Steel Door Frame Installation in Masonry Construction

Similar documents
Product Description. Standard Sizes and Hardware Locations

Table of contents (click below or use bookmarks)

INDEX General Information Flush Frames Drywall Frames Technical Data Sheets Anchors

FRAMES. TELL MANUFACTURING, INC Page

HMMA hmm08b Installation and Storage of Hollow Metal Doors and Frames. An American Institute of Architects (AIA) Continuing Education Program

The fire resistance required for doors in this building is 1 (one) hour resistance in compliance with the below general specifications:

HOTEL SPECIFICATION SECTION 08100

DETAIL INSTRUCTION No. 1

1. Bullet resistant hollow metal door and frame assemblies tested in accordance with UL 7 52 and in compliance with the following:

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

Metal Door Frames & Meter Boxes

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

SECTION METAL DOORS & FRAMES

SECTION FIBERGLASS REINFORCED POLYESTER (FRP) DOORS AND ALUMINUM FRAMES

DETAILED METAL DOOR SPECIFICATION. UNIVERSITY CONTACT: Mark Golden, Supervisor of Structural Services (302)

Recommended Erection Instructions for Steel Frames

SECTION STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

SECTION TILT-UP PRECAST CONCRETE. A. Work includes, but is not limited to, the following:

Installation Instructions For Overly Acoustical / Bullet Resistant Window

Install Instruction LOOP RECESSED

[PROJECT NAME] [PROJECT NUMBER] [CITY AND STATE]

SECTION NON-STRUCTURAL METAL FRAMING

Standard hollow metal doors frames. Minimum Thickness: Minimum thickness of base metal without coatings.

A. Minimum Thickness: Minimum thickness of base metal without coatings according to NAAMM-HMMA 803 or SDI A250.8.

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

ThermaSteel Corporation ASSEMBLY MANUAL

HOLLOW METAL DOORS AND FRAMES SECTION HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL

OmniFlex 300 Plus Installation Instructions

Single Mount Installation Instructions

SECTION HOLLOW METAL DOORS AND FRAMES

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

SECTION ORNAMENTAL WELDED STEEL FENCING

Site Preparation... 2

Rack-in-a-BoxTM INSTALLATION MANUAL

Rytec Corporation One Cedar Parkway Jackson, WI GO-RYTEC (262)

1701 Hollow Metal Door with Polystyrene Core Bullet Resistant UL 752 Level 1

SUPRAFRAME BOX STUD SITE REFERENCE. Construction of a SUPRAFRAME Boxed Stud Wall Framing System. 600 mm stud spacing. Tile Roof.

Rough-in frame and flush-mount panel installation instructions

INSTALLATION MANUAL KOCH

DIVISION 8 OPENINGS SECTION HOLLOW METAL DOORS AND FRAMES

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION HOLLOW METAL DOORS AND FRAMES. A. Section includes steel doors and frames (hollow metal) indicated and as specified.

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Project No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6

A. Flat corner wall-to-wall See page 8. C. Outside corner wall-to-wall See page 8. B. Inside corner kit wall-to-wall See page 7

Multi-Piece Shower with Trench Drain

SKAMOTEC 225 INSTALLERS GUIDE For 1-1/2 Thickness

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS

BETAFRAMES. Engineered products for the building industry Solutions without compromise. Industry Knowledge. Flexible Manufacturing.

ADVANCE METAL INDUSTRIES L.L.C.

Multi-Piece Shower with Trench Drain

Open-Web Truss Long Span Installation Guidelines

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

Multi-Piece Shower with Trench Drain

TILT-UP LIFTING PRODUCTS

Important: Before You Start

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

SECTION NON-STRUCTURAL METAL FRAMING

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

Lykes Steamship Building 1770 Tchoupitoulas St. New Orleans, LA

B. Related Sections: The following Sections contain requirements that relate to this Section:

Built to Order. Stile. Frames. Section Contents. Profiles. Elevations. Double Egress Frames Pocket Frames

WALL SYSTEMS ( Ref: The Building Illustrated, Ching, Francis DK )

SECTION BLAST RESISTANT DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

INSTALLERS GUIDE For 1-1/2 Thickness

Bullet Resistant Doors P/N BRD_

Modern Rumford. MR 48 fireplaces

1. Non-load-bearing steel framing systems for interior gypsum board assemblies. 2. Suspension systems for interior gypsum ceilings and soffits.

B. Hollow Metal work for Interior frames, including Glazing Stops.

Revision Details TECH MANUAL

CEILING & WALL SYSTEMS

SECTION METAL STAIRS

SYSTEM 600 BILL CHANGER INSTALLATION INSTRUCTIONS Congratulations...

INSTALLING A POUR-IN-PLACE DOCK LEVELER (EH & RR)

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

PRE-INSTALLATION GUIDE

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

Concrete Framing Systems - Walls and Columns

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description

SECTION DOOR HARDWARE

Specifications PRE ASSEMBLED DOOR SPECIFICATION PART 1 GENERAL 1.01 SUMMARY

1. Include plans, elevations, sections, details, and attachments to other work.

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

AMBICO Limited Section BLAST RESISTANT STEEL DOOR & FRAME ASSEMBLY Page 1

SECTION HOLLOW METALWORK. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

BILCO TYPE FR FIRE RATED FLOOR DOOR

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work.

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

SECTION GYPSUM BOARD ASSEMBLIES

C. Samples: For each door face material, at least 3 by 5 inches (75 by 125 mm) in size, in specified finish.

INSTRUCTIONS AND GUIDELINES

Student Services & Classroom Addition SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS

SECTION VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.

Transcription:

Steel Door Frame Installation in Masonry Construction Steel Door Frame Installation in Masonry Construction This manual provides step-by-step instructions for the installation of a steel door frame in masonry construction. It is a companion piece to the SDI video How to Install Steel Door Frames in Masonry Construction. Please watch the video for a demonstration of all steps in this process. To view the video, scan the QR code below or visit the SDI website at www.steeldoor.org. Link to video.

Steel Door Institute Frame Installation: Masonry Construction Regardless of the type of building project, secure openings require proper frame installation. This manual will walk you through the three phases of the installation process for a steel door frame in masonry construction. Prepare: Install: Verify: Select the right materials and tools for this project. Set the frame plumb, level & square; complete frame installation. At least a 2-day process with masonry construction. Test the door to ensure that it is functioning properly. Step 1: Preparation 1. Locate the frame at the door opening location. Verify that the frame numbers match those of the opening location. 2. Compare the handing and size of the frame to the drawing. 3. Check the hardware schedule. Contract your distributor if information does not match. 4. Verify that the proper hardware reinforcements are installed on the frame. Also verify the hinge size, strike type and closer mounting. 5. The floor finish will affect the way the door should be installed. Determine if the floor finish will be: Concrete Carpet Wood Tile As shown in the image below, we are using a 4-1/2 hinge, an ASA strike and both regular arm and parallel arm closer reinforcements. Wire anchors work in a variety of masonry applications and will be used in this installation as well. NOTE: Some wood and tile finishes, such as quarry, are up to 3/4 thick. Steel Door Frame Installation in Masonry Construction

Steel Door Frame Installation in Masonry Construction Before setting the frame, always verify that the floor conditions match the drawing that you are using. Circumstances may call for mounting the frame directly to the concrete. You may be installing the door frame prior to floor installation. It s critical that you know the specifications of the floor that will be laid, so that the door will not drag or have too large of a gap when the installation is complete. 6. Adjust the frame to match the floor finish thickness. Frames are provided with adjustable base anchors that allow you to adapt to floors that are up to 1-3/8 thick. CAUTION: Not all floor anchors are adjustable. We recommend that you contact your job supervisor and verify the floor anchor requirements of the finish flooring. SDI manufacturers may provide either adjustable or fixed anchors. Pre-welded frame 7. The frame may be shipped already welded or it may ship KD (knock down). 8. Install base anchors to the frame using the screws provided. Pre-welded frames are transported to the job site using a shipping bar to prevent the frame from twisting in transit. This bar is not to be used as a spreader bar to set the frame. Spreader bar Some assembly is required with KD frames, but it is minimal. Note that each slot has an associated tab. The most important tab connection is at the rabbeted part of the frame; those tabs should be bent in an outward postion. 9. Stand the frame up in the wall line at the proposed location. Stand the frame up in the wall line The shipping bar comes welded from the factory. It is important that it is properly removed by grinding off. Do not bend or twist off. 10. Place the spreader, that has been precisely cut to the door opening specification, between the hinges and strike jambs at the floor.

Steel Door Institute CAUTION: Check the spreader to ensure that it has been cut squarely and accurately. This will help align the jambs as they are anchored to the floor, which is critical to proper installation. Place spreader between hinges and strike jambs Step 2: Setting the Frame Plumb, Level & Square 11. Attach the base anchors to the floor on each jamb, using a concrete screw or drive pin anchor. 12. Check to ensure the frame has not moved away from the layout lines. 13. Verify that the head of the frame is level. Attach base anchors to floor 14. You may need to adjust the base anchors to achieve a level head and proper floor clearance. Throughout any frame installation, it is important that the frame is continually checked to be plumb, level and square. 15. Shim the bottom of the jamb with a flat washer or a fender washer if needed. 16. Recheck for level accuracy after you make every adjustment. With the frame in place, the jamb should be temporarily braced. 17. If your installation requires electrical components, now is the time to install conduits or flex cable for low voltage wiring. 18. Install a piece of tie wire around the frame 48 from the finished floor. Twist the wire tight. This creates inward tension to hold the spreader in place. Steel Door Frame Installation in Masonry Construction

Steel Door Frame Installation in Masonry Construction 19. Place another spreader in between the hinge and strike jambs. This mid-frame spreader is important for keeping the frame straight and in alignment. 20. Check the frame for plumb, level and square accuracy. Bend the anchor ear around the stud to hold the anchor in place. 21. As the mason begins to lay the block, the courses should be brought up evenly on both sides of the doorframe. CAUTION: Be sure not to push the frame out of plumb with the block. Bring the courses up evenly Lay a wire anchor at the third course 22. Fill the jambs with mortar evenly up both sides. Lightly tap the frame to settle the mortar. 23. At the third course, or approximately 24 from the floor, lie in a wire anchor on the hinge and strike jambs. Then check the frame again to be sure it is still plumb, level and square in all directions. Make any necessary adjustments. 24. Continue laying the block, filling the jambs with mortar evenly up both sides and lightly tapping the frame to settle the mortar as you go. 25. At the sixth course, or approximately 48 from the floor, lay in another anchor on the hinge and strike jambs. Then check the frame again to be sure it is still plumb, level and square. Make any necessary adjustments. 26. Continue laying the block, filling the jambs with mortar evenly up both sides and lightly tapping the frame to settle the mortar as you go. 27. After laying 8 or 9 courses, the masonry should be allowed to set overnight. Leave the spreaders and temporary back bracing in place overnight. Before leaving the site for the day, clean any mortar out of the hinge pockets and strike reinforcements. Also clear any mortar droppings away from the base of the frame. Leave the spreaders in place overnight Step 3: Completing the Installation (Day Two) 28. Begin day two of your installation by removing the back braces. Be very careful not to damage the doorframe. The spreader should remain in place if at all possible. When using wood stud anchors, bend the ears tightly against the stud. 29. Evenly fill the jambs with mortar on both sides and lightly tap the frame to settle the mortar.

Steel Door Institute 30. At the next course, or approximately 72 from the floor, lay in another anchor on the hinge and strike jambs. Again, check the frame to be sure it is plumb, level and square. Make any necessary adjustments. Any time you fill a head more than 42 in length with mortar, you will need to insert a vertical brace to prevent sagging. The brace stretches from the bottom of the head down to the floor. Shim the vertical brace as needed to maintain a level head on the frame. 31. Continue laying the block and filling the jambs with mortar evenly up both sides. Lightly tap the frame to settle the mortar and continue up to the top of the frame. The head will now need to be filled with mortar. 32. Lay the lentil over the frame. Tap the frames to settle the mortar Step 4: Verification 33. Check that the frame head is still level and that no sagging has taken place. If it is level, your frame installation is complete. 34. The frame installation is now complete and ready for the next stage of construction. The procedures described in this document are only guidelines. Please follow all applicable building codes, standards and accepted practices specific to your geographic location. For more information, visit www.steeldoor.org. Steel Door Frame Installation in Masonry Construction