Student Green Energy Fund Proposal Application Form

Student Green Energy Fund Proposal Application Form

Full Name Unit/Department Phone Lauren Reilly

Parking Lot 5A & Cedar Circle LED Lighting Retrofit

Parking Lot 6 LED Lighting Retrofit

Abstract Student Engagement & Why LEDs? Sustainability Benefits Project Implementation Timeline Long Term Sustainability Maintenance Contractor

Proposal Title: Lighting the Way to Savings with LEDs. Total Number of Pages (not counting cover pages): 9

Total Material Cost and Labor ($) 179,238 Less Rebates and Incentives ($) 2,000 Net Cost of Project ($) 177,238

The National Optical Astronomy Observatory s IYL2015 QLT Kit Energy Calculation Worksheet SAMPLE Bulb Data Sheet

Maine Solar Energy Rebate Program 2007 Annual Report. December 1, 2007

SUSTAINABILITY An Energy & Emissions Case Study

Surprising as it may sound,

Meeting AB 32 Cost-Effective Green House Gas Reductions in the Residential Sector

Complete Retrofit of Gym w/o Occupancy Sensors

LIGHTING THE WAY/PATH TOWARDS SUSTAINABILITY Student Sustainability Proposal for WMRC Oct 14, 2007

State Electronics Challenge 2008 Partner Accomplishments

KEY FACILITIES METRICS SURVEY

Job Costing (JC) General Features: Interface with other Systems: System Setup and Maintenance:

Request for Proposal Complete Interior Design for 2- Story Historic Building into Collaborative Innovation Space Proposals are due: December 6, 2014

LOCAL GOVERNMENT PARTNERSHIP CITY OF BEAUMONT

Proposal Details. Zaida Darley

BENCHMARKING & DISCLOSURE REPORT

Definition. Name of the tool or technique Project mission statement

WIRELESS CONTROLS WHAT, WHY, WHERE AND WHEN SHOULD THEY BE CONSIDERED?

Lighting Options for Your Home

Carbon Footprint of Single-Family Residential New Construction

Decision Makers Guide

LED vs. Fluorescent Lighting: An RSMeans life cycle cost comparison

2012 Grant Application

Conservation and Demand Management Plan July 1, 2014

Third Party Marketing

Gessler: DG4 and DG6 LED Exit Signs

Lighting Commercial Spaces 101. An Introduction to LED and Lighting Controls

Understanding and Measuring School Electronics

Thank you for the opportunity to present at this years IFMA New Mexico Conference. John Christensen Director of Physical Plant Albuquerque Academy

Farm Energy IQ. Farms Today Securing Our Energy Future. Farm Energy Efficiency Principles Tom Manning, New Jersey Agricultural Experiment Station

Carbon Management Plan

Measuring Electricity Class Activity

Denison University. Green Hill Fund. Shoshana Blank, Senior Research Fellow Sustainable Endowments Institute

Cost Estimating & AE Evaluation Service. Manual for Preparation of Cost Estimates & Related Documents for VA Facilities

City of Carson City 3505 Butti Way Carson City, NV PUBLIC WORKS SOLAR PV SYSTEM PROJECT EXECUTIVE SUMMARY

DOE's ISO Superior Energy Performance Program: Driving Energy Efficiency and Productivity Initiatives at HARBEC. Bob Bechtold March 27, 2015

Page 2. Q1.An electrician is replacing an old electric shower with a new one. The inside of the old shower is shown in Figure 1.

Student Green Energy Fund

Green Lights Economics: Graphic Design Considers a Lighting Upgrade

Keycard Based Energy Saving Pilot Program

AT&T 10x Case Study:

Measuring School Electronics Energy at Work 1

CHAPTER 7: BUSINESS SKILLS FOR TECHNICAL PROFESSIONALS

APPENDIX B: CITY OF RED LODGE BASELINE INVENTORY

Farm Energy IQ. Farm Energy Efficiency Principles 2/16/2015. Farm Energy Efficiency. Basic Energy Principles

Name CHAPTER 12 NONRENEWABLE ENERGY RESOURCES. (watts)(hours used per day)(365 days) = total kwh used 1000

Technical Documentation: A how-to guide for the Smith College Proxy Carbon Life Cycle Cost Calculator

return on investment from Issuetrak software

Greenhouse Gas Emissions. Climate Change: Taking Action for the Future

Implementing Reliability Excellence By Randy Heisler, CMRP As appeared in the February 2005 issue of Maintenance Technology

ENERGY AND SCHOOLS: ENERGY AUDIT

Energy Audit. 4. Presentation (optional) Present the information found through steps 2 and 3.

Heat Pumps: Save Money, Save Energy, Save the Environment

Effective Energy Management

DWSD Strategies to Reduce Water Loss and Energy Use MARCH 14, 2013

Carbon accounting manual

Grays Harbor PUD Energy Services. Commercial, Industrial, Agricultural Incentive Program Catalog IT S YOUR PUD!

Sample PureWhite LED Pool Light Savings Analysis

DIGITAL AND ENVIRONMENTAL SKILLS FOR FACILITIES MANAGEMENT

Surprising as it may sound,

White Mountain Final Report

LED Lighting and Retrofit Design

AUDITING INVOICES 101

Disclosing Company Guidance for Applying the GEC EPEAT Ecolabel to the 2017 CDP Climate Change Questionnaire

Where Are We And Where We Are Going Walmart

Business Programs: Commercial and Industrial Renewable Energy Loan Program. Technical Application and Instructions

STATE OF NEW JERSEY Honorable Jon S. Corzine, Governor

Project Submittal for Sustainability Committee Loan Funding: Illini Union Lighting Occupancy Sensors

Environmental Performance Report. City of Portland, Maine

West Virginia University Compensation Strategy Non-classified Employees August, 2015

Green Initiatives at

How To Attack Lighting Energy Waste

Cool Roof Rating Council Database and Online Application Portal

Energy Savings by replacing old facility o Energy savings o Emissions

BECOME A CARBON ZERO HEROTM. EYP/energy. Case Studies

Bank of America Corporation Estimated economic benefits of the Environmental Business Initiative September 2017

6 Cost Analysis. Table 6.1 Initial System Costs

4.1 Where does your electricity come from? (Word Processor, internet)

[ 8 ] Humid continental [ 9 ] Subarctic. (provide total area in meter square) (provide total area in meter square)

RENEWABLE ENERGY FINANCE AND ENERGY EFFICENT (LOAN) FACILITY [INSERT COMPANY NAME]

Displaying the Benefits of a Zero Energy Home A Monitoring Case Study By Craig R. Clark, Alfred State College; and Dave Kostick, IMT Solar

COST OF OWNERSHIP (COO) FOR OPTOELECTRONIC MANUFACTURING EQUIPMENT

Industrial Lighting. Solutions. MADE in USA. Warehouses Distribution Centers Factories.

Case Study: Improving Sustainability of an Existing Building

First Solar Sustainability Metrics

Carbon & Fuel Reduction Panel Retail Industry Leaders Association Sustainability Conference. Jim Cornwell Senior Director of Design and Construction

Technical Facility Management FACILITY CONSULTING SERVICES. The Facility Audit Program

Levelock Final Report

X470 Project Management UC Berkeley Extension, Business and Management August 2009

PROPOSAL FORM AND CONTENT (An excerpt from the LTRC Research Manual, 2003 Edition, Chapter 2, Pages 14-19)

Date: June 24, Subject: LED Street Light Conversion Project

Energy Conservation Program Energy Conservation Program

Value Driven Solution For Chiller Optimization EVOLUTIONARY ENERGY SOLUTIONS.

Energy in nature and technology

Transcription:

Student Green Energy Fund Proposal Application Form Section 1: Summary Information Project Title: Beard Parking Garage LED Lighting Installation Duration (months): 3 months Total Budget ($): $429,603.90 Requested SGEF Funds ($): $409,603.90 Matching Funds ($): $20,000.00 Proposed Starting Date: November 2 PI Graduation Date (if applicable): June 2016 Section 2: Applicant Information Full Name Unit/ Department Principal Investigator John Pilz College of Arts and Sciences Investigator 1 Frank Granda Parking and Transportati on Services (PATS) Investigator 2 Raymond Mensah PATS Director Phone Email (727)452-0603 johnpilz@mail.usf.e du (813) 974-5963 fgranda@usf.edu 813-974-5961 rmensah@usf.edu

Investigator 3 Roger Stern Morsani College Investigator 4 Chi-Kai Hung College of Business (813) 817-9231 (813) 300-0216 rogerstern@mail.usf.edu Chikai@mail.usf.edu Section 3: Project Description Describe the project, including goals and objectives, methods to be used to assess the outcome of the project, and how the results of the project will be communicated to the USF community and the sustainability of the project Project background and purpose (reasons motivating request) (Max 500 words) USF Tampa has the potential to dramatically reduce it s energy consumption and greenhouse gas contributions through saving the energy through amenities it already has parking garage lighting. The Beard Parking Garage is an 8 stories structure that uses a lot of electricity, with several lights noticeably constantly burning out due to the short life spans they have and their constant usage. USF has the potential to pay more for lighting that will last longer and cost less over their lifetime. After speaking with Parking and Transportation Services (PATS), it was discovered that they want to update the lighting. They have dedicated $20,000 towards this project, should it be approved by SGEF. Project activities (Max 250 words) With funding from SGEF, this project will provide 746 light fixtures to the Beard Parking Garage Facility. The light fixtures currently existing will be replaced with new fixtures that are scientifically proven to last longer and cost less to maintain overall (the majority of the lighting industry approves as it is common knowledge). Project results (Max 500 words) The benefit of this project is immediate, with the potential to dramatically reduce the energy consumption and carbon footprint of the Beard Parking Garage. Over the course of 10 years, the total project has the potential to save the school $1,003,823.02.00 in combined 10 years savings, with the $935,236.40 coming from lighting and the $68,586.62 from yearly re-lamping savings. Outcomes of the project (narrative) The project is expected to serve as a testament to the money of SGEF being well-spent, as people coming into the garage will notice the difference and an educational sign can be utilized to educate

students by the now pre-existing electric car charging stations placed on the first floor. As the costs of this project serve to eliminate huge costs to USF, the funding saved could be potentially used as collateral for projects that need maintenance funding from the university to be maintained (funding to pay for upkeep of solar umbrellas, solar panels arrays, maintenance of electric car charging stations, the USF energy monitor at the Marshall Student Center that has remained broken for over a year). The money saved from the LED lighting can help SGEF justify projects that require maintenance from USF Physical Plant. Annual Cost Savings: ($1,003,823.02.00 total savings) / 10 years = $100,382.30 saved per year Return on Investment, %: ($1,003,823.02.00 total savings - $449,603.90 total cost)/ ($449,603.90 total cost) = 123%return on investment Annual Energy Savings -More detail on annual kwh savings: First we estimate the amount of energy saved from both lightings, and we multiply by total 746 lamps in Beard Parking Garage: Energy saved for total lighting = - [(Total retrofit LED consumption) (total current energy consumption)] = - [(746 lamps * 60 Watts * 24 hours * 365 days * 0.001 converted to kilowatt) - (746 lamps * 175 Watts * 24 hours * 365 days * 0.001 converted to kilowatt)] = - [(392,097.6) (1,143,618)] = 751,520.40 kwh saved per year Annual Greenhouse Gas Reduction -> -More detail on annual Carbon Footprint savings: Calculate with Carbon Dioxide Equivalent provided by EPA, United States Environmental Protection Agency: Greenhouse Gas Equivalence 751,520.40 kwh = 518 metric tons of CO 2 saved per year P.s. Value obtained using EPA s calculator, plugging in the annual energy savings value below: http://www.epa.gov/cleanenergy/energy-resources/calculator.html#results Project Sustainability (Max 200 words) This project has a very high return on investment (ROI). The Payback is expected to complete within only 1.71 years (value is constantly shrinking). Parking and Transportation Services will assume the ownership of the lighting, and they will maintain as needed. This project will pay for itself. Section 4: Additional Materials

Provide detail all activities and responsibilities including schedule for the project from start to finish, noting the general dates of major milestones and accomplishments. Also provide details of expenditures for the project, including a brief statement describing the nature and necessity of the expense. Provide a schedule for the project from start to finish, noting the general dates of major milestones and accomplishments (These may be uploaded as additional files) Detailed work plan/schedule of activities (Max 250 words) The project is expected to start with the filing of space impact form with PATS and SGEF Project Manager followed by the official bidding process to obtain bids that provide the best in terms of performance and cost. Once vendor is secured, the project will commence with any required permitting to be secured. Then the installation should commence and take 9.3 weeks for all the lights to be installed. Budget breakdown and justification -Project budget cost breakdown: 1. Personnel: For Beard Garage, we estimate that total hourly wage asks for $102.00, including hourly master electrician $43.00, hourly journey man $37.00, and hourly helper $22.00. We estimate that total labor cost asks for $76,092.00. Lastly, we estimate the schedule will be accomplished within 18.7 weeks for 40 working hours per week. -Disposal cost calculations: Project has not been competitively bid. Recommend allocating 25% of the proposal labor for disposal costs as following: $76,092.00 * 25% allocating = $76,092.00 * (1 + 0.25) = $95,115.00. 2. Contractual: ($279.00 for each LED * 746 lamps) + ($50.00 retrofit installation * 746 lamps) = = ($208,134.00) + ($37,300.00) = $245,434.00 $245,434.00 + $30,000.00 estimated contract arrangement = $275,434.00 3. Other (specify): Adding 4% contingency and 6% FP&C cost = 10% additional costs needed = $370,549.00 * 10% = $37,054.90 4. Total project cost: $370,549.00 project costs + $ 37,054.90 additional costs = $429,603.90 5. Request from SGEF: $429,603.90 - $20,000.00 matching funds from Parking and Transportation Services (PATS) = $409,603.90

Project Budget breakdown must follow the following format: Category Request from SGEF Applicant Total Contribution Personnel (include all $95,115.00 involved) Equipment Supplies/Materials Contractual $275,434.00 Construction (PATS) $20,000.00 Signage Other (10% of cost) $37,054.90 Total Project Cost $409,603.90 $20,000.00 $429,603.90