Contractor Estimating Systems: System Adequacy Standards and Key Compliance Issues

Similar documents
Contractor Business Systems Earned Value Management, Material Management and Accounting, and Property Management

Understanding the DCAA Audit Process and How to Prepare for Success

Make or Buy Decisions in a Proposal Audit. Next Slide

STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 5, Lesson 1 Cost Analysis Process, Players, and Business Systems

DFARS Business Systems Compliance. March 11, 2015

How to Prepare a DCAA Compliant Cost or Price Proposal. Bag Lunch Webinar November 17, 2016

Government Contract Controls: Going Beyond Business Systems

Keeping your Business Systems Current in Response to DCAA Initiatives and Emerging Regulations

Contractor Purchasing Systems Reviews (CPSR) The Current CPSR Environment. Bryan Felber, Director of Purchasing & Compliance

PSP A/ March 28, PSP-003(R)

Purchasing System (Including Counterfeit Parts)

DFARS Accounting System Reviews

Best Practices in Dealing with the DCAA

Defective Pricing- Material Pricing Deficiencies. Next Slide

GC-153. Preparing for the CPSR A Practical Guide. Presented By: Susan Longo, Supervisor, Watkins Meegan Rich Wilkinson, Director, Watkins Meegan

Subcontract Management Regulatory Compliance - The Most Current Trends and Issues

2018 National Contract Management Association Boston Workshop

MACPA 2013 Government Contractors Conference. Current Accounting Issues

Advantages of Having an Approved Purchasing System

Contractor Business System MMAS

Forward Pricing Proposal- Labor Categories. Next Slide

DCMA Manual Negotiation Intelligence Procedures

Contractors Purchasing System Review

Policy Changes Needed at Defense Contract Management Agency to Ensure Forward Pricing Rates Result in Fair and Reasonable Contract Pricing

Contractor Purchasing System Review, an Alternative Perspective

July 30, (1) CHAPTER 5. Table of Contents

TEXAS BOARD OF NURSING CONTRACT PROCUREMENT AND MANAGEMENT HANDBOOK JULY 2018

Material Transfers and Material Management and Accounting System (MMAS) Next Slide

Government contracting hot topics

DCMA INSTRUCTION 2501 CONTRACT MAINTENANCE

CPSR Expectations Before, During and After Review

Repetitive Bidding of Duplicative Material Costs. Next Slide

What Exactly is an Acceptable Accounting System?

L.20; L.25; L.9; L.12;M.1; K; A]...

Master Document Audit Program. Version 4.28, dated March 2018 B-1 Planning Considerations

Master Document Audit Program. Version 1.7, dated April 2016 B-01 Planning Considerations

Preparing for a CPSR Audit

A cost analysis is required for any negotiated (non competitive) contract procurement on behalf of any University program, if:

SAM Supplement Representations, Certifications and Other Statements of Offerors for Government Related Orders

Master Document Audit Program. Statement. Version 4.9, dated December 2017 B-1 Planning Considerations

The New Purchasing System Review

Times Are Changing: Contractor Purchasing System Review Expectations and Realities for 2017

The Contracts Crunch. Jennifer Eastman Senior Product Marketing Specialist, Deltek. Melissa Amdahl Product Manager, Compusearch.

Adequate Accounting Systems for Cost-Type Work

Subcontract Management Certification Program (ScMCP ) SUBCONTRACT MANAGEMENT TECHNICAL COMPETENCIES. SUBCONTRACT MANAGER (ScM)

Accounting and Auditing for Government Contractors

Master Document Audit Program

Report to Congress on FY 2013 Activities at the Defense Contract Audit Agency

Long Beach City Auditor s Office

PHASE 4 - Post-Award. Type of Feedback Type of Contract Feedback Category Feedback

Master Document Master Document. Version 4.28, dated December 2017 B-1 Planning Considerations

Subcontractor and Vendor Kickbacks. Next Slide

Standards, Best Practices, and Typical Problems for Companies New to the Federal Market

Improper Billing of Costs on Progress Payments 1

SAN MATEO COUNTY FAIR REQUEST FOR PROPOSALS ADVERTISING, MARKETING & PUBLIC RELATION SERVICES RFP #

Materials Management and Accounting System Compliance Statement

Master Document Audit Program. Version 9.6, dated November 2017 B-1 Planning Considerations. Purpose and Scope

B-1 Preliminary Steps WP Reference

Internal Audit Report. Facilities Services Contract Management

DCMA Manual Forward Pricing Rates

POLICY AND PROCEDURES FOR THE DOD PILOT MENTOR-PROTEGE PROGRAM (Revised August 12, 2008)

PSP A/ November 27, PSP-006(R)

Master Document Audit Program. Activity Code Compliance Audit CAS 407 Version 5.19, dated December 2017 B-1 Planning Considerations

Master Document Master Document. Version 8.13, dated December 2017 B-1 Planning Considerations

DFARS Appendix I. Appendix I Policy and Procedures for the DoD Pilot Mentor- Protégé Program TABLE OF CONTENTS. I-100 Purpose. I-101 Definitions.

FEDERAL AWARD PROGRAMS INTERNAL CONTROL EVALUATION. Cross-cutting characteristics (generally applicable to all fourteen requirements)

Master Document Audit Program

Comprehensive List of Fraud Indicators

DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Technical Pricing Support

Real-Time Labor Evaluations

ATSP4 RFP Questions and Answers Last edited 10 March 2015 Questions have been modified only to provide anonymity

Top 10 Cost/Price Proposal Missteps

Framework for Government - Industry Engagement Through the Planning and Execution of the Acquisition Process

Master Document Audit Program. University Indirect Cost Allocation (F&A rate) Proposal. Version 1.0, dated February 2019 B-1 Planning Considerations

DEPARTMENT OF DEFENSE Defense Contract Management Agency ANNEX. Technical Support to Indirect Costs (TSI)

FIAT CHRYSLER AUTOMOBILES N.V. AUDIT COMMITTEE CHARTER

Price to Perform: Winning the Battle of Business in an Austere Environment

SENIOR MANAGEMENT ANALYST

Washington Metropolitan Area Transit Authority Board Action/Information Summary. MEAD Number:

P031OO -os- m? Office of the Inspector General uric QUALITY u^^ctbd i Department of Defense DEFENSE CONTRACT AUDIT AGENCY COMPENSATION AUDITS

Master Document Audit Program. Version 5.28, dated March 2018 B-1 Planning Considerations

Master Document Audit Program. Activity Code Compliance Audit CAS 420 Version 5.21, dated March 2018 B-1 Planning Considerations

COAA EPCM CONTRACT PHILOSOPHY. COAA EPCM Contract Committee

Master Document Audit Program. Activity Code Compliance Audit CAS 408 Version 5.21, dated March 2018 B-1 Planning Considerations

INSIGHTS. DCAA s FY 2014 Staff Allocation Plan: Audits Targeted as High Priority. Government Contract SEPTEMBER Volume 31

DCAA Contract Audit Manual

Uncompensated Overtime. Next Slide

Leading KPIs of Positive Financial Performance. Presented by: Hugh Shaw, Ventera Corporation Bill Riviere, Unanet

OPERATIONAL RISK EXAMINATION TECHNIQUES

Developing a Compliant Procurement Policy. Bag Lunch Webinar August 29, 2017

Defense Federal Acquisition Regulation Supplement SUBPART 215

Procurement Under Uniform Guidance

The New Era of Transparent Internal Audit: What You Should Know

TCAQ UNCLASSIFIED. Together, we deliver.

Contract Management Internal Audit Report August 17, 2018

APPLYING FOR ARCHITECT-ENGINEERING (A-E) CONTRACTS AT NAVFAC PACIFIC. Department of the Navy NAVFAC Pacific A-E Contracts II Branch

Cancer Prevention and Research Institute of Texas

Master Document Audit Program. Interviews. Version 4.25, dated March 2018 B-1 Planning Considerations

DCAA Audit and Compliance Strategies

Understanding Contractor Purchasing System Reviews

Transcription:

McKenna Government Contracts, continuing excellence in Dentons Contractor Estimating Systems: System Adequacy Standards and Key Compliance Issues Joe Martinez, Esq. Dentons US LLP Michael Steen, CPA Redstone Government Consulting

Agenda Third session in Public Contracting Institute s 2016 series on contractor business systems Focus on hot topics related to accounting systems Business Systems Rule Overview Estimating Systems Rule Overview System Criteria Key Audit and Compliance Issues Best Practices Inspector General Report Questions 2

Overview of the Business Systems Rule Interim Rule published May 2011, Final Rule published Feb 2012 Interim rule (76 Fed. Reg. 28,856 (May 11, 2011)) Final rule (77 Fed. Reg. 11,355 (Feb. 24, 2012)) Applicable through clauses in DFARS, CAS-covered contracts awarded after May 2011 Other agencies (e.g., DOE) adopting/applying DFARS criteria Subcontractor compliance Disapproved system results in withholding from: Progress payments Performance based payments Interim payments under cost, T&M, and labor-hour contracts 3

Overview: Applicability DFARS Rule requiring acceptable estimating system applies only contracts awarded based upon cost or pricing data that meet CAS threshold Estimating system disclosure, compliance criteria and approval process applies to large contractors that: Received $50 million of DoD prime contracts or subcontracts in previous fiscal year for which cost or pricing data were required May be required (if determined to be in the best interests of the government) from contractors that received between $10 million and $50 million of DoD prime contracts or subcontracts in previous fiscal year for which cost or pricing data were required 4

Overview: The Basics Overarching requirement The Contractor must establish, maintain and comply with an acceptable estimating system. DFARS 252.215-7002(b) Estimating system includes (DFARS 252.215.7002(a)): Organizational structure Established lines of authority, duties and responsibilities Internal controls and managerial reviews Flow of work, coordination and communication Budgeting, planning, estimating methods, techniques, accumulation of historical costs and other analyses used to generate cost estimates 5

Overview: The Basics (Cont.) An acceptable estimating system (DFARS 252.215-7002(a)): (1) Is maintained, reliable, and consistently applied; (2) Produces verifiable, supportable, documented, and timely cost estimates that are an acceptable basis for negotiation of fair and reasonable prices; (3) Is consistent with and integrated with the Contractor s related management systems [e.g., accounting and procurement systems]; and (4) Is subject to applicable financial control systems. The system accomplishes 17 relevant functions in DFARS 252.215-7002(d)(4). 6

Overview: System Design and Disclosure The DFARS Rule requires that the Contractor (DFARS 252.215-7002(d)(1), d(3)): Disclose its system in writing to ACO Comply with the system as disclosed Timely disclose to ACO any significant changes Impact of disclosure requirement: Detail requirement? ACO challenge to system efficacy? Failure to disclose changes? What is significant? 7

Overview: Contractor Processes Rule targets contractor processes for: Budgeting/Forward Pricing Rate Development Business base projections Estimates of labor rates, fringes and pool expenses Maintenance of up-to-date and verifiable forward pricing rates Contract Proposal Development Compliance with RFP and FAR Subpart 15.4 Bases of estimate/estimating methods Subcontract and vendor pricing Application of forward pricing rates and factors System administration Policies and procedures/internal audit Management review of proposals Training and qualifications of estimating staff Integration of systems 8

Functional Criteria The DFARS Rule s 17 relevant estimating system functions include (DFARS 252.215-7002(d)(4)): (1) Preparing and supporting an acceptable proposal (2) Estimating system designed to meet requirements (3) Use of sound data/integration of other systems (4) Estimating methods/techniques (5) Internal controls to ensure system compliance 9

1. Preparing and Supporting an Acceptable Proposal Proposal preparation and support (DFARS 252.215-7002(d)(4)(xiv)-(xv), (xvii)) Procedures to update cost estimates and notify CO in a timely manner Procedures to ensure subcontract prices are fair and reasonable, based on documented review and analysis provided with prime proposal Adequate system description, including policies, procedures and practices that comply with FAR/DFARS 10

2. Estimating System Designed to Meet Requirements Estimating system design (DFARS 252.215-7002(d)(4)(i)-(ii), (v), (xii-xiii), (xvi)): Clear responsibility for prep, review, approval of cost estimates and budgets Written description of organization/personnel duties for same Adequate supervision through process 11

2. Estimating System Designed to Meet Requirements (Cont.) Estimating system design (cont.) Require management review, including verification of estimating/budgeting policies, procedures and practices Internal review of/accountability for acceptability of estimating system (including budgetary data supporting indirect cost estimates, comparisons of projected results to actual results) Estimating/budgeting procedures that consistently generate sound proposals compliant with solicitation and adequate as basis to reach fair and reasonable price 12

3. Use of Sound Data/Integration of Other Systems Sound data/integration of other systems data (DFARS 252.215-7002(d)(4)(iv), (vii)-(ix), (xi), (xiii)): Protect against cost duplication Use historical experience where appropriate ( appropriate is not defined) Integrate information available from other systems Internal review of/accountability for acceptability of estimating system (including budgetary data supporting indirect cost estimates, comparisons of projected results to actual results) 13

4. Estimating Methods/Techniques Estimating techniques (DFARS 252.215-7002(d)(4)(iv), (vi), (x)): Identify and document sources of data, estimating methods and rationale used in developing cost estimates and budgets Consistent application of estimating and budgeting techniques* Use of appropriate analytical methods ( appropriate is not defined) * Some DCAA audits have literally interpreted this to mean that forecasts and budgets had to be at the same level of detail for all years. DCAA policy now recognizes that out-year forecasts/rates can be less detailed. 14

5. Internal Controls to Ensure System Compliance System administration and internal controls (DFARS 252.215-7002(d)(4)(iii), (xii)-(xiii)): Sufficient training, experience and guidance of personnel to ensure performance of estimating/budgeting tasks in accordance with established procedures Management review, verification of estimating/budgeting policies, procedures, practices Internal review of/accountability for acceptability of estimating system (including budgetary data supporting indirect cost estimates, comparisons of projected results to actual results) 15

Key Audit and Compliance Issues DCAA Director s Statements Contractor Support Adequate proposals and assertions Effective walk-throughs (early identification of inadequacies) Identification of internal reviews leveraged by DCAA to reduce resource impact on contractor Adequate supporting data, timely access to key personnel responsible for the data or activity Real time DCAA access to contractor systems 16

Key Audit and Compliance Issues DCAA Director s Statements & Planning DCAA focusing on identifying business systems deficiencies during ongoing audits (bid proposals or forward pricing rates) DCAA is performing full-up audits at select high-risk contractors results will help improve future DCAA audits and policy DCAA s 2016 Program Plan did list Estimating System Audits (12 Audits at 5,000 hours each at specific contractors) and MMAS (5 audits at 4,000 hours each at specific contractors) All contractors (audited by DCAA) remain at risk for deficiency reports (business system significant deficiency identified during an audit of a bid proposal or forward pricing rate proposal) 17

Key Audit and Compliance Issues Inadequate policies and procedures Inadequate record-keeping for proposals submitted Misapplication of FAR Part 15 proposal standards DCAA applies non-competitive proposal requirements to competitive proposals Non-compliance allegations based upon failure to comply with system and FAR Subpart 15.4 procedures Compliance with DFARS proposal adequacy checklist (78 FR 18865 (March 28, 2013)) Internal audits of estimating system Too infrequent or planned but not executed Insufficient scope Inadequately documented and/or untimely corrective action 18

Key Audit and Compliance Issues (Cont.) Independent management review Insufficient management oversight concerning high-risk proposals Unclear lines of authority for proposal approval Lack of documentation of review/approval process Calculation of estimated labor rates Appropriate grouping of labor categories Reasonable basis for rate escalations Reliance on historical experience Periodic internal reviews of estimates Monitoring and tracking estimates against actual costs Integration of estimate reviews into proposals 19

Key Audit and Compliance Issues (Cont.) Integration with other systems Accounting: Inconsistent use of actual costs to support estimates BOE states historical costs, but without any reference to specific accounting data Inadequate monitoring/analysis of accuracy of estimates Purchasing: Subcontractor price/cost analysis Insufficient objective evidence for commerciality and/or fair & reasonable price Inadequate competition Unsupported subcontractor cost/price analysis Misapplication of competitive selection process to strategic teammates and expectations for degree of competition disclosed in follow-on procurements or contract rebaselining 20

Key Audit and Compliance Issues (Cont.) Training/qualifications of estimating staff Insufficiently trained and experienced estimating personnel, especially price/cost analysts Lack of clear, defined training plans including comprehensive subject matter of courses or course content consistent with auditor s subjective expectations One-size fits all estimating system training vs. training tailored to specific functions (e.g. rate estimators differentiated from engineers preparing labor hour basis of estimates) Incomplete training records; lack of automated tracking of employee compliance with training plan 21

Best Practices Continuous system maintenance/improvement Use internal audits to identify weaknesses and implement corrective action; document improvements Comprehensive training plan Timely policy revisions/distribution of updates Focus on proposal format and content Comply with FAR 15.408, Table 15-2, and DFARS Adequacy Checklists Bid Proposal and Forward Pricing Rates Proposal Integration of systems Enhanced system automation Purchasing and accounting system data flows into estimating to justify subcontract type and price 22

Inspector General Report DODIG-2015-139 (June 29, 2015): Evaluation of DCMA Actions on Reported DoD Contractor Estimating System Deficiencies 18 DCAA Reports (Contractor Estimating Systems 252.242-7005) Contracting Officers did not: Issue timely initial and final determinations Obtain or adequately evaluate contractor responses, and Withhold a percentage of contractor payments DCMA Director generally agreed with DOD-IG Recommendations Note: DOD-IG accepts at face value that significant deficiencies (reported by DCAA) are significant deficiencies (DFARS 252.242-7005) 23

Inspector General Report (Cont.) Implications for Contractors; Contracting Officers will: Make initial determinations (one or more significant deficiencies) within 10 days of report receipt Request and require contractor responses within 30 days of the initial determination Make final determinations within 30 days of receipt of the contractor response (more than 30 days depending upon the complexity of the issues) Implement withholds if final determination of one or more significant deficiencies 24

Questions Joe Martinez, Esq. Dentons US LLP 303-634-4371 joe.martinez@dentons.com Michael Steen, CPA Redstone Government Consulting 256-704-9806 msteen@redstonegci.com 25