List of Enquiry Items for Enquiry BAP/PUR/FGD/EQS/2014/ E dt

Similar documents
ANNEXURE C to Open tender ENQ. No. BAP/PUR/FGD/SLURRY PUMPS/ E dt

STANDARD TECHNICAL SPECIFICATION FOR FLOW NOZZLE ASSEMBLY with ACCESSORIES

STANDARD TECHNICAL SPECIFICATION FOR FLOW ORIFICE ASSEMBLY with ACCESSORIES

PRE BID MEETING QUERIES & REPLIES FOR FGD SYSTEM REQD. FOR BONGAIGAON PROJECT - REVISED

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT

CENTRAL ELECTRICITY AUTHORITY NEW DELHI

STANDARD TECHNICAL SPECIFICATION FOR ROTAMETER VOLUME - IIB. SPECIFICATION No: PE-SS I010

QUALITY ASSURANCE PROTOCOL (QAP)

STANDARD TECHNICAL SPECIFICATION FOR SIGHT FLOW INDICATOR VOLUME - IIB. SPECIFICATION No: PES

NEW GC-16 IN WEST KUWAIT MATERIAL REQUISITION FOR LEVEL GAUGE TABLE OF CONTENTS

Section 4. Annex to IAEA Request for Proposal STATEMENT OF WORK. Primary/Secondary cooling water Heat Exchangers

NUCLEAR POWER CORPORATION OF INDIA LTD TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 REV NO : 0 DATA SHEET A

1.0 INTRODUCTION GENERAL SUPPLIER S RESPONSIBILITY CODES AND STANDARDS... 4

PART- A ROTARY TABLE : 3000 X 4000 MM

FABRICATION OF A NEW INDUCED DRAUGHT FAN DUCTING KILN 2

ISO INTERNATIONAL STANDARD. Petroleum, petrochemical and natural gas industries Hairpin-type heat exchangers

SPECIFICATIONS - DETAILED PROVISIONS Section Horizontal Centrifugal Water Pumps C O N T E N T S

Regardless of any alternative pricing provided, a quotation for the items specified herein shall be provided.

TECHNICAL BID T 3655

STANDARD TECHNICAL SPECIFICATION FOR ELECTROMAGNETIC FLOW METER with ACCESSORIES

NUCLEAR POWER CORPORATION OF INDIA LTD. (A GOVT. OF INDIA ENTERPRISE) SPECIFICATION NO.PB-E-542/REV. No.0

GUJARAT NARMADA VALLEY FERTILIZERS & CHEMICALS LIMITED

3.2 Dimensional tolerance for the expansion bellows should be as per EJMA.

AUTOCLAVE AIR COMPRESSORS

VOLUME-III PRICE SCHEDULE, REV-01

OIL INDIA LIMITED ( A Govt of India Enterprise) P.O. Duliajan , Assam Fax No ;

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS

SPECIFICATIONS - DETAILED PROVISIONS Section Progressing Cavity Pump C O N T E N T S

Stainless Steel Aeration Equipment Specification

Regardless of any alternative pricing provided, a quotation for the items specified herein shall be provided.

ANNEXURE-IA. Bid Security Amount : INR 5,00, OR USD 11, ( or equivalent Amount in any currency )

STATEMENT OF WORK. Primary/Secondary Cooling Water Heat Exchangers. for WWR-SM Research Reactor, UZBEKISTAN

STRUCTURAL STEEL FRAMING

COMMERCIAL TERMS AND CONDITIONS. Tender Bid Submission The Tender Quotations against the enquiry are invited in two parts i.e Two Part Bid system-

Talwandi Sabo Power Limited Tender document for Design & Engineering, Supply and Erection of Slurry pumping system from Plant to Ash Dyke

SECTION 1 SCOPE, SPECIFIC TECHNICAL REQUIREMENTS AND QUANTITIES

(Name and address of Manufacturer) (Name and address of Purchaser) (Name and address)

TRIPURA NATURAL GAS COMPANY LIMITED

INSPECTION AND TEST. PROCEDURE Total Page 13

Design, Fabrication, Supply, Installation & Commissioning of Scissor Lift for ITMT Building at. CREST, Hosakote. Indian Institute of Astrophysics

Annexure-I. Specification sheet for LDO fired boiler

STEAM TURBINE-GENERATOR & AUXILLIARY SYSTEMS Presentation by: RANA NASIR ALI General Manager, Power Plants Projects, at PITCO November 02, 2017

TECHNICAL SPECIFICATION

Enquiry No : VAL-OT-1006 dt for Repair work of Valve castings inside BHEL premises

TECHNICAL SPECIFICATION FOR RATE CONTRACT OF INSULATING MATS

TECHNICAL SPECIFICATIONS

All definitions are defined according to ANSI/AWWA C

DUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS

TEXAS DEPARTMENT OF TRANSPORTATION PROCUREMENT DIVISION TANK, POLYETHYLENE, ELLIPTICAL LEG, MINIMUM 1235 GALLON CAPACITY

All definitions are defined according to ANSI/AWWA C b. Flanged Joint: The flanged and bolted joint as described in ANSI/AWWA C110/A21.10.

Not Applicable DD/MM/YY Completed Forms to be submitted by 30/08/2013 : Hrs IST. Date of Opening for Technical Bids 30/08/2013 : 14.

TECHNICAL BID T 3524

AMENDMENTS TO OPSS 1802 (JAN 95) MATERIAL SPECIFICATION FOR SMOOTH WALLED STEEL PIPE SUPPLY, STORAGE, AND DELIVERY OF WELDED STEEL PIPE

TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION TANK, POLYETHYLENE, HORIZONTAL LEG, MINIMUM 500 GALLON CAPACITY PUBLICATION

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

NATIONAL CENTER FOR COMBUSTION RESEARCH AND DEVELOPMENT (NCCRD) INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI , INDIA

SCOPE OF WORK SUBSTATIONS

SECTION LINEAR MOTION SLUDGE MIXERS

SPECIFICATION NO. TxDOT DATED: JUNE 2005

Do not place bundles of deck so as to overload the supporting structure.

56-SDMS-01 REV. 01 SPECIFICATIONS FOR

PURCHASE SPECIFICATION Rev. 02 Erection & Supply of Valves. Piping & Testing Dt.30/07/10 For the Pump Test Rig (Refer Dwg. No RD DG )

Plot No. 1-7/B, Laxmi Co-op Industrial Estate, Hatkanangale , Kolhapur Dist. TENDER NO D5

JOB SPECIFICATION FOR ROTARY PUMP (SCREW TYPE)

DIVISION 15- MECHANICAL Section Fire Pumps

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)

TITLE: SPECIFICATION NO. PE-MSE-VD-VP VOLUME:

Specifications of Impeller forgings. Quantity: 2 No s. (Please find the attachment for material specification HY19391)

SCHEDULE-A MODIFIED CLAUSES/ PAGE NUMBERS: Vol. No. Section/ Description SECTION IA/ ANNEXURE XII :INPUT DRAWINGS (PT plant) Clause no of 920

MATERIAL AND EQUIPMENT STANDARD FOR LARGE WELDED LOW PRESSURE STORAGE TANKS ORIGINAL EDITION MAY 1993

The Israel Electric Corp. Ltd. Orot Rabin Power Station Rutenberg Power Station

SPECIFICATION FOR SPHERICAL VESSELS (PROJECT STANDARDS AND SPECIFICATIONS)

A. Section Metal Decking. (05300 in MF95) B. Section Cold Formed Metal Framing. (05400 in MF95)

TECHNICAL BID T NO RFQ NO TENDER FOR THE WORK

JAMISON SOUND DOOR SPECIFICATIONS VERTICAL SLIDING SOUND REDUCTION DOOR - STC 53 POWERED OPERATION

ASME BPVC.CC.BPV.S Approval Date: October 7, 2015

INDRAPRASTHA GAS LIMITED. (IGL) CITY GAS DISTRIBUTION PROJECT IN NCT OF DELHI & NCR

SPECIFICATION CUM COMPLIANCE CERTIFICATION FOR PRESSURE TESTING PUMP

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

TECHNICAL SPECIFICATION OF HORIZONTAL MILLING MACHINE

No: PUR/IMP/JPL/UVIT/ISO/39 July 29, 2008

MATERIAL AND EQUIPMENT STANDARD FOR STEAM JET EJECTORS ORIGINAL EDITION NOV. 1993

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

TECHNICAL SPECIFICATION FOR ELECTRICAL ASSET S CONDITION MONITORING EQUIPMENTS

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - ECCENTRIC LOADER TERMINAL SYSTEM

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

ANNEX 5 PRODUCT SPECIFICATIONS AND TECHNICAL REQUIREMENTS

TECHNICAL SPECIFICATIONS

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

SCOPE OF WORKS COOLING TOWER & CWTP PACKAGE (PLOT PLAN & WATER) SCOPE OF WORKS BEARING COOLING TOWER & CWTP PACKAGE

CONTENTS. Foreword... xiii Statements of Policy... xv Personnel... xvii Organization of Section III... xxvii Summary of Changes...

HINDUJA NATIONAL POWER CORPORATION LIMITED. HNPCL, (2X520 MW). VIZAG Technical Enquiry Specification for PU Coated Pipe For Ash Water Recovery System

The Edge Protection Federation Containment Systems Product Specification, Test Methods

Gustafsons HV2. High Velocity Duct for Residential Properties

SCOPE OF WORK FOR ELECTRICAL WORK

05510: TAPERED STEEL TROLLEY POLES AND ACCESSORIES

Gas Industry Standard

Preparation and Installation of the FA, FAV, and FAS Type Rupture Discs in Forward Acting Insert, Full Bolted, and Union Type Holders

Specification for Pipe Fittings

2. REFERENCE SPECIFICATIONS

Transcription:

List of Enquiry Items for Enquiry BAP/PUR/FGD/EQS/2014/4231581E dt 13.03.2014 Sl.No Material Code Description Unit Qty Destination 1. RFW301290000 EMERGENCY QUENCHING SYSTEM AT GGH INLET AS PER TECHNICAL SPECIFICATION NTPC:FGD:BONG:EM.QUENCH:50 ST 3 BHEL Stores Ranipet

BONGAIGAON 3X250 MW FLUE GAS DESULPHURIZATION SYSTEM TECHNICAL SPECIFICATION OF EMERGENCY QUENCHING NOZZLES & HEADERS IN GGH INLET CUSTOMER: NATIONAL THERMAL POWER CORPORATION LIMITED NTPC: FGD: BONG: EM.QUENCH:50 Flue Gas Desulphurization Group Air Quality Control Systems BAP :: BHEL :: Ranipet Page 1 of 19

Prepared Checked Approved KABILASH ENGINEER-FGD SHAKTI KANTA DASH SR.MANAGER-FGD K.RAJAVEL AGM/FGD Dated 03 02 2014 Page 2 of 19

CONTENTS Sl.No. Description 1.0 PROJECT INMATION 2.0 INDENT OF SPECIFICATION 3.0 SCOPE OF SUPPLY 4.0 BASIC DESIGN 5.0 ACCESSORIES 6.0 INSPECTION AND TESTING 7.0 BIDDER'S DATA & DOCUMENTATION 8.0 ANNEXURES 8.1 ANNEXURE I SCHEDULE OF GUARANTEED DATA 8.2 ANNEXURE II LIST OF MANDATORY SPARES 8.3 ANNEXURE III LIST OF RECOMMENDED SPARES 8.4 ANNEXURE IV REFERENCE LIST/EXPERIENCE PERMA 8.5 ANNEXURE V LIST OF DEVIATIONS 8.6 ANNEXURE VI SCOPE OF SUPPLY 8.7 ANNEXURE VII FLOW DIAGRAM 8.8 ANNEXURE VIII P&ID OF EMERGENCY QUENCHING ARRANGMENT 8.9 ANNEXURE IX VENDOR SCOPE 8.10 ANNEXURE X 3D LAYOUT Page 3 of 19

1.0 PROJECT INMATION Owner NTPC Buyer BHEL, Ranipet Capacity 3X250MW Process / application Wet Lime Stone FGD system No of FGD units 3 1.1 SITE CONDITIONS Ambient temperature (Guarantee) 27 Deg C Ambient temperature (Design) 50 Deg C Relative Humidity 60 % 1.2 LOCATION AND APPROACH Project location Bongaigaon Assam Place Kumkuri near Salakati, Bongaigaon District Kokrajhar State Assam Height above sea level 47 m Page 4 of 19

2.0 INTENT OF SPECIFICATION TECHNICAL SPECIFICATION The Bidder shall offer only proven design of Quenching system in successful operation. This specification together with the attendant Technical Data Sheet and other specifications/attachments defines the minimum requirements for Emergency Quenching Nozzles and Headers along with their accessories/auxiliaries for use in the process of 3 No s of Flue gas Desulphurization (FGD)units of NTPC Bongaigaon 3X250MW Project. Bidder shall make all possible efforts to comply strictly with the requirements of this specification and other specifications/attachments to inquiry/order. In case, deviations are considered essential by the Bidder (after exhausting all possible efforts), these shall be separately listed in the Bidder's proposal under separate section, titled as "List of Deviations/Exceptions to the Enquiry Document (Annexure-V)". Deviation shall be listed separately for each document with cross reference to Page No./Section/Clause No. /Para etc. of the respective document supported with proper reasons for the deviation for purchaser's consideration. Any deviation, not listed under the above section, even if reflected in any other portion of the proposal, shall not be considered applicable. No deviation or exception shall be permitted without the written approval of the purchaser. Compliance to this specification shall not relieve the Bidder of the responsibility of furnishing equipment and accessories/auxiliaries of proper design, materials and workmanship to meet the specified start up and operating conditions. In case the Bidder considers requirement of additional instrumentation, controls, safety devices and any other accessories/auxiliaries essential for safe and satisfactory operation of the equipment, he shall recommend the same along with reasons in a separate section along with his proposal and include the same in his scope of supply. 2.1 CODES AND STANDARDS The design, manufacture, inspection and testing of Emergency Quenching System shall comply with all the currently applicable statutes, regulations and safety codes in the locality where the equipment are to be installed. The equipment shall also conform to the latest applicable Indian/British/American standards. Other Internationally acceptable standards, which ensure equal or higher performance than those specified, shall also be accepted. Nothing in this specification shall be construed to relieve the Contractor of the required statutory responsibility. In particular the nozzles shall conform to the latest edition of the applicable standards. Page 5 of 19

3.0 SCOPE OF SUPPLY 3.1 GENERAL The flue gas system including GGH and its flue gas ducts shall be designed to meet the following conditions: Short temp excursion temperature of inlet gas -300 deg. C (For approx. fifteen(15) minutes at a time) Emergency Quenching system is to be provided in all 3 no s of FGD units at GGH inlet to meet the above mentioned requirement. a. Quenching Nozzles and Spray Headers Quantity : Refer Table.1 for details on operating conditions to calculate the Quenching nozzles and spray headers quantity based on amount of water required for quenching. b. Mandatory Spares - As per Annexure - II. c. Service Engineer Visit : Bidder s Service Engineer shall visit the site for supervision of Erection and commissioning of the complete emergency quenching system. Erection and commissioning supports: Six (6) Man days are considered for supervision of Erection& commissioning of all the nozzle arrangement in all three (3) FGD units at Bongaigaon site. d. Operation & Erection Manuals : Ten (10) Hard copies of O&M Manual including erection and installation procedure shall be submitted by the Bidder. A soft copy of the O&M manual containing all details of reference drawings and technical data shall be furnished by the Bidder in CD (soft copy). 4.0 BASIC DESIGN 4.1 GENERAL This section covers the manufacturing and performance requirement of the Emergency Quenching nozzles, Spray Headers and its accessories. 4.2 NOZZLES TYPE AND OPERATION a. The nozzles shall be designed for mode of operation as mentioned in Table 1. Page 6 of 19

4.3 OPERATING CONDITIONS TECHNICAL SPECIFICATION Table.1 Operating conditions of Emergency Quenching System Sl. No Description Guarantee Point Design Point 1. Purpose of Emergency To cool down Flue gas in emergency situation Quenching System 2. No of Emergency Quenching 3(Unit #1-3) System required 3. Cooling Media Service Water 4. Operation Method Gravity Method 5. Design Flow Capacity 150m3/hr 6. Holding Capacity of Emergency 80m3 Tank(BHEL Scope) 7. Emergency Tank Location 35m above Ground Level 8. GGH inlet Duct Location 25m above Ground Level 9. Emergency Quenching Pipe up 200NB/C.S to common header refer Annexure-IX 10. Spray Nozzle Type Spiral 11. Spray Pattern Full Cone 12. Spray angle 170 13. Spray Nozzle flow rate 50 LPM 14. Spray Nozzles Quantity 48 No s 15. Operating Pressure 0.7-1.5 bar 16. MOC of Main header C.S 17. MOC of Spray header AL6XN OR SS 904L SCH 40 18. MOC of Nozzle PTFE 19. Gas Volume in Nm3/sec 303.3 20. Density of flue gas in kg/m3 0.794 21. Flue Gas Pressure 360mmwc 22. Inlet Flue Gas Temperature 300 deg celsius 23. Desired Flue Gas Temperature 170 deg celsius after Quenching 24. Excursion Time 15 min 25. Duct Dimension 6mx6m 26. Flue Gas Velocity 12-15 m/s Page 7 of 19

4.4 DUTY PARAMETERS AND REQUIREMENT a. Bidder to submit the filled in data sheet as mentioned in Datasheets as mentioned in Annexure 8.1 4.5 REQUIREMENTS a. Design criterion of nozzles and all headers shall be consistent with a minimum service life of 10 years. b. Zero Leakage, should be ensured. If it is required, manufacturer to indicate the plan and necessary piping. 4.6 NOZZLES & MISCELLANEOUS CONNECTIONS a. Spray Headers should be as per standard nominal pipe (NPS) or DN. b. Flanges should be of same rating and raised- face, suitable for through bolting. c. All connections shall be suitable for hydrostatic test pressure d. Companion flange along with necessary Bolt, Nut and Gasket shall be taken as Vendor s scope of supply. Material of the companion flange should be as per attached Vendor scope drawing. 4.7 EXTERNAL NOZZLES CES & MOMENTS Allowable nozzle load and a figure that defines the co-ordinate system, in which the load are applied, shall be supplied with tender. Permissible load and moment from pipe line should be as per HI 12.2-12.6-2005 or ISO standard. 4.8 ASSEMBLY AND DISMANTLING Assembly and dismantling of each nozzle with spray pipes shall be possible without disturbing the alignment and easy handling. 4.9 OTHER COMPONENTS All internal fasteners, coming in contact with liquid medium should be Type A4, ISO- 3506. Other fasteners should be of Class 6.6 or higher, galvanized as per ISO-898. All other components, not mentioned anywhere in the specification but required for assembly of equipment are as per manufacturer s own practice. 4.10 MATERIALS a. Nozzles and spray headers designated as Full Compliance Material shall meet the Page 8 of 19

requirements of the industry specification as listed for the material in the table as well as in the specification in the respective section. b. Material shall be clearly identified in the proposal with their applicable industry standard number (along with equivalent ASTM, if different standard is followed) and grade. c. If no such designation is available, the supplier material specification, giving physical properties, chemical composition, and test requirements, shall be included in the proposal. d. Materials casting factors and the quality of any welding shall be equal to those required by Section VIII, Division-1 of ASME Code or equivalent.(if applicable) e. A detail quality plan is to be submitted along with offer for all items marked ASTM Full Compliance Material. f. Final acceptance of the quality plan will be approved by ultimate user (hereafter called NTPC). Hence, it is expected that manufacturer to submit quality plan (QAP) along with the offer. The same shall be followed at post order stage also. QAP should be as per the best practice followed internationally to avoid any conflict of interest g. Scope of supply incorporates the material, testing/inspection, painting, packing forwarding, installing at site and commissioning at site of the equipment. h. Certain activities may be excluded from Bidder s scope as per Annexure VI - Scope of Supply which shall be mutually agreed upon as per the sheet. 5.0. ACCESSORIES 5.1 SPECIAL TOOLS Emergency quenching arrangement shall be designed to be assembled, disassembled, and maintained with standard hand tools. However, if at all the Vendor desires special tools are required; the same has to be supplied along with the Emergency quenching system. List of the special tool is to be indicated in Annexure VI (Scope of supply). 6.0 INSPECTION AND TESTS a. Material test: All material inspection and testing will be as per submitted QAP, Purchaser s representative shall have access to review the supplier s quality assurance program. b. Maximum severity level of defects in casting for the Linear Discontinuities, Shrinkage, Inclusions, Chill and Chaplets, Porosity and Welds must be indicated in QAP.(if applicable) c. The customer hold points can be altered at the discretion of ultimate customer Page 9 of 19

(NTPC). The same will be intimated when approving the final quality plan. d. Performance test: Performance testing of nozzles at manufacturer s shop shall be conducted. e. Guaranteed Data as indicated in Annexure I of Data Sheet shall be the final acceptance norm of equipment. 6.1 PREPARATION SHIPMENT Flanged openings shall be provided with metal closure of 4.8 mm (3/16 inch) minimum thickness with rubber gaskets and at least four full diameter bolts. The equipment shall be protected for storage of 12 months at site, if any extra precaution is to be taken by the Purchaser for storage beyond 12 months the same shall be explicitly indicated in the operation and maintenance manuals. 6.2 GUARANTEE REQUIREMENT: 12 months from the date of commissioning or 18 months from the date of supply whichever is earlier for defective material and workmanship 7.0 BIDDER'S DATA AND DOCUMENTATION 7.1 CONTRACT DATA Documentation: Following items are required to be duly filled and submitted along with the proposals minimum requirement; a. Compliance of the specification, duly signed and stamped by the designating authority of manufacturer, duly indicating the deviation that are taken. b. General arrangement drawing, indicating showing direction of rotation, size, battery limit,indicating scope of supply, connection detail, overall dimensions, maintenance clearance, overall weight and maximum weight to be handled. Final drawing, after post order stage, has to be in scale. c. Cross-sectional drawing of Nozzles and Spray Headers (Type). d. Data sheet clearly indicating exhaustive data of Spray Nozzles and Headers etc along with material of construction. e. List of Mandatory spares and recommended spares for 2 Years of operation. (Annexure I & II) f. Experience Record Performa. (Annexure IV) g. List of Deviations/Exceptions to the Enquiry Documents. (Annexure V) h. List of scope of supply (Annexure VI) Page 10 of 19

EMERGENCY QUENCHING NOZZLES & SPRAY HEADERS BHEL Document No.: NTPC: BONG: FGD: EQW SYSTEM-SPEC-050: REV00 8.0 ANNEXURES ANNEXURE-I 8.1 SCHEDULE OF GUARANTEED DATA (TO BE FILLED BY VENDOR) Sl. No Description Vendor s Reply 1. Spray Nozzle Type 2. Spray Pattern 3. Spray angle 4. Water Pressure at nozzle outlet 5. MOC of nozzle 6. MOC of Spray header 7. Common Header Flange details 8. Amount of water to be sprayed in lpm 9. Straight Height Required in m Note: No (-) negative tolerance on efficiency and desired outlet Flue gas temperature is admissible. SIGNATURE OF BIDDER -------------------- NAME ------------------- DESIGNATION --------------------- Page 11 of 19

ANNEXURE-II 8.2 LIST OF MANDATORY SPARES (SHALL BE SUPPLIED ALONG WITH THE NOZZLES AND HEADERS) Quantity will be Number or Set as applicable Sl No. Item Mandatory Spares 1. Spray Nozzles : 20% of each type 2. Spray Headers : 10% of each type 3. Flanges and fasteners : 10% of each type 8.3 LIST OF RECOMMENDED SPARES (PROVIDED BY VENDOR) Sl No. Item Recommended by vendor 1. 2. 3. 4. ANNEXURE-III SIGNATURE OF BIDDER -------------------- NAME ------------------- DESIGNATION --------------------- Page 12 of 19

8.4 EXPERIENCE RECORD PERMA (ERP) ANNEXURE - IV Sl. No Customer Project Model Flue Gas Flow m 3 /hr Inlet Flue Gas Temp deg C Desire d Flue Gas Temp deg C Year of Commg Purpose Qty 1. 2. 3. SIGNATURE OF BIDDER -------------------- NAME ------------------- DESIGNATION --------------------- Page 13 of 19

8.5 LIST OF DEVIATIONS TECHNICAL SPECIFICATION ANNEXURE - V Sl No Clause No Page No Description of deviation Note: Enlarge the table to incorporate items SIGNATURE OF BIDDER -------------------- NAME ------------------- DESIGNATION --------------------- Page 14 of 19

8.6 SCOPE OF SUPPLY A--Materials: TECHNICAL SPECIFICATION ANNEXURE -VI Sl. Item Unit of Quantity Quantity No. 1. Spray Nozzles for 3 units No 2. Headers for 3 units No 3. Fasteners No 4. Flanges No 5. Special Tools Set 6. Supporting arrangement for all headers and Set nozzles 7. Mandatory Spares Set Note: Enlarge the table to incorporate items SIGNATURE OF BIDDER -------------------- NAME ------------------- DESIGNATION --------------------- Page 15 of 19

8.7 FLOW DIAGRAM: ANNEXURE -VII Emergency Tank is placed at a height of 35m above ground level Gas to Gas Heater Inlet Duct is at a height of 25m above ground level Page 16 of 19

8.8 P&ID OF EMERGENCY QUENCHING SYSTEM ANNEXURE VIII VENDOR SCOPE NOTE: All other equipments except Quenching arrangement shown in the P&ID will be in BHEL Scope of Supply Page 17 of 19

8.9 VENDOR SCOPE ANNEXURE IX Flanges including counterflanges Common Header Spray Header Spray Nozzles Common Header, Spray Headers and Spray Nozzles Flanges Fasteners Page 18 of 19

8.10 3D LAYOUT Annexure-X GGH ID FANS EMEREGENCY QUENCHING NOZZLES LOCATION IN DUCT Page 19 of 19