Cashflow. Total price. Total cost. Contract completion. Predicted revenue (2) Total price. Total price. Total cost. Total cost. Contract completion

Similar documents
TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

Project Controls Expo

SAN FRANCISCO PUBLIC UTILITIES COMMISSION WATER SYSTEM IMPROVEMENT PROGRAM CONSTRUCTION MANAGEMENT PROCEDURES

Cost Monitoring & EoT

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE

SECTION CONSTRUCTION PROGRESS DOCUMENTATION

45. Feedlot construction delivery

Building and renovating

THE ROLE OF A BRIDGE INSPECTOR

CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS

Assessing Extensions of Time Tony Farrow Trett Consulting March 2006

How do FIDIC contracts work

Sickness Absence Policy

CASUAL EMPLOYEE TERMS & CONDITIONS OF EMPLOYMENT

SENIOR PROJECT MANAGER

Course List 2008 Civil Engineering Commercial Training

00010ACT CARRIER BROKER CONTRACT

Inkosi Logistics (Pty) Ltd

East Central College

a) Hostel 50 Capacity with twin sharing basis b) Common room for Hostel c) Dean s Residence d) Care taker residence

Principles of Planning for Building and. by Eastwood Harris Pty Ltd. Introduction Emergency Evacuation. Course Outline.

CONSTRUCTION DELAY FACTORS IN GENERAL AND ESPECIALLY IN DEVELOPED COUNTRIES

EXPLANATION: SECTION 198 AMENDMENTS

The building contract a tool to minimise disputes and enhance productivity

COSCSMO15 SQA Unit Code H99L 04 Control projects in construction management

Awarding Extensions of Time Christopher Miers. 23rd October 2013

Procedure for Stage 8 Post Project Evaluation. Procedure No. 017

ICES Core Cost Engineering Competencies

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

CONTRACT NO MURRAY IRRIGATION 2013 GRADER HIRE MURRAY IRRIGATION LIMITED. Client. Contractor

TERMS AND CONDITIONS OF CARRIAGE

Consulting Newsletter

THE PARTNERSHIP TRUST. Sickness Absence Policy

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL

Chapter 8 Project Monitoring and Control It s important to have a schedule, but it s more important to use it

Review of Employment Act (Phase 1)

THE CONTRACTORS' GUIDE TO OPERATIONS AND PROCEDURES

Design Team Procedures Practice Note 1, February DESIGN TEAM PROCEDURES PRACTICE NOTE 1 (Revision 2)

1.1. In these Terms of Business the following definitions apply:

Umbrella Body Guidance

CONSTRUCTION MANAGER

COSCCOMO17 Optimise and control contract progress and costs in construction contracting operations management

1.1.3 In order to achieve effective time management there must be:

Office Building. Analysis #2: Utilizing a Matrix Schedule

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 1997 to 2015

MG Food Handel & Beratung e.k. General Terms and Conditions

OUTAGAMIE COUNTY REQUEST FOR BID FOR HAULING SERVICE OF RECYCLABLE PLASTIC BALES FOR THE DEPARTMENT OF RECYCLING & SOLID WASTE

SECTION NETWORK ANALYSIS SCHEDULES (NAS) FOR DESIGN-BUILD 8/10

Document No: SB002-P3 Revision No: Last Updated: April

Pay or Play Penalty Special Rules for Temporary Staffing Firms

The company JY.A. LEBRETON reserves the right to modify these Terms at any time.

PUBLICATION Commercial Refrigeration and Process Cooling and Heating R

Blue List. Green List. Civil Engineering Commercial Training Courses

Procurement Department PROCUREMENT POLICY

Terms of Sale. Page 1 of 5

BRITISH COLUMBIA LABOUR RELATIONS BOARD CARECORP HOLDINGS INC. CARRYING ON BUSINESS AS CARECORP SENIOR SERVICES. ("Holdings") -and B.C. LTD.

Schedule Guidance Document

Consulting Newsletter

SECTION CONSTRUCTION PROGRESS DOCUMENTATION SECTION CONSTRUCTION PROGRESS DOCUMENTATION

Minnesota State University Moorhead Construction Management CM 496 CM Capstone Project Semester Project Description Fall 2004

MARK TURTON MCIOB, MAPM

From Uncertainty to Certainty; How Clients can Improve their Experience of the Construction Process

CONTRACT FOR CARRIAGE. All business undertaken by the Courier is subject to the following terms and conditions:

AFRICAN JOURNAL OF APPLIED RESEARCH (AJAR) Vol.1, No.1 ISSN January 2015

Making a denial of contractual benefits claim. Information Kit. Advice Line or

BROKERAGE DIVISION 101 East Town Place, Suite 120 St. Augustine, FL PH: FAX: TERMINAL PHONE #:

IMPROVING SUBCONTRACT CONDITIONS TOWARDS SUCCESSFUL INFRASTRUCTURE PROJECTS IN GAZA

Pay or Play Penalty Special Rules for Temporary Staffing Firms

CLAIMS AND DISBURSEMENTS

CONTRACT WITH THE TEMPORARY WORKERS (TERMS OF ENGAGEMENT/CONTRACT FOR SERVICES) 1.1. In these Terms of Engagement the following definitions apply:

DETAILED PROVISIONS RELATED TO TRANSPORT

EAST AFRICA TRADE AND INVESTMENT HUB REQUEST FOR PROPOSALS (RFP) RFP-NAI Payroll & Employee Benefits Management Services

MODEL OVERPAYMENT POLICY AND PROCEDURE FOR TEACHING AND SUPPORT STAFF IN ACADEMIES

REDUNDANCY BRIEF. Purpose:

Construction Cost Consultants and Quantity Surveyors Manitoba Hydro Capital Expenditure Review. January 2018

Unit 3: Traditional Project Delivery Using IT Applications

THIS ADDENDUM IS FOR THE PURPOSE OF MAKING THE FOLLOWING CHANGES OR CLARIFICATIONS:

Louisiana Society for Human Resource Management

The Survey Says! Source: The Project Manager, Pinnell-Bush, Inc. Owner s say 31% of contractors do not submit monthly updates. 41% don t submit recove

CHAPTER 1 INTRODUCTION

ELECTRICAL CONTRACTORS AND CONSUMER LAW

MIX WORK AND TRAINING SCHEME

Terms and Conditions of Business

Terms of Business for the Supply of Services

Document B252TM 2007

By participating in the Programme you will be deemed to have read, understood and accepted these terms and conditions.

SCHEDULE 5 ADDITIONAL PAVEMENT MARKING SERVICES

FIATA MODEL RULES FOR FREIGHT FORWARDING SERVICES

What Should an Owner Do With the Contractor s Schedules? Seminar for the FEFPA Ted Trauner Trauner Consulting Services, Inc.

Xtend-Life Wholesale Program Terms & Conditions

Offsite modular construction

We reserve the right to update this privacy notice at any time. Please check our website from time to time for any changes we may make.

CHAMPIGNON-HOFMEISTER GROUP (CU) TERMS AND CONDITIONS OF PURCHASE AND PAYMENT. Validity of conditions

Chapter 2 Parties to the Contract

Construction Formwork Inventory Control Tracking System

P6 Instructors Sample Presentation

Schedule 3 Services Schedule Equipment and Equipment-Related Supplies

GUIDELINES FOR MAKING A CLAIM AND COMPLETING THE CLAIM FORM

* The use of these areas can vary from car park space, where little waterproofing is required through to store rooms or plant rooms where a high

bagport UK Ltd STANDARD TERMS AND CONDITIONS FOR SALE OF GOODS & SERVICES

Transcription:

Cashflow The significance to the contractor s cashflow of different patterns of payment from the client and of delays is illustrated in the next figure showing a hypothetical contract of 2 years duration. The predicted assumes monthly payments for work completed and a 4-week delay between certification and payment by client. The shaded area between the curves represents the funding to be provided by the contractor. This would be considerably reduced if the client agreed to a 10 % advance mobilization payment (3), or increased if payments were received late (4) as illustrated in the following figure. Revenue payment delayed Revenue with mobilization fee (3) Revenue with mobilization fee (3) 1

Delayed revenue payment (6) Delay The effect of delay in completion is serious as cost increases and payment for completed work is delayed. If the delay is caused by factors outside the contractor s control, an extension of time may be granted. Programming techniques The best form of plan for site use is the bar chart. Each activity is shown in its schedule position which results in efficient use of resources. There is inter-relationship of activities and movement of resource teams Important constraints and key dates are marked to ensure that these are clearly communicated to all concerned with the project Cost Estimating Estimates of cost and time are prepared and revised at many stages throughout the development of a project or contract. The accuracy of successive estimates should improve as the project or contract develops. 2

Cost Estimating The requirements of an estimate are: To predict the most probable cost of the works and also to define the range within which the final cost is likely to lie. To produce a forecast of expenditure: the cashflow based on the project programme. Cost Estimating These predictions will be influenced by factors specific for the project: location weather availability and capacity of resources Cost Estimating techniques Additional work in a contract can be assessed and evaluated based on: 1. Manhours: This is suitable for labour intensive construction where reliable records of hourly productivity of different trades is available. The total manhours estimated for a given operation are then costed at the current labour rates and added to the costs of materials and equipment. Cost Estimating techniques Additional work in a contract can be assessed and evaluated based on: 2. Unit rates For additional work, the unit rates in the bills of quantities is used. If unit rates for a similar work does not exist in the bills of quantities, then Manhours are used. 1. Where a Contractor submits a programme which is approved or accepted by the architect/engineer, is he obliged to follow it or can he amend it at his own discretion (judgment)? The programme is usually intended to be a flexible document. If the contractor gets behind (maybe due to delays by a subcontractor), he would normally expect to revise the programme in an attempt to make up lost time. For this reason, programmes are rarely listed as contract documents. However, there are some contracts that do not permit the contractor to amend its programme once accepted without approval. If a contract does not require approval by the engineer for a programme to be revised, the contractor can revise his programme as he wishes. An architect/engineer who has not been asked to approve or accept an amended programme may feel under no obligation to issue drawings in good time to enable the contractor to comply with the revised programme. 3

2. Is a subcontractor obliged to follow a main contractor s programme? Most standard forms of contract provide for the contractor to produce a programme. A failure to do so, is a breach of contract. It is unusual however, for a programme to be classified as a contract document. If it were so, then contractors would be required to carry out work strictly in accordance with the programme. This could in many cases prove impossible. The situation with subcontractors is similar to that of a main contractor. A court case between Pigott Foundations v. Shepherd Construction: Pigott was employed as a subcontractor to design and construct bored piling on a new fourteen storey office block. Shepherd Construction was the main contractor. Pigott s subcontract provided 8 weeks work. The work started on 26 th June 1989. However, the majority of the works were completed by 20 th October 1989. Pigott then left the site and returned in April 1990 to complete the remaining 9 piles. The work continued slowly and difficulties arose due to piling work which was alleged to be defective. It was not clear whether this was due to faulty design or bad workmanship and Pigott claimed that the difficulties arose as a result of ground conditions. A solution to the problem was reached which involved installing additional piles. The court decision in this case, was that the subcontractor was not required to comply with the main contractor s programme. If there exists an obligation for a subcontractor to carry out work to suit a main contractor s programme, it also requires an obligation upon the main contractor to provide access to enable the subcontractor to carry out the work in accordance to the main contractor s programme. A subcontractor is not required to follow a main contractor s programme unless provided in the terms of the subcontract. Equally, the main contractor is not obliged to grant access to enable the subcontractor to do so. 3. Who owns float time in the contractor s programme, the architect/engineer or the contractor? Most sensible/careful contractors, will allow some form of contigency in their programme to accommodate for bad ground, strikes, weather conditions, shortages of labour and materials etc. If the contractor has clearly programmed an activity to take longer than is estimated to complete, can the employer take advantage of the float time? This might be useful if the engineer is late issuing drawings or delays have been caused by the employer. Float time was the issue in a court case in 1999 between Ascon Contracting Ltd v Alfred McAlpine Construction. McAlpine was the main contractor and Ascon was the subcontractor for constructing the reinforced concrete floor slabs, basement walls and upright columns between floors. The subcontract period was 29 weeks commencing on 28 th August 1996 and completing works on 5 th March 1997. Completion of the subcontract was not achieved until 9 th May 1997, nine weeks late. 4

No extension of time was granted. Ascon submitted a claim for extension of time and payment of 337,918.00(UK pounds). McAlpine counterclaimed 175,000(UK pounds) liquidated damages paid to the employer plus its own loss and expense. A dispute between Mc Alpine and the employer had been compromised by a final payment of 9,475.00 (uk pounds) and no deduction was made for liquated damages. Part of Mc Alpine s case against Ascon was that if all subcontractors started and finished on time and Mc Alpine executed their work on time, completion of works would have been 5 weeks early. McAlpine s agrument was that the 5 weeks float time was for their benefit to absorb their own delays. Because these 5 weeks were used by Ascon, McAlpine claimed they were entitled to recover their lost benefit. The judge rejected this argument. McAlpine could not claim against the subcontractors. If float time is available, it can be used on a first come first served basis. 5