TELEPHONE: (215) Addendum No. 1

Similar documents
TELEPHONE: (215) ADDENDUM No. 1

Project Number BID NO. CAG 18 2 ROOF REPLACEMENT FOR HARFORD COUNTY PUBLIC SCHOOLS NORTH HARFORD ELEMENTARY. Addendum # 2

Procurement and Contracting Services

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SOPREMA JARDIN Double Layer Torch-on membrane For water proofing roof gardens and planters

ADDENDUM NO. 1. JULY 11, 2016 AT 11:00 AM (Noon, Local Prevailing Time) At the office of the Schuylkill County Housing Authority

Schedule A Development Permit No Issued this 18 day of April, 2018

General Conditions for Roofing Warranties. Section 2 Specific conditions for material warranty - Roofing products Eligibility and duration

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

General Conditions for Roofing Warranties. Section 2 Specific conditions for material warranty - Roofing products Eligibility and duration

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT

The Alabama Building Commission has adopted the 2006 International Energy Conservation Code as the State Energy Conservation Code

Addendum # 2. T Title: JD Kline Water Supply Plant Roof Replacement

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

REROOFING THE CAREER TECHNICAL SCHOOL FOR THE CLEBURNE COUNTY BOARD OF EDUCATION HEFLIN, ALABAMA

Architectural Inspection Pitched Roofing

ST. PETERSBURG COLLEGE ADDENDUM #1

NOTICE TO BIDDERS OF RECORD

ROOF DETAILS RD-0 CONSTRUCTION DOCUMENTS - AGENCY/ FEBRUARY 13, 2017 MURRAY ASSOCIATES ARCHITECTS, P.C.

DIVISION 07 THERMAL AND MOISTURE PROTECTION ROOFING

ADDENDUM NO. 3 February 28, 2017

Design and Construction Standards SECTION MODIFIED BITUMEN ROOFING SYSTEM

Update In Progress. Division 7 Thermal and Moisture Protection Page Section ROOFING AND WATERPROOFING

SECTION ADDENDUM NUMBER ONE

C. Jointing of Exterior Vertical Surfaces. Section D. The Secretary of the US Department of the Interior s Standards for Rehabilitation.

When submitting the edited forms to the A/E for approval, provide an additional copy that clearly notes any changes that have been made in the text.

2 + 3 A-2.0 A A-2.1 A-2.0 A A '-8" A-2.0 A-2.0 A-2.0 SIM. A-2.0 A-2.0 A-2.0 SIM. A-2.0 SIM.

A. Remove Table of Contents and insert new attached Table of Contents.

DIVISION MEMBRANE ROOFING & ROOFING ACCESSORIES

D. Submit three sheet samples, approximately 8 inches x 10 inches, of base sheet and cap sheet.

ASHLEY AVE. PARKING GARAGE CHILLER TOWER ROOF REPAIRS

SECTION TOPSHIELD GUIDE SPECIFICATION SMOOTH AND GRANULE SURFACE ROOF RESTORATION TS-AC yr

SAM HOUSTON STATE UNIVERSITY DIVISION 07 THERMAL & MOISTURE PROTECTION SECTION ROOFING SYSTEMS DESIGN AND CONSTRUCTION STANDARDS February 2016

ADDENDUM NO. 1 May 31, 2018

University of Colorado Colorado Springs. National Cybersecurity Center Roof Replacement Package CSNA Project Number

SECTION PREPARATION FOR RE-ROOFING

C. All roofs shall be installed according to manufacturers guidelines. Corrections due to workmanship shall be at contractors expense.

REPORT OF ROOF CONDITION STUDY. YOUR FACILITY Your Facilities Location. Date YOUR FACILITY S IDENTIFICATION. Prepared for Your Company

BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

MODIFIED BITUMINOUS SHEET AIR / VAPOUR BARRIERS SELF ADHESIVE

ADDENDUM # 2. - Page 1 of 2

ROOF DETAIL RD-16 CONSTRUCTION DOCUMENTS - PHASE / PENNSYLVANIA HOUSING FINANCE AGENCY/ MAY 22, 2017 MURRAY ASSOCIATES ARCHITECTS, P.C.

Schedule of Values Cruise Terminal 2 Expansion

REROOFING ANALYSIS OF K-12 BUILDING. Unified School District 306 Gypsum, Kansas

COUNCIL ROCK SCHOOL DISTRICT ADMINISTRATION & BUSINESS OFFICES The Chancellor Center 30 North Chancellor Street Newtown, PA ADDENDA No.

Architectural Inspection Low Slope Roofing

Tuscaloosa Police Station

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof

Light-Metal Roof Edge, Raised

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

*************************************************************************************************************

SECTION CO-POLYMER ELASTOMERIC COOL-ROOF COATING

WICOMICO COUNTY BOARD OF EDUCATION

Prepared By. Accent Building Sciences Inc. For

CERVANTES COMMUNITY CENTER RE-ROOFING NEW MEXICO STATE UNIVERSITY

PURCHASING SECTION Avenue, Surrey BC V3T 1V8 Tel: ADDENDUM #2

DUKE UNIVERSITY CONSTRUCTION STANDARDS

RIVERSIDE CHURCH OF CHRIST. Lafayette, LA

Division 00 Procurement and Contracting Requirements

DOCUMENT ADDENDUM NO. 1

ROOF INSPECTION AND ANALYSIS PROCEDURE QUINLAN ASSOCIATES, LLC. 166 SHORE DRIVE BURR RIDGE, ILLINOIS

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO

Shepard & Associates, LLC

Addendum No. 3 Borough of Manhattan Community College Roof Replacement Project No: MC

Building Excellence IV Capital Levy Projects Under Construction

APPLICATION AND CERTIFICATE FOR PAYMENT

EVALUATION REPORT Soprema, Inc. 310 Quadral Drive Wadsworth, OH 44281

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

ADDENDA #5- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services

A. National Roofing Contractors Association (NRCA) Roofing and Waterproofing Manual

ITEM NO. 2 - INVITATION TO BID, INSTRUCTIONS TO BIDDERS, CALENDAR OF EVENTS

SECTION SINGLE-PLY ROOFING SYSTEM

Project: Lake Creek Village Apartments Project No: 0547

Item 2.3 Unit pricing GC to provide a square foot unit cost for material and labor to replace plywood decking beneath new concrete walkway slab.

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Roof Replacement. Notes: T-1 (Title Page) 709 Bull Street Columbia, South Carolina. University of South Carolina. Callcott Social Science

BOONE COUNTY PUBLIC LIBRARY (859) 342-BOOK (2665)

TELEPHONE: (215) Addendum No. 1

FirstEnergy Program Overview

STANMYRE + NOEL Architects, P.C Preston White Drive, Suite 104 Reston, VA v f

REQUEST FOR PROPOSALS March 4, 2010 PROJECT OVERVIEW:

LOG COLLEGE MIDDLE SCHOOL

CONSULTING PROJECT LOCATION

THERMOTEK ACRYLIC ELASTOMERIC SYSTEM OVER MODIFIED BITUMEN AND/OR BUR MEMBRANE

333-90TH STREET DALY CITY. CA ADDENDUM #1 CONTRACT BID DOCUMENTS FOR DOELGER SENIOR CENTER BOILER REPLACEMENT (101 LAKE MERCED BOULEVARD)

WVU DESIGN GUIDELINES & CONSTRUCTION STANDARDS DIVISION 07 THERMAL AND MOISTURE PROTECTION

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7

NEW CONSTRUCTION ADDENDUM TO COA APPLICATION

Roof Replacement. Notes: T-1 (Title Sheet) Roof Key Plan Russell House Student Union 1400 Greene Street Columbia, South Carolina 29208

ADDENDUM No. 3 NUMBER OF PAGES SENT WITH THIS ADDENDUM:

Design for Daytona State College Building th Street. New Smyrna Beach, FL 32168

4615 E. State Street Suite 206 Rockford Illinois /

ADDENDUM 2 TO INVITATION FOR BID 5270-FG UNLV SOUTH RESIDENTIAL COMPLEX RENOVATION

REBECCA LG BOSTICK, ARCHITECTS, INC

Project Manual Index of Specifications Shenandoah Schools Concession Building

DALLAS-FORT WORTH INTERNATIONAL AIRPORT

ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section )

CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS

Transcription:

THE SCHOOL DISTRICT OF PHILADLPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor - Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 1 Subject: Thurgood Marshall Elementary School Roof Replacement SDP Contract No. B-059C of 2016/17 Location: Thurgood Marshall Elementary School 5120 North Sixth Street Philadelphia, Pennsylvania 19120 This Addendum, dated November 30, 2017 shall modify and become part of the Contract Documents for the work of this project. Any items not mentioned herein, or affected by, shall be performed strictly in accordance with the original documents. This addendum contains two (2) numbered pages, one page of revised specifications, one (1) ADD. #1 Sketch and one (1) Sign-in Sheet for a total of five (5) pages. A. Bids are still due by 2:00 p.m., Tuesday, December 5, 2017 2. Post-Bid De-Scope Conference A. A Post-Bid, De-Scope meeting is scheduled for the following day, Wednesday, December 6, 2017 at 10:00 a.m. at the Office of Capital Programs, conference room 3126, 3 rd floor, 440 North Broad Street. The apparent Low-Bidder is required to attend, a principal of the bidder or representative authorized to make binding commitments must attend the meeting. 3. Revisions to GENERAL SPECIFICATIONS-Division 01 4. Drawings A. Correct the headers to read: THURGOOD MARSHALL ELEMENTARY SCHOOL-ROOF REPLACEMENT SDP CONTRACT NO. B-059C of 2016/17 B. Correct Section 01 1000 SUMMARY SCOPE OF WORK as follows: DELETE Paragraph 1.1 A through E and REPLACE with the attached Pararagh 1.1-SUMMARY SCOPE OF WORK C. CORRECT Paragraph 1.3 as follows: A. Project Identification: Specification B-059C of 2016/17-Marshall Elementary School Roof Replacement. B. Project Location: 5118-5150 North 6th Street, Philadelphia, PA 19120 C. Architect/Engineer: Wist Janney Elstner Associates A. Sheet R-1 (refer to attached partial roof plan drawing ADD. #1) a. Revise key note 5 for Roof Area B to read: Remove and discard abandoned satellite dish, dish support frame, and frame ballast. b. Add key note 10 to northeast corner of Roof Area A. c. At northeast corner of Roof Area B, revise noted legend from S ( service line) to G (ground) and add key note 12 to this lightning protection ground post. Page 1 of 2

Addendum No. 1 (cont > d) 5. Specifications 6. Other A. Specification Section 07 22 00 - Roof Insulation: add the following: 2.lB.4 Soprema: Sopra-ISO+ B. Specification Section 07 24 00 - Modified Bituminous Membrane Waterproofing Vapor Barrier: omit Section 2.2.B. C. Specification Section 07 53 10 - Modified Bitumen Membrane: Section 2.2.A.3. Flashing (2-ply) shall be revised to Parafor 30TG over Paradiene 20TG. D. Specification Section 07 24 00 - Modified Bituminous Membrane Waterproofing Vapor Barrier: add the following: 2.2A.4 Soprema: Sopralene Flam 180 2.5A.4 Soprema: Sopralene Flam Stick E. Specification Section 07 53 10 - Modified Bituminous Membrane: add the following: 2.2.A.4 Manufacturer: Soprema Bottom Ply: Sopralene Flam 180 Top Ply: Sopralene Flam 180 FR GR with highly reflective white granules Flashing (2-ply): Sopralene Flam 180 FR GR with highly reflective white granules over Sopralene Flam 180 and Alsan Liquid Flashing over Sopralene Flam 180 2.4A.4 Soprema: Alsan RS 2.5A.4 Soprema: Flam Stick 2.1 la.4 Soprema: Soprawalk Additional Scope and Clarifications A. New roof membrane assembly to be constructed with two plies of heat welded modified bitumen (one granule-surfaced ply over one smooth-surfaced ply). B. Lightning protection system to be removed and/or reinstalled where in contact with roofing to be removed and replaced, and as necessary to complete the specified work. Work to be performed by a lightning protection installation firm that will provide a Certificate of Compliance with UL96A and NFPA 780 upon completion of the work and prior to acceptance of the work. C. All roof drains to be tested for free flow/blockage prior to and upon completion of the work with all results provided in a report to the School District Project Manager. -END OF ADDENDUM NO. 1- Page 2 of 2

THURGOOD MARSHALL ELEMENTARY SCHOOL - ROOF REPLACEMENT SDP CONTRACT NO. B-059C of 2016/17 1.1SUMMARY SCOPE OF WORK- The work includes, but is not limited to: 1. Testing of roof drains and storm water inlets at grade prior to start of work to verify if clear and free flowing. 2. Inspection of all rooftop mechanical equipment, power and control wiring/conduit, antennae and satellite dishes, and related cable and light fixtures for existing damage and to verify if functioning properly. 3. Infrared roof moisture survey after completion of all insulated low-slope roofing. 4. Completely remove and discard all low sloped roofing to structural roof decks, walls, and curb substrates and remove all plywood cants at the base of rising walls. 5. Remove and discard existing sheet metal flashings, except where noted to be reused. 6. Remove and replace all existing roof drains. 7. Temporary disconnection and reinstallation of the lightning protection system by a licensed lightning protection system installer as necessary to perform the roofing and related work. 8. Install one ply of modified bitumen vapor barrier over all low slope concrete roof deck substrates. 9. Install insulation board, tapered insulation board, and cover board over all low slope roof deck substrates. 10. Install 2-ply modified bitumen roof membrane system over all low slope roof areas. 11. Install new sheet metal flashings, gutters, downspouts, and scuppers as noted on the drawings and in the specifications. 12. Remove and replace the existing gutters and downspouts on metal roof areas M-1 and M-3. 13. Remove and replace sealants in masonry wall control and expansion joints in rising walls above project roof areas and around the skylight glass on Roof Area A. 14. Install new pre-formed sealant over all end joints in the existing coping. 15. Paint existing ferrous metal (steel), including but not limited to, dunnage, roof hatch cover, roof access doors, and door framing. 16. Install one new roof access window and stairs for access to Roof Area F. 17. Replace plumbing vent flashings on metal roof area M-3. 18. Protect all new roofing throughout project from damage from construction related damage and wear. 19. Upon completion and acceptance of the work, provide contractor s two-year guarantee for all new roofing and related work and the low slope roof membrane manufacturer s 25-year No Dollar Limit roofing system warranty. SUMMARY OF WORK