RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES

Similar documents
RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) OF THR 8th PRIMARY SCHOOL TOILETS IN MYTILENE. Annex A - BILL OF QUANTITIES 1/9

Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL Bill of Quantity : Package2 - Lot 3

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

Bill of Quantity (BOQ)

EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS

Bill of Quantity (BOQ)

SECTION STORM DRAINAGE

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

July Bill No.1: Preliminaries

Bill No.1: Preliminaries

Bill of Quantity (BOQ)

Bill of Quantity (BOQ)

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

Jericho Agro Industrial Park

Bill of Quantity (BOQ)

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.

APPENDIX A MEASUREMENT AND PAYMENT

B Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1

Requirements for Measuring and Pricing of Structural Concrete

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

CW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS

APPENDIX 5: CONSTRUCTION CHECKLISTS

2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION CONTRACT NO ADDENDUM NUMBER TWO. Scope of this Addendum

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

SECTION MEASUREMENT AND PAYMENT

Estimate FOR THE SEPTIC TANK

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

SECTION A1 EXCAVATION AND BACKFILL GENERAL

Figure Inlet protection (Source: Minnesota DOT)

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:

CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

The Regional Municipality of Peel Basis of Payment

1.02 RELATED WORK: Refer to the following sections for related work:

STANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS

Description Unit Quantity Rate Kshs. Amount Kshs.

ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV

SECTION 807 PUMP STATION REHABILITATION

SECTION 303 CULVERTS

CONSTRUCTION SPECIFICATION FOR REMOVAL OF ELECTRICAL EQUIPMENT AND MATERIALS

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA

(SIZE) MANHOLES CATCH BASINS AND DITCH INLETS -Item No. ADJUSTING AND REBUILDING MANHOLES, CATCH BASINS AND DITCH INLETS - Item No.

FORM OF TENDER RITHET RESERVOIR DRAIN PROJECT ( TITLE OF CONTRACT ) T 34/16 ( OWNER S CONTRACT REFERENCE NO. )

SECTION EXCAVATION AND FILL

APPLICABILITY TABLE. Council BSC CHRC GRC IRC LSC MRC RRC Applicable Yes Yes Yes Yes Yes Yes Yes

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY

2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY

A. BILL OF QUANTITIES FOR SANITARY SEWER

Section 7: Specifications

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

B. Fiberglass for construction in back lot easements placed on cast-in-place base.

UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ. Original Issue Bamyan MAC Site Services - Phase 1 Bamyan, Bamyan, Afghanistan

REPUBLIC OF LEBANON MINISTRY OF ENERGY AND WATER UNITED NATIONS DEVELOPMENT

EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:]

This type of masonry shall consist of brick laid in full beds of cement mortar.

Requirements for Measuring and Pricing of Traffic Signs and Road Markings

MATERIAL ALLOWANCES AND UNIT PRICES

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation

SECTION DRILLED CONCRETE PIERS AND SHAFTS

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

BILL OF QUANTITIES FOR KIPUNGANI SEA WALL

BUILDING SEWER AND GRINDER PUMP CONNECTION & CONSTRUCTION STANDARDS

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

CONTRACT NO ITEM NO PAYMENT DESCRIPTION UNIT QUANTITY REFERS BROUGHT FORWARD : PREVIEW COPY ONLY

ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE...

The work required for this project includes, but is not limited to, the following items, not listed in order of execution.

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

TABLE OF CONTENTS

Section 403. DRAINAGE STRUCTURES

WORKS DESCRIPTION Unit. Quantity Unit price Total USD

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

TECHNICAL SPECIFICATION

SECTION MEASUREMENT AND PAYMENT

INVITATION TO TENDER ITT PS

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION

Special Provision No. 421F01 April 2006

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

REVISED PER ADDENDUM No. 1 - Unit Price Bid Schedule

Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries

TENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1

CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS, AND VALVE CHAMBERS

Job Order Sewer Repair Services

Price Schedule 1 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE COVERAGE BIDDER TO PRICE EACH ITEM...

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Bill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No.

CATCHMENT STRUCTURE 13M X 15M

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

Transcription:

RFP/GRC/LSV/2017-003: RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES 1/7

The Contractor shall consider in his price all costs or expenses of all requirements stipulated in the section entitled General preceding this Bill. General: 1. The rates to be inserted shall include for all costs associated with the followings: -All items listed in the data sheet scope of works, tehnical description, specifications, drawings and Bill of quantities. -The contractor's supplied materials, testing labor and overheads. -Protection of materials, Municipality property and public service equipment in the vicinity of the works. The contractor shall make the necessary temporary water, electrical power connections etc to prevent interruption of the power and water supply for the existing functioning building. The contractor is responsible to fix any damage that may occur during demolition and construction work. -Clearing and cleaning the places and transport the debris and litter collected to a place approved by the corresponding municipality, on his expenses,including any fees. -Scaffoldings and any kind and type of special equipment 2. Contractor's other costs for any item of work or obligation which is necessary for the completion of the works as required by the tender documents. All site and management costs, including salaries, general and insurance expenses, costs for temporary site facilities, site operation expenses, taxes, permits, all costs for labor, works, provisions, fuel, materials and equipment for Site Installations required by the Contractor and stipulated in the Tender Documents shall be included in the various unit prices of the Bill of Quantity. No extra payment will be allowed by the Employer for any of these activities. All skilled labour should have experience in renovation works,especially in old structures. The contractor shall take all necessary measures to protect and minimize environmental hazards including pollution, noise, dust etc. Abbreviation: m: meter lm: linear meter m2: square meter m3: cubic meter kgr: kilogram ls: lump sum pc: piece Architectural & Civil Works 1 Demolishing & Dismantling Works 2/7

Preambles The rates to be inserted shall include for all costs associated with the followings: -The contractor is responsible to fix any damage that may occur during demolition and construction work by replacing, repairing, and reinstatements of any infrastructure networks affected and/or damaged. -Clearing and cleaning the places and transport the debris and litter collected to a place approved by the corresponding municipality, on his expenses,including any fees. -Scaffoldings and any kind and type of special equipment are included in the rates. All skilled labour should have experience in renovation works, especially in old structures. The contractor shall take all necessary measures to protect and minimize environmental hazards including pollution, noise, dust etc. The contractor is obliged to use trucks with sealed cover. 1.1 1.2 1.3 Stripping out of existing wooden benches, all works included, and the removal to a designated disposal site. Stripping out of existing railings, all works included, and the removal to a designated disposal site. Removal of excavation and demolition products by any means. Loading and unloading by mechanical means, and transportation to a designated disposal site on dirt roads..00 kgr 50.00 m3 40.00 2 Earth Works Preambles: The Contractor shall take into consideration that all direct and indirect works and expenses required for the completion of the coming items are included in the unit price. All works must be according to technical description, drawings and specifications. Rates shall include : 1. Shore up the sides of excavation and take all precautions to keep the adjacent buildings and existing infrastructure utilities (sewage, water, electricity and telecommunication works )safe. And repaire any damage occure in the site. 2. Cleaning the site and removing all debris and rubbles to approved dump site, on his expenses, including any fees. The contractor shall take all necessary measures to protect and minimize environmental hazards including pollution, noise, dust etc. The contractor is obliged to use trucks with sealed cover. 3. Suitable clean sand or soil material should be used for backfilling in layers (25cm max each & compaction test 98%), selected from the approval excavated soil or imported. Prices shall include supply, wetted, compacted transporting, tested and anywhere else, needed all according to drawings specifications, conditions and directed instructions by the Engineer or his representative 2.1 Excavations compliant to Greek Technical Standards ΕΤΕΠ 02-04-00-00 m3 13.00 2.2 Excavations compliant to Greek Technical Standards ΕΤΕΠ 02-03-00-00 m3 24.50 2.3 Uprooting and removal of logs. m3 5.00 3/7

2.4 Backfilling on specified areas by using approved materials (all works included). This item includes the backfilling to maintain the required levels as described in the drawings, technical descriptions and according to the Construction Manager's instructions. m3 10.50 3 Concrete & Reinforcement Concrete Works Preambles: The Contractor shall take into consideration that all direct and indirect works and expenses required for the completion of the coming items are included in the unit price. Rates of concrete works shall include: -Shuttering, supply and placing of concrete, vibrating, curing, striking. The concrete mix shall be transported in concrete transit mixing trucks in accordance with greek regulations and specification to avoid any contamination, segregation and loss of consituent materials. -Concrete additives -Making and transporting of formwork, oil, nails. -Mix ratio for reinforced concrete shall be in accordance with greek regulations and specification for concrete. Cleaning, fabrication, placing, the provision for all necessary temporary fixings and supports including tie wire and chair supports, laps, spacers and wastage. 3.1 3.2 3.3 3.4 Reinforced concrete C16/20, according to the National Concrete Technology Regulations (ΚΤΣ) Reinforced concrete C12/15, according to the National Concrete Technology Regulations (ΚΤΣ) Reinforcement steel mesh (B500c), supply, fabricate and installation of steel mesh T131 Reinforcement steel rods (B500c), supply, fabricate and installation of steel bars of diameter Ø 8mm - 20mm m3 2.50 m3 13.00 kgr 141.00 kgr 20.00 4 Finishes Precast concrete curbs of dimensions 4.1 100x15x30 cm m 70.00 4/7

4.2 Safety rubber floor tiles of dimensions 50x50x5cm, shockproof, consisting of a mixture of recycled natural rubber grains and coloured (green or dark red) polyurethane glue. The industrially manufactured product must be very resilient and compliant to standards by the Greek Standardisation Agency (ΕΛΟΤ), ΕΝ 1176 & ΕΝ 1177. Works include the supply, transportation, packaging and unpacking, temporary storage and onsite retention, assembly, fixing on a concrete base will all additional materials and equipment required, according to the manufacturer s instructions, as well as onsite protection measures for damages during construction, all according to Greek Technical Standards (ΕΤΕΠ 10-02-02-01). m2 70.00 4.3 Pressed soil m2 180.00 5 Steel constructions 5.1 Steel railing m2 168.00 6 Miscellaneous & urban furniture/equipment 6.1 Clearing and cleaning/preservation of existing stone wall 6.2 Wooden bench pc 6 6.3 Wooden seesaw two seats.00 6.4 Individual seesaw spring pc 2.00 6.5 Wooden swing two seats.00 6.6 Octagonal cast iron waste basket pc 3 6.7 Information sign (reflective) on a type 2 base compliant to standards (ΕΛΟΤ EN m2 0.50 12899-1). EMVAC Works 7 Electrical Works 7.1 Supply and installation of main switchboard in enclosure 7.2 Supply, installation and connection of supply and distribution cables 3X10 m 15 7.3 Supply, installation and connection of distribution cablesnyy 3X2.5 m 60 7.4 Supply and installation of underground conduit Ø40 m 50 7.5 Supply, installation and connection of earthing conductor 16mm² m 50 7.6 Supply and installation of earthing rod 2.5m 7.7 Excavation works hr 2 5/7

7.8 Supply installation (base and anchoring) and connection of pole mounted, prewired lighting fixtures for outdoor use pc 4 8 Mechanical Works 8.1 8.2 8.3 8.4 8.5 8.6 8.7 8.8 8.9 Supply and Install UPVC pipes PN6, as per ΕΝ 1329 ΕLΟΤ 686, laid, jointed, tested, with all required fittings and auxiliary materials, Ø100, complete all as per drawings and Supply and Install UPVC pipes PN6, as per ΕΝ 1329 ΕLΟΤ 686, laid, jointed, tested, with all required fittings and auxiliary materials, Ø100, painted in the color of stone complete all as per drawings and Engineer instruction. Drilling into stone wall of a hole for installation of a PVC Ø100 pipe and after installation backfilling and restoration of the wall, complete all as per drawings and Excavation for pipe trench, complete all as per drawings, technical description and Backfilling of pipe trench, complete all as per drawings, technical description and Sand for pipe embedment, complete all as per drawings, technical description and Warning mesh as per technical description and Supply and Install floor drain, jointed and tested, with all required fittings and auxiliary materials, complete all as per drawings, technical description and Cleaning of drainage pit, adjustement of the top in order to meet the new final surface level and replacement of the grating, complete all as per technical description and m 3 m 3 m3 0.32 m3 0.14 m3 0.16 m 3.00 8.10 Excavation into stone wall for creation of a tray for installation of recessed pipe Ø25 and after installation restoration of the wall, complete all as per drawings, technical description and 6/7

8.11 Supply and Install HDPE pipes PN20, as per ΕΝ 12201-2, laid, jointed, tested, with all required fittings and auxiliary materials, m 23 Ø25, complete all as per drawings and 8.12 Excavation for pipe trench, complete all as per drawings, technical description and m3 2.42 8.13 Backfilling of pipe trench, complete all as per drawings, technical description and m3 1.04 8.14 Sand for pipe embedment, complete all as per drawings, technical description and m3 1.37 8.15 Warning mesh as per technical description and m 23.00 8.16 Supply and Install recessed chromium plated brass antifreeze water faucet 1/2", complete all as per drawings and Engineer instruction. 8.17 Precast reinforced concrete manhole 30x30 with cast iron A15 cover. 8.18 Supply and Install ball valves of chromium plated brass, 3/4", complete all as per drawings and 7/7