UCL ESTATES & FIRE STANDARD - GENERAL PERFORMANCE FOR SITE HOARDING AND CONTRACTOR CABINS

Similar documents
Construction Method Statement

This was followed by a Part 2 experimental scoping study focusing on the issue of external fire spread, to be covered in next month s issue.

West & North Yorkshire Chamber of Commerce. Serviced offices project, Bradford. Information for contractor Expressions of Interest

Contractors Safety Code of Practice

Management Plan: Hazardous Materials Removal & Demolition

Façade Fire Safety Design Practice Guide

INTERIOR FINISHES CHAPTER 8

INTERIOR FINISHES CHAPTER 8

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC CALIFORNIA BUILDING CODE 301

UKTFA Risk assessment checklist

INTERIOR FINISHES CHAPTER 8 SECTION 801 GENERAL

PROTECTION OF SINGLE PLY MEMBRANE ROOF SYSTEMS DURING CONSTRUCTION AND SERVICE

FRINGE COMMERCIAL ZONE RULES

Constraints on how the Contractor Provides the Works

New Nursery Project Overview

Products for Marketing Agencies. A one stop shop partner for all your display marketing requirements.

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

ANNEXURE 3. CASSIA GLADES Stage 2A DEVELOPMENT CONDITIONS AND BUILDING GUIDELINES LOT

Building Guidelines. No development is to be commenced on any lot without the plans having been approved in writing as set out above.

COMMERCIAL BROCHURE WA3 6BX. Tel: Tel:

QLDC PROPOSED DISTRICT PLAN [PART THREE] AUGUST 2015 BUSINESS MIXED USE

INTERIOR FINISHES CHAPTER 8

HS00: CONSTRUCTION PHASE HEALTH & SAFETY PLAN JOB THE PADDOCKS - SAMPLE PROJECT FOR TRIAL USERS: THE PADDOCKS 2015

Costs and benefits of reducing waste in construction. Defence sector new build Woolwich single living accommodation modernisation (SLAM)

6-Storey Residential Buildings Combustible Construction. A Regulator s Perspective City of Richmond, BC Canada

Combustible materials in façades should they be banned?

HS41 Guidance Note - Contractor Guidelines

Contractors Code of Practice

Construction Method Statement

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

CORPORATE PROCUREMENT UNIT SITE & SECURITY PROCEDURES BOSTON SPA VERSION 7 APR09

914. "I-1", LIGHT INDUSTRIAL DISTRICT

MIXED ACTIVITY ZONE. Chapter 4. Mixed Activity Zone

Centre Buildings Redevelopment Explaining the impact on LSE staff and students

PRICING DOCUMENT FOR REQUEST FOR APPLICATIONS FOR APPOINTMENT TO A MULTI-PARTY FRAMEWORK AGREEMENT FOR ENERGY EFFICIENCY RETROFITTING WORKS FOR

BUILDING PRODUCT USE BAN NOTICE UNDER SECTION 9(1) OF THE BUILDING PRODUCTS (SAFETY) ACT 2017

Business and Industrial Areas Queenstown, Frankton, Arrowtown and Wanaka 11.1 Issues, Objectives and Policies

Sustainable buildings design, construction and refurbishment standard

CTC MEETING #25 CHILD WINDOW SAFETY REPORT

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

Determination under the Building Act 1991

The Butler Gallery at the Evans Home CONSERVATION REPORT. McCullough Mulvin Architects. September 2016

Fire Safety Design Report

East Cheshire NHS Trust Lift Policy

No.-O CASHIERS COMMERCIAL AREA DEVELOPMENT ORDINANCE REVISIONS Amended June 02, 2016

The Hong Kong Polytechnic University Facilities Management Office

Terry Johnson SENIOR FIRE SERVICES ADVISOR Fire and Rescue Services Dubai Civil Defence

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Stage 6. Annexure 3. October 2015 Development Conditions and Building Guidelines

WHS Management Plans

This marked up copy of part 10a.12 shows the amendments resulting from the council s decision on submissions to part 10a.12 (decision report no.

EXTERNAL MARQUEE USAGE POLICY ECD-HS-PO

Advertising Signs. Development Control Plan No.28. Adopted by Council - 27 March 1996 Effective - 17 April 1996 Amended - 23 March 2007

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and &

Fire Engineering, the BCA (NCC) & Bushfire Calculator. Keith Nicholls - Manager Product Testing and Assessments (Australia) Exova Group Limited

MacKimmie Redevelopment Project Public Protection Site Safety Plan. Prepared by Stuart Olson Construction Ltd.

CHAPTER BEVERAGE CONTAINER RECYCLING COLLECTION CENTERS

SUBURBAN COMMERCIAL ZONE - RULES

Fire safety issues with balconies

PROCEDURE (Essex) / Linked SOP (Kent) Asbestos Management. Number: U 1005 Date Published: 22 July 2015

WORKING AT ELEVATED PLACES Working on Roofs

DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS RADIANT LAKE ESTATES SUPPLEMENTAL ARCHITECTURAL GUIDELINES ARTICLE I INTRODUCTION AND POLICY

A2B. Construction (Design and Management) Regulations 2015 PRE CONSTRUCTION INFORMATION PACK (V ) PROJECT:

Permit-to-Work. Procedure and Requirements EHSP-005. Page 1 of 18

Iluka Views Design Guidelines

2020 DISPLAY REGULATIONS

CODE ANALYSIS REPORT SECOND FLOOR

Regarding the compliance of a ground floor landing to a set of stairs in a residential unit at 21 Commercial Street, Takaka

Construction Products Regulations Curtain walling. Stephen Ledbetter, CWCT

Safe System of Work Policy

PRICING DOCUMENT FOR REQUEST FOR APPLICATIONS FOR APPOINTMENT TO A MULTI-PARTY FRAMEWORK AGREEMENT FOR ASBESTOS REMOVAL AND DISPOSAL CONTRACTORS FOR

(DC2) SITE SPECIFIC DEVELOPMENT CONTROL PROVISION

The only hoarding solution you ll ever need

Code of Construction Practice Part B: Site Specific Requirements

Assessing the costs and benefits of reducing waste in construction

PRESCRIPTIVE COMPLIANCE METHOD

supports the needs of the community and businesses to identify and advertise businesses and activities; and

Terminal Tracks - Managing the Risk

City of Sebastopol Design Review Board Staff Report

ESTATES DEPARTMENT. Management of Asbestos Policy and Procedures Document. Rev 9

D E S I G N G U I D E L I N E S

Safe planning and operation for Mobile Elevated Working Platforms (MEWPs)

Pg. xiv, xv Definitions. Pg. 2 A brief history pg. 12 Codes definition. Pg. 13 The principal purpose of code. Pg. 16 IBC. PG. 27 PG.

Certificate No: EWWS546

Combustible Exterior Wall Cladding Systems: An ICC Perspective

Sheet No: Fire resistant glazing Fire resisting glass. Design Guide for the Fire Protection of Buildings FUNCTION OF FIRE RESISTING GLASS

siting, building and design guidelines April 2017 Newgate, Tarneit Design Guidelines

Design Guidelines - Amendments & Updates Stages 1, 2 & 3

APPENDIX A: AT: CRICKLEWOOD SIDINGS, LAND REAR OF BRENT TERRACE (SOUTH) CRICKLEWOOD LONDON NW2 1BX DRAFT PLANNING CONDITIONS

GUIDANCE ON ALUMINIUM COMPOSITE MATERIAL (ACM) FAÇADE SYSTEMS

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted:

Fire Engineering and Structures a Fire Service View

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

Brighton & Sussex University Hospital

Design guide to separating distances during construction

Section Safety Section Cleanup. None Required

WINDMILL CROSSING HOMEOWNERS ASSOCIATION, INC. Architectural Committee Guidelines For Townhomes

Amendments to the Approved Documents

Serenity, Bundamba & Greenview releases Individual lot guidelines Protecting your investment

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

Transcription:

Mandatory Fire Safety Instruction UCL ESTATES & FIRE STANDARD - GENERAL PERFORMANCE FOR SITE HOARDING AND CONTRACTOR CABINS UCL general hoardings details - what you need to know: Prohibited Note Prior to introducing any hoarding or skips, consultation with the UCL fire safety team must be held (fire@ucl.ac.uk). Fire spread may be a significant risk due to the contractor s activities and therefore in all cases fire separation in construction sites must be considered. The following note provides high-level information in relation to the fire performance required for the provision of site hoardings and contractor s cabins on UCL construction sites both internal and external works; Internal construction site - any refurbishment (alterations, renovation or repair of an existing building or structure) works or storage areas connected to those works, commenced or undertaken without appropriate fire separation* between site and occupied areas being used by UCL staff, students or visitors; Exterior construction site - any refurbishment / construction works or storage areas connected to those works in close proximity (less than 6m away) to occupied premises for the safety UCL staff, students & visitors commenced or undertaken without appropriate fire separation*; Exterior construction site - to separate and protect UCL staff, students & visitors using adjoining escape routes and circulation areas from construction site commenced or undertaken without appropriate fire separation* being considered; Temporary buildings/structures - the use of temporary site structures [including waste skips, prefabricated cabins (PortaKabins), site huts, ISO cargo containers, caravans, portable and sectional buildings] brought onto site for use as offices, stores, workshops, welfare facilities etc. and, during the course of the works that are not appropriately fire rated*; Temporary accommodation - the use of a segregated part of the building under construction or undergoing refurbishment occupied as offices, stores, workshops, welfare facilities etc. during the course of the works that are not appropriately fire separated* to protect UCL staff, students & visitors; Acceptable *Proportionality - generally fire separation and prevention to separate safely refurbishment works, site accommodation, temporary structures / buildings or activities shall be initially assessed in respect to duration, surrounding interface between UCL occupants, their means of escape and the protection of property. The degree of proportionality needs to be determined at RIBA Stage 3 in conjunction with any fire safety and logistical constraints identified, the agreed constraints outcome then included in tender enquires to ensure that all costs and requirements can be tendered for; Smaller works - for example painting & decorating, minor maintenance tasks etc. may not need to be fire horded or specifically fire separated to protect UCL staff, students & visitors. But, will need to demonstrate through comprehensive Risk Assessment & Method Statement (RAMS) and a phasing programme, clear separation of activities from impacting on the means of escape from the premises and general fire safety arrangements during the works; Note - See Table 1 below for further guidance on the minimum fire separation ratings required. Last Amended: Rev: 2 / Dated: Dec 15 1.

Contents UCL Mandatory Fire Safety Instruction - MI07 1.0. Introduction Objectives for UCL Hoarding Standards... 2 2.0 UCL Hoarding... 3 3.0 Temporary Works Designers Brief... 4 4.0. Fire Rated Hoarding... 5 Table 1 - Overview (See Table 2 For More Details):... 5 5.0. Fire Rated Technical Standard & Specifications... 8.Table 2* - Specific Details:... 9 1.0. INTRODUCTION OBJECTIVES FOR HOARDING STANDARDS This document identifies specific requirements for fire rating, material, visual impact and other considerations for hoardings based on a risk-based approach, to ensure correct design, installation and maintenance. UCL is undertaking an extensive programme of regeneration across the entire campus, including large and smaller scale projects, maintenance, engineering and infrastructure works often in close proximity to one another but with differing programmes. The consistent and safe use of hoardings and branding around project sites will create secure compounds whilst reducing the visual impact of the works on students, staff and the public, using appropriate branding, as well as providing the opportunity for safety and way finding signage; All UCL Project Officers (UPOs) and Project Managers (PMs) must take account of these Standards when putting together project documentation or entering into contracts; The UCL Logistics Partner is responsible for the design, deployment, maintenance and inspection of site boundary hoardings; The Contractor is responsible for the design, deployment, maintenance and inspection of all hoardings internal to the construction site or works area. This document identifies specific requirements for fire rating, material, visual impact and other considerations for hoardings based on a riskbased approach, to ensure correct design, installation and maintenance. All hoarding and fence lines are classified as temporary works and need to adhere to an agreed temporary works design produced by a qualified person; This document outlines the strategy and notional information that will be required to facilitate UCL hoarding and temporary fencing; Last Amended: Rev: 2 / Dated: Dec 15 2.

2.0 HOARDING All proposals for hoarding and skip locations must be approved by the UCL fire safety team (fire@ucl.ac.uk). All hoarding must be fit for purpose and consideration must be made to each individual site requirement, as the conditions for each will be unique. It is imperative that each hoarding or gate is designed by a temporary works engineer and checked to Category One in accordance with temporary works procedure. 2.1. External Site Boundary Hoardings - site boundary hoarding will be typically constructed of a timber frame using proprietary panels with bespoke restraints. Foundation systems will vary dependent on the location and internal requirements and these will be identified in the temporary works design brief. The Logistics partner will be responsible for the design, installation, maintenance, relocation and subsequent demobilisation of all external site boundary hoardings. They will ensure designs are prepared and that inspections and maintenance is carried out to an agreed regime. Timber facing panels must be fair faced and be of such material that is with the visual effect that UCL has for its construction sites and additionally be capable of supporting branding in the form of aluminium or dibond sheets that can be applied and remain for a pre-determined period. All timber hoardings are to be painted in the UCL branded colour of Stone (pantone 7527). All hoardings are to incorporate fixed wooden header and kicker trimming panels (150mm vertical measurement) painted to a good quality finish in Stone colour. Vision cut out panels, approximately 250mm x 250 mm, are to be provided by the hoarding provider, as and when directed by the UPO or PM or where required for safety reasons. No form of advertising is permissible to be affixed to hoardings by main or sub-contractors. All designs will be prepared and that inspection and maintenance is carried out to an agreed regime. Safety signage (including Fire escape signs) site rules, site entrance, Project Team contact information, Considerate Contractor or similar signage must be approved in writing by the UPO/PM. Last Amended: Rev: 2 / Dated: Dec 15 3.

2.2. Internal Site Hoardings - a risk assessment will be undertaken by the contractor against the UCL criteria outlined in this document to determine the material, fire retardant properties and branding requirements. 3.0 TEMPORARY WORKS DESIGNERS BRIEF During Project Stage Gate 3, a risk assessment of the hoarding requirements will be prepared by the UPO/PM. The following information will be provided to the Contractor during the ITT or the Logistics Partner four weeks prior to mobilisation or change request to enable them to provide the correct hoarding. PSO project number; Site Plan showing dimensioned extent of all internal and external hoarding and any change in levels; All elements of the hoarding must comply e.g. scaff wrap tags should be constructed of the appropriate level of fire retardant material. Gaps in the hoarding will be considered non-compliant with the fire rating; Any specific hoarding material and hoarding type, for example timber, foundation style; Height requirements; Branding requirements, including colour and use of graphics; Locations of any pedestrian or delivery gates including dimensions and type of security devices required; Any sensitive surface where foundations or floor or wall fixings may not be suitable; Ground survey for services (including depths) or any other restrictions where posts or ground fixings are required, including identifying any adjacent excavations; Anticipated period during which the hoarding will be in position and the date proposed to be installed; Any other special requirements: vehicle strike protection, crowd loading, vision panels; Last Amended: Rev: 2 / Dated: Dec 15 4.

4.0. FIRE RATED HOARDING 4.1. Fire Rated Hoardings mitigate fire, spreading from: an internal construction site - between construction site within an occupied building and the premise occupants; an exterior construction site - in close proximity to occupied premises for the safety UCL staff, students & visitors; an exterior construction site - to separate and protect occupants using adjoining escape routes and circulation areas from construction site; 4.2. Fire spread may be a significant risk due to the contractor s activities and therefore in all cases construction sites are to be fire separated. The following note provides high-level information in relation with the fire performance required for the provision of site hoardings and contractor s cabins on the UCL Construction Sites. Fire rating requirement will be based on: o use, storage of materials;, o proximity to adjacent buildings & projects; o whether it needs to protect fire escape routes or fire service access; Where herras fencing with fire retardant wrapping is considered appropriate, the wrapping material should be secured with fire retardant tags to the same standard as the wrap. All plastic hoardings must meet the fire retardant requirement for its use and adhere as close as possible to the UCL branding colour of Stone. Table 1 - Overview (See Table 2 for more details): Location of Hoarding or Cabin Internal Location - separating construction or storage areas from occupied areas Internal Location - part of a fire fighting shaft (stair, lobby, access corridor) External Location - office use, adjacent to escape routes or other buildings External Location - storage use, adjacent to other buildings or escape routes External Location SKIPS** - Skips waste removal located adjacent to buildings (unless located greater than 3m from any structure) then must be fire horded between the skip and the building External Location - more than 20m from other buildings, escape routes Fire Rating (for exposure from each side separately) *60 minutes (FR60) fire separation required 120 minutes (FR120) fire separation required *30 minutes (FR30) fire separation required 60 minutes (FR60) fire separation required 30 minutes (FR30) fire separation required No fire separation required Comments See more specific details and how to achieve at Table 2 below: Last Amended: Rev: 2 / Dated: Dec 15 5.

Notes: *Proportionality - generally hoarding provision shall be initially assessed in respect to duration, surrounding activities and nature of the site particularly where the hoardings required, are to be reusable / movable UPVC type, Herras with Monarflex or the timer stone coloured hoarding required to enhance the student, staff and visitor experience. The degree of proportionality needs to be determined at Stage 3 in conjunction with any fire safety and logistical constraints identified, the agreed constraints outcome included in tender enquires. 4.3. Skips** - the fire separation of skips and their loading area adjacent to a building or structure suggestions are summarised below: A potential fire size for a waste fire (3820 kw and 1500kW) based on these fire have provided two alternative protection solutions for waste bins/skips located within 3m of the building envelope.. (a). Clear height above skips - it is calculated for 6.1m 3 skips with a fire size of 3820kW that it is feasible to locate waste within 3 meters of a building, if the façade is made of fire resisting construction and there are no windows located up to 6m high. For windows above 6m, it is recommended to have the windows permanently shut to reduce the risk of hot smoke in the unlikely event of a fire. Minimum dimensions required for a solid wall to prevent fire spread (b). Covered skip of any size - if there are windows above the skips that are below 6m, and the skips cannot be located 3 m away from the building, a possible solution is using covered skips or using fire resisting blankets above the skips. Example of a covered skip. Last Amended: Rev: 2 / Dated: Dec 15 6.

(c). UCL Mandatory Fire Safety Instruction - MI07 Clear height above waste bins - it was calculated for a 660L bin that it is feasible to locate the bins within 3 meters of a building, if the façade is made of fire resisting construction and there is no windows located up to 4m high. For windows above 4m, it is recommended to have the windows permanently shut to reduce the risk of hot smoke in the unlikely event of a fire. There are various rubbish bin sizes ranging from 90L to 1100L, as illustrated in the image below. Illustration of different type of rubbish bins (d). Waste Type and Fire Size - as a difference from the waste skips, the rubbish bins are normally made of high-density polyethylene, which is a combustible material. Therefore, a fire on a rubbish bin is likely to melt the container and subsequently feeding in the combustion process. Minimum dimensions required for a solid wall to prevent fire spread (e). In accordance with HSG 168 the barrier/covering should be designed to achieve a minimum fire resistance of 30 minutes (stability, integrity and insulation). The insulation criteria can be reduced to 15 minutes fire resistance, by placing reliance on fire service intervention in line with Approved Document B (ADB). Last Amended: Rev: 2 / Dated: Dec 15 7.

5.0. FIRE RATED TECHNICAL STANDARD & SPECIFICATIONS 5.1. Table 2 below, summarises the minimum fire performance required for the site hording or cabin provided in the UCL Construction site, to provide adequate UCL life safety, property protection and business continuity goals. 5.2. Unless specifically identified, any fire rating is to be provided for fire exposure from each side separately. Surface spread of flame: Class 0, or B-s3-d2 this needs include any surface treatment such as printing, when tested to BS 796-6 & 7 or BS EN 13501-1. Any materials used overhead of escape routes should be B-s3- do i.e. not produce flaming droplets. Fire rating performance of the hoarding, may require a fire resistance rating in both directions of between 30 and 120 minutes, depending on its location. It may be more efficient to build this as a second skin behind the hoarding where needed, rather than include this into the hoarding specification. Relevant tests would be to BS476 or BS EN 1363. The material used for the hoarding should be of limited combustibility this includes insulation materials. Relevant tests are BS476-11 or Class A2- s3, d2 in accordance with BS EN 13501-1:2007, when tested to BS EN ISO 1182 or BS EN ISO 1716 and BS EN 13823. 5.3. The exact specification will depend on where the hoarding is located and if it needs to for example, protect escape routes and fire service access or is needed to prevent fire spread between buildings, which will need to meet the more stringent requirements from a fire-rating point of view. Other Information: 5.4. This note is to be read in context with other fire safety documents for UCL construction sites: Fire prevention on Construction Sites: The Joint code of Practice on the Protection from Fire on Construction Sites & Buildings Undergoing Renovation, 9 th Edition, October 2015 - available from the UCL Fire Safety on request. This note does not cover fire safety requirements required for Building Regulations compliance, which may apply to site cabins that are in place and occupied for more than 28 day Last Amended: Rev: 2 / Dated: Dec 15 8.

Table 2* - Specific Details: Location of Hoarding or Cabin Fire Rating (for exposure from each side separately) Insulation Material Surface Spread of Flame Part of a fire fighting shaft (stair, lobby, access corridor) internal. 120 minutes (stability, integrity, insulation) In accordance with the BS 476-20, BS 476-21, and/ or BS 476-22, the standard performance delivered by the element of construction may also be achieved based on the equivalent rating (measured in minutes) when tested against EN 1363-1:2012 and associated relevant harmonised testing standards. Non-combustible Tested to BS 476-4: 1970 or BS 476-11: 1982 By reference to the test method specified in BS 476-11:1982 Non-combustible Classified in accordance to BS 1350-1:2002 and tested to BS EN ISO 1182:2002 and BS EN ISO 1716:2002 Classified in accordance with BS EN 13501-1:2002 and tested to BS EN ISO 1182:2002 or BS EN ISO1716:2002 and BS EN 13823:2002 Class 0 to BS 476-4:1970 or, BS 476-11:1982 or, BS 476-6:1989 and BS 476-7:1997 BS3 d2 to BS EN 13501-1 Tested to BS EN ISO 11925-2 and BS EN ISO 13823 Separating construction or storage areas from occupied areas; internal 60 minutes (stability, integrity, insulation) In accordance with the BS 476-20, BS 476-21, and/ or BS 476-22, the standard performance delivered by the element of construction may also be achieved based on the equivalent rating (measured in minutes) when tested against EN 1363-1:2012 and associated relevant harmonised testing standards. Non-combustible Tested to BS 476-4: 1970 or BS 476-11: 1982 By reference to the test method specified in BS 476-11:1982 Non-combustible Classified in accordance to BS 1350-1:2002 and tested to BS EN ISO 1182:2002 and BS EN ISO 1716:2002 Classified in accordance with BS EN 13501-1:2002 and tested to BS EN ISO 1182:2002 or BS EN ISO1716:2002 and BS EN 13823:2002 Class 0 to BS 476-4:1970 or, BS 476-11:1982 or, BS 476-6:1989 and BS 476-7:1997 BS3 d2 to BS EN 13501-1 Office use, adjacent to escape routes or other buildings; external 30 minutes (stability, integrity, insulation) In accordance with the BS 476-20, BS 476-21, and/ or BS 476-22, the standard performance delivered by the element of construction may also be achieved based on the equivalent rating (measured in minutes) when tested against EN 1363-1:2012 and associated relevant harmonised testing standards. Non-combustible Tested to BS 476-4: 1970 or BS 476-11: 1982 By reference to the test method specified in BS 476-11:1982 Non-combustible Classified in accordance to BS 1350-1:2002 and tested to BS EN ISO 1182:2002 and BS EN ISO 1716:2002 Classified in accordance with BS EN 13501-1:2002 and tested to BS EN ISO 1182:2002 or Class 0 to BS 476-4:1970 or, BS 476-11:1982 or, BS 476-6:1989 & BS 476-7:1997 B S3 d0 to BS EN 13501-1 Note that a d0 performance (no flaming droplets) is recommended for materials on escape routes BS EN ISO1716:2002 and BS EN 13823:2002 Last Amended: Rev: 2 / Dated: Dec 15 9.

Table 2 - Specific Details (Cont.): Location of Hoarding or Cabin Fire Rating (for exposure from each side separately) Insulation Material Surface Spread of Flame Storage use, adjacent to other buildings or escape routes; external 60 minutes (stability, integrity, insulation) In accordance with the BS 476-20, BS 476-21, and/ or BS 476-22, the standard performance delivered by the element of construction may also be achieved based on the equivalent rating (measured in minutes) when tested against EN 1363-1:2012 and associated relevant harmonised testing standards. Non-combustible Tested to BS 476-4: 1970 or BS 476-11: 1982 or By reference to the test method specified in BS 476-11:1982 Non-combustible Classified in accordance to BS 1350-1:2002 and tested to BS EN ISO 1182:2002 and BS EN ISO 1716:2002 Class 0 to BS 476-4:1970 or, BS 476-11:1982 or, BS 476-6:1989 and BS 476-7:1997 B S3 d0 to BS EN 13501- Classified in accordance with BS EN 13501-1:2002 and tested to BS EN ISO 1182:2002 or BS EN ISO1716:2002 and BS EN 13823:2002 More than 20m from other buildings or escape routes No requirements No requirements No requirements *Guidance provided by Arup Fire Engineering Last Amended: Rev: 2 / Dated: Dec 15 10.