iktva Program Framework & Business Opportunities Saudi Aramco: Public

Similar documents
In-Kingdom Total Value Add (IKTVA) Program Creating Value in the Kingdom IKTVA Workshop 2017 First Time Filers

King Salman Energy Park (SPARK)

in-kingdom total value add guidelines

Supplier s Technical Approval Technical and Quality Management System Evaluation

Engineering Field Service ASME Repairs B31.3 piping Bundle Extraction Maintenance

PROTECH Energy Services Limited

SEA Certified Piping Design Engineer

All our products Quality Assurance QUALITY Ensure quality control and it strive for the following:

Other Opportunities Workshop. Saudi Aramco: Public

Industrial Waste Management and Water Treatment Opportunities November Saudi Aramco: Public

Section 11. API 7500lb Mud Gate Valves

GULF TECHNICAL FACTORY

RJ Engineering Systems, Inc. Company Profile

In-Kingdom Total Value Add Program IKTVA Survey Guide. Version 2.0

MANUFACTURERS FOR THE NIGERIAN OIL AND GAS PARK SCHEME Category Sub Category Sub Sub Category Products/services

Saudi Aramco s Registration and Prequalification for Service Suppliers. Copyright 2016, Saudi Aramco. All rights reserved.

MEMBER REZAYAT GROUP OF COMPANIES

your partner in oil & gas power generation since S L O V E N I A Ptuj I T A L Y Avigliana (TO) Trino V.se (VC) Calenzano (FI)

WE PROVIDE QUICK RELIABLE AFTERSALES SERVICE AND SUPPORT FOR OUR CUSTOMERS

Code. 1) Code. Standard or Specification. Bolting

A106 Gr.B Pipes & Tubes

Servicing of drilling-rig BOPs

Palpsht Company FOR CONSTRUCTIONS AND GENERAL CONTRACTING

ENGINEERING SERVICES

BONDSTRAND Glassfiber Reinforced Epoxy Piping Systems for Offshore Applications

A World Class Manufacturer of Induction Bends

CPTDC. The Strongest Chinese Sourcing Channel for Australian Energy & Mining Industry

C0 2 / Acid Gas. Conversion. Prepared for the 5 Th Well Bore Integrity Network Meeting. Calgary Alberta May 14, 2009

Technical Summary. 1. Purpose

Tianjin Nolite Steel Co.,Ltd Page 1 of 10. Tianjin Nolite Steel Co.,Ltd

Coiled Tubing for Downhole Applications

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Drilling and production equipment Drillthrough

Maximum number of hours an employee may work in a day

Unconventional Reservoirs

Water Treatment. Saudi Aramco: Public

Composite-wrapping services

METAL PRODUCTS PIPELINE ENGINEERING. Engineered Products for the Pipeline Pigging and Flow Assurance Industry

ISO 9001:2008 IML Italy, Delcorte France, Metalfar Italy, ULMA Spain

Technical Summary. Purpose. ITER_D_RZ5S7J v2.1

PIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping

Anchorage Fabrication Facility

Chita Works, JFE Steel

Since its inception in 2011, YUCO ALLIANCE DMCC provides superior products and service solutions to the diverse streams such as upstream, midstream,

Capillary Injection Tubing Anchor Technologies


TULLOW OIL SUPPLY CHAIN

Design, Specifications and Future Challenges for Cryogenic Valves

Cost Effective One-Stop-Shop CRA SolutionsSolutions

Compact Trunnion Mounted Side Entry Ball Valves

Bolt-On Products & Systems

Combatting HCl Acid-Dewpoint Corrosion at The Geysers. John Farison Calpine Corporation

CAIRN ENERGY INDIA PTY LIMITED (Incorporated in New South Wales, Australia ACN )

This document is a preview generated by EVS

QUALITY ASSURANCE PROTOCOL (QAP)

Astm A350 Lf2 Carbon Steel Abbey Forged Products

Pipeline Oil & Gas Equipment, Inc.

RP 65 and other API Activities on Carbon Capture and Storage

U.S. Bellows, Inc. Worldwide Leader in Metallic and Fabric Expansion Joints. Fast Turnaround Repair Replace Refurbish Quick Delivery

valves and actuators compact valves

No project is too big, too small, too simple or too complex

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Drilling and well-servicing equipment

COMPANY SHORT PRESENTATION

VISION MISSION VALUES. To be a leading local manufacturer and reliable partner providing engineered products and solutions to our customers.

ISO INTERNATIONAL STANDARD. Bolted bonnet steel gate valves for the petroleum, petrochemical and allied industries

Our Vision. Our Divisions. Our Mission Statement. Our Team

CLEARMAX Wellbore Cleaning Services

API-5L Line Pipe. API-5L X-42, X-46, X-52, X-56, X-60, X-65, X-70, X-80 PSL-1 PSL-2 Line Pipe. API 5L Grade B PSL1 Line Pipes - Available ex-stock

ISO INTERNATIONAL STANDARD

ABOUT US. Our philosophy is to supply quality products at best possible price in a timely manner for utmost customer satisfaction.

Softener and Filters Components and Accessories

There are currently national certifying organizations that cover certification for businesses owned by: Aboriginal Peoples Visible Minorities Women

Preliminary Well Plan Detailed Well Design Drilling Operations After Drilling

Modularity Approach of the Modular Pebble Bed Reactor (MPBR)

Overview of Completions

COMPANY PRESENTATION. arconi. Quality, Service and Warranty.

YARWAY WYE-TYPE PIPELINE STRAINERS 900 SERIES

Non-metallic & Chemicals Investment Opportunities November Saudi Aramco: Public

Mechanical Engineering Fundamentals Aug $3,750 Abu Dhabi, UAE

SECTION CONCRETE ABOVE GROUND FUEL STORAGE

5400 Continuous Flow Tubular Reactors

What we stand for. safe ethical innovative responsive quality and cost conscious driven to deliver

Producing a well. Folie 1

Experiences in the Salt Creek Field CO2 Flood

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Downhole equipment Packers and bridge plugs

OIL COUNTRY TUBULAR GOODS (OCTG) PIPELINE TO DYNAMIC GROWTH

Load Cell Weigh Modules

Tubular Products. within Oil & Gas World ME 2015 MKT PPT EN V01

FORMERLY SMITH PIPE - SAME PEOPLE, SAME SERVICE PETROSMITH.COM

PREMIUM MILLS, PREMIUM STEEL. Linepipe Seamless Pipe/O.C.T.G Stainless Steel Pipe and Tube Steel Plate Fitting & Flange Wind Tower

Deepwater: Drilling Trouble Zones and Well Integrity. Ron Sweatman HALLIBURTON RPSEA Forum at University of Southern California November 29, 2006

Northeast Process Controls Tel: Fax: CLOSURES

SECTION 2.0 REFERENCES

Without having Cost Estimation Model you are putting your Project on a Big RISK

Hydraulic & Offshore Supplies. Seamless Coiled Tube YOUR GATEWAY TO GLOBAL SUPPLY

METALLIC MATERIAL SPECIFICATION

leading stockiest reliable supplier

HAWK International Fabrication Workshop(HIFW)Facility 2010

GLOBAL SOURCE GLOBAL SUPPLY

Taras D. Semeniuk, M. Eng., P. Eng.

Shale Gas Innovation & Commercialization

Transcription:

iktva Program Framework & Business Opportunities

Agenda iktva Program Framework Business Opportunities 1 2 3 1 2 iktva Baseline 5 Year iktva Action Plan iktva integration in Procurement Historical and Future Spend Winning More Business

Agenda iktva Program Framework 1 2 3 1 2 iktva Baseline 5 Year iktva Action Plan iktva integration in Procurement Historical and Future Spend Winning More Business

Supplier Training and Support for iktva Baselines 1 www.iktva.sa 3 iktva survey template 4 Detailed guidelines for iktva survey 2 iktva summary presentation

iktva Survey Guidelines - Highlights Included Goods & Services IK Manufactured Goods & Services IK Operating & Admin Expenses Excluded OOK Goods & Services Materials/Services from Agents Capital Expenditures Compensation Training Saudi Compensation: Salary & Bonus Housing Transportation Education Assistance All Costs Associated With Saudi Training Internships Scholarships Travel and Accommodations Course Fees All Expat Base Salary & Bonuses. Training Costs Associated With Expats Supplier Development All Cost Including Workforce, Materials, Travel,.

3 rd Party Certifier Suppliers Supplier Survey Preparation and Submission Review Online Tools and Download Templates Prepare Survey and Select Certification Firm Provide Management Representation Letter Submit Survey to Saudi Aramco Review and Certify Survey Prepare Certification Report

Agenda iktva Program Framework 1 2 3 1 2 iktva Baseline 5 Year iktva Action Plan iktva integration in Procurement Historical and Future Spend Winning More Business

iktva Action Plan Components 1. Company Background: Executive summary Corporate structure 2. Goods and Services: Company supply chain overview Plan to increase procurement in-kingdom 3. Human Resources: Current and planned number of Saudis employed Training plans 4. Suppliers Development: Development plans for in-kingdom suppliers

iktva Action Plan Components cont. 5. Research and Development Initiatives: In-kingdom technology roadmap Technology acquisition plans 6. Exports: Current and planned exports volume 7. Business and Market Challenges: Major challenges with increasing iktva Global competitive challenge 8. 5 Year Forecasted iktva Company iktva 2017 2018 2019 2020 2021

Agenda iktva Program Framework 1 2 3 1 2 iktva Baseline 5 Year iktva Action Plan iktva integration in Procurement Historical and Future Spend Winning More Business

iktva in Procurement Process 1. No Change in technical evaluation process 2. An iktva evaluation step has been established 3. No change in commercial evaluation process

iktva Target Setting Process Generate Breakdown of materials, services & labor required Determine what can be sourced locally Calculate Percentages for categories A-R Set iktva target Create material lists, services & labor requirements using scope of work and modeling/forecasting software Determine what can be procured locally (capacity & capability) and if there are limitations Use material and labor cost to develop iktva percentages for IK materials, services, and labor Using Aramco & industry information, set iktva targets

Agenda Business Opportunities 1 2 3 1 2 iktva Baseline 5 Year iktva Action Plan iktva integration in Procurement Historical and Future Spend Winning More Business

Business Opportunities Historical Material Spend 10 Year Demand Forecast (Materials & Services) $6.7 Billion Annually $37.3 Billion Annually

Business Opportunities Historical Material Spend $6.7 Billion Annually

$6.7 Billion Historical Annual Material Spend OOK & IK Spend (3+ IK MFRs) 45% OOK Spend (Zero IK MFRs) 23% 55% of spend represents areas of Immediate Opportunities: Materials sourced OOK only Average Annual Spend $6.7 Billion* Materials with 1-2 IK MFRs 45% of spend represents areas for further development: OOK & IK Spend (1-2 IK MFRs) 32% Materials with 3+ IK MFRs but limited in capacity and capability *Sample of historical spend: Average of 6 years

Materials Currently Sourced OOK Only OOK & IK Spend (3+ IK MFRs) 45% OOK Spend (Zero IK MFRs) 23% Average Annual Spend $6.7 Billion* 55% of spend represents areas of Immediate Opportunities: Materials sourced OOK only Materials with 1-2 IK MFRs OOK & IK Spend (1-2 IK MFRs) 32% *Sample of historical spend: Average of 6 years

Materials Currently Sourced OOK Only Drilling $620 MM Chemicals $469 Valves $97 Compressors Pipe Electrical Heat Transfer Equip Instrumentation Pipe Fittings Turbines Pumps $27 $22 $14 $49 $45 $72 $71 $84 Adv Well Comp Eqpt 27% Average Annual Spend $620 Million Csg Acc & Cement Eqpt 16 Downhole Equipment HANGER: LINER; FOR GAS WELLS PACKER, MECHANICAL, SWELLABLE, ISOLATION PACKER: PRODUCTION; NON-KHF HANGER; LINER; FOR OIL WELLS VALVE: SUB-SURFACE SAFETY Adv Well Comp Eqpt EQUALIZER/ SCREENS ACCESS GAUGES EXPANDABLE, CASING & ACCESSORIES PDHMS, ACCESSORIES $ 125 MM $ 83 MM $ 38 MM $ 32 MM $ 21 MM $ 117 MM $ 27 MM $ 11 MM $ 7 MM Vessels $13 Downhole Equipment 54%

Materials Currently Sourced OOK Only Drilling $620 Chemicals $469 MM Valves Compressors $84 $97 Drllg Fluids MUD 20% Pipe Electrical Heat Transfer Equip Instrumentation Pipe Fittings $27 $49 $45 $72 $71 Average Annual Spend $469 Million Well Stiumln Agents 9% General Drilling Chemicals Salts $ 228 MM Lubricants $ 60 MM Shale/borehole stabilizer $ 27 MM Thinner $ 4 MM Defoamer $ 3 MM Detergents, emulsifiers & surfactants $ 2 MM Turbines $22 Mud system Drilling Fluids - MUD $ 95 MM Pumps $14 Vessels $13 Drllg Chem General 69%

Materials Currently Sourced OOK Only Drilling $620 Chemicals $469 Valves Compressors $84 $97 MM Butterfly Valve 17% Pipe Electrical Heat Transfer Equip Instrumentation Pipe Fittings Turbines $27 $22 $49 $45 $72 $71 Check Valve 17% Average Annual Spend $97 Million Ball Valve Valve; ball; split body; trunnion; steel $ 15 MM Valve; ball; split body;steel;26 in & up $ 6 MM Valve: ball;nps 26&up asme class 150&up $ 5 MM Valve; ball; scraper launching; steel $ 3 MM Plug Valve Valve; plug; lubricated Valve; plug; steam jacketed; $ 15 MM $ 2 MM Pumps Vessels $14 $13 Plug Valve 18% Ball Valve 31%

$6.7 Billion Historical Annual Material Spend OOK & IK Spend (3+ IK MFRs) 45% OOK Spend (Zero IK MFRs) 23% Average Annual Spend $6.7 Billion* 55% of spend represents areas of Immediate Opportunities: Materials sourced OOK only Materials with 1-2 IK MFRs OOK & IK Spend (1-2 IK MFRs) 32% *Sample of historical spend: Average of 6 years

Material Spend with OOK & IK Sources (1-2 IK MFRS) Drilling $831 MM Chemicals $508 Pipe $243 Turbines Valves Pipe Fittings Instrumentation Electrical Heat Transfer Equip Pumps Structural Steel Vessels $7 $2 $15 $67 $51 $41 $41 Wellhead Prod Trees 17% Gas Wellhead Eqpt 20% $170 $168 Average Annual Spend $831 Million Csg Acc & Cement Eqpt 11% OCTG-API & Semi Prem. 40% OCTG - API Casing; octg; api gr; seam or erw Casing: octg; high nickel; seamless Casing: octg; api gr; erw Casing: octg; api gr; saw Tubing: octg; api gr; seamless Gas Wellhead Eqpt Spool assy: tubing; psl 3-4 Spool assy: casing Spool assy: casing head Bonnet: tubing; khf; 10-15m Hanger; assy: tubing; 10m-15m Mudline suspension: comp & assy $ 95 MM $ 80 MM $ 70 MM $ 45 MM $ 34 MM $ 77 MM $ 18 MM $ 18 MM $ 12 MM $ 10 MM $ 10 MM

Material Spend with OOK & IK Sources (1-2 IK MFRS) Drilling $831 Chemicals $508 MM Pipe $243 Turbines $170 Drllg Fluids Mud 48% Valves $168 Pipe Fittings $67 Drllg Fluid - MUD Oil Base Mud Products $ 242 MM Instrumentation Electrical Heat Transfer Equip Pumps Structural Steel Vessels $7 $2 $15 $51 $41 $41 Drllg Chem General 31% Average Annual Spend $508 Million Drllg Cement Additive 17% Drllg Cement Additive Cement and Additives Drllg Chem- General Fluid Loss Control Lost Circulation, Bridging Material Alkalinity control Corrosion Inhibitors $ 87 MM $ 105 MM $ 44 MM $ 5 MM $ 4 MM

Material Spend with OOK & IK Sources (1-2 IK MFRS) Drilling $831 Chemicals $508 Pipe $243 MM Turbines Valves Pipe Fittings $67 $170 $168 Pipe, Seamless CS 52% Pipe, Seamless CS Pipe; metallic; seamless $ 116 MM Pipe; metallic; seamless; low temp $ 7 MM Pipe: metallic, astm a106, seamless $ 3 MM Instrumentation Electrical Heat Transfer Equip $51 $41 $41 Average Annual Spend $243 Million Pipe, ERW, CS Pipe; metallic; hfw class b sour service Pipe; metallic; hfw class c for sour gas $ 47 MM $ 9 MM Pumps Structural Steel Vessels $7 $2 $15 Pipe, Metal other 19% Pipe, ERW, CS 23% Pipe, Metal - other Pipe; metallic; astm; any process, $ 33 MM ss Pipe: metallic, weld overlayed pipe $ 14 MM

Business Opportunities 10 Year Demand Forecast (Materials & Services) $37.3 Billion Annually

Capital Program 10-Year Forecast ($37.3 Billion / Year) 10-Year Capital Program Forecast Maintain Potential 14% Process Facilities 12% Infrastructure 7% Pipeline 3% Other 4% Unconventional Resources 8% Drilling 52% Disclaimer: This slide contains forward-looking statements regarding future events based on current expectations, estimates, forecasts, and projections. The slide is subject to updating, revision, further verification and amendment without notice. No reliance may be placed for any purpose on the information or opinions contained in this presentation or any other document or statement, or on the completeness, accuracy or fairness of such information or opinions therein. No representation or warranty, express or implied, is made or given by or on behalf of Saudi Aramco or its employees, or any other person as to the accuracy or completeness or fairness of the information or opinions contained in this presentation and no responsibility or liability is accepted by any of them for such information or opinions or for any errors, omissions, misstatements, negligent or otherwise, or for any communication written or otherwise, contained or referred to in this presentation.

Drilling Materials 10-Year Forecast Quantity Examples Percentage of Total Material Spend other, 27% ICDS & ICD- SCREENS, 14% ICDS & ICDscreens 1.2 million units Trees 13,900 units Casing heads 14,000 units Additives, 2% Weighting Materials, 3% $66 Billion OCTG - API & Semi Premium, 6% OCTG - Premium, 17% Hanger assemblies, 33,000 units Cement 6.8 million tons Mud Products (liquid) 636 million gallons Stabilizers, 3% Mud Products, 3% SPOOL ASSY, 4% ISOLATION PACKERS, 4% TREE ASSY, 5% Workover/ Completion Products, 5% Circulation Products, 6% Disclaimer: This slide contains forward-looking statements regarding future events based on current expectations, estimates, forecasts, and projections. The slide is subject to updating, revision, further verification and amendment without notice. No reliance may be placed for any purpose on the information or opinions contained in this presentation or any other document or statement, or on the completeness, accuracy or fairness of such information or opinions therein. No representation or warranty, express or implied, is made or given by or on behalf of Saudi Aramco or its employees, Saudi or anyaramco: other person aspublic to the accuracy or completeness or fairness of the information or opinions contained in this presentation and no responsibility or liability is accepted by any of them for such information or opinions or for any errors, omissions, misstatements, negligent or otherwise, or for any communication written or otherwise, contained or referred to in this presentation.

Drilling Services 10-Year Forecast Rig Drilling Ops Services = $52.5 Billion 112 81 61 31 Drilling Equipment Rental 9% Casing / Tubing & Handling, 4% Cementing / Pumping Services, 4% Perforating Directional Drilling 27% Oil - Onshore Gas - Onshore Oil - Offshore 5 Gas - Offshore UR Monitoring & Testing 9% Logging 9% Well Services Total Spend $64.5 Billion Roads & Locations 5% Operations & Completion Services11% Technical Services 22% Disclaimer: This slide contains forward-looking statements regarding future events based on current expectations, estimates, forecasts, and projections. The slide is subject to updating, revision, further verification and amendment without notice. No reliance may be placed for any purpose on the information or opinions contained in this presentation or any other document or statement, or on the completeness, accuracy or fairness of such information or opinions therein. No representation or warranty, express or implied, is made or given by or on behalf of Saudi Aramco or its employees, Saudi or anyaramco: other person aspublic to the accuracy or completeness or fairness of the information or opinions contained in this presentation and no responsibility or liability is accepted by any of them for such information or opinions or for any errors, omissions, misstatements, negligent or otherwise, or for any communication written or otherwise, contained or referred to in this presentation.

Surface Facilities 10-Year Forecast Maintain Potential $40.3 Billion Gas Facilities $25.3 Billion Refinery & Petrochem $25 Billion Infrastructure $21.6 Billion Other $16.3 Billion Pipeline Oil Facilities $10.7 Billion $9.9 Billion Power $2.1 Billion Renewables $1.1 Billion Disclaimer: This slide contains forward-looking statements regarding future events based on current expectations, estimates, forecasts, and projections. The slide is subject to updating, revision, further verification and amendment without notice. No reliance may be placed for any purpose on the information or opinions contained in this presentation or any other document or statement, or on the completeness, accuracy or fairness of such information or opinions therein. No representation or warranty, express or implied, is made or given by or on behalf of Saudi Aramco or its employees, or any other person as to the accuracy or completeness or fairness of the information or opinions contained Saudi in thisaramco: presentation Public and no responsibility or liability is accepted by any of them for such information or opinions or for any errors, omissions, misstatements, negligent or otherwise, or for any communication written or otherwise, contained or referred to in this presentation.

Surface Facilities Materials 10-Year Forecast (example) PROCESS VESSELS CS - 6,000 UNITS CARBON STEEL PIPING - 23 MILLION TONS HEAT EXCHANGERS - 3,500 UNITS SS FITTINGS & VALVES - 6 MILLION UNITS CS FITTINGS & VALVES - 19 MILLION UNITS FIELD INSTR, ANALYZERS, GAGES - 70,000 UNITS CONTROL VALVES - 90,000 UNITS STRUCTURAL STEEL - 650,000 TONS CONCRETE - 24 MILLION M3 PROCESS VESSELS SS - 620 UNITS Ball valves 0.36 MM valves 2% Check Valve 0.17 MM valves, 1% STAINLESS STEEL PIPING (SS314/316) - 137,000 COMPRESSORS - 500 UNITS AIR COOLERS - 500 UNITS STORAGE TANKS - 1,000 UNITS LOW VOLTAGE CABLING - 56,000 KM PUMPS CS - 3,500 UNITS BOILER PLANT EQUIP - 160 UNITS Pipe Fitting, CS, 16.6 MM fittings, 87% Gate Valves 2.0 MM valves, 10% Disclaimer: This slide contains forward-looking statements regarding future events based on current expectations, estimates, forecasts, and projections. The slide is subject to updating, revision, further verification and amendment without notice. No reliance may be placed for any purpose on the information or opinions contained in this presentation or any other document or statement, or on the completeness, accuracy or fairness of such information or opinions therein. No representation or warranty, express or implied, is made or given by or on behalf of Saudi Aramco or its employees, Saudi or anyaramco: other person aspublic to the accuracy or completeness or fairness of the information or opinions contained in this presentation and no responsibility or liability is accepted by any of them for such information or opinions or for any errors, omissions, misstatements, negligent or otherwise, or for any communication written or otherwise, contained or referred to in this presentation.

Surface Facilities Materials 10-Year Forecast (example) PROCESS VESSELS CS - 6,000 UNITS CARBON STEEL PIPING - 23 MILLION TONS HEAT EXCHANGERS - 3,500 UNITS SS FITTINGS & VALVES - 6 MILLION UNITS Ball Valves All Types CS FITTINGS & VALVES - 19 MILLION UNITS FIELD INSTR, ANALYZERS, GAGES - 70,000 UNITS 80,000 60,000 40,000 CONTROL VALVES - 90,000 UNITS 20,000 STRUCTURAL STEEL - 650,000 TONS 0 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 CONCRETE - 24 MILLION M3 CS SS Non-Metallic PROCESS VESSELS SS - 620 UNITS STAINLESS STEEL PIPING (SS314/316) - 137,000 COMPRESSORS - 500 UNITS AIR COOLERS - 500 UNITS STORAGE TANKS - 1,000 UNITS 70000 60000 50000 40000 30000 20000 70,000 60,000 50,000 40,000 30,000 20,000 LOW VOLTAGE CABLING - 56,000 KM PUMPS CS - 3,500 UNITS BOILER PLANT EQUIP - 160 UNITS 10000 0 2017201820192020202120222023202420252026 <4" 4" - 24" > 24" 10,000 0 2017201820192020202120222023202420252026 150 300 600 900 1500 Disclaimer: This slide contains forward-looking statements regarding future events based on current expectations, estimates, forecasts, and projections. The slide is subject to updating, revision, further verification and amendment without notice. No reliance may be placed for any purpose on the information or opinions contained in this presentation or any other document or statement, or on the completeness, accuracy or fairness of such information or opinions therein. No representation or warranty, express or implied, is made or given by or on behalf of Saudi Aramco or its employees, Saudi or anyaramco: other person aspublic to the accuracy or completeness or fairness of the information or opinions contained in this presentation and no responsibility or liability is accepted by any of them for such information or opinions or for any errors, omissions, misstatements, negligent or otherwise, or for any communication written or otherwise, contained or referred to in this presentation.

Agenda Business Opportunities 1 2 3 1 2 iktva Baseline 5 Year iktva Action Plan iktva integration in Procurement Historical and Future Spend Winning More Business

Material Limitations Definition Limitations are specific restrictions that limits the level of approval for a supplier against a certain material. The limitations are decided based upon the final result of the technical evaluation of each facility. Limitations could be on many aspects: o Metallurgy o Model type o Size o Thickness o Engineering

Supplier Development Workbooks - Static Equipment example Static Equipment Common Limitations Thermal design Mechanical design Assembly & Welding Wall thickness Engineering design Fabrication only Size Metallurgy Pressure ratings Sample Workbook Manufacturer Name 10 Years Forecast: SR 87 B Initiative Lead: Current Situation Future Situation (2021) Enablers 600000XXXX: TANK; SHOP FABRICATED. 1) Only carbon steel 2) Diameter up to 10 feet. 3) Excluding dome roofs. 4) Excluding external and internal floating roofs. 600000XXXX: VESSEL; PRES.; MAX. WALL THK OF 19 MM. Tangent-to- Tangent length of pressure vessels is limited to 6 m maximum. 1. Different types of metallurgy. 2. Flexible and dome roofs 3. Various sizes and pressure Local Business Development 1. ES to work with supplier in developing capabilities to add 9COMs. 2. Supplier must be willing to expand skillset, add 9COMs and ensure quality standards. 3. Form a cooperative team between Saudi Aramco and the supplier to move forward. Manufacturer Team Aramco Team Manufactrurer Notes Unit Representative Unit Representative Discussion points and suggestions

Saudi Aramco Contact details Limitations program, materials or capacity expansion for local facilities Supplier Solution Center Unit SSC@aramco.com New local businesses, market information Local Business Development Unit Local-content@aramco.com General Inquiries Supplier Help Desk Tel.: 874-2222 SupplierHelpDesk@aramco.com iktva Inquiries www.iktva.sa/contact-us iktva@aramco.com

Thank you