EUROMED ACTIVITIES ON UN AGREEMENTS CONCERNING ROAD VEHICLES Phases I and II. EuroMed RRU Transport Project

Similar documents
European Commission EuropeAid

WP5 UN ECE Working Party on Transport Trends and Economics 8-10 September 2014

Euro-Mediterranean Working Group on Energy Statistics

ACTION PLAN Water Strategy in the Western Mediterranean. Ramiro Martínez General Coordinator Mediterranean Network of Basin Organizations - MENBO

Concept note for identified area of CBC (WP5 and WP6):

European Commission. Regulatory approximation in the transport sector. Anna Panagopoulou Directorate General Energy and Transport

BARCELONA, October 2015

The Challenges of Climate Change in a Mediterranean in Transition

Opportunities for the private sector in Neighbourhood countries

Strengthening EU-Lebanon trade and investment relations

WP5 UN ECE Working Party on Transport Trends and Economics Geneva, 5 7 September Transport in the Mediterranean region

MEDA-ETE PROJECT EDUCATION AND TRAINING FOR EMPLOYMENT Sub Component 2-1 Launch Seminar

MEDENER A unique Association for facilitating networking, exchange of experiences and joint regional EE and RE projects in the Mediterranean

European Commission EuropeAid

Developments in border crossing facilitation 2017

PRIMA Partnership for Research and Innovation in the Mediterranean

Euro-Mediterranean cooperation in maritime transport

Gas and energy security in the wider Mediterranean region

The establishment of the Regional Soil Partnership for MENA region. Dr. Mahmoud Alferihat

The European Commission s science and knowledge service. Joint Research Centre

National Plan for developing The Renewable Energy in Libya ( )

TASK 5: MEDITERRANEAN SEA - IDENTIFICATION MARITIME COOPERATION STUDY TO SUPPORT THE DEVELOPMENT OF SEA BASIN COOPERATION REPORT 4 EXECUTIVE SUMMARY

Foreword. Twinning, TAIEX and SIGMA within the European Neighbourhood and Partnership countries 2013 activity report

LOGISMED Euro-Mediterranean network of logistics platforms

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION TO THE COUNCIL

AN INTRODUCTION TO THE SWIM PROGRAMME SWIM Launching Workshop, 7 December 2011, Brussels Presented by: Dr. Sherif Arif, Team Leader SWIM-SM

Harmonized European standards for construction in Egypt

TWINNING PROJECTS IN THE AIDCO/A6 NEIGHBOURHOOD REGION

Methodology and proposal for newly developed H2020 Industrial Emissions Indicators

Mediterranean Water Knowledge Platform. Exchange of experience workshop on Water Information Systems (WIS) Barcelona October 2017.

Covenant of Mayors for Climate and Energy

Dangerous Goods and Special Cargoes Section

Presentation of Priority Survey Results

CP/RAC Focal Point Meeting 2013

Newsletter. Water-DROP

Strengthening Euro-Mediterranean Cooperation through R&I 4PRIMA Conclusive Event 18 January 2017, Brussels

PRELIMINARY OVERVIEW OF CLIMATE FINANCE SITUATION IN THE MENA REGION AND LOOKING FORWARD

Facility for Euromed Dialogue and Exchange of Best Practices

Insight on some water processes within the Euro-Mediterranean agenda

A Mediterranean electricity co-operation strategy. Vision and rationale

EIB s role in facilitating the implementation of water-related innovative solutions in MED partner countries: MeHSIP II

UNECE s Working Party on Transport Statistics (WP.6)

Energy and Climate Policies in the Mediterranean after COP21 in Paris

Euromed GNSS II project/medusa

The Research Reactors in Arab Countries: characteristics and utilizations. D. MOSBAH and S.TAKRITI Arab Atomic Energy Agency AAEA - Tunis

UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE (UNECE)

Economic and Social Council

Publishable executive summary

EU-OECD Programme on Promoting Investment in the Mediterranean REGIONAL SEMINAR. Institutional Reforms of Investment Promotion Agencies

Association of Mediterranean Energy Regulators ACTION PLAN

UN Environment MAP MEDPOL Marine Litter Monitoring Activities

MEDCITIES EXPERIENCES ON CITY SUDSTAINABLE DEVELOPMENT STRATEGIES

Mediterranean EGNOS Data Collection Network. Session A5: Local & Regional Augmentation Systems ENC-GNSS 07 31st May 2007 Geneva

New Challenges for Energy System in the Mediterranean Region 2014 Edition

THE MEDPARTNERSHIP AND THE CLIMATE VARIABILITY & ICZM PROJECTS. Lorenzo Galbiati, Project Manager UNEP/MAP

Role of AFD in financing Urban Transport

Covenant of Mayors Perspectives. Giulia Melica. PROMOTING SUSTAINABLE ENERGY Data quality to support local action

Covenant of Mayors Perspectives. Giulia Melica. PROMOTING SUSTAINABLE ENERGY Data quality to support local action

The Needs of Water and Wastewater Utilities in the Arab Region - Overview Eng. Khaldon Khashman ACWUA Secretary General

Context and state of play

Mediterranean Hot Spot Investment Programme:

Tapping a Hidden Resource: Energy Efficiency in the Middle East and North Africa

A Sustainable Development in the Mediterranean Area Basilica di San Giovanni Maggiore - Naples, By: Jamila Matar Director, Energy Department -LAS

"ECOlogical use of native PLANTs for environmental restoration and sustainable development in the MEDiterranean region"

Increasing quantities of waste and its negative impact on the environment, water quality and health are a growing problem in the countries of the

ENPARD South: the beginning of a long story?

Organic Agriculture in the Mediterranean Development, tendency, prospects. Charikleia Minotou, AgriBioMediterraneo Ifoam, President

Economic and Social Council

Status and Progress of CPFs in the NENA Region February 2016 FAO RNE Regional Professional Staff Meeting

OME Context Present situation and prospects Recommendations

Cooperation Action (MIRA)

Paul van Son, RWE/Dii

The European Investment Bank Experience

NEAR EAST FORESTRY AND RANGE COMMISSION TWENTIETH SESSION SECOND NEAR EAST FORESTRY WEEK ANTALYA, TURKEY 29 JANUARY 02 FEBRUARY 2012

SECOND EURO-MEDITERRANEAN MINISTERIAL CONFERENCE ON THE INFORMATION SOCIETY. Cairo 27 February 2008 DECLARATION

How Regional Cooperation Helps to Enhance Energy Security in ESCWA Region

TORINO PROCESS 2014 IN LEBANON

Walid Salameh Project Coordinator

Forestry, the Mediterranean, Women: a networking perspective

Key Accountabilities (not all-inclusive, within delegated authority):

SWIM-H2020 SM. SWIM and Horizon 2020 Support Mechanism

Renewable Energy investments in the Mediterranean and beyond. Roberto VIGOTTI, Secretary General RES4MED&RES4Africa

Strategic Research and Innovation Agenda (SRIA) First results from the Public Open Consultation 4PRIMA Work Package 5 on SRIA by: The PRIMA

Outline. I. Industrial Upgrading: II. The Industrial Upgrading Approach: III. UNIDO s upgrading experience. Why does it matter?

Strengthening Stakeholder Engagement in the Mediterranean Environment and Water agendas

Addressing Climate Change in the MENA Region: a Regional Program. Raffaello Cervigni The World Bank May 2009

Pharmaceutical Sector Governance in the Middle East and North Africa Region A Regional Review by the World Bank

Development of Statistics. Statistics for Development.

MED BRIEF FEMISE. May 2018 Med Brief No 6. The Importance of Reconciling South MED Countries positions on The Paris Agreement *

European Parliament. Renewable Energy in the MEDA Region.. Public Hearing on. Brussels 16 June Albrecht Kaupp MED-EMIP Team Leader

CIHEAM The Mediterranean organic route

SwitchMed Programme. SwitchMed demonstration component

Mednet Project. Newsletter N 3. puts you in touch with Innovative Energy Technologies

Webinar on the implementation of the Shared Environmental Information System (SEIS) principles and practices on the ENP Sought region (ENP-SEIS)

Electricity interconnection projects between North Africa and Europe: challenges and opportunities

European Commission EuropeAid

SWIM-H2020 SM in a Snapshot

E Distr. LIMITED E/ESCWA/ECW/2017/IG.1/L.1 12 August 2017 ENGLISH ORIGINAL: ARABIC

Sustainable Water Integrated Management and Horizon 2020 Support Mechanism

Water Quality Management in Mashreq and Maghreb Countries. Presented BY Prof. NAHLA ZAKI

Transcription:

EUROMED ACTIVITIES ON UN AGREEMENTS CONCERNING ROAD VEHICLES Phases I and II EuroMed RRU Transport Project ITC, 23 26 February 2016 1

The Project In the context of ENPI: European Neighbourhood and Partnership Initiative South Concerned countries: Algeria, Egypt, Israel, Jordan, Libyan, Libya, Morocco, Palestine, Syria, and Tunisia Bureau of the project: Tunis Phase I covered: Jordan, Morocco and Tunisia Phase II covered: Jordan, Morocco, Tunisia, Egypt and Israel Consulting LEEGO 2

Project objectives Land transport Regulatory reform and adaptation Operational conditions as to facilitate cross-border transport Safety in land transport modes Sustainable and efficient transport in urban areas Learning from experience in the wider Mediterranean region 3

Project Objectives Promote the main UNECE Road Transport Agreements Better understand benefits and adopt national legislation Share experiences from countries implementing these agreements Discuss potential reforms in the field of road transport 4

Upgrading and harmonizing vehicle regulations in the region Phases I & II Phase I: Pilot work in Jordan, Morocco and Tunisia Phase II: Continuation and extension of the pilot work implemented in 2014 The specific objectives are to: Conduct a diagnosis of the actual situation relating to vehicle regulations and compare it with UN related Agreements and EU Regulations. Having a clear picture of the actual situation, identify and suggest appropriate legislative modification to existing national legislation; Promote accession to and implementation of the UN 1958 Agreement and the UN 1997 Agreement; Organize on a demand driven basis Capacity building events and Type approval workshops; and Provide ad-hoc TA on the accession to and implementation of the respective Agreements and on the functioning of the type approval and periodical technical inspections systems Extend the pilot action done in Jordan, Tunisia and Morocco to Egypt and Israel 5

Participating Countries - Jordan (Phases 1 & 2) - Morocco (Phases 1 & 2) - Tunisia (Phases 1 & 2) - Israel (Phase 2) - Egypt (pending) 6

Jordan ROAD RAIL URBAN TRANSPORT Participated in phases 1 & 2 of Euro Med programme A. FINDINGS: No Contracting Party to the 1958 and 1997 Agreements Has a legal national system of Vehicle Type Approval (VTA) Jordan standards on VTA based on old versions of both UN Regulations annexed to the 1958 Agreement and on EU Directives and regulations Practical implementation of the VTA needs to be improved Has a national Periodical Technical Inspection (PTI) system, which is no far from the provisions of the 1997 Agreement 7

Jordan ROAD RAIL URBAN TRANSPORT B. RECOMMENDATIONS: Accede to the 1958 and 1997 Agreement Modify the national legislation for an effective VTA system based on the UN Regulations of the 1958 Agreement. Select a number of UN Regulations as mandatory for registration process Implement, in practise, the VTA system Adapt the national PTI system to that of the 1997 Agreement, making its 2 UN Rules mandatory More Technical Assistance is needed 8

Morocco Participated in phases 1 & 2 of Euro Med programme A. FINDINGS: No Contracting Party to the 1958 and 1997 Agreements Has a legal national system of Vehicle Type Approval (VTA) Its VTA system is based on more than 100 UN Regulations of the 1958 Agreement, but at the 1998 level The practical implementation of the VTA is near to that of the EU system concerning the Whole Vehicle Type Approval. Has a national Periodical Technical Inspection (PTI) system, which is no far from the provisions of the 1997 Agreement 9

Morocco B. RECOMMENDATIONS: Accede to the 1958 and 1997 Agreement Modify the national legislation for an updated VTA system based on the UN Regulations of the 1958 Agreement. Select a number of UN Regulations as mandatory for national VTA system and registration process, the same that of the EU Continue the application of the VTA based either on the EU Whole VTA system or on the UN Regulations of the 1958 Agreement Align the national PTI system to that of the 1997 Agreement, making its 2 UN Rules mandatory More Technical Assistance is needed 10

Tunisia Participated in phases 1 & 2 of Euro Med programme A. FINDINGS: Contracting Party to the 1958 and 1998 Agreements. No to the 1997 Agreement Has a legal national system of Vehicle Type Approval (VTA) Its legal VTA system is based on a generic reference to the approval of systems and components The practical implementation of the VTA is based on UN Regulations and EU directives. Type Approval Authority has recently been nominated Has a national Periodical Technical Inspection (PTI) system, which is no far from the provisions of the 1997 Agreement, although needs more resources to apply all the provisions 11

Tunisia B. RECOMMENDATIONS: Accede to the 1997 Agreement Modify the national legislation for an updated VTA system based on the UN Regulations of the 1958 Agreement. Select a number of UN Regulations as mandatory for national VTA system and registration process Continue the application of the VTA based either on the EU Whole VTA system or on the UN Regulations of the 1958 Agreement Align the national PTI legislation to that of the 1997 Agreement, making its 2 UN Rules mandatory Increase resources for a complete application of the provisions of the 1997 Agreement More Technical Assistance is needed 12

Israel ROAD RAIL URBAN TRANSPORT Participated in phase 2 of Euro Med programme A. FINDINGS: No Contracting Party to the 1958 and 1997 Agreements Has a legal national system of Vehicle Type Approval (VTA) Its VTA system is based on the WVTA of the EU acting as a EU member State Israel also accepts vehicles in conformity with USA standards (NHTSA and EPA) Has a national Periodical Technical Inspection (PTI) system, which is the same of the EU one 13

Israel ROAD RAIL URBAN TRANSPORT B. RECOMMENDATIONS: Accede to the 1958, 1998 & 1997 Agreements Modify the national legislation for an updated VTA system based on the UN Regulations of the 1958 Agreement and on the EU WVTA Apply the same UN Regulations applied by the EU as mandatory for national VTA system and registration process More Technical Assistance if required by Authorities 14

Egypt ROAD RAIL URBAN TRANSPORT Awaiting for agreed dates to participate in Phase 2 of EuroMed programme A. SITUATION: Contracting Party to the 1958 Agreement, applying all the un Regulations annexed to the 1958 Agreement No Contracting Party to the 1997 Agreement 15

Regulated Activities Emissions of pollutants and CO 2 General safety Passive safety Noise Active safety Lighting and light signalling 16

WP.29 How it works How to join it? http://www.unece.org/trans/main/wp29/wp29wgs/wp29gen/wp29pub.html 17

Thanks for your attention 18