32 3.9 ENERGY /POWER REQUIREMENT: Power Supply: Electric power supply line does not exit near the mining lease area. The nearby villages area electrified. It is proposed to connect the applied mine with power supply connection in the future 3.10 QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR MANAGEMENT/DISPOSAL About 1382 Cum of mineral reject will be generated at the end of five years period. This will be dumped in the statutory barrier and plantation will be done over it. At the conceptual phase no dump will be left. Table 3-9: QUANTITY OF WASTE TO BE GENERATED PARTICULARS MANAGEMENT 14

3.0 Project Description Topsoil Overburden Thin cover of scree is available in the lease area which will be stacked separately and simultaneously used for plantation of saplings within the lease area. About 1382 cum mineral reject will be generated at the end of first five year s period. Total waste generated at conceptual stage will be 2495 Cum. The waste will be stabilized by plantation over it. 15

4.0 SITE ANALYSIS 4 SITE ANALYSIS 4.1 CONNECTIVITY (Mine Site) The site is well connected by road as the study area is already well explored having many mines. The connectivity details are given in Table & below. Table 4-1: Connectivity PARTICULARS Nearest Railway Station Nearest Airport Nearest Highway DISTANCE & DIRECTION Choti Udai Railway Station at a distance of ~8 km. in NW direction from Mining Lease area. Jaipur at a distance of around ~111 km. in North-West direction from Mining Lease area. SH-1 is ~3.0km in NW direction from the mine site. 4.2 LAND FORM, LAND USE AND LAND OWNERSHIP LAND FORM The Mining lease area is low undulating area. LAND USE The present land use pattern is as below:- Table 4-2: Land Use Pattern S. No. Particulars Present Land-use (ha.) 1. Excavation Pit (Voids Only) --- 2. Waste Dump (External) 0.0106 3. Infrastructure including office Road Nil 4. Afforestation Nil 5. Undisturbed Area ------ 6. Green Belt Development ------ 7. Minerals Stack Yard Nil 8. Undisturbed area 4.29 Total 4.80 LAND OWNERSHIP The land as per revenue records is government waste land of 4.80 hectare. The Surface Plan is enclosed as Plate No.-III 16

4.0 SITE ANALYSIS 4.3 TOPOGRAPHY Topographically, the Mining area is high undulating area having highest elevation of 358mRL and lowest elevation of 296.4mRL. 4.4 EXISTING LAND USE PATTERN Mining lease falls in government waste land, the existing land use pattern of the mining lease is given in table below. S. No. Particulars Forest Land Table 4-3: Existing Land Use Pattern (In Ha.) Govt. Grazing Land 17 Govt./ Private waste land Private land Ag. Non Ag. Total 1. Excavation Pit (Voids -- -- -- -- -- -- Only) 2. Waste Dump (External) -- -- 0.0106 -- -- 0.0106 3. Infrastructure including -- -- -- -- -- -- office Road 4. Afforestation -- -- -- -- -- -- 5. Undisturbed Area -- -- 4.29 -- -- 4.29 6. Minerals Stack Yard -- -- -- Total -- -- 4.80 -- -- 4.80 As mentioned the mining lease is in government waste land and study area is devoid of any National Park, Wild Life Sanctuary, Biosphere Reserve, Tiger Reserve, Wildlife Corridor, Reserved Forest the environmental settings of the study area are given in Table 4-4 below and also shown in Figure II. Table 4-5: Environmental Settings S. No. Particulars Details 1. National Park, Wild Life Sanctuary, Biosphere Reserve, Tiger Reserve, Wildlife Corridor, Reserved Forest No National Park, Wild Life Sanctuary, Biosphere Reserve, Tiger Reserve, Wildlife Corridor, Reserved Forest Following Protected Forests falls within 15 km radius of Buffer zone, are as follows: Two protected forest are present within the 15 Km of the mining lease. Name Distance Directions Paitoli P.F 5.77K.M. South-East Gauneshra P.F 8.10 K.M. South-East Karauli P.F 12.60 K.M. South-East

4.0 SITE ANALYSIS Kohri P.F 13.75 K.M. South-East 2. River / water body Water bodies and rivers within 15 Km radius Buffer zone as follows: - NAME DISTANCE DIRECTIONS Chandpura Talav 11.0 K.M. North-West Bhambalka Talav 5.75 K.M. South Panchal Nadi 14.42 K.M. South-East Namai Nadi 9.66 K.M. South-East 18

4.0 SITE ANALYSIS Figure 4-1: KEY Plan 19

4.5 EXISTING INFRASTRUCTURE Refer the para no. 4.1 of section 4.0 4.0 Site Analysis 4.5.1 WATER The total water demand will be as follows: Daily Water Demand 6.32 KLD Domestic 0.52 KLD Dust Suppression 2.0 KLD Plantation 3.8 KLD 4.5.2 BASIC AMENITIES a) School:-The Primary school & High school facility is available at Sewa (3.0Km, NW). b) Hospital: - Nearest dispensary is located at Sewa 3.0Km NW of lease area while hospital is available at Karauli (15.0 Km, NW). 4.6 SOIL CLASSIFICATION Soils of the district are classified as: Loamy sand to sandy loam Sandy clay loam Sandy clay 4.7 CLIMATE The climate in the region shows broadly four seasonal variations, namely: Winter: December - February Summer: March Mid June Monsoon: Mid June - September Post-monsoon: October November 20

4.0 Site Analysis Information presented in subsequent paragraphs is from the Indian Meteorological Department (IMD), Long Term Climatological Tables, 1977-2000, Sawai Madhopur. These tables give useful information about a region s weather, since they are collected over a 30-year period. 4.7.1 Temperature May is the hottest months of the year mean daily maximum temperature recorded is 45.9 C and a minimum of 21.4 C. Highest temperature ever recorded at Sawai Madhopur is 48.0 C on 24 th & 13 th of May & June 1983 respectively. During winter season mean daily minimum temperature drops down to -1.0 C in the month of January, the lowest temperature ever recorded at Bhilwara is -1.0 C on 20 th of January 1983. During the post-monsoon months of October and November mean daily maximum mean daily minimum temperatures remain between 34.2-4.2ºC. 4.7.2 Wind Long- term wind direction data is presented in Table 4 5: and give its reference and indicates that the predominant wind during the summer season is (March- May) North- West winds at daytime as well as evening time. During monsoon season also the first predominant wind direction is Clam winds, second predominant is observed to be West direction, during winter season also the first predominant is calm wind and second predominant being West again. Predominant Wind Direction Table 4-6: Wind Direction as per Climatological Table of IMD First Predominant Wind Direction Second Predominant wind Direction 21 Third Predominant wind Direction Month Morning Evening Morning Evening Morning Evening January Calm Calm N/NE North South West North East February Calm Calm N/SW North NW/NE North West March Calm North South West Calm North West West April Calm North South West Calm West West West May Calm North West West South West North West June Calm North West West North West N/SW

4.0 Site Analysis West July Calm Calm West West SouthWest SouthWest August Calm Calm W/SW West NorthWest SouthWest September Calm Calm SouthWest W/NW West N/SW October Calm Calm SouthWest North S/W NorthWest November Calm Calm SouthWest North North/West NE/NW December Calm Calm SouthWest North North NorthEast 4.7.3 Humidity: Most humid conditions are found in the monsoons, followed by summer, post-monsoons, and winter in that order. Mornings are more humid than evenings and humidity ranges from a high of 84-75% in monsoon mornings to a low of 35.56% in winter evenings. During post-monsoon season, in morning humidity remains between 76-65 % and in the evening it remains between47-42%. 4.7.4 Rainfall: The total rainfall in a year is observed to be 872.5 mm. Distribution of rainfall by season is 25.9 mm in winter (December, January, February), 27.2 mm in summer (March, April, May), approximately 88% of the total rainfall i.e. 776.8 mm in monsoons (June, July, August, September) and 42.7 mm in post-monsoons (October November) 4.8 SOCIAL INFRASTRUCTURE AVAILABLE The social infrastructure available in the study area is given in Table below. Table 4-7: SOCIAL INFRASTRUCTURE Particulars Name Distance (Km) Direction (From Mine Area) Nearest Habitation Karauli 15 Km NE Nearest Town Karauli 15 Km NE Nearest Airport Jaipur 111 Km North-West Nearest Highway SH 3.0 NW Nearest Station Railway Choti Udai 8.0 Km NW Nearest Dispensary Karauli 15 Km NE Educational Facility Karauli 15 Km NE 22

5.0 Planning Brief S. No. Human 5 PLANNING BRIEF 5.1 PLANNING CONCEPT Type of Industry: Mining of White Clay/ China Clay Facilities: Drinking water, first aid, mine office, rest shelter Transportation: White Clay/China Clay will be transported by means of Dumpers Town and Country Planning Development Authority Classification: not applicable, since this is a mining 5.2 PROJECTPOPULATION PROJECTION Settlement In the Buffer zone, total household is 2550. Total population is 16489 out of which, 8892 are males and 7597 are females. The total literate person in the surrounding area is 8268 and total worker s population is 6855. The detailed demographic profile of villages located in the study area is given below:- Table 5-1: Demographic Profile Total Total Total Total Total Total Total Total Non- House Hold Population Male Female Literates Illiterates worker Worker 1 Manderoo 326 2363 1261 1102 1237 1126 837 1526 2 Bholooki Kothi 50 318 179 139 109 209 170 148 3 Nangal Sultanpur 97 614 329 285 358 256 277 337 4 Bhandari Berooni 190 992 508 484 567 425 275 717 5 Bindapura 80 594 338 256 282 312 304 290 6 Jagatpura 23 160 99 61 93 67 86 74 7 Bharka 95 610 333 277 403 207 258 352 8 Anandgarh 76 506 268 238 237 269 192 314 9 Rundi 150 909 478 431 423 486 388 521 10 Rampur Palan 61 368 198 170 213 155 95 273 11 Doondipura 196 1308 729 579 1182 887 923 414 12 Paharpura 146 967 533 434 413 275 274 717 13 Haroti 560 3535 1891 1644 1384 2151 1410 2125 14 Fatehpur 139 863 465 398 419 444 321 542 15 Suratpura 108 753 414 339 288 465 339 414 16 Ramthara 253 1629 869 760 660 969 706 923 TOTAL 2550 16489 8892 7597 8268 8703 6855 9687 (Source: Census Data, 2011) 23

5.0 Planning Brief 5.3 LAND USE PLANNING The sapling for plantation for green belt development will be selected based on less water availability in the region and according to climatic condition and hence it is proposed to plant 760 saplings per year. The plantation will be done at the lease boundary and outside the lease area. Year- wise programme of green belt development for five years, about 760 saplings will be planted in an area of 1.584 ha. Up to the conceptual phase 760 saplings will be planted. Green belt development will improve the eco-system and aesthetic beauty of the area. Post plantation care will be taken such as provision for watering, soil mulching manure supply to plants etc these activities will be taken up for plants. The list of the species to be planted in the green belt is provided below:- Table 5-2: Green belt Programme Year Area (ha.) No. of Species Place of Saplings Plantation I 0.3168 152 Babool, Salar, Boundary barrier II 0.3168 152 Neem & of the lease&in the III 0.3168 152 Khejari. lease area& Near IV 0.3168 152 By Grampanchayt, Hospital, School V 0.3168 152 etc After - -- V th Year At the end of Lease period 1.584 760 5.4 ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL AND SOCIAL) The mine area is easily accessible from the state highway by SH-1 is ~3.0km in NW direction from the mine site. These state highways will be helpful for approach of workers to the mine site as well as transportation of mineral to the nearby areas and end users. Choti Udai Railway Station at a distance of ~8 km. in NW direction from Mining Lease area. The infrastructure demand in the villages will be evaluate on the basis of necessity and priority. Job opportunities are inadequate and new possibility for income generation is required. 5.5 AMENITIES/FACILITIES Mine Office: It is proposed to have a temporary mine office with First Aid Facility. 24

5.0 Planning Brief Rest Shelter: Temporary Rest Shelter will be made available. Drinking Water Facility: The drinking water will be made available from the nearby open well as well as from the PHED supply of Sewa village by water tankers. It will be stored in earthen pots and tanks at the site. Toilets: The toilet facility is proposed for the better sanitary condition of the workers employed in Mining area. Other facilities will be developed as per recumbent of the local people of the local of the nearby area under corporate social responsibilities programs. Table 5-3: Break-up of Budgetary Provision for the Facilities provided for the Labours S. No. PARTICULARS CAPITAL COST RECURRING COST (P.A.) (IN RS.) 1. Shelter, Safe Drinking water, 35,000 (One Drinking water, Sanitation Facility Time) 15,000 2. Health facility -- 15,000 3. Education for Children for -- 15,000 mine employees Total 35,000/- 45, 000/- 25

6.0 Proposed Infrastructure 6 PROPOSED INFRASTRUCTURE 6.1 INDUSTRIAL AREA The area is well connected by road network to the mines, District headquarter etc. The area is self-sufficient to supply the needs of the project. Hence no, infrastructure is proposed. 6.2 RESIDENTIAL AREA (NON PROCESSING AREA) The local people will be employed, hence no residential area/ housing is proposed. 6.3 GREEN BELT Refer point no. 5.3. 6.4 SOCIAL INFRASTRUCTURE The proposed project is situated at Village Sewa, Tehsil & District Karauli (Rajasthan). As local people will be employed for excavation activities, no permanent infrastructure is required. The workers will come to the site by company s vehicle. By this project, indirect means of earnings in the area will be developed, which will bring a positive impact on the adjacent habitation. 6.5 CONNECTIVITY Given in Para No. 4.0. 6.6 DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF WATER) The total water requirement for the proposed activity is 6.32 KLD which will be met from the nearby village pond (desolation and impoundment will be carried out by P.P.). On one hand this will recharge the ground water table on the other will act as a water source nearby habitants. Only water for drinking purposes i.e. 0.07 KLD will be brought from nearby dug well/phed. However, rain water stored in the pit during the rainy season will be used for plantation and dust suppression. The proposed indigenous water source created by the project proponent will fulfill the water demand of local habitants. 6.7 SEWAGE SYSTEM Sewage will be disposed of in soak pit at site. 6.8 INDUSTRIAL WASTE MANAGEMENT No industrial waste will be generated. 26

6.0 Proposed Infrastructure 6.9 SOLID WASTE MANAGEMENT Given in point no. 3.9 6.10 POWER REQUIREMENT & SUPPLY/SOURCE For the proposed mining activity no power is required. If electricity is required it will be provided by the AVVNL. 27

7.0 Rehabilitation And Resettlement (R & R Plan) 7 REHABILITATION AND RESETTLEMENT (R & R PLAN) 7.1 POLICY TO BE ADOPTED No rehabilitation and resettlement is either required or proposed for the project as mining will be carried out entirely on Government Waste Land. 28

8.0 Project Schedule and Cost Estimate 8 PROJECT SCHEDULE AND COST ESTIMATES 8.1 TIME SCHEDULE FOR THE PROJECT The project will be started immediately after Environmental Clearance and other necessary approvals from concerning authorities of State Government. 8.2 ESTIMATED PROJECT COST Project cost The proposed project cost will be Rs. 40.0 Lac/Annum Capital Cost: Rs. 28 Lac/Annum Recurring Cost: Rs. 12. Lac/Annum 8.3 Expenditure Proposed for Environmental protection activities: It is proposed to invest an amount of Rs 1.50 Lac towards environmental action plan. The details of the same are given below: Table 8-1: Expenditure Proposed for Environmental Protection Activities S. No. Description of Item Recurring Cost (Rs) 1 Air Pollution Control - Water Sprinkling 20,000 2 Environmental Monitoring and Management 25,000 3 Green Belt Development 30,000 4 Water Pollution control 10,000 Total 85,000/- Table 8-2: ESR (Entrepreneur Social Responsibility) S. No. ESR Activity Proposed Budget ( in Lacs) 1. Proposed rain water harvesting 0.18 2. Social Forestry (At Gram Panchayat, 0.15 Schools, Hospital) 3. Social responsibility for surrounding area 0.26 of mine site Drinking water facilities near -by Govt. Hospital, 4. Health check - up Camps for villagers as 0.21 well as mine workers Total 0.80 29

9.0 Analysis of Proposal 9 ANALYSIS OF PROPOSAL Proposed White Clay/China Clay mine project will result in growth of the surrounding areas. Direct and indirect employment will be created for local people in nearby villages as per eligibility criteria. Special emphasis on Financial and Social benefits will be given to the local People. No major adverse effect on environment is envisaged as the required mitigation measures are inbuilt in the project. 30

10.0 Environment Management Plan 10 ENVIRONMENT MANAGEMENT PLAN Table 10-1: below gives the environment management plan for the proposed mining project. Table 10-2: ENVIRONMENT MANAGEMENT PLAN PARTICULARS Air Quality Excavation, Loading and Transportation Water Quality Noise Quality Drilling, Blasting, Loading and MANAGEMENT Dust generated due to drilling, blasting and vehicular movements will be suppressed by water spraying on haul road. To avoid the dust generation from the drilling operations wet drilling method will be practiced. Drill machines will be fitted with dust collectors. Use of appropriate explosives for blasting. Controlled blasting techniques will be practiced. Dust mask will be provided to the workers. Proper maintenance of vehicles & machineries will be done. Water sprinkling on the haul road and other road at regular intervals will be done. Speed of the vehicles will be kept within the prescribed limits. Dumpers will not be over loaded. Sewage will be generated by employing 15 workers in the mine which will be diverted into a septic tank followed by soak pit. Garland drains will be made around the mining area to channelize surface run off into natural drainage pit so that it can be utilized for dust suppression. Mining operations will be at higher levels; therefore there will be no effect on ground water condition due to mining. Adequate silencers in all the diesel operated vehicles will be used. 31

10.0 Environment Management Plan unloading of Mineral Personnel protective equipment will be provided to and movement of the workers/employed persons. Trucks. Proper maintenance of machines at regular intervals will be done. Green belt development and plantation. Waste generated during mining operation will be Solid Waste stacked separately in the boundary barrier and will be stabilized by plantation. Small amount of domestic waste will be generated for which dustbin will be kept at proper place and it will be disposed properly and regularly. At the end of life of mine, total excavated area will be Land Reclamation 0.78 ha out of which 0.5880 ha will be converted into reservoir, 0.1920 ha area will be backfilled and 0.6400 ha area will be planted around the periphery. Environmental Management plan is enclosed as Plate No.-III. 32