Furnish, Deliver and Install New Generator USC Aiken

Similar documents
C o u n t y o f F a i r f a x, V i r g i n i a

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT

Closing Time: 2:00 P.M. CST, Friday, September 14, 2018 Opening Time: 2:01 P.M. CST, Friday, September 14, 2018

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR Conway, South Carolina

APPENDIX A - TECHNICAL SPECIFICATIONS Lift Station Electric Feed Overhead to Underground Projects for JEA

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

Electrical System, Maintenance and Repair Services For the PennDOT District 6-0 Office and Lab Buildings Statement of Work

Addendum No. 3 Queens College TV Production Studio Renovation Project No: QC BOD: 2/19/14

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL

ADDENDUM 1. Repair and Maintenance of Landfill Gas Chiller System. Return date: Bid must be received no later than 2:00 PM, Monday, June 25, 2018

FENCING AND FENCE REPAIR

For Addendum No. 6 Revised Bid Form Page 1 of 7. Revised Bid Form

ADDENDUM NO. 2 to Bid Documents for Project No , Community Center Generator Enclosure. Date: March 24, 2016

CITY OF TACOMA Tacoma Power & Public Works Engineering

Event Summary - Furnish and Install Furniture. Bid and Evaluation. Visibility and Communication. Commodity Codes. Event Dates

Invitation for Bid (IFB)

ADDENDUM # 1 TO: FROM:

Gadsden City Schools

Design Standard Basic Electrical Requirements

APPENDIX A TECHNICAL SPECIFICATIONS FORM ITN FACILITIES REPAIR AND MAINTENANCE OF GENERATORS

Invitation for Bid - Standard Office Furniture / Task Chair

ADDENDUM 2 KODIAK ISLAND BOROUGH CHINIAK TSUNAMI CENTER AND LIBRARY Kodiak, AK

Request for Quotation (RFQ) Amended #1. Solicitation of Document for Supply and installation of two set Battery Banker (Power Back-up)

SAN ANTONIO WATER SYSTEM University Pump Station Improvements Project SAWS Job No Solicitation No. B DD

SPECIFICATIONS FOR TENDER # SUPPLY AND INSTALLATION OF LAUNDRY ROOM AIR SUPPLY FAN WESTERN HEALTH

INVITATION FOR BID (IFB):

REQUEST FOR QUALIFICATIONS

REQUEST FOR PROPOSALS Garfield Charter Township Hall Sidewalk Snowmelt Heating System Repairs Garfield Township, Grand Traverse County

STATE OF NORTH CAROLINA B DEPARTMENT OF ADMINISTRATION February 1, 2013 PURCHASE AND CONTRACT DIVISION A MARCH 8, 1995

INVITATION FOR BIDS (IFB's) FOR PERSONS QUALIFIED TO PROVIDE SEEDING OF 30+ ACRES OF SIDE SLOPES IN 2-8 ACRE INCREMENTS AT REGIONAL LANDFILL

Amity School District 4J

Request for Proposals for Photovoltaic System Installation

SWITCH GEAR SERVICE AND MAINTAINNANCE SAFETY MEASURES AND REQUIREMENTS

REQUEST FOR QUALIFICATIONS

BID NUMBER/TYPE DATE/TIME REQUISITION NO BUYER PHONE

March 28, Addendum #4 IFB SA 1713 POTOMAC MILLS T23 WATER TANK REHABILITATION

NY State Unified Solar Permit

B. Sections and all references contained therein form a part of this Section of the Specifications.

ADDENDUM #1. for the. Physical Security (Phase II), #31336 Bid #G San Jose City College

3. Delete Sales Contract Exhibit 1-1, Price Proposal Page, and replace with the attached Revised Exhibit 1-1, Price Proposal Page.

NY State Unified Solar Permit

CITY OF CHINO HILLS. Request for Proposals (RFP) for. On-call Electrical Repair Service. On-call Electrical Repair including Water and Wastewater

DOCUMENT POST BID INTERVIEW

ADDENDUM #1 FOR RFP #PC507 Tree Removal and Sewer/Water Line Rehab at Medical Center PH Community

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY

Sewer Capital Improvement Program Wastewater Treatment Plant No. 3 Generator Banking Sealed Bid No A/E Project No. 2282

SUBJECT: SUBJECT: SOLICITATION NUMBER: USC-IFB-2340-CJ PROVIDE TRAVEL SERVICES FOR USC ATHLETICS DEPARTMENT

ALL BIDDERS shall acknowledge receipt of this Addendum No. 1 on the BID FORM or the BID will be deemed to be invalid for the purposes of this project.

Page 1 of 2 AMENDMENT - REQUEST FOR QUALIFICATIONS (RFQ)

REQUEST FOR QUOTATION RFQ #27 ( ) GENERATOR INSTALLATION ARFICAN RAINFOREST PAVILION ADDENDUM # 3

ADDENDUM TO REQUEST FOR IFB 5234-BC. UNLV Wright Hall Build Out. University of Nevada, Las Vegas. Purchasing Department Maryland Parkway

NY State Unified Solar Permit

TRIAD ENGINEERING CONSULTANTS, INC.

REQUEST FOR WRITTEN QUOTATION

Address of Installation Building Permit #

INSTRUCTIONS TO BIDDERS

NY State Unified Solar Permit

NY State Unified Solar Permit

RFP for Elevator Maintenance

APPENDIX A STATEMENT OF WORK SCRAP RUBBER/TIRE REMOVAL AND RECYCLING SERVICES

Invitation to Bid SAFETY TILE PLAYFILL - MULCH

SEMINOLE TRIBE OF FLORIDA INVITATION TO BID

I INVITATION TO BID City of Fort Morgan Water Distribution Department Waterline Isolation Project

SECTION AUTOMATIC TRANSFER SWITCH

NY State Unified Solar Permit

Clemson University Procurement Services

SAN ANTONIO WATER SYSTEM PRE-CONSTRUCTION MINUTES

ADDENDUM NO Bid Form REPLACE in its entirety with the attached revised Bid Form.

CONSTRUCTION DOCUMENTS Part 1

CITY OF GRAND FORKS NORTH DAKOTA REQUEST FOR BID/PROPOSAL

We will require two copies each of your lump sum proposals, vendor qualification questionnaire and your bid bond documents.

Addendum No Variable Frequency Drives Section A, revise per following:

EXHIBIT II SCOPE OF CONTRACTOR'S SERVICES


REQUEST FOR WRITTEN QUOTATION

NY State Unified Solar Permit

SMALL/MINORITY/WOMEN-OWNED AND DISADVANTAGED BUSINESS UTILIZATION

A D D E N D U M. REPLACE: Project Summary with attached revised Project Summary. 1 Specification Section Project Summary

DESCRIPTION. BID Gasoline and Diesel Fuels

Invitation For Bid Amendment - #1 DESCRIPTION: Digital Marketing Services

1. Are there plans and specs for this project? Yes, the plans and specs are within the RFP and can also be found at the RFP website.

BID ADDENDUM. 1 of 1. State Project No: H27-Z381 ADDENDUM NO.: PROJECT NAME: 1600 Hampton St. Building Roof Replacement

INTRODUCTION. A. Overview. A. Scope of Work. B. Additional Requirements

NY State Unified Solar Permit

REQUEST FOR QUOTATION (RFQ)

RFP NO AMENDMENT No. 2 Page 1 of 11

REQUEST FOR PROPOSAL NO. 1004/KB/08 For INFORMATION TECHNOLOGY SERVICES ADDENDUM NO. 2

INVITATION TO BID. (This is not an order.)

Memphis Housing Authority Capital Improvements Department 700 Adams Street, Room 107 Memphis, Tennessee

INVITATION FOR BID. December ,

Mini Bid Adjustable Wall Bracket for Interactive Flat Panel

RFP Questions and Answers 1 (Pre-Bid Meeting)

Boise State University. Request for Quote RFQ CF Crowd Control Barriers

Request for Proposal Internet Access Columbus Urban League

CITY AND COUNTY OF SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY INVITATION FOR BIDS. Replacement of Manual Trolley Switch System Phase 1

Addendum 1 Close Circuit Television Services (RFQ) Request for Qualification - Solicitation No June 30, 2016

ACKNOWLEDGMENT OF RECEIPT OF ADDENDUM NO.

INVITATION TO BID. (This is not an order.)

Scope of Work Bid Package C-8 - West Overhead Doors

REQUEST FOR QUOTATION

Transcription:

AMENDMENT NO. 1 TO: FROM: SUBJECT: ALL VENDORS Lana Widener USC-IFB-2710-LW Furnish, Deliver and Install New Generator USC Aiken DATE: October 24, 2014 This Amendment No. 1 modifies the Invitation for Bid only in the manner and to the extent as stated herein. ITEM ONE: ITEM TWO: A SC LICENSED ELECTRICIAN IS REQUIRED FOR THIS JOB. A REVISED BID SCHEDULE, SECTION VIII, IS ATTACHED TO THIS AMENDMENT ITEM THREE: ADD THE FOLLOWING TO SECTION III. SCOPE OF WORK / SPECIFICATIONS: Add: Remove old generator from current site. Add: Contractor is to ensure outriggers on lift have impose a pressure less than 2,000 lbs/sf. when removing old generator and installing new generator. ITEM FOUR: VENDOR S VENDOR A Who will supply fuel for the New Generator? USC Aiken will provide fuel and coordinate with contractor start up testing. Will the University dispose of the old fuel in the old Generator prior to removal? Yes. What is to be done with the old Generator after removal? Contractor is to remove existing generator to a designated site on the USC Aiken campus determined by USC Aiken Representative. University will dispose of old generator. Does the University require a Remote Annunicator to match the new Generator? Refer to attached Revised Bid Schedule. This has been included as Option 1. 1 P a g e

QUESITON Please clarify if the old cable can be reused if usable and replacing only what needs replacing. Refer to attached Revised Bid Schedule. This has been added as Option 2. VENDOR B S Do you want a 2 hour load bank test to be performed at start up? Yes, a 2 hour load bank test is required as well as load transfer switch test. Who is responsible for fuel removal and disposal from existing generator? USC Aiken will remove fuel and will coordinate with contractor schedule The new generator will need 2 disconect breakers on the generator. (1 for each ATS) Yes, two breakers are needed. Who is responsible for fueling new generator? USC Aiken will provide fuel for new generator and coordinate with Contractor schedule. Who will be responsible for removal and disposal of existing generator? Refer to Vendor A question/answer. Who will disconect existing rental generator from the 2 ATS's? A third party vendor will remove rental generator and cables. This will be coordinated by USC Aiken and with the Contractor so the equipment will not impede contractor progress. Does our pricing on quote need to include replacing of the older and outdated Kohler ATS? No. VENDOR C S Are offers for this solicitation to be licensed electrical contractors in the State of SC? Yes, refer to Item No. 1. Regarding contract schedule, will the scheduled contract start and finish be connected to successful contractors submitted equipment deliver time? IE equipment to arrive eight 2 P a g e

weeks after award clock to complete work starts upon projected equipment arrival date and successful contractors time estimated time to complete project, assuming estimate time to complete after award is required. Yes, that is correct. Are engineered services required, IE to provide as-built drawings. No drawings. However, O&M manual and warranty information are required. Load bank testing required? Yes, a two (2) hour load bank test is required as well as load transfer switch test are required. Megger insulation testing and reports required on all associated conductors either reused or new to insure no damage to the conductors. Yes. Owner to remove fuel from existing tank.(?) Yes, USC Aiken will coordinate schedule with Contractor. Contractor to fuel new tank to 80% full. (?) 100% is not recommended. No. USC Aiken will supply new fuel. Existing Generator, contractor to dispose of OR to turn over to owner as scrap metal? Contractor is to remove existing generator to location on campus designated by USC Aiken. USC Aiken will dispose of old generator. New generator to have two separate OCPD (Circuit Breakers - over current protection devices, based on wire sizes maximum ampacity. Yes. For the 4/0 circuit feeding transformer, need transformer KVA to insure correct sizing of OCPD, as inrush may cause nuisance tripping if OCPD incorrectly sized. (Maintenance should be able to provide this information. Transformer is 30KVA. 3 P a g e Who is AHJ (Authority having jurisdiction) in regards to permits, final inspections and closeout.

Contractor is responsible all licenses and permits, refer to Section VII. Terms and Conditions B. Special of the solicitation. USC Aiken representative will approve final inspections and closeout. Contractor to provide owner with required power outages to connect new conductors two week in advance. It is assumed these activities will be coordinated by owner and performed after hours during week or weekend. The Contractor is to provide USC Aiken a two (2) week notice for required power outages to connect new conductors. Yes, USC Aiken will coordinate; performance will be after hours and/or weekend. Are progress meeting to be held, if so at what interval? Initial kick-off meeting to be held by Contractor at USC Aiken. Contractor to submit a schedule. One final close out meeting after work is complete. Contractor assumes "Normal" hours as either 4-10 hour days or 5-8 hour days with afterhours for shutdowns dictated by owner. USC Aiken representative and the Contractor will coordinate schedule prior to start of project. Who is responsible for removing temporary cables from rental generator? Refer to Vendor B question/answer. The control wires from one of the ATS switches looks to have been spiced in a conduit body which is a NEC violation, further does the owner want the control wiring replaced OR the NEC violation repaired? Wiring can be replaced. Does the owner intend to have a ATS representative / (s) (two different ATS units) OR Universities normal maintenance staff/ and or normal generator ATS contractor (two different ATS units) USC Aiken will have Maintenance staff will be present. However, Contractor will be responsible to ensure transfer switch transfers as designed and when needed. BIDDER SHALL ACKNOWLEDGE RECEIPT OF AMENDMENT NO. 1 IN THE SPACE PROVIDED BELOW AND RETURN IT WITH THEIR BID RESPONSE. FAILURE TO DO SO MAY SUBJECT BID TO REJECTION. Authorized Signature Firm Date 4 P a g e

ATTACHMENT REVISED BID SCHEDULE VIII. BIDDING SCHEDULE / PRICE-BUSINESS PROPOSAL Commodity (Material) 1 1 Job A New CAT Diesel Generator Set or equivalent, includes all freight costs. NOTE: this includes all materials and equipment to perform all work as described in this solicitation. $ Manufacturer: Product No.: Resident Vendor Preference SC End Product Preference US End Product Preference NOTE: The commodity preferences do not apply to a single unit of an item with a price in excess of $50,000 or a single award with a total potential value in excess of $500,000. [11-35-1524(E)(2) Please refer to the preference clauses listed in the terms and conditions of this solicitation to ensure that you qualify to select the above preferences. SERVICES (LABOR) 2 1 Job Labor to perform all work (includes start-up test) as described in this solicitation. $ Resident Contractor Preference Resident Sub-Contractor Preference (2%) Number of Sub-Contractors _ Resident Sub-Contractor Preference (4%) Number of Sub-Contractors _ NOTE: The service preferences do not apply to a bid for an item of work by the bidder if the annual price of the bidder s work exceeds $50,000 or the total potential price of the bidder s work exceeds $500,000. [11-35- 1524(E)(3)] Please refer to the preference clauses listed in the additional conditions of this solicitation to ensure that you qualify to select the above preferences. Bidder is to submit the following for preferences requested above: 1) Identify the subcontractor to perform the work: 2) Identify the work the subcontractor is to perform: 3) Bidder s factual basis for concluding that the subcontractor s work constitutes the required percentage of the work to be performed in the procurement. TOTAL BID PRICE ITEMS 1-2: $ 5 P a g e

OPTION 1 3 1 ea A remote annunciator to match New Generator as listed in Item No. 1. $ Manufacturer: Product No.: Resident Vendor Preference SC End Product Preference US End Product Preference OPTION 2 3 1 ea A remote annunciator to match New Generator as listed in Item No. 1. $ Manufacturer: Product No.: Resident Vendor Preference SC End Product Preference US End Product Preference NOTE: The commodity preferences do not apply to a single unit of an item with a price in excess of $50,000 or a single award with a total potential value in excess of $500,000. [11-35-1524(E)(2) Please refer to the preference clauses listed in the terms and conditions of this solicitation to ensure that you qualify to select the above preferences. ESTIMATED DELIVERY SCHEDULE FOR EQUIPMENT (ARO): 6 P a g e