Kelly Village Apartments 3118 Green Houston, Texas 77020

Similar documents
11/1/2016. Smoke detectors will be furnished by MHA and installed by contractor.

TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up

ADDENDUM NO 1 Issued November 21, 2017

LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No. 1-AMP Christopher Christopher Repair

By YR Communities.

LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No

Address: Contractor: Contractor Phone: Line Item Bid Parts/Labor Labor Only Bid Week Complete (Circle One)

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

OF WORK SCOPE. (a) The contractor shall bid to furnish the following: labor, licenses, material, and equipment.

WorkWrite-Up and Bid Document

Schedule C STANDARD Specifications

WorkWrite-Up and Bid DocumentlBy Trade

Newberry. Foundation Framing

Lake County Housing Authority North U.S. Highway 45 Grayslake, IL 60030

CENTRAL GREAT PLAINS SERIES

Helms Builders, Inc.

Lake County Housing Authority North U.S. Highway 45 Grayslake, IL 60030

New Homes Starting at $124,900

Multi Family, San Diego, CA

Straub Homes, Inc. Building Standards of Excellence for all Straub Homes

pershing+ desperes uichomes.com 6005 and 6007 Pershing Avenue pershing+desperes call or

Standard Sample Building Specification Windy Hollow, Merrimack, NH * Revised April 1st, 2015

Work Write-Up and Bid Document

Delta Gamma Sorority Renovation Budget Scope 3/7/2018

Cheshire, CT. By: A.M. Napolitano, LLC. Project Manager: Carolyne Sakonchick Ext. 323

Décor Design Construction llc

Schedule D. RTM Finished Home Specifications

FOUR CORNERS CUSTOM BUILDERS, LLC

Interior Remodeling Proposal

Bath Project General Services GC/PS Worksheet

OLD GRACE HOUSING CO-OPERATIVE

NORMAL HILLS BUILDING 8 COSMESTIC UPGRADES PROJECT

NORMAL HILLS BUILDING 6 COSMESTIC UPGRADES PROJECT

ADDENDUM A CONSTRUCTION SPECIFICATIONS

Date: Kitchen Project General Services GC/PS Worksheet

Lake County Housing Authority North U.S. Highway 45 Grayslake, IL 60030

HC Homes at Tehaleh Standard Features

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

HC Homes at Tehaleh. Framing

General Construction Specifications For

REHABILITATION STANDARDS CHECKLIST


Z & C Construction, Inc. Subdivision:

Features & Amenities

D D. WorkWrite-Up and Bid Document/By Trade. Harriett Petit. Contractor Name: PO Box 282 Marble City, OK (918)

SCOPE OF WORK DEMO: ELECTRIC: 4) The contractor shall bid to remove all switches, outlets and covers.

QUINN COMMONS. Quinn Ln. SOLD

Home Features. ELECTRICAL COMPONENTS Copper wire electrical system Minimum 150-amp electrical panel with circuit breakers

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Coquille Indian Housing Authority Maintenance Report March 2019

Single Family, Orange, CT

STANDARD CONSTRUCTION PACKAGE Addendum A REV SITE & EXCAVATION Layout of the foundation and septic system as approved by local and state author

Homes at Pine Ridge - NEW CONSTRUCTION SPECS

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Lot 5. 7 Liam s Lane, Methuen, MA Price: $579,500 Lot: 22,651 SQ FT Home: 2,797 SQ FT

Lot 2. 1 Liam s Lane, Methuen, MA Pre-Construction Price: $579,500 Lot: 17,613 SQ FT Home: 2,797 SQ FT

Appalachian Log Structures Construction Cost Estimating Guide

Mountainview Estates.

Features & Amenities. EXTERIOR FINISHES COMMUNITY FEATURES

Boyle. contemporary new homes with great curb appeal. boyle call or 3br/2.5bth, 1905sf

SERVPRO OF SAGINAW TAX I.D. # FRANCHISE # N

Quail Run Condominiums

Window and Door Casings Colonial casing 3½ trim OR Strafford Casing Base Molding Base 5¼ - 1 piece base to match window and door casing

FLOORPLAN /ELEVATION SQ.FT. BDRM BATHS GARAGE BASE PRICE

Wallingford, CT. Project Manager: Karen Charest Ext. 233

TRIPLEX BUILDING 3 TOWNHOUSE UNITS

OFFICE Space STANDARD SPECS Page 1

Rental Inspection Checklist

Sams & Associates York Field Services

Renovation Estimate $ 95, Page 1 of 6. Preliminary Cost. General Fees SUB TOTAL $ - Powered by HomeWorx Unlimited, LLC.

SPEC SHEET Truman Model 8013 Key West Conch Drive

What this Family Room Specification Package can be used for:

Property: Operator Info: Operator: Estimator: Sales/Estimator. Labor Efficiency:

678 Ridley Circle Fire Loss Repairs

Electrical & designer allowance

Davis Frame Co., Inc. Construction Budget Considerations

Proposal. Lexington, MA. Price Work Description

PLANNING FOUNDATION FRAMING

Vacant Unit Turnover Services Invitation for Bid (IFB) Project No

FOUR CORNERS CUSTOM BUILDERS, LLC

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

PeachStone Capital, Inc. Atlanta s Hard Money Lender When timing is everything, we close! Hard Money Loan Property Worksheet Checklist

Features & Amenities COMMUNITY FEATURES EXTERIOR FINISHES

RALEIGH - SINGLE FAMILY HOME INCLUDED FEATURES

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

Water s Edge Parkview Collection Jill Delmastro

The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits

For More Information Contact: Brian Daniels

Chapter 33 - Checklists

For More Information Contact: Brian Daniels

Highland Grove. Westfield Collection Everything s Included Standard Features ( STARTS)

COOL AMENITIES for Modern Living

KC Stephen Ct. Garage Right

BRENTWOOD CALL JESSI KELLY TODAY FOR MORE INFORMATION! BEAUTIFUL, UNIQUE BRAND NEW HOMES IN CHINA SPRING ISD

Oak Springs. 14/16 Series. Skyline Homes Built in Fair Haven, Vermont

SINGLE FAMILY HOME SPECIFICATIONS

New Homes Forestbrook Road. Yes, it s INCLUDED!

Transcription:

Kelly Village Apartments 3118 Green Houston, Texas 77020 Houston Housing Authority J. Allen Management Managing Agent Scope for Kelly Village Unit #1125 Overall Scope: Demolition, Renovation, and Restoration Work to be done in timely fashion and coordinated with the property management with weekly progress reports. All work to be done 8 5 Monday Friday while staff is present. All Code compliance is mandatory, example building permits, insurance, state, federal and local. Line Checks are required to be called in and marked. Contractor responsible for all underground plumbing and electrical damage. All schedules will be coordinated with staff to inform residents so that onsite management can (give written notice) of work 48 hours in advance. All documents, Section 3, MWBE, Davis Bacon, Bid Bond, HUD 5369 A, and HUD 5370/EZ must be submitted with the bid if not, the bid will not be considered. A bid bond is required for a bid over $100,000. All debris will be put immediately into refuse containers for proper disposal according to code and not temporarily left in parking lot or on grass areas. (provided by contractor) All aspects of work done by contractor will be held to scope by Management. All bids must have line item details of work, but wording must also state price as per supplied scope. Permits: Required, to be copied and given to Management Team.

DEMO: Remove all kitchen cabinets and backsplash Remove base from entire apartment Remove interior doors and frames Remove bathroom accessories Remove tub and wall surrounds Remove remaining appliances Remove closet shelves and rod in all closets General notes: All paint surfaces need to be painted with 1 coat of primer and at least 2 coats of paint All items are supplied and installed by contractor BUILD: Replace any damaged studs Replace framing for hot water heater Replace wiring from switches to fixtures as permit requires Replace all supply lines and any drain lines to code Replace switches and outlets in entire unit Replace all plumbing valves in unit Inspect plumbing pipes in walls for proper bracing. Repair or add bracing as necessary. Replace demolished sheetrock with 5/8 sheetrock Apartment should be retextured to match new sheetrock (orange peel texture) Hung, taped, ready for texture (Screwed not nailed sheetrock) All doors to be 6 panel (Vented door for water heater per code) Install bi fold doors for closets Pine window seals in all windows (excludes bathroom) Casing to surround 4 sides of all windows (excludes bathroom) Casing to surround 3 sides of doors on both sides of opening 4 base along all walls (base to be a type of Casing pattern) Closet shelves and closet rod package in all closets Quarter round installed at bottom of baseboards Matching ADA compliant hardware for all doors 955 SQFT (per Floorplan) paint all walls and ceilings Seal and paint closet shelves Seal and paint pantry shelves Stain (Pine) closet rod Paint baseboards Smoke detectors/carbon monoxide detectors to be installed per code Install hot water heater to match existing 955 SQFT Floor prep 955 SQFT of overlay vinyl floor for whole unit Window blinds for all windows (2 pvc, per PHO)

1 living room light fixture (no incandescent lighting, HHA Guidelines) 2 bedroom light fixtures (no incandescent lighting, HHA Guidelines) Kitchen Area Base cabinets to match existing LF (¾ plywood with hardwood faces) (color TBD at time of award of contract) Upper cabinets to match existing LF (¾ plywood with hardwood faces) (HUD Grade/No Particle Board) Install granite pattern laminate in kitchen Backsplash at kitchen counter tops (full laminate up to bottom of cabinets) (Stainless surround behind stove) (color TBD at time of award of contract) Correct non compliant wiring to outlets Stainless steel double sink in kitchen 50/50 8 depth Stainless steel kitchen faucet (Delta or comparable) Pantry shelves should be made of 1 x12 pine laid in 4 rows New Free standing gas range New vent hood New refrigerator 1 kitchen light fixture (to be energy efficient lighting (no incandescent lighting, HHA Guidelines) 1 light fixture over kitchen sink (no incandescent lighting, HHA Guidelines) Bathroom Area Replace room heaters in bedrooms 1 hall light fixture (no incandescent lighting, HHA Guidelines) 1 bathroom light fixture (no incandescent lighting, HHA Guidelines) Exhaust fan (to code) Bathroom sink faucet Mirror in bathroom 24 x 36 Medicine cabinet Fill in fix hole in floor where old sewage line is present Replace window in bathroom to match existing Install cultured marble sill in window Install backer board behind time areas Waterproof window to prevent water penetration Install 12x24 tile as new tub surround Bathroom towel bar and towel ring New bathtub Toilet paper holder Tub/shower faucet (stainless delta comparable) New Toilet (water saving) Toilet seat Install 36 vanity in bathroom Install 36 cultured marble vanity top with sink Exterior Area Replace exterior wall light

COLOR SPECIFICATIONS: All areas will be painted with BEHR premium plus ultra (2 coats) or comparable, PPG, Sherwin Williams Super Paint and Valspar Signature. All paint thickness and conditions will be adhered to in the application of the paint. http://www.behr.com/consumer/products/safety msds All appliances to be white All light fixtures to have satin nickel finish All bathroom accessories to be satin nickel finish All switches and outlets to be white All mini blinds to be white All smoke detectors to be white White exhaust fan All hardware to be satin nickel Standards of quality: Trim shall smooth and free of divots or splinters Trim material is to be finger jointed Paint will be applied evenly and not have lumps or bubbles Screws will not be exposed in the face of cabinets or openings (use appropriate screws covers to hide screws Flooring will not be ran around toilets (it will be installed prior to flooring) Shelves will be level and ran the full length in all closets Use appropriate braces so that shelves are properly supported Outlet covers and switch plates will be free of paint and texture Appliances will only be accepted dent free without scratches or marks When possible doors should be installed to swing towards walls and not into open space Flooring should be free of paint and texture Damage as a result from install will not be accepted Use green coated water resistant sheetrock in wet areas Gaps in sheetrock will not be accepted Windows should be clean on both inside/outside as well as the track Blinds will not be accepted with damage If unable to install a door stop, a hinge stop shall be installed instead Tile will be free of cracks and paint/texture Closet rods will not be fixed in place and should be free from paint/texture Escutcheon rings should be installed properly around all wall penetrations as necessary

Unused holes in sink will be capped No lines in sheetrock shall be visible Texture should be uniform throughout unit Windows should open and close properly when work is complete Fans should be balanced properly Caulk joints need to be applied evenly and clean