Objectives of NatVent

Investigation of indoor climate in a naturally ventilated building

Potential of natural ventilation in shopping centres

Work Package 2: Performance of naturally ventilated buildings

Advanced Ventilation Technologies

Tage Møller Architect office building

BUILDING INTEGRATED VENTILATION SYSTEMS MODELLING AND DESIGN CHALLENGES

VELUX A/S, Daylight Energy and Indoor Climate, Ådalsvej 99, 2970 Hørsholm, Denmark *Corresponding author:

Work Package 2: Performance of naturally ventilated buildings

Modelling Analysis of Thermal Performance of Internal Shading Devices for a Commercial Atrium Building in Tropical Climates

The Elithis Tower is an experimental and demonstration. Elithis Tower in Dijon, France. nzeb case studies

Evaluation methods for indoor environmental quality assessment according to EN15251

Potential of Natural Ventilation in Shopping Centres Diederichsen, Alice; Friis, Kristina; Brohus, Henrik; Tranholm, Gitte T.

PRINCIPLES AND POTENTIALS OF VENTILATIVE COOLING

Thermal Comfort Measurements in a Hybrid Ventilated Office Room

171: An urban office designed for the southern Brazilian climate

An Experimental Study for the Evaluation of the Environmental Performance by the Application of the Automated Venetian Blind

Evaluation of indoor air quality in classrooms equipped with different methods of ventilation

Air distribution and temperature control in classrooms

Natural Ventilation in Schools and Commercial Buildings (CPD No. 31) Issue 2 May 2017

The energy benefits of View Dynamic Glass

Natural ventilation and low energy building design

ENERGY ANALYSIS AND ENERGY CONSERVATION OPTION FOR THE WAREHOUSE FACILITY AT THE HUMAN SERVICES CENTER COMPLEX DRAFT REPORT.

Monitoring of Advanced Facades and Environmental Systems

Henrik N. Knudsen 1, Ole M. Jensen 1, Lars Kristensen 2 Danish Building Research Institute, Aalborg University The green House/Energy Service Denmark

546: High Altitude Design, Optimising Residential Architecture in the Alborz Mountains, Iran

NatVent. Overcoming technical barriers to low-energy natural ventilation in office type buildings in moderate and cold climates

Chapter 7. Passive Solar Contents

INTEGRAL BUILDING AND ENERGY DESIGN OF AN OFFICE BUILDING COMPARISON OF INITIAL DESIGN IDEAS WITH MONITORED RESULTS

Characterization and performance evaluation of solar shading devices

Designing natural ventilation for thermal comfort in buildings

Using passive solutions to improve thermal summer comfort in timber framed houses in South-west France

SIMPLIFIED HOURLY METHOD TO CALCULATE SUMMER TEMPERATURES IN DWELLINGS

Advanced Ventilation Technologies

The Embassy of the Kingdom of the Netherlands, Amman - Jordan

THERMAL MASS CHAPTER 6. Understanding thermal mass. Seasonal effects of thermal mass

Denmarks first public CO 2 -neutral building

Wind-Driven Natural Ventilation Systems. PRESENTED BY NIRAJ MISTRY

Understanding thermal mass

NatVent. Overcoming technical barriers to low-energy natural ventilation in office type buildings in moderate and cold climates

Ventilated Illuminating Wall (VIW): Natural ventilation and daylight experimental analysis on a 1:1 prototype scale model

DYNAMIC FACADE. BUILDING ENERGY EFFICIENCY REHABILITATION.

SKYLIGHT DESIGN PERFORMANCE EVALUATION METHOD DEVELOPMENT WITH THERMAL AND DAYLIGHT SIMULATION

What is Sustainable Design?

APT building in Engelsby, DK

additional cooling energy consumption. Because the thermal resistance of windows has always been a weak point, even with vacuum glass or low-e glass,

ANALYSIS AND EXPERIMENTAL INVESTIGATION OF THE NTCH BUILDING ON ENERGY CONSERVATION DESIGNS

Analysis of a plus-energy house for improved building and HVAC system design

Effect of Building Orientation and Window Glazing on the Energy Consumption of HVAC System of an Office Building for Different Climate Zones

Great Ocean Rd Ice Creamery

Practical experiences with buildings in Arctic Greenland

Indoor environment for energy performance of buildings a new European draft standard

SOUTH LANARKSHIRE COLLEGE LOW CARBON TEACHING BUILDING TECHNICAL CASE STUDY

User Interactions with Environmental Control Systems in Buildings

Contact Details: Phone Fax . Work Description: New Building Extensions Refurbishment Change of Use. Yes No Method:

Effect of a Window Shade on Home Energy Use

Assessing thermal comfort of dwellings in summer using EnergyPlus

ANALYSIS OF ENVELOPE THERMAL BEHAVIOUR THROUGH PARAMETRIC STUDIES. Civil Engineer, PhD, Assistant Professor, Civil Engineering Department (3)

Pearl River Tower. Guangzhou, China. AEI Professional Project Awards January 2014 PHOTO CREDIT: TIM GRIFFITH

Environmentally Responsive School Buildings in the UK

Summer season temperature control in Finnish apartment buildings

Bioclimatic approaches of modern residential architecture in Cyprus,

Findings of Field Survey for Thermal Comfort and Ventilation in US Office Buildings

UT Zero-Energy House Screen House University of Tennessee, Knoxville Arc 572 I Spring 2008

SOLAR XXI: A Portuguese Office Building towards Net Zero-Energy Building

CAE 331/513 Building Science Fall 2017

Summer thermal comfort in traditional buildings of the 19th century in Florina, north-western Greece

Advanced Ventilation Technologies

Passiv Haus Institut. Certification as "Quality Approved Passive House" Criteria for Non-Residential Passive House Buildings

Improvement of Indoor Living Environment by Occupants Preferences for Heat Recovery Ventilators in High-Rise Residential Buildings

DESIGN, MONITORING AND EVALUATION OF A LOW ENERGY OFFICE BUILDING WITH PASSIVE COOLING BY NIGHT VENTILATION

Influence of Building Orientation on the Indoor Climate of Buildings

Design Strategies and Guide lines for Tropical Coast of Pakistan, Using Climate Consultant

Bruck an der Mur. Project summary. Energy concept: Background for the renovation reasons

Introduction to basics of energy efficient building design

Evaluating the Building Performance of the Center for Promotion of Science in Block 39 in Belgrade, Serbia

ScienceDirect. Simulation based mixed mode building design

OPEN COMPETITION Energy Design of High Performance Buildings Organised by EC-JRC and ESRU

Selecting Energy Efficient Replacement Windows in Florida

UT Zero-Energy House Layer House University of Tennessee, Knoxville Arc 572 I Spring 2008

State Of The Art Office Building & Campus For Maharashtra Energy Development Agency(MEDA) At AUNDH, PUNE

Cold Plane Innovative Method for Humidity Condition Control

Design and retrofitting of a hybrid building in Athens

Model Home 2020 project i CarbonLight Homes

Optimising Ventilative Cooling and Airtightness for [Nearly] Zero-Energy Buildings, IAQ and Comfort

Selecting Energy Efficient New Windows in Tennessee

Building Performance Evaluation

REAL-TIME CONTROL OF OCCUPANTS THERMAL COMFORT IN BUILDINGS. Galway, Ireland

Selecting Energy Efficient New Windows in Nevada

EVALUATION OF THE INDOOR AIR QUALITY IN A SINGLE FAMILY ACTIVE HOUSE

Designing carbon neutral schools: The Victor Miller Building, a critical review

A STUDY OF WALL SURFACE TEMPERATURE VARIATIONS FOR HOUSING IN MODERATE CLIMATES

DESIGN OF A GREEN DEMO BUILDING IN A HOT AND HUMID CITY IN CHINA. Ana Bacall Sebesta Blomberg & Associates Woburn, MA

Transcription:

Work Package 2: Performance of naturally ventilated buildings Detailed Monitoring Report BRF-kredit Headquarters (DK2) Niels C. Bergsøe Danish Building Research Institute, SBI Energy and Indoor Climate Division Table of contents 1. INTRODUCTION...2 2. VENTILATION OF OFFICE BUILDINGS...2 3. PROCEDURE...3 3.1 Technical measurements...3 3.2 User questionnaire...4 4. DESCRIPTION OF THE BUILDING...4 5. VENTILATION PHILOSOPHY AND AIMS...6 6. TECHNOLOGY...6 7. INVESTIGATED OFFICES...9 8. MONITORING RESULTS, SUMMER SEASON...1 8.1 Measurements...1 8.2 Questionnaire...12 8.3 Major findings...13 8.3.1 Thermal comfort...13 8.3.2 Indoor air quality...13 8.3.3 Occupants views...13 9. MONITORING RESULTS, WINTER SEASON...14 9.1 Measurements...14 9.2 Questionnaire...16 9.3 Major findings...17 9.3.1 Thermal comfort...17 9.3.2 Indoor air quality...17 9.3.3 Occupants views...17 1. LESSONS LEARNT AND SUGGESTED IMPROVEMENTS...18

1. Introduction The work within the pan-european research project NatVent Overcoming technical barriers to low energy natural ventilation in office-type buildings in moderate and cold climates has been divided into three work packages. The second work package, WP2, is titled Performance of naturally ventilated buildings and it is centred on evaluating the performance of existing buildings designed and constructed specifically as energy-efficient naturally ventilated buildings. This detailed monitoring report forms part of the reporting of the work carried out within WP2. The report documents results and findings of measurements performed in the BRF-kredit Headquarters being one out of three Danish buildings investigated within WP2 of the NatVent project. In addition to this detailed monitoring report a summary report is available and also a CD-ROM. 2. Ventilation of office buildings Increased concern over the adverse environmental impact of energy use has encouraged the design and construction of energy efficient buildings. This has lead to a growing interest for natural ventilation strategies and much attention is being given to the development of such systems. Whether mechanical or natural ventilation systems are applied two basically different performance situations must be considered. In the winter-time the major challenge for the ventilation system is to provide a good indoor air quality, whereas in the summer-time the challenge is to control the internal temperature in order to avoid overheating. During winter the ventilation concept for achieving acceptable indoor air quality is essentially based on the dilution principle. Outdoor air is supplied to the space and the concentration of contaminants in the room air is reduced through dilution. The resulting indoor air quality is primarily linked to the source strength of the contaminants and the air flow rate even if also adsorption and desorption effects should be considered. Utilising natural ventilation the air flow rates varies as a function of time and depends on prevailing climatic conditions, i.e. wind and temperature. Therefore, optimisation is essential in order to be able to combine good indoor air quality and low energy demand. During summer the aim is to have maximum exchange of heat between the building structure and the ventilation air. Utilising natural ventilation large openings in the building envelope should be applied in order to facilitate high air flow rates. In addition, as the outdoor air is relatively cold night-time ventilation should be applied. Controlling the air flow rates is normally not an issue. Important parameters influencing the internal temperature are heat gains, i.e. internal heat gains and solar gains, building characteristics including thermal mass and the use of the building. The required air flow rates for achieving good indoor air quality in the winter-time are different from the air flow rates required for controlling the internal temperature in the summer-time. Hence, the sizes of the required ventilation openings are different for the two situations. BRF-kredit Headquarters (DK2) 2/18

3. Procedure In order to gain a better understanding of the applicability and limitations of natural ventilation, 2-3 office-type buildings have been selected and studied in each of the seven European countries participating in the NatVent project. Of the selected buildings, BRFkredit Headquarters is one out of three office buildings that have been studied in Denmark. Studies have been conducted during the summer-time cooling season as well as during the winter-time heating season. During each of the seasons technical measurements have been performed, questionnaires have been filled in by the occupants and additional registrations and interviews have been conducted. 3.1 Technical measurements Technical measurements have been carried out in selected offices. The table below summarises the measured parameters and the equipment used. Measured parameter Unit Equipment used Indoor air temperature (Measurements taken.1 m above floor as well as 1.1 m above floor) Mean air velocity (Probe placed on the desk) CO concentration CO 2 concentration H 2 O concentration (Measurements taken in a representative point in the office) Dosed tracer (SF 6 ) Indoor air tracer gas concentration (SF 6 ) [ C] [m s -1 ] [mg m -3 ] [ppm] [g kg -1 ] [ml s -1 ] [ppm] TinyTalk II, Orion Components Dantec Multichannel Flow Analyser, type 54N1 Brüel & Kjaer Multi-gas Monitor, type 132 Brüel & Kjaer Multi-gas Monitor, type 132 and Multipoint Sampler and Doser, type 133 Based on the measured parameters a number of related parameters have been calculated including the turbulence intensity [%], relative humidity [%], ventilation air supply [l s -1 m -2 ] and air change rate [h -1 ]. In addition to the measurements performed in the building measurements have been taken outdoors. These comprise CO, CO 2 and H 2 O-concentration. Climatic data have been obtained from a nearby meteo station. The data exists as hourly values and they comprise: temperature [ C] relative humidity [%] wind velocity [m s -1 ] wind direction [ ] As the purpose of the summer-time ventilation (indoor temperature control) is different from the winter-time ventilation (indoor air quality control) the arrangement and the set-up of the measurements has been adjusted according to season. Further information on the basic monitoring procedures and the general monitoring protocol including duration of continuous BRF-kredit Headquarters (DK2) 3/18

measurements, sampling intervals, averaging timings etc. can be obtained from Annex A, Detailed Monitoring Protocol. 3.2 User questionnaire A questionnaire has been distributed to the occupants. The questionnaire has been distributed twice once in the summer-time and once in the winter-time. The questionnaire concerns the occupants views on various environmental conditions in their office, and it is intended to complement the technical measurements. 4. Description of the building BRF-kredit is a financing institute for property mortgages. The BRF-kredit Headquarters is located in Lyngby about 1 kilometres north of Copenhagen City. The building, completed in 1986, is a four-storeyed office building consisting of a main building and three office blocks. Figure 1 is showing a typical floor plan. N Office block 4 Main building Office block 3 Office block 2 Figure 1: Typical floor plan. The depth of the offices is about 5 metres. BRF-kredit Headquarters (DK2) 4/18

Figure 2: Outside view of the BRF-kredit Headquarters with the main building in the foreground and one of the office blocks (office block 2) to the right. The facades of the building have a finish of brickwork. The facade of the main building faces a moderately busy road whereas the three office blocks, which in effect holds the offices, faces quiet surroundings. The four sections of the building are linked together and at the connection points between the buildings there are staircases, lifts and toilets. Each of the building sections has a glass covered central room. In the main building there is a quadratic shaped atrium and in the office blocks there are arcade rooms, stretching lengthwise between the two ends of the block Skylight Arcade room Open through 1 st, 2 nd and 3 rd floor Offices Ground floor Basement Figure 3: Sectional view of an office block The quadratic shaped atrium in the main building is open from ground floor through third floor whereas the arcade rooms in the office blocks are open through first, second and third floors. There is no access of daylight to the circulation area of the ground floor. This investigation has been focusing on the offices in the office blocks and figure 3 is showing a sectional view of an office block. BRF-kredit Headquarters (DK2) 5/18

Figure 4: View from the second floor of the arcade room in one of the office blocks. The main structure of the building includes a vertical supporting system of reinforced concrete columns and, at the internal balconies, reinforced concrete girders. Facades and horizontal divisions are prefabricated elements. Facades have a finish of brickwork, as can be seen from figure 2. The thermal mass of the building can be characterised as heavy. Windows are aluminium frames with three layers of normal float glass; skylights are two layers. In the skylights in the arcade rooms there are 4 m 2 of window per m in the longitudinal direction of the building and the transparent part amounts to 85 percent. Figure 4 is showing a view of the arcade room of one of the office blocks Being a financing institute for property mortgages the activity in the building is mainly paperwork. There are both open plan offices holding up to 1-15 persons and cellular offices. About 6 persons are working in the building. The floor area of the building is about 2. m 2 ; about 1. m 2 (5 percent) is offices and meeting rooms, 6. m 2 (3 percent) is circulation area and the remaining 2 percent is toilets, cloakrooms and service area. 5. Ventilation philosophy and aims Mechanical ventilation is provided only in the meeting rooms, toilets, canteen and the central computer room. Mechanical cooling is provided only in the central computer room. Space heating is covered by a conventional radiator system with thermostats on each radiator. Space heating and hot water is supplied from a joint heating plant, the fuel being natural gas. Both in the summer situation (temperature control) and in the winter situation (indoor air quality control) the ventilation in the offices in the office blocks is based on the occupants use of multi-position windows in connection with automatically controlled opening of windows in the skylights in the arcade rooms. Night time cooling is part of the ventilation strategy. In addition, automatically controlled exterior solar shading will contribute to reducing the risk of overheating due to excess solar radiation. 6. Technology Considering the open architecture of the arcade rooms in the office blocks the ventilation in the offices is based on natural ventilation. Effectively, the ventilation is based on manually operated openable windows in the offices and automatically controlled openable windows in BRF-kredit Headquarters (DK2) 6/18

the skylights in the arcade rooms. Hence, ventilation is based on a combination of cross ventilation and stack driven air flows. Figure 5 and figure 6 are showing interior views from the offices. Figure 5: In the offices there are manually operated multi-position windows, the so-called tilt and turn windows. Figure 6: Solar shading in the offices is exterior Venetian blinds. The windows in the offices are equipped with exterior Venetian blinds. The blinds are operated automatically and controlled through the use of light sensors. The blinds can also be operated manually on an individual basis. However, even if it is possible to override the automatic control, the manually chosen position cannot be permanently fixed, i.e. after some time it will be changed according to the automatic control system. BRF-kredit Headquarters (DK2) 7/18

Figure 7: Skylights in the arcade rooms. Solar protection is external fabric shading, which can be seen to the left in the picture. Figure 8: The ventilation openings in the skylights in the arcade rooms are automatically controlled through a number of temperature sensors positioned in the upper part of the arcade room. BRF-kredit Headquarters (DK2) 8/18

Skylights: Automatically controlled windows and exterior fabric shading Arcade room: Open through 1 st, 2 nd and 3 rd floor Offices: Manually operated tilt-and-turn windows and automatically controlled exterior Venetian blinds Ground floor Basement Figure 9: Summary of ventilation provisions in the office blocks. The ventilation in the offices is based on cross ventilation and stack driven air flows in the arcade rooms. 7. Investigated offices N Office 1 Office 3 Office 2 Office 4 Figure 1: Location of the investigated offices on the third floor of office building 3. The offices 1, 2 and 3 are cellular offices and office 4 is an open plan office holding 8 persons. Four offices located on the third floor of office block 3 were chosen for the investigation, see figure 1. Office 1 is a relatively large cellular office of 25 m 2, office 2 and 3 are smaller cellular offices of equal size, 12 m 2 each, and office 4 is a large open plan office of 5 m 2 holding 8 persons. Office 1, 2 and 3 are facing essentially east, whereas office 4 is a corner office facing south west. BRF-kredit Headquarters (DK2) 9/18

8. Monitoring results, summer season 8.1 Measurements The main objective of the summer season monitoring has been to provide data for evaluation of the performance of the ventilation system concerning the thermal conditions in the building during the cooling season. Figure 11 is showing indoor and outdoor temperatures and figure 12 and 13 are showing examples of results of measurements in office 2 and 4, respectively. 35 3 25 2 15 1 5 Indoor temperature Outdoor temperature 28.7.97 : 4.8.97 : 11.8.97 : 18.8.97 : 25.8.97 : 1.9.97 : 8.9.97 : Temperature [ C] 15.9.97 : 22.9.97 : 29.9.97 : Figure 11: Indoor and outdoor temperatures during a two months period. The indoor temperature, [ C] is averaged from recordings taken simultaneously in office 1, 2, 3 and 4 every 3 minutes. The outdoor temperature, [ C] is hourly values from a nearby meteo station. The curves have been smoothed in order to emphasise the overall trends. 5 4 3 2 1 Temperature Air supply CO 2 conc. 31.7.97 : 1.8.97 : 2.8.97 : 3.8.97 : 4.8.97 : 5.8.97 : 6.8.97 : 7.8.97 : 8.8.97 : Temperature [ C], Air supply [l s -1 m -2 ] 5 4 3 2 1 CO 2 concentration [ppm] Figure 12: Results of measurements in office 2 (cellular office) during about one week. The temperature, [ C] taken 1.1 m above floor, has been recorded every 3 minutes. The CO 2 - concentration, [ppm] and the air supply, [l s -1 m -2 ] have been recorded approximately every 1 minutes. The curves have been smoothed in order to emphasise the overall trends. BRF-kredit Headquarters (DK2) 1/18

Temperature [ C], Air supply [l s -1 m -2 ] 5 4 3 2 1 Temperature Air supply CO 2 conc. 5 4 3 2 1 31.7.97 : 1.8.97 : 2.8.97 : 3.8.97 : 4.8.97 : 5.8.97 : 6.8.97 : 7.8.97 : 8.8.97 : CO 2 concentration [ppm] Figure 13: Results of measurements in office 4 (open plan office) during about one week. The temperature, [ C] taken 1.1 m above floor, has been recorded every 3 minutes. The CO 2 - concentration, [ppm] and the air supply, [l s -1 m -2 ] have been recorded approximately every 1 minutes. The curves have been smoothed in order to emphasise the overall trends. Figure 14 and figure 15 are showing examples of results of measurements of the air velocity in office 2 and in the corridor adjacent to office 2, respectively. 5.5 Temperature [ C], Turbulence [%] 4 3 2 1 Turbulence intensity Temperature Mean air velocity.4.3.2.1 19.8.97 : 2.8.97 : 21.8.97 : 22.8.97 : 23.8.97 : 24.8.97 : 25.8.97 : 26.8.97 : 27.8.97 : 28.8.97 : Mean air velocity [m s -1 ]. Figure 14: Results of measurements in office 2. The turbulence intensity has been calculated from measurements of the mean air velocity and the room temperature recorded every 5 minutes as an average value over the previous 3 minutes. The curves have been smoothed in order to emphasise the overall trends. BRF-kredit Headquarters (DK2) 11/18

5.5 Temperature [ C], Turbulence [%] 4 3 2 1 Turbulence intensity Temperature Mean air velocity.4.3.2.1. 19.8.97 : 2.8.97 : 21.8.97 : 22.8.97 : Mean air velocity [m s -1 ] 23.8.97 : 24.8.97 : 25.8.97 : 26.8.97 : 27.8.97 : 28.8.97 : Figure 15: Results of measurements in the corridor adjacent to office 2. The turbulence intensity has been calculated from measurements of the mean air velocity and the room temperature recorded every 5 minutes as an average value over the previous 3 minutes. The curves have been smoothed in order to emphasise the overall trends. 8.2 Questionnaire Through the questionnaire the occupants were encouraged to express their views on various environmental conditions in their office. The questionnaire included two identical parts. One part was to be filled in with respect to the summer season in general and the other was to be filled in with respect to one particular period, namely the one in which the technical measurements were performed. The occupants expressed their views by placing marks on dimensionless horizontal lines of equal length each ranging from most positive to most negative. Figure 16 summarises the ratings reported. Summer season in general 1 Particularly Jul. 3 th - Aug. 8 th 1 Temperature Comfortable 64 Uncomfortable Comfortable 66 Uncomfortable Air movement Comfortable 65 Uncomfortable Comfortable 68 Uncomfortable Air quality Fresh 56 Stuffy Fresh 56 Stuffy Odour intensity Odourless 38 Smelly Odourless 37 Smelly Acceptability Acceptable 45 Not acceptable Acceptable 45 Not acceptable Light 32 3 Noise 41 36 Overall comfort 48 45 Figure 16: Averages of about 1 occupants ratings of various conditions in their office. Each occupant indicated his/her rating of each of the conditions (temperature, air movement etc.) through placing vertical marks on dimensionless, horizontal lines of equal length ranging from most positive (comfortable, fresh etc.) to most negative (uncomfortable, stuffy etc.). The rating is quantified by measuring (in millimetres) the distance along each line from most positive to the occupant s mark. For practical purposes, the ratings have been converted into the range 1. To the left is shown average ratings concerning the summer season in general, and to the right is shown ratings concerning the period in which the measurements were performed. BRF-kredit Headquarters (DK2) 12/18

Also, the occupants were ask to indicate to what extent they felt they could control the temperature, the ventilation and the lighting in their office. Figure 17 summarises the results. 2 4 6 8 1 Temperature control No control 29 Full control Ventilation control No control 34 Full control Lighting control No control 7 Full control Figure 17: Averages of about 1 occupants views on to what extent they feel they can control the temperature, the ventilation and the lighting in their office. Each occupant placed vertical marks, according to his/her rating, on dimensionless, horizontal lines of equal length ranging from No control to Full control. The rating is quantified by measuring (in millimetres) the distance along each line from No control to the occupant s mark. For practical purposes, the ratings have been converted into the range 1. 8.3 Major findings 8.3.1 Thermal comfort From figure 11 it appears that during a hot summer season and with night time cooling in operation indoor temperatures of around 25 C is not unusual. In fact, during almost a three week period in the month of August, the indoor temperature, taken as the average of simultaneous recordings in four offices, was constantly exceeding 25 C. In the period some days were exceptionally hot and even the night time temperature was extraordinary high, around 2 C, and on those days the indoor temperature peaked close to 3 C. From around mid September the outdoor temperature dropped, and the curve for the indoor temperature is clearly showing five peaks for the week days and a decaying temperature during the week end. 8.3.2 Indoor air quality From figure 12, showing results from a cellular office, it is evident that the occupant of office 2 kept both the window and the door to the adjacent corridor open during office hours. Apparently the office was not in use August 1 st. Due to security reasons the door to the office must be closed out of office hours and during nights and week ends. The CO 2 - concentration is well below critical levels. In office 4, being an open plan office holding 8 persons, the air supply is noticeable lower than in office 2, see figure 13. This leads to a slightly higher CO 2 -concentration, but still well below critical limits. 8.3.3 Occupants views The occupants reported dissatisfaction regarding the thermal conditions and the internal air movements. Also, the occupants feel they have limited possibilities of controlling the temperature and the ventilation in their office, see figures 16 and 17. BRF-kredit Headquarters (DK2) 13/18

9. Monitoring results, winter season 9.1 Measurements The main objective of the monitoring during the winter season has been to provide data for evaluation of the performance of the ventilation system with respect to providing acceptable indoor air quality. Figure 18 is showing indoor and outdoor temperatures and figure 19 is showing indoor and outdoor CO 2 -concentrations. 3 Temperature [ C] 25 2 15 1 5-5 Indoor temperature Outdoor temperature 1.11.97 : 17.11.97 : 24.11.97 : 1.12.97 : 8.12.97 : 15.12.97 : 22.12.97 : 29.12.97 : Figure 18: Indoor and outdoor temperatures during a two months period. The indoor temperature, [ C] is averaged from recordings taken simultaneously in office 1, 2, 3 and 4 every 3 minutes. The outdoor temperature, [ C] is hourly values from a nearby meteo station. The curves have been smoothed in order to emphasise the overall trends. 12 CO 2 concentration [ppm] 1 8 6 4 2 Indoor CO 2 conc. Outdoor CO 2 conc. 14.11.97 : 15.11.97 : 16.11.97 : 17.11.97 : 18.11.97 : 19.11.97 : 2.11.97 : 21.11.97 : 22.11.97 : 23.11.97 : 24.11.97 : Figure 19: Indoor and outdoor CO 2 -concentration during about one week. The indoor CO 2 - concentration, [ppm] is averaged from recordings taken simultaneously in office 1, 2 3 and 4. Both indoor and outdoor concentration has been recorded approximately every 3 minutes. The curves have been smoothed in order to emphasise the overall trends. BRF-kredit Headquarters (DK2) 14/18

Figures 2 and 21 below are showing examples of measurement results obtained in office 2 (cellular office) and 4 (open plan office), respectively. Temperature [ C], Air supply [l s -1 m -2 ] 5 4 3 2 1 Temperature Air supply CO 2 concentration 1 8 6 4 2 15.11.97 : 16.11.97 : CO 2 concentration [ppm] 17.11.97 : 18.11.97 : 19.11.97 : 2.11.97 : 21.11.97 : 22.11.97 : 23.11.97 : 24.11.97 : Figure 2: Results of measurements in office 2 (cellular office) during about one week. The temperature, [ C] taken 1.1 m above floor, has been recorded every 3 minutes. The CO 2 - concentration, [ppm] and the air supply, [l s -1 m -2 ] have been recorded approximately every 1 minutes. The curves have been smoothed in order to emphasise the overall trends. Temperature [ C], Air supply [l s -1 m -2 ] 5 4 3 2 1 Temperature Air supply CO 2 concentration 1 15.11.97 : 16.11.97 : 17.11.97 : 18.11.97 : 19.11.97 : 2.11.97 : 21.11.97 : 22.11.97 : 23.11.97 : 24.11.97 : 8 6 4 2 CO 2 concentration [ppm] Figure 21: Results of measurements in office 4 (open plan office) during about one week. The temperature, [ C] taken 1.1 m above floor, has been recorded every 3 minutes. The CO 2 - concentration, [ppm] and the air supply, [l s -1 m -2 ] have been recorded approximately every 1 minutes. The curves have been smoothed in order to emphasise the overall trends. BRF-kredit Headquarters (DK2) 15/18

Figure 22 is showing an example of results of measurements of the air velocity in office 2. 5.5 Temperature [ C], Turbulence [%] 4 3 2 1 Turbulence intensity Temp. Mean air velocity.4.3.2.1. 23.11.97 : 24.11.97 : 25.11.97 : 26.11.97 : Mean air velocity [m s -1 ] 27.11.97 : 28.11.97 : 29.11.97 : 3.11.97 : 1.12.97 : 2.12.97 : 3.12.97 : 4.12.97 : 5.12.97 : 6.12.97 : Figure 22: Results of measurements in office 2. The turbulence intensity has been calculated from measurements of the mean air velocity and the room temperature recorded every 5 minutes as an average value over the previous 3 minutes. The curves have been smoothed in order to emphasise the overall trends. 9.2 Questionnaire Through the questionnaire the occupants were encouraged to express their views on various environmental conditions in their office. The questionnaire included two identical parts. One part was to be filled in with respect to the winter season in general and the other was to be filled in with respect to one particular period, namely the one in which the technical measurements were performed. The occupants expressed their views by placing vertical marks on dimensionless horizontal lines of equal length each ranging from most positive to most negative. Figure 23 summarises the ratings reported. Winter season in general 1 Particularly Nov. 14 th - 25 th 1 Temperature Comfortable 46 Uncomfortable Comfortable 43 Uncomfortable Air movement Comfortable 55 Uncomfortable Comfortable 51 Uncomfortable Air quality Fresh 62 Stuffy Fresh 56 Stuffy Odour intensity Odourless 45 Smelly Odourless 42 Smelly Acceptability Acceptable 41 Not acceptable Acceptable 4 Not acceptable Light 36 33 Noise 41 4 Overall comfort 45 42 Figure 23: Averages of about 1 occupants ratings of various conditions in their office. Each occupant indicated his/her rating of each of the conditions (temperature, air movement etc.) through placing vertical marks on dimensionless, horizontal lines of equal length ranging from most positive (comfortable, fresh etc.) to most negative (uncomfortable, stuffy etc.). The rating is quantified by measuring (in millimetres) the distance along each line from most positive to the occupant s mark. For practical purposes, the ratings have been converted into the range 1. To the left is shown average ratings concerning the winter season in general, and to the right is shown ratings concerning the period in which the measurements were performed. BRF-kredit Headquarters (DK2) 16/18

In addition to the occupants ratings of various environmental conditions, the occupants were ask to indicate to what extent they felt they could control the temperature, the ventilation and the lighting in their office. Figure 24 below summarises the results. 2 4 6 8 1 Temperature control No control 34 Full control Ventilation control No control 32 Full control Lighting control No control 6 Full control Figure 24: Averages of about 1 occupants views on to what extent they feel they can control the temperature, the ventilation and the lighting in their office. Each occupant placed vertical marks, according to his/her rating, on dimensionless, horizontal lines of equal length ranging from No control to Full control. The rating is quantified by measuring (in millimetres) the distance along each line from No control to the occupant s mark. For practical purposes, the ratings have been converted into the range 1. 9.3 Major findings 9.3.1 Thermal comfort Figure 18 is indicating good heating control. As appears from the figures 18, 2, 21 and 22 the room air temperature reaches about 22 C during occupancy indicating acceptable thermal conditions. In the open plan office there may be a tendency that the room air temperature is slightly higher. During week ends the indoor temperature drops to about 18 C. 9.3.2 Indoor air quality On average (four offices) the indoor CO 2 -concentration during occupancy peaks at about 1. ppm, see figure 19. Focusing on a cellular office (office 2, figure 2) the maximum CO 2 -concentration is about 1. ppm, which generally is considered just about acceptable. In the open plan office however, the CO 2 -concentration peaks at 1.5-2. ppm, which must be considered critical, see figure 21. Comparing the two offices regarding the air supply significant differences can be seen as well. The results indicate some support of the general assumption, that in offices where many persons with individual comfort criteria have to come to an agreement regarding window opening (draught risk and indoor temperature considered), the ventilation may end up being too low. 9.3.3 Occupants views The overall picture obtained from the questionnaire shows that the occupants are rating the indoor environment to be more on the comfortable side during the winter time than during summer time. Still, some discontent is detected regarding the occupants views on the freshness/stuffiness of the indoor air. BRF-kredit Headquarters (DK2) 17/18

1. Lessons learnt and suggested improvements In certain periods the summer of 1997 was uncommonly hot. Nevertheless, indoor temperatures between 25 C and 3 C for longer periods must be considered unacceptable. From an engineering point of view, the automatic control system managing the openable skylights and the external fabric shading in the arcade rooms as well as the external Venetian blinds in the offices performed reliable and as intended. On the upper floors, second floor and third floor, the occupants are permitted to leave their window in the office ajar during night time. However, due to security reasons this is not allowed on the lower floors. In order to facilitate out door air supply out of office hours trickle ventilators should be installed. Due to security reasons, the occupants must keep the doors to the offices closed out of office hours. Closed doors will influence the performance of the cross/stack ventilation in the offices and prevent effective use of night cooling out of office hours. The tilt-and-turn windows, which can be left ajar out of office hours on the upper floors, are normally used in the bottom hung tilt position. This setting is unsuitable for providing effective single-sided ventilation. In order to provide air flow through the offices out of office hours grilles should be installed in the doors or in the parting walls to the corridor in addition to the above mentioned trickle ventilators. An indicator of the occupants dissatisfaction concerning the thermal environment and internal air movements were seen from the wide use of desk ventilators which were found in a majority of the offices. Generally, in open plan offices holding many persons it may be problematic to establish a common understanding on the supply rate of outdoor air necessary for maintaining an acceptable indoor air quality. The overall picture obtained from the questionnaire shows that the occupants are rating the indoor environment to be more on the comfortable side during the winter time than during summer time. Still, some discontent is detected regarding the occupants views on the freshness/stuffiness of the indoor air. Despite the fact that not very favourable thermal conditions prevailed during the summer season and equally unfavourable indoor air quality conditions prevailed in the open plan office during the winter season the occupants expressed a positive attitude in general. This attitude may possibly be related to the choice of colours and materials and the internal architecture of the building in general, which appears very open, bright and friendly. BRF-kredit Headquarters (DK2) 18/18