Florida Department of Transportation District Four KICK-OFF MEETING. I-95 at Southern Boulevard (SR 80) Project Development and Environment Study

AIR QUALITY TECHNICAL MEMORANDUM

LOCATION HYDRAULIC REPORT

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

NORTH I-75 MASTER PLAN Summary Report

I-4 Beyond the Ultimate Project Development & Environment (PD&E) Reevaluation Study FROM WEST OF SR 528 (BEACHLINE EXPRESSWAY)

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4G. Intergovernmental Coordination and Review Log

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

Final Air Quality Report

Concept, Feasibility & Mobility Studies. Southport Connector Expressway

ENVIRONMENTAL ADVISORY GROUP MEETING NO. 2

Project Study Area. Presentation. July 8, 2008

How Should MPO s Engage in Setting Freight Priorities?

Florida Gas Transmission 24-Inch Pipeline Hydrostatic Test

US 27 MULTIMODAL CORRIDOR TREASURE COAST REGIONAL PLANNING COUNCIL SOUTH FLORIDA REGIONAL PLANNING COUNCIL

NOVEMBER 13, 2017 S O L I C I T A T I O N N O. V P

SR 60 Grade Separation over CSX Railroad Traffic Technical Memorandum

1.4 Analysis of Alignment Alternatives

9.0 I-26 & I-526 Interchange Improvements

Final Air Quality Report

CENTRAL FLORIDA EXPRESSWAY AUTHORITY. SR 408 Eastern Extension PD&E Study

CMNAA. Central Manatee Network Alternatives Analysis Alternatives Public Meeting CMNAA STUDY PROCESS. STUDY AREA 17th St. W

2018 ACEC OF FLORIDA OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

State Route 8 Bridge Replacement Project

DRAFT AIR QUALITY TECHNICAL MEMORANDUM

Central Manatee Network Alternatives Analysis

APPENDIX Methodology Letter of Understanding (MLOU) and Agency Correspondence

SR 50 PD&E Study

SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

Chapter 2 Transportation Element Goals, Objectives and Policies

TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING

US 27 Transportation Alternatives Study

I-10 CONNECT. Public Meeting #1

M E M O R A N D U M. To: Council Members AGENDA ITEM 7

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination

FLORIDA DEPARTMENT OF TRANSPORTATION PROCEDURE DEVELOPMENT OF THE

Section 7 Environmental Constraints

Table of Contents. Introduction 1. E1 Purpose and Need 1. E2 Alternatives Development Approach 7. E3 Tier I Alternatives 9. E4 Tier II Alternatives 13

North I-75 Master Plan Summary

3.1.3 Horizontal and Vertical Alignments Intersections and Signalization Conditions Access Management Classification...

DRAFT PRELIMINARY ENGINEERING REPORT

LOOP 9 SOUTHEAST WELCOME TO THE LOOP 9 CORRIDOR/FEASIBILITY STUDY. Presentation 6:30 p.m. to 7:00 p.m.

Final Recommendations Identification of Improvements, Strategies, and Solutions

Alico Road. Connector Study. Lee County Department of Transportation. Prepared by. Lee County, Florida

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

FROM THE CHAIR By: Michael Dorweiler, AICP 2007 Chairman for the Tampa Bay Applications Group DATES TO REMEMBER

Miami-Dade Transit. Alice N. Bravo, P.E. Director. Miami-Dade Transit 1

MEDIAN OPENINGS AND ACCESS MANAGEMENT

2050 VISION WORKSHOP

NEPA and Design Public Hearings

A Presentation to: Project Advisory Group Meeting #7

MARTINSVILLE SOUTHERN CONNECTOR STUDY CITIZEN INFORMATION MEETING Magna Vista High School 701 Magna Vista School Road Ridgeway, Virginia May 8,

SUMMARY S.1 PROJECT DESCRIPTION AND LOCATION S.2 PURPOSE AND NEED

Pinellas County Metropolitan Planning Organization 2035 Long Range Transportation Plan Environmental Resource Evaluation Methodology

CHAPTER 8 TRANSPORTATION ELEMENT

Background Study Goals and Objectives

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

Willmar Wye Public Open House #4 and Public Hearing

Working with Transportation Concurrency Exception Areas

NOISE STUDY REPORT. for the WEKIVA PARKWAY (SR 429)/SR 46 REALIGNMENT PD&E STUDY. Orange, Lake, and Seminole Counties, Florida

POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009

LA 23 NOGC Railway Relocation PE/NEPA Project. Public Meeting

SIS 2045 Multimodal Unfunded Needs Plan: FDOT District Four Projects. Project Review with Metropolitan/ Transportation Planning Organizations

Northwest State Route 138 Corridor Improvement Project

D R A F T. SECTION 4(f) EVALUATION. INTERSTATE 73 From I-95 to the Myrtle Beach Region

Florida Department of Transportation

MEMORANDUM #4. DATE: November 4, Warrenton TSP Project Management Team. Ray Delahanty, AICP, DKS Associates Kate Petak, EIT, DKS Associates

CORRIDOR ALTERNATIVES EVALUATION SUMMARY REPORT

Florida Department of Transportation

I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012

Overview of Prior Studies

Florida Department of Transportation

HILLSBOROUGH COUNTY METROPOLITAN PLANNING ORGANIZATION

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) TYPE 2 CATEGORICAL EXCLUSION DETERMINATION FORM

Florida Department of Transportation

Preparation of an Environmental Impact Statement for High Capacity Transit

Air Quality Analysis Technical Memorandum

Governor s Transportation Task Force. MEGAPROJECT NEEDS RPC Freight Roundtable Executive Director: Walter Brooks

MDX PROCUREMENT/CONTRACT NO.: RFP MDX WORK PROGRAM NO.:

Air Quality Analysis Technical Memorandum

Engineering Assessment Process: Keys to a Solid Engineer s Report

CHAPTER 5. City of Greensburg Comprehensive Plan. Introduction. Transportation Goals & Objectives

MID FLORIDA LOGISTICS PARK

Project Evaluation Criteria

LA 23 NOGC Railway Relocation PE/NEPA Project

FASTLANE Grant Project US-69 through Calera. Oklahoma Traffic Engineering Association 2017 Fall Meeting

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines

Lubbock Outer Route Feasibility Study Report Executive Summary

Air Quality Analysis Technical Memorandum

vi Figures viii Summary S.1

III. Regional TSM&O Overview from the 2040 Regional Transportation Plan (Jessica Josselyn, Kittelson & Associates, Inc.)

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that

Derry-Londonderry I-93 Exit 4A Public Officials/Information Meeting

INTERCHANGE MODIFICATION REPORT

Transcription:

SR 874/Don Shula Expressway Ramp Connector Project Development & Environment (PD&E) Study PUBLIC HEARING December 8, 2011 MDX Contract #: RFP-09-04 MDX Work Program #: 87410.011 ETDM #: 11501 1

This Public Hearing is being held in accordance with: Chapter 23 of United States Code 128. Title 40 of the Code of Federal Regulations, Parts 1500 through 1508. Title 23 of the Code of Federal Regulations, Part 771. Title 50 of the Code of Federal Regulations, Part 402. Federal Aid Highway Act of 1968, as amended. Americans with Disabilities Act of 1990. Title VI of the Civil Rights Act of 1964, as amended. Presidential Executive Order 11990, Protection of Wetlands. May 24, 1977. Presidential Executive Order 11988, Floodplain Management and Protection. 2

3

MDX Work Program Project #: 87410.011 Efficient Transportation Decision Making (ETDM) #: 11501 4

Project Life Cycle 5

PD&E Process 6

Coordination On-going/Planned Developments Miami-Dade County Florida Department of Transportation ( FDOT) Florida Turnpike Enterprise (FTE) Miami Dade Public Works (MDPW) Miami Dade Transit (MDT) Florida Department of Environmental Protection (FDEP) South Florida Water Management District (SFWMD) Florida Power & Light (FPL) CSX Transportation (CSX) Federal Aviation Administration (FAA) 7

Project Description SR 874/ Don Shula Expressway Urban Principal Arterial Expressway Approximately 7.2 miles Posted Speed Limit 55 mph Hurricane Evacuation Route Part of SIS/FIHS New on/off ramp from SR 874 to SW 128 th St Roadway improvements along SW 128 th St from SW 122 nd Ave to SW 137 th Ave 8

Purpose and Need 1. Social Demand and Economic Development 2. System Connectivity 3. Capacity 4. Evacuation Route/ Emergency Services 9

Purpose and Need Social Demand and Economic Development West Kendall is one of the fastest growing communities in the state t Anticipated growth by 2035: Population: 104% Jobs: 37% Future development in the project vicinity includes: Kendall-Tamiami Executive Airport improvements ZooMiami iexpansion Schools Housing developments DRI s 10

Purpose and Need System Connectivity Existing connections to expressway system: SW 152 nd Street (HEFT & SR 874) SW 120 th Street (HEFT) DOWNTOWN MIAMI SR 874 provides a southwest to northeast connection from the HEFT to the Palmetto Expressway/SR 826 The new facility would provide local traffic a more direct route to the centers of employment in the County Downtown Miami Miami International Airport Miami Beach Port of Miami STUDY AREA 11

Purpose and Need Capacity Expressways and interchanges in the area are heavily congested The proposed ramps would provide an alternate travel route, relieving congestion 12

Evacuation Route/ Emergency services Purpose and Need The lower southeast Florida region has been identified d as one of the most thurricane vulnerable areas in the United States The SR 874/Don Shula Expressway facilitates access to other critical north-south facilities (i.e. SR 826/Palmetto Expressway, US-1, I-95) This project would provide an additional connection to the SR 874 facility and improve the mobility at the Turnpike interchanges decreasing overall evacuation time 13

Key Project Components Engineering Environmental Public Involvement 14

Community Involvement Public Involvement Coordinated with Key Stakeholders, businesses, etc. Public Meetings held: Agency/Elected Officials i Kick-off Meeting Public Kick-off Meeting Public Alternatives Workshop Ways of engaging the community: Fact sheets Newsletters 15

Stakeholder Meetings Public Involvement Have met with the following Owners/Agencies: o Bonita Lakes (HOA) o Venezia Lakes (HOA) o Eagle Lake Office Park o Wynn Building Corporation o J&B Importers o The Flyer o PERA P.E.R.A. (Nixon Smiley & Tamiami Pineland Preserve) o Miami Dade County Public Works and Waste Management o Miami-Dade County Parks, Recreation and Open Spaces 16

Project Constraints Tamiami and Nixon Smiley Pineland Preserves Multiple Residential neighborhoods Existing and proposed FP&L Transmission lines & Davis Substation CSX Railroad Proposed Turnpike improvements Kendall Tamiami Executive Airport FAA compliance Engineering Analysis 17

Engineering Analysis 18

Engineering Analysis Traffic Analysis Traffic Analysis Years: Opening: 2017 Interim: 2027 Design: 2037 Determined traffic improvements/ impacts on local roads Preparation of an Interchange Justification Report (IJR) FDOT review (FIHS/ SIS facility) 19

Engineering Analysis PARAMETERS ALTERNATIVES 20

Engineering Analysis Alternative Corridor A (SW 128 th Street) Provides new on/off ramps from SR 874 to SW 128 th Street New ramps come down to ground level just east of SW122 nd Avenue Requires widening of SW 128 th Street from 2 to 4 lanes Avoids impacts to Pineland preserves Minimizes right-of-way impacts 21

Engineering Analysis Alternative Corridor C (SW 136 th Street) Provides new ramps from SR 874 to SW 136 th St New ramps come down to ground level just east of SW 127 th Ave Direct impacts to Tamiami Pineland Preserve Direct impacts to CSX R/W and FP&L Transmission lines Significant public opposition from abutting residences 22

Engineering Analysis Alternative Corridor F (SW 128 th Street/SW 136 th Street) Provides two one way ramps (entrance at SW 136 th St, exit at SW 128 th St) Direct impacts to Tamiami Pineland Preserve Direct impacts to CSX R/W and FP&L Transmission lines 23

Engineering Analysis Preferred Alternative Corridor A (SW 128 th Street) from SR 874 to SW 122 nd Avenue Two 2-lane on/off ramps to SR 874 (Don Shula Expressway) New ramps come down to ground level just east of the SW 122 nd Avenue. 12 foot frontage road east of SW 122 nd Avenue will provide access to abutting businesses. 24

Engineering Analysis Preferred Alternative Corridor A (SW 128 th Street) from SW 122 nd Avenue to SW 137 th Avenue Widens SW 128 th Street from two to four lanes from SW 122 nd Avenue to SW 137 th Avenue Provides 6 ft sidewalk on the north side and a 10 ft shared use path on the south side. Requires intersection improvements at the intersections of SW 128 th Street with SW 122 nd Avenue, SW 127 th Avenue and SW 137 th Avenue. 25

Engineering Analysis Preferred Alternative Corridor A - Right of Way Impacts 26

Environmental Analysis Direct Effects Natural Issues Threatened/ Endangered Species Minimal Impacts Wetlands No involvement Water Quality Minimal Impacts Physical Issues Noise Minimal Impacts No noise walls required Contamination Only low risk sites located in the area Air Quality No Impacts Socio-Economic / Cultural Issues Historical No involvement Archaeological No involvement 4(f) Sites No Impacts Socio- Economic Positive Impacts Relocation - No impacts Indirect & Cumulative Effects May increase exposure to noise, litter and traffic for the Nixon Smiley Pineland Preserve 27

Environmental Analysis Socio-Economic i Impacts SR 874 Ramp Connector to SW 128 th Street Comparative Study Study evaluated 6 different expressway ramps within Miami-Dade and Broward County with similar conditions to the proposed project Inclusion of the ramp will have a beneficial impact due to increase accessibility to the expressway SR 874 RAMP CONNECTOR TO SW 128 th STREET COMPARATIVE STUDY APRIL 5, 2011 PREPARED BY: BERMELLO AJAMIL & PARTNERS, INC. 28

Project Documents Draft Project Development Summary Report Draft State Environmental Impact Report Draft Endangered Species Biological Assessment Draft Contamination Evaluation Screening Report Draft Noise Study Report Draft Cultural Resource Assessment Survey Draft Interchange Justification Report Draft Wetland Technical Memorandum 29

Schedule & Cost Schedule Next Steps Final Design: 2012-2013, Right-of-Way: 2013-2015, Construction: 2015-2017 Preliminary Construction Cost Approximate construction cost: $108 Million 30

Engineering Analysis Preferred Alternative Corridor A 31

Written Statements, 7:00 p.m. Ms. Tere C. Garcia MDX Public Information Officer William M. Lehman MDX Building 3790 NW 21 st Street Miami, FL 33142 (786) 277-9292 874ramp@mdxway.com 32

For additional information please contact: Ms. Tere C. Garcia Public Information Officer Phone: (305) 860-3758 Cell: (786) 277-9292 Fax: (305) 860-3759 E-mail: Tgarcia@mdxway.com 33

Your COMMENTS and CONCERNS are solicited tonight! 34