Annual CSAH Needs Update for 2017

Similar documents
Annual CSAH Needs Update for 2018

STATE AID GUIDE FOR: Updated: December 16, 2005

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

Concrete Pavement Estimating 101 and. March 10, 2017 CPAM Concrete Paving Workshop Mankato MN Presenters:

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

ATP-6 STIP APPLICATION FORM FOR FISCAL YEAR 2017 Page AGENCY (Requestor or Agency who'll open bids): Contact: Phone:

2399 Pavement Surface Smoothness

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 07/10/17 Comp. Dt:

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

QUANTITIES MOBILIZATION PAVT, REM EROSION CONTROL, INLET PROTECTION, FABRIC DROP 12 EA AGGREGATE BASE AGGREGATE BASE, CONDITIONING SHOULDER, CL II

BRIDGE INSPECTION REPORT

MNDOT PAVEMENT DESIGN MANUAL

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 04/03/17 Comp. Dt: 10/06/17

54 th Annual Concrete Paving Workshop March 13, 2015

PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR

COUNTY ROAD ASSOCIATION OF MICHIGAN

Exhibit A Scope of Work. 0.0 Separation of work Types and Cost Estimate

GOV: HOW TO MANAGE PAYROLL PAYMENTS

Constructability Guidelines

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

TH 13 Port of Savage Truck Access Study

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

Review of Plans and Specs from a Constructability Perspective

South Carolina Department of Transportation. Engineering Directive

PREVENTATIVE MAINTENANCE

State-Aid Bridge News July 20, 2004

Plan Unit Description

September 2007 Thomas Bohuslav Texas Department of Transportation

Preventive Maintenance Project & Treatment Selection

NOTICE. Registration Form and Notice of Needed Revisions

EXCELLENCE IN CONCRETE PAVEMENT AWARDS NOMINATION FORM

INDEX Warrant for Reclaiming Asphalt Pavement - Partial Depth Warrant for Reclaiming Asphalt Pavement - Full Depth

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

February Page 1

PUBLIC NOTICE MEDINA COUNTY HIGHWAY ENGINEER SHAW ROAD BRIDGE REPLACEMENT - DESIGN REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ)

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 20 over POMME DE TERRE RIVER. Date of Inspection: Equipment Used: 06/18/2016. County Highway Agency

ODOT ADA Program 10/31/2017. Recent ADA outcomes. What you need to know. Settlement Agreement approved. Updated Transition Plan

INNOVATIVE CONTRACTING GUIDELINES

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:]

OHIO PUBLIC WORKS COMMISSION SMALL GOVERNMENT PROGRAM PY 33 METHODOLOGY. May 2018

CUY-480-Valley View Bridge. Matchmaker April 20, 2017 Bureau of Workers Compensation 4800 E. 131 st Street

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

Research Initiatives at TxDOT Related to Utilities and Right of Way

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

TABLE OF CONTENTS. Manual Section. Introduction 1. Using This Manual 2-3. Administrative Actions 4-6. Road and Bridge Project Types 7

Bridge Construction. Nick Haltvick North Region Bridge Construction Engineer May 17, Bridge Office mndot.gov/bridge/construction.

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

Information for File # RJH

ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007


Lehigh Valley Transportation Study

APPENDIX I APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

PD-19: Reduce, Reuse and Repurpose Materials

ESS - Payroll Direct Deposit/Bank Information

Cuyahoga County Constructs a Perpetual Pavement

Wall Asset Management Implementation at Colorado Department of Transportation. Bryant Walters, Collins Engineers Mark Vessely, Shannon & Wilson

Commercial Tax Abatement

Highway Construction Workforce Development For AGC DOT Improvement Meeting April 8 9, 2014

STRUCTURE AND BRIDGE DIVISION

Maintains the status quo even though deteriorated. To keep at original condition or use.

VDOT S BRIDGE PRESERVATION PROGRAM. Virginia Concrete Conference, 2012 RICHMOND, VA. March 9, 2012

Red Wing Bridge Alternates

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST

Construction Cost Estimation Preparation Manual (Metric Units)

Roadway Surfaces and Traffic Control Elements

Community Improvement Districts CIDs. CID concepts

COST ESTIMATE STREET IMPROVEMENTS (Off Site)

SS David L. Seago, P.E. Assistant Director of Construction Dallas District CST Conference

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

GRAYSON COUNTY POLICY, PROCEDURES AND SPECIFICATIONS OF GRAYSON COUNTY, TEXAS FOR THE INSTALLATION OF DRIVEWAY

St. Tammany Parish Government Department of Procurement P. O. Box 628 Covington, LA Phone: (985) Fax: (985)

Technical Memorandum: Road Safety Hardware Series. technical memorandum

CHAPTER 5: UTILITIES

Plan Unit Description

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 22 over POMME DE TERRE RIVER. Date of Inspection: Equipment Used: 06/18/2016. County Highway Agency

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)

CONTRACTOR S PROPOSAL FISCAL YEAR STREET IMPROVEMENT PROJECT AND MAIN STREET BRIDGE REHABILITATION

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 4/27/2015

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

LRRB Local Operational Research Assistance Program (OPERA) for Local Transportation Groups Field Report

1. Chip Seal Preservation/Funding 2. BST Summits (2006, 2007, 2009, 2010) 3. Double Seal Experiments (2008 and 2010)

Zoo Interchange Reconstruction

COUNTY OF SUTTER ENCROACHMENT PERMIT

B HOT MIX, HOT LAID ASPHALTIC CONCRETE OPSS 313

Design of rural and urban roads contributes a lot towards safety of users. Identify some low-cost

Chapter 3: Permit Procedures and Requirements

TRANSPORTATION. Governmental Projects

CHAPTER 11 PAVEMENT TYPE DETERMINATION

Transcription:

Annual CSAH Needs Update for 2017 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segments and project data using the SANeeds system. To access the SANeeds system you must obtain a user account from State Aid. Please go through the State Aid website to apply for an account and to access the SANeeds system. http://www.dot.state.mn.us/stateaid/csah.html Please contact Kim DeLaRosa; Kimberlie.delarosa@state.mn.us or 651-366-3810 or John Pantelis at john.pantelis@state.mn.us or 651-366-3811 if you have any questions. Update Road Project Data It is important for counties to review their existing project data and add projects completed in previous construction years (i.e. 2012-2015) because unit costs are determined by project financial data. The pool of projects that will be used to determine unit cost for the 2018 distribution will be those awarded between 2012-2016. While reviewing your project data please keep the following in mind: Enter only projects that are approved to the construction or reconstruction standard: rural 8820.9920, urban 8820.9936 & 8820.9981 NPR. Turn lanes, intersection improvements, mill & overlays and bridge replacements are not included. Enter all complete 2016 awarded construction projects. Add all phased contract costs to the final surfacing project and report as one complete project cost. E.g. grading done in 2014, base and non-wear course done in 2015, final wear course in 2016. Total all three projects (state aid eligible items), report under the 2016 project number. Split projects that change design (rural/urban) or traffic groups. The table below specifies the traffic groups and design types: Traffic Group Design Type 0-149 Rural 150-1499 Rural 1500-6999 Rural 7000+ Rural 0-9999 Urban 10,000-19,999 Urban 20,000-34,999 Urban 35,000+ Urban E.g. A 3.0 mi project starts in a city and continues outside the city limits for 2.2 mi. Enter the 0.80 mi urban design as one project and use the same project number again for the 2.2 mi rural design portion.

Split out the costs from projects that have both reconditioning and reconstruction. E.g. A 10 mile mill & overlay with 1.5 mile reconstruction segment should be reported as a 1.5 mile reconstruction project with the appropriate costs. Counties do not have to enter culvert projects or preservation projects. The Needs Unit will enter those costs. To update project data access the SANeeds system (http://www.dot.state.mn.us/stateaid/csah.html) and follow the links to the application. Once you have successfully logged on, click on the Needs Data button Road Projects, choose your county and click Search. Select project to revise or click Add New Road Project: Update existing project:

Add New road project For new projects: Enter project number (there may be multiple entries for the same project number) Enter award date for project. When construction is done in multiple years enter the award date for the last (surfacing) project. Projects are considered complete on the award date. Update or revise the length (miles) of the new or reconstructed length. Enter projected AADT from the plan Enter total state aid eligible construction costs regardless of the funding source. Staged construction projects are added together and put in the year of the surfacing project. Subtract out bridge costs, culverts >10, traffic signal costs or any other state aid ineligible items, see list below. You may use final costs up to year five after the award date. You may change projects costs to reflect final costs within the five year window and you must submit documentation to DSAE. Enter only eligible right of way costs associated with the construction project listed. Eligible costs include all payments to those with property interests, including utility companies. Condemnation, commissioner and court awarded payments, payments to property owners for appraisal costs, fees, damages, etc. are eligible costs. Agency incurred abstract fees, appraisal costs, attorney fees, court fees, filing fees, taxes and payroll are not eligible needs costs. Note: Scan and email all supporting documentation and forward to your DSAE for review!!

Exhibit 2 When entering or revising road project data, the following are considered Ineligible Items: Ineligible Items Spec. Item 2011.xxx 2013.xxx 2015.xxx 2016.xxx 2104.xxx 2211.xxx 2221.xxx 2231.xxx 2355.xxx 2356.xxx 2401.xxx 2402.xxx 2403.xxx 2404.xxx 2405.xxx 2412.xxx 2433.xxx 2452.xxx 2453.xxx 2461.xxx 2471.xxx 2472.xxx 2476.xxx 2478.xxx 2479.xxx 2480.xxx 2481.xxx 2503.xxx 2504.xxx 2514.xxx 2520.xxx 2540.xxx 2541.xxx 2545.xxx 2550.xxx 2557.xxx 2560.xxx 2564.xxx 2565.xxx 2571.xxx 2572.xxx 2577.xxx Description Miscellaneous Items Miscellaneous Items Miscellaneous Items Miscellaneous Items All removal, salvage, abandon, and relocate items associated with water, gas, and sanitary sewer storm sewer is OK Aggregate Base (stockpile items only) Aggregate Shouldering (stockpile items only) Bituminous Surface Reconditioning Bituminous Fog Seal (2357 is OK) Bituminous Seal Coat Concrete Bridge Construction Steel Bridge Construction Timber Bridge Construction Concrete Wearing Course for Bridges Pre-stressed Concrete Beams Box culverts over 10 with a structure number Structure Renovation Piling Drilled Shaft Items Structural Concrete Structural Metals Metal Reinforcement Painting Items Organic Zinc-Rich Paint System Inorganic Zinc-Rich Paint System Painting Items Waterproofing When used for sanitary and water mains Water System Items Slope Paving Lean Mix Backfill Landscaping Items Historic Items Electric Lighting Systems Traffic Management System Fencing Highway-Railroad Grade Crossing Signals Traffic Signs and Devices Traffic Control Signals Plant Installation Protection and Restoration of Vegetation Soil Bioengineered Systems

Incentives and disincentives Update Road Segment Data When revising CSAH Segment data please keep the following in mind: Update segments based on Commissioner Orders approved in 2016. Please split segments if you had corporate limit changes that fall within an existing segment. Please split segments in which the design, number of lanes or traffic group changes fall within an existing segment. You DO NOT HAVE to split segments because of a project. Make sure your signals are entered. (one signal per leg of the intersection) Use the comment field for project numbers and any other information that pertains to that segment. Compute flag defaults to Yes. Please change it to No if this is an interchange segment or MN bridge. When you build or participate in an interchange or MnDOT bridge project you must create a segment for the interchange or bridge length. Enter all state aid eligible county costs associated with that interchange or county cost participation on the bridge and the application will compute the appropriate money needs. Please call the CSAH Unit for assistance when entering interchange segments.

To update CSAH Segment data access the SANeeds system (http://www.dot.state.mn.us/stateaid/csah.html) and follow the links to the application. Once you have successfully logged on click Needs Data Needs Data Road Segments, select your county and click Search. Road Segment Screen: Update Structure Data The application will compute needs on every existing structure with a bridge number based on the existing size. Please update all bridge and culvert replacements in 2016. Add any missing structures and delete any structures that have been removed or are not on a CSAH. Pedestrian bridges, railroad bridges and TH bridges do not receive needs. When revising structures please keep the following in mind: For bridges, please verify the structure number, length and width, milepoint on route, year bridge built, and type of structure. For Culverts (10 or larger only) please verify the structure number, length, barrel width and height, number of barrels (e.g. 1=single, 2=double, 3=triple), culvert length, area of waterway opening Indicate whether or not the structure is on the county line and shared with another county or state. Use the comment field to enter project number or any information related to the structure.

Bridge Screen: Culvert Screen:

Update Railroad Data Each railroad crossing on a CSAH will receive needs for the length of one track of crossing surface and the existing protection. RR crossings: Choose a rail company Fill in the USDOT number Enter the mile point on the route, not the segment Choose your existing protection type Enter last year of upgrade on crossing protection Enter the crossing material length Last year crossing surfaced Is it a shared crossing on county line Use the comment field to enter project number or any information related to the crossing. Railroad Crossing Screen:

Submit Project and Segment Data Please submit changes to your District State Aid Engineer by March 31, 2017. You must login to the program and submit your county even if you had nothing to update. From the main menu select Needs Data Submit County: Your county should appear on the list. Click Submit. Once submitted the DSAE will have the ability to review.