OWNER S REPONSIBILITIES AND PREPARATION INSTRUCTIONS. Schedule "C"

Similar documents
Schedule C STANDARD Specifications

The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits

Schedule D. RTM Finished Home Specifications

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

STANDARD CONSTRUCTION PACKAGE Addendum A REV SITE & EXCAVATION Layout of the foundation and septic system as approved by local and state author

Alabama Home Inspections

Décor Design Construction llc

SECTION 6. Residential Warranty Corporation 10 Year, Limited Structural Warranty. Year One

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

The Inspector. Property Inspection Report

Welcome to Smithfield Crossing Condominiums

Appalachian Log Structures Construction Cost Estimating Guide

Equine Barn LLC 213 Crescent Moon Way Canton, Ga Proposal

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR. Scope of Work. Plumbing. Division 055 Plumbing Rough

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

EcoSteel Pre-Engineered Steel Buildings provide the world s most advanced Eco friendly construction systems.

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

BUILDING PERMIT APPLICATION CITY OF SIDNEY BUILDING INSPECTION DEPARTMENT

CARBON MONOXIDE ALARMS

Inspection Report. Property Address:

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

District of Ucluelet Building Permit Guide

Ubuildit. Construction Project Budget for Date Prepared wholesale retail

Inspection Report. Prepared for: Gil Turiel. Property Address: 545 Briar Run Court Loganville, GA Date: July 17, 2011


City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Rossetti Development LLC RS Builders and Developers LLC Standard Specifications For Tinty Farms, Farmington

REEDY MEADOW ESTATES OF GROTON 5 OLIVIA WAY, GROTON, MA CONSTRUCTION SPECIFICATIONS

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Standard Sample Building Specification Windy Hollow, Merrimack, NH * Revised April 1st, 2015

Building Permits A Guide for Homeowners

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

1234 Main St Denver CO 80210

The Inspection Process. Waxhaw N.C.

J & M Solutions, LLC

Country Village Maintenance Responsibility Guidelines BUILDING - EXTERIORS AND INTERIORS

McAllen House Restoration, April 2016 through April 2018

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

Lonsdale Building Inspections Department 415 Central Street W. PO Box 357 Lonsdale, MN (507) fax (507)

Home Building Planner

Each homeowner will be billed separately by road maintanece providers.

TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up

Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50

Quail Run Condominiums

TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION

Inspection Report. Prepared for: Tonia Mann. Property Address: 1295 Greyland Hills Drive Lawrenceville, GA Date: April 24, 2012

CONSTRUCTION COST BREAKDOWN THIS IS FORM CCB

component was performing its intended function; installation and condition were appropriate for age and use.

Elko County Building & Safety Division

Feature Zone IECC 2009 IECC

A Rater s perspective from the field. Thomas H. Marston, February 21, 2007

Policies & Guidelines

ADDENDUM A 6 OLIVIA WAY, GROTON, MA CONSTRUCTION SPECIFICATIONS

FINEGAN INSPECTION SERVICES, INC. 76 WEST FOSTER MAINEVILLE ROAD MAINEVILLE, OHIO PHONE FAX

PROPOSAL NOTE: ALL SURFACES TO BE PROTECTED AT ALL TIMES. WE ALSO REMOVE AND REHANG DRAPES, MOVE ALL FURNITURE AND PUT IT BACK WHEN JOB COMPLETED.

HOME INSPECTION CHECKLIST

BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS

Rental Inspection Checklist

PREP + INSULATION. DISCLAIMER: These tools are for illustrative purposes only and

New Home Warranty Handbook

All Pro Home Inspection. Home Report North Your Town

Helms Builders, Inc.

The CornerStone Cottage Series

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

PLYMOUTH CREEK HOME OWNERS ASSOCIATION

RSH ENGINEERING, INC. END OF BUILDERS WARRANTY INSPECTION REPORT INSP#: K00001 DATE: 00/00/11 PAGE #: 1

BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample

Z & C Construction, Inc. Subdivision:

Residential Building Plans

Inspection Report. Prepared for: Yossi Berg. Property Address: 4925 Diggers Way Sugar Hill, GA. Date: July 20, 2011

Davis Frame Co., Inc. Construction Budget Considerations

Property Inspection Report

SUMMARY 792 Youngfield Ct., Lakewood CO Frank Oz January 13, 2018

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

Town of Farragut RESIDENTIAL CONSTRUCTION ENERGY EFFICIENCY. LAST UPDATE: July 03, 2014

EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR. Scope of Work. Electrical. Division 155 Electrical Rough

ADDENDUM A CONSTRUCTION SPECIFICATIONS

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

1234 Main St. Buyer Name. Table of Contents

Advanced Building & Development, LLC

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS

APPLICATION FOR FINISHED BASEMENT PERMIT

Oregon Building Officials Association

Smokey Ridge, Christiansburg, Virginia

Residential Construction Minimum Required Inspections

Town of Pawling Residential Building Permit Application

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

QUINN COMMONS. Quinn Ln. SOLD

Seal Harbor Development 1 Nagog Park Acton, MA 01720

Friendly Inspection Services

Page 3 of 12. Inspected Describe. Explained. Health & Safety. Maj. Def. Examiner Notes STRUCTURE N/A. Financial Impact. Impact.

Chapter 33 - Checklists

INSPECTION REQUIREMENTS Page 1 of 5. JOB SITE ADDRESS posted during entire construction process.

Job Ready Assessment Blueprint. Test Code: 4012 / Version: 01 Building Trades Maintenance

Proud of its Heritage, Preparing for its Future

Table Air Barrier and Insulation Inspection Component Criteria

Cheshire, CT. By: A.M. Napolitano, LLC. Project Manager: Carolyne Sakonchick Ext. 323

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

Transcription:

OWNER S REPONSIBILITIES AND PREPARATION INSTRUCTIONS Schedule "C"

Building Code All Ready To Move (RTM) Homes are built according to the Alberta Building Code and National Building Code. Please note that any local or area requirements such as snow loads, wind loads, height restrictions need to be made aware to Bold Manufacturing to be incorporated into the design and cost of the home. What to expect: Plumbing - All plumbing fixtures are installed, pressure and flood tested. - Homeowner will be required to pull a permit to tie in plumbing, and have the following items tested at time of inspection: main stack, DWV and P traps - All plumbing tie-ins are the homeowner s responsibility. Gas - Natural Gas fireplace will be installed and vented outside -Gas fireplace not tested in factory. - Homeowners will be responsible to connect gas utility to fireplace unit and pull gas permit for all gas fixtures in home. Electrical Drywall - Circuits will be tied in to electrical panel, energized and tested for polarity. - Homeowner will have to pull permit to connect main electrical service to panel and have inspected. -All additional electrical including the basement wiring is purchasers responsibility. - Drywall will be hung, taped, mudded, sanded and primed. Finishes Appliances - All finishes will be completed in factory, including: millwork, door casing, hardware, mirrors, cabinets, floor, finishing trim and paint - Homeowner will be responsible to change out exterior door knobs as builder locks will be installed at time of delivery. - No appliances, builder is not responsible for any connections associated with installation of appliances. - Bold will not be responsible for any damages caused by installation of appliances.

Site Preparation and Foundation Foundation specifications and design are contingent on your specific site conditions/ requirements/local jurisdiction, as determined by homeowner s own foundation contractor. The RTM homes may be designed for crawlspace or foundation (pre-cast, wood or concrete) Site preparation and foundation will the responsibility of the homeowner. This includes (but is not limited to): Move Development and building permits Insure foundation size is accurate to actual house measurements. Foundation and installing beam and Tele-posts according to the foundation plans and engineered floor system layout. Backfilling foundation Ensuring site is prepared for delivery; free of debris or any obstacles that could include trees, posts, etc. Any ground leveling or fill that would need to be done by any machinery must be done prior to the house being delivered. If this is not done and the Mover has to bring in machinery it will be up to the homeowner s to be responsible for payment. This is not the Mover s responsibility! Move and placement of RTM is an extra cost and will be quoted separately. Move date to be scheduled only after foundation is completed; it will be up to the homeowner to inform Bold upon completion. If purchaser elects to move RTM, purchaser will be responsible to hire a competent contractor to transport the RTM home to its delivery location, as well as setting the home onto its foundation. If homeowners hire their own Mover they must supply Bold with the movers insurance. Costs for the move will be invoiced separately and will be quoted as per site visit. Bold Manufacturing will not be responsible for home set up or damages should homeowner choose to have the home moved with own contractors. See other homeowner responsibilities, below. Pre and post delivery inspections to be done by a representative of Bold Manufacturing. Insurance must be put on the home by the homeowner on the day the house has been delivered and a copy given to Bold Manufacturing. Fortis and Utility charges are the homeowners responsibility and will only be billed after the move is complete. All utility hookups, delivery repairs and possession of the home must be completed within 90 of the delivery date. If not completed within this time frame warranty will be voided completely. Electrical & Mechanical It will be the responsibility of the homeowner to apply for and oversee the installation and hook-up of all utilities. Ensure that utilities and appliances are installed in accordance with code requirements, note that hot water tank, furnace and appliances usually not provided. If home packages include Hot Water Tank Furnace and Pressure System, it is on a supply only basis and is the purchaser s responsibility to install as well as setting and adjusting all water and faucet temperature controls. See below for minimum requirement Bold Manufacturing will not be responsible for linking these utilities to the home after set-up is complete.

Bold Manufacturing will not be responsible for appliance installation or any damages done during installation. 100 amp residential service 50 US gallon natural gas or electric hot water heater Forced air, high efficiency furnace, check with installer for minimum capacity requirements. Minimum requirements: - Bold s RTM homes will only accommodate high efficiency mechanical components Other Homeowner Responsibilities The following is a list of additional responsibilities to the homeowner: All decks, porches, posts and railings (Supply and Install) Stairs and railings(exterior and interior) (Supply and Install) Insulating joist cavities in basement Install vapor barrier on joist cavities Basement parging Finishing trim on cantilevers and basement Interior railing and spindles where needed Fastening home to its foundation - see attached installation diagram Homes with garages or site built (if applicable) supply and installation of overhead doors and man door is the purchaser s responsibility. Tele-Posts and Beams are to be maintained by the homeowner to assure home remains level. This will assure minimal cracking in your walls and ceiling. Warranty Bold Manufacturing is a member of National Home Warranty program. Once your home is delivered, Bold Manufacturing will service and adjust finishes after home is heated and climatized. Also note after pouring your floor in the basement or crawlspace the homeowner or contractor will have to install dehumidifiers to remove any moisture from remaining in the RTM. Bold Manufacturing will not monitor the dehumidifier or be responsible for damages due to moisture damage created. Should further deficiencies arise, please notify us in writing and a work order will be processed at that time. Please refer to our Defect Guideline to see what is covered under our warranty, provided to you in your final customer package. Note: Damages due to conditions such as extreme weather, windstorms, and excessive amounts of snow Is not a warranty item. It will be the homeowner s responsibility to contact their insurance company to report any damages if necessary and arrange for repairs. For excessive snow fall it is up to the homeowner to remove snow off their roof to prevent snow from entering the vents and later on melting and leaking into home and causing unnecessary damages.

SECURING HOME TO FOUNDATION DETAILS

New Requirements as of February 1, 2014 for Builders Home Warranty Bold Manufacturing will require the following paper work: ALL PERMITS, APPLICATION FORMS, INSPECTIONS and SUB-TRADE INFORMATION All of the above information is the homeowner s responsibility and will have to be provided to Bold Manufacturing before and after each stage has been completed, however appropriate. Upon your foundation being completed and inspected, you must contact Bold Manufacturing in order for our Representative to inspect the foundation, all permits and inspections must be provided prior to the house being delivered. All documentation must be provided in a timely fashion, delays will result in back charges and the build schedule of your home. Any additions, changes or modifications to home as provided by Bold Manufacturing will not be covered under any warranty and may void all completely. All work must be done by a professional contractor. Any work performed by the homeowner or a non professional will not be covered under any warranty and may void the Builder s Warranty and National Home Warranty. Purchaser: Date: Purchaser: Date: Bold Manufacturing Inc. Per: Date: