Small Generator Interconnection Procedures (SGIP) Customer Guide

Similar documents
Small Generator Interconnection Procedures (SGIP) (For Generating Facilities No Larger Than 20 MW)

ATTACHMENT N. Small Generator. Interconnection Procedures and Agreement. (For Generating Facilities No Larger Than 20 MW)

An Introduction to Interconnection Policy in the United States

Long Island Power Authority Seventh Revised Leaf No. 16

Cluster Study Process

Long Island Power Authority Seventh Revised Leaf No. 16

PJM Queue Position Establishment Background and Support for Problem Statement

Wholesale DER Interconnections

Generator Interconnection Procedures Overview

SMALL GENERATOR INTERCONNECTION PROCEDURES (SGIP) (For Generating Facilities No Larger Than 20 MW)

Generator Interconnection Process. Wholesale Distribution Overview

Firm Transmission Feasibility Study: A study conducted by the Transmission Provider in accordance with Section 36.4 of the Tariff.

Interconnection Specialists ensure all projects are treated in accordance with the current applicable tariff provisions

PG&E s WDT Interconnection Reform Principles Document

ATTACHMENT P SMALL GENERATOR INTERCONNECTION PROCEDURES (SGIP) (For Generating Facilities No Larger Than 20 MW)

NYISO Governance Summary of Sector Definitions and Related Terms

Rule 21 Tariff / Process Overview 6/17/2015

What You Need to Know Before Requesting Interconnection

DG Interconnection Procedures Collaborative. January 20, 2017

Small Generator Interconnection Procedures

effective date 1/8/01

NEW JERSEY BOARD OF PUBLIC UTILITIES N.J.A.C. 14:4-9 Net Metering and Interconnection Standards for Class I Renewable Energy Systems

TARIFF FOR WHOLESALE TRANSMISSION SERVICE SHARYLAND UTILITIES, L.P. SHARYLAND UTILITIES, L.P North Akard Dallas, Texas 75201

Queue Management. A look at queue reform and. Jennifer Heintz and Janet Wheeler June 12, 2012

Business Practice Manual for Distributed Generation Deliverability. Version

Q: What do I do if I need more information? A: Check back with this FAQ page periodically. If your question is not here, contact the RFP manager:

Is FERC s Generator Interconnection Policy really conducive to efficient generation development?

Feasibility Study Report

Union Power Cooperative

Stakeholder Comments Template. Subject: Small and Large Generator Interconnection Procedures Draft Final Proposal and Meeting

NV Energy s Open Access Transmission Tariff (OATT) Proposed Changes. November 2011

Renewable Market Adjusting Tariff (ReMAT) Feed-In Tariff (FIT)

Transmission Expansion and Interconnection Manual. June 2017

First Revised Sheet No. 449 Canceling Original WN U-60 Sheet No. 449 PUGET SOUND ENERGY Electric Tariff G SCHEDULE 449 RETAIL WHEELING SERVICE

SMALL GENERATION SYSTEM APPLICATION (10 kw OR LESS)

PJM Manual 14E: Additional Information for Upgrade and Transmission Interconnection Projects Revision: 05 Effective Date: April 1, 2018

ENTERGY FACILITY CONNECTION REQUIREMENTS March 2007

SCE s Renewable Market Adjusting Tariff (Re-MAT) Bidders Conference September 18, 2013

Interconnection of New Generation Facilities

Generation Interconnection Process. SWANA Spring Conference Atlantic City, NJ April 18, 2016

September 30, Louisville Gas & Electric Company, et al., Docket No. ER The ITO s Semi-Annual Report

New York Independent System Operator System Reliability Impact Study Criteria and Procedures

Dated: April 16, 2002

Transmission Planning Process Phase 3 Competitive Solicitation

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position AA1-038

Relevant changes will be made to corresponding sections of OA and RAA.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

SERVICE CLASSIFICATION NO. 14-RA STANDBY SERVICE

Request for Proposal

Procedure: Station Power Portfolio Application

Defining Outage States to Include a Mothball Outage

Smart Grid Small Generator Interconnection Procedure (SGIP) Updates. December 06, 2016

COMBINED HEAT AND POWER CALL FOR CHP PROJECTS PROJECT SUBMISSION FORM

Requirements For Generation and Transmission Interconnections

SERVICE AGREEMENT FOR WHOLESALE DISTRIBUTION SERVICE. Between SOUTHERN CALIFORNIA EDISON COMPANY. And DECADE ENERGY, LLC

Queue Management Process

CHOPTANK ELECTRIC COOPERATIVE, INC. P.S.C. Md. No. 3 Fifth Revised Page No. 59 COGENERATION AND SMALL POWER PRODUCTION RATE SCHEDULE X

Revised Transmission Planning Process. Complete Final Proposal

NBP (ATG) IR 01 March 5, Reference: NBP 18.01

SERVICE AGREEMENT FOR WHOLESALE DISTRIBUTION SERVICE. Between SOUTHERN CALIFORNIA EDISON COMPANY. And

83D Q & A Set #8. Answer: Please see response to question 117.

Stakeholder Comments Template. Generator Interconnection Procedures Phase 3 ( GIP 3 ) Issue Paper, posted March 1, 2012

SPP at a Glance. Located in Little Rock. Approximately 600 employees

ISA FORM TEMPLATE (From Attachment O of the PJM Tariff)

KANSAS CITY POWER & LIGHT COMPANY FERC ELECTRIC TARIFF, THIRD REVISED VOLUME NO. 3 (OPEN ACCESS TRANSMISSION TARIFF)

PJM Strawman Proposal

RATE DS-4 LARGE GENERAL DELIVERY SERVICE

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY

Business Practice Energy Imbalance Market (EIM BP) Revision Number: Revision Date: November 30July 29, 2015

DISTRIBUTED ENERGY RESOURCE INTERCONNECTION PROCESS FACT SHEET

ENERGY IMBALANCE MARKET BUSINESS PRACTICE ( EIM BP ) TABLE OF CONTENTS 1. Introduction 2. Communication with the PSEI EIM Entity 3.

SERVICE AGREEMENT FOR WHOLESALE DISTRIBUTION SERVICE. Between SOUTHERN CALIFORNIA EDISON COMPANY. And TECHNI-CAST CORPORATION

Mothball Outages in Capacity Markets

Renewable Generation - REFIT and Grid Connection

FERC ELECTRIC TARIFF EIGHTH REVISED VOLUME NO. 7 OF PUGET SOUND ENERGY, INC. filed with the FEDERAL ENERGY REGULATORY COMMISSION

Generation Interconnection Feasibility Study Report. For. PJM Generation Interconnection Request Queue Position AA1-038

The State of Wind Energy in New England

Water & Energy Consulting Lon W. House, Ph.D.

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

BC Hydro Open Access Transmission Tariff Effective: April 18, 2013 OATT Terms and Conditions First Revision of Page i

OPEN ACCESS TRANSMISSION SERVICE TARIFF OF THE

Presentation Title ( Arial, Font size 28 ) Urban Rooftop PV Projects

GRENLEC s Renewable Standard Offer

SCHEDULE 12 Transmission Enhancement Charges. Establishment of Transmission Enhancement Charges.

SERVICE AGREEMENT FOR WHOLESALE DISTRIBUTION SERVICE. Between SOUTHERN CALIFORNIA EDISON COMPANY. And RADIANT BMT, LLC

OPEN ACCESS TRANSMISSION SERVICE TARIFF OF THE AMERICAN ELECTRIC POWER SYSTEM

SCHEDULE 12 Transmission Enhancement Charges

Interconnection Application

MISO MODULE B FERC Electric Tariff TRANSMISSION SERVICE MODULES Effective On: November 19, 2013

Transmission Interconnection Requirements. Table of Contents

PACIFIC GAS AND ELECTRIC COMPANY WHOLESALE DISTRIBUTION TARIFF

Business Practices for. Schedule 21-ES. (Modifications Issued on August 11, 2016)

INTERCONNECTION PROCEDURES FOR DISTRIBUTED GENERATION

PJM Business Practices for Hudson Transmission Service

BGE Smart Energy Savers Program Combined Heat and Power Program Manual

ATTACHMENT DD. Reliability Pricing Model

Distributed Generation. Technical Requirements and Interconnection Agreements

Financial Transmission Rights

Capacity Market. Overview RPM Capacity Market. Market Design

Transcription:

Customer Guide SCE&G utilizes a FERC mandated and approved process, known as the Small Generator Interconnection Procedure (SGIP), to evaluate the interconnection of small generators to the SCE&G transmission and distribution system. The SGIP and all required documents can be found on SCE&G s Open Access Same-time Information System (OASIS). This document is intended as a guide to help the Interconnecting Customer understand the SGIP. Should there be any discrepancies in this document and the SGIP, the SGIP will apply. FACILITY SIZE 1 APPLICABLE TARIFF PROCEDURE > 20 MW LARGE GENERATOR INTERCONNECTION PROCEDURE, PLEASE REFER TO THE SCE&G OASIS FOR MORE INFORMATION. QUALIFYING FACILITIES NOT PARTICIPATING IN THE STATE NET METERING PROGRAM STATE NET METERING PROGRAM >5 MW - 20MW, or <5 MW and ineligible for Fast Track or 10kW inverter process 10kW - up to 5 MW See table below for eligibility SGIP STUDY PROCESS SGIP FAST TRACK PROCESS (IF SCREENS ARE MET, OTHERWISE STUDY PROCESS) 0-10kW SGIP INVERTER PROCESS (IF SCREENS ARE MET, OTHERWISE STUDY PROCESS) 0-100kW PLEASE CONTACT SCE&G RENEWABLES PRODUCTS & SERVICES AT 866-660-3705 The SGIP contains four processes. The applicable process for each specific interconnection request depends on a number of factors. 1. Pre- Application Process An Interconnection Customer (IC) may submit a formal written request form along with a non-refundable fee of $300 for a pre-application report on a proposed project at a specific site. Transmission Provider (TP) shall provide pre-application report within 20 Business Days (BD) of receipt of the completed request form and payment of the $300 fee. The report need only include existing data. The report is non-binding, does not confer any rights, and the IC must still successfully apply to be interconnected to the TP s system. 1 Interconnection Requests shall be evaluated based on the Small Generating Facility s maximum rated capacity. 1 of 5

Customer Guide 2. Fast Track Process For Certified Small Generating Facilities as identified on Fast Track Eligibility table, Technical screens are used to quickly identify reliability and safety issues instead of the interconnection studies. Line Voltage Fast Track Eligibility for Inverter-Based Systems Fast Track Eligibility Regardless of Location Fast Track Eligibility on a Mainline 2 and 2.5 Electrical Circuit Miles from Substation 3 5kV 500kW 500kW 5kV and < 15kV 2MW 3MW 15kV and < 30kV 3MW 4MW 30kV and 69kV 4MW 5MW 3. Study Process Default method consisting of a scoping meeting, a feasibility study, a system impact study and a facilities study. Feasibility Study - This is a preliminary technical assessment of the proposed interconnection. 4 System Impact Study - This is a more detailed assessment of the effect the interconnection would have on the TP s electric system and Affected Systems. Facilities Study This determines what modification to the TP s electric system are needed, includes detailed costs and scheduled completion dates for these modifications. Once IC agrees to fund any needed upgrades, the Parties execute a Small Generator Interconnection Agreement (SGIA ) that, among other things, formalizes responsibility for construction and payment for Interconnection Facilities and Upgrades. 4. 10 kw Inverter Process For Certified inverter-based Small Generating Facility no larger than 10kW Small Generator Interconnection Agreement (SGIA) does not apply to requests to interconnect submitted under the 10kW Inverter Process. The TP s evaluation of a project with multiple Points of Interconnection should be performed, using Good Utility Practice (TP has the option to either treat such projects separately for queuing and interconnection study purposes, or as a single Point of Interconnection), based on the project s unique engineering and geographic needs. 2 A main line is a three-phase backbone of a circuit; will typically constitute lines with wire sizes of 4/0 American wire gauge, 336.4 kcmil, 397.5 kcmil, 477 kcmil and 795 kcmil. 3 An Interconnection Customer can determine this information about it s proposed interconnection location in advance by requesting a pre-application report pursuant to section 1.2. 4 In the case an overlap between the feasibility study and the system impact study occurs, it may be reasonable to skip the feasibility study entirely where the distinction may not be enough to require that both studies be performed. 2 of 5

Section 1. Pre-Application/Request Note: 1. $300 non-refundable fee for a pre-application report on a proposed project at a specific site. 2. A complete IR includes a completed application form, $1,000 deposit, and demonstration of site control. IC deposit goes towards the cost of the feasibility study. A $500 processing fee is required under the Fast Track Process. A $100 non-refundable application fee is due under the 10kW Inverter Process. 3 of 5

Section 2. Fast Track Process (Only available for certified SGF s based on Fast Track eligibility ) 1 Notes: 1. A Certified Small Generating Facility is one that has been certified by a nationally recognized laboratory before the Interconnection Request is submitted to the TP. 2. The Fast Track Process is available to the IC if the SGF meets the requirements of Attachments 3 & 4 of the SGIP, or if the TP has reviewed the design or tested the SGF and is satisfied that it is safe to operate [2.1]. 3. If the IC does not sign the IA, or request that it be filed unexecuted within 30 BD, the IR is deemed withdrawn. 4 of 5

Section 3. Study Process Notes: 1. The Scoping Meeting may be omitted by mutual agreement. 2. The TP has 20 additional BD to complete a system impact study requiring review by Affected Systems. 3. In cases where upgrades are required, the facilities study must be completed within 45 BD. In cases where no upgrades are necessary, and the required facilities are limited to Interconnection Facilities, the facilities study must be completed within 30 BD. 4. If the IC does not sign the IA, or request that it be filed unexecuted within 30 BD, the IR is deemed withdrawn. 5. Facilities Study Agreement, Section 9. 5 of 5