Annual Report. December 2010 November Bradley Cole 2/7/2012

Similar documents
Local Water Supply Planning - North Carolina Division of Water Resources

Presentation Overview

Surfside Homeowners Association

Water Resources Director: Chris Graybeal

Table of Contents. 1. Introduction... 1

Finch Drinking Water System O. Reg. 170/03 Schedule 22 - Summary Report for Municipalities

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Rainwater Harvesting

Sanitary Sewer Collection System Annual Performance Report 2018 WDR R

Community Involvement Within Your Organization

OCSD Urban Runoff Program SCAP Collection Systems in Motion

Traffic Department Anchorage: Performance. Value. Results.

2011 ANNUAL WATER REPORT

QUARTERLY OPERATIONS REPORT 4 th Quarter, April June 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 INFLUENT MONTHLY AVERAGE EFFLUENT MONTHLY AVERAGE

HILLS CITY OF BEVERLY HILLS BEVERLY PUBLIC WORKS SERVICES DEPARTMENT MEMORANDUM TO: PUBLIC WORKS COMMISSION FROM:

Tempering the Thirst Of America s Driest City

CERTIFICATION AND FINANCING PROPOSAL

CERTIFICATION AND FINANCING PROPOSAL

2013 Annual Water Report

Xavier University of Louisiana

Street Maintenance Section Maintenance and Operations Division Public Works Department Anchorage: Performance. Value. Results.

NYSAWWA 2015 New York s Water Event April 14, 3015

2010 Annual Report. Matthew W. Jordan, PE Chief Executive Officer November 10, 2010

CITY OF PEORIA UTILITIES DEPARTMENT

Electric Forward Market Report

Arlington East WRF Influent Channel Rehabilitation - Final

WATER MANAGEMENT AND CONSERVATION PLAN FOR THE BEAVER DAM VILLAGE SPECIAL SERVICE DISTRICT FINAL. September 14, 2004 Job Number:

Utility Funds. Department of Public Works Utilities. Fiscal Year 2017

Traffic Division Public Works Department Anchorage: Performance. Value. Results.

Surfside Homeowners Association

PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY BOARD OF DIRECTORS MEETING December 5, 2018 ROUTINE STATUS REPORTS ITEM 1

Water Supply Citizens Advisory Committee. Metropolitan Tunnel Redundancy

Improving WTP Performance Tools to Help Achieve Optimization

District of Peachland Annual Drinking Water Report 2017

Annual State of Drinking Water Quality Report

ORANGE WATER AND SEWER AUTHORITY

EPA / WERF/ WaterRF Framework

Actions Taken. Implementation Comments. Qualification. State Water Resources Control Board Office of Research, Planning & Performance

APS Sustainability and Changing Grid Conditions. Charlene Saltz & Kent Walter January 23, 2018

AGENDA ITEM C9 TAMPA WATER

QUARTERLY OPERATIONS REPORT 3 rd Quarter, January March 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 EFFLUENT MONTHLY AVERAGE INFLUENT MONTHLY AVERAGE

The Impacts of Climate Change on Portland s Water Supply

Domestic Self-Supply and Private Landscape Irrigation Wells

Stormwater Reuse Through Aquifer Storage & Recovery

Los Angeles 3 rd Regional

August 22, City of Gooding. Public Meeting. Keller Associates, Inc. 305 N. 3 rd, Suite A Pocatello, ID Water System Evaluation

City of Cambridge 2017 Annual Summary Water Report

Finch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities

Norwood High Service Pump Replacement

Groundwater Reduction Plan Monthly Operations Report

CITY OF BEVERLY HILLS PUBLIC WORKS DEPARTMENT MEMORANDUM

Ground Transportation Management Services

The year 2005 was one of significant change for

2012 ANNUAL WATER REPORT

August 2017 Monthly Report

Water Management and Conservation Plan

Water Resources of the Virgin River Basin

Potential Public Private Partnership Projects. Miami-Dade Water and Sewer Department

The Sustainability of Floods Pond

Making a Dramatic Impact on Water Loss. Robert Horvat, PE cell:

SANTA MARGARITA WATER DISTRICT LARGE LANDSCAPE LUNCHEON

Strategic Plan Progress Report Goal 1 Focus. April 2014 San Francisco, California

2019 Salt River Siphon Outage Customer Focus Meeting

Maintaining Water Supply Resilience in Extreme Times

GET AHEAD OR GET PARCHED: SIX WAYS TO SURVIVE THE DROUGHT

Microgeneration Installation Standard : MCS 024 SOLAR DOMESTIC HOT WATER ENERGY CALCULATION. to be used in conjunction with MIS 3001:

Water Utility: An Informational Presentation. High Bridge Borough Council Town Hall Meeting - October 7, 2017

Department of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD Phone: 605/ FAX: 605/

Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge. Presentation to Board April 21, 2011

Rainwater tank study of new homes

Hetch Hetchy Water and Power

Climate Change & Urbanization Have Changed River Flows in Ontario

Hydraulic Modeling, PUDs & Managing Water System Growth

Conservation Success & Challenges

THE MAJOR STEPS OF A WATER SAFETY PLAN

Wastewater Collection System Rehab

ISO EMS OVERVIEW FOR SUPPLIERS 7/21/17

Infrastructure Asset Management in Action at Onondaga County Department of Water Environment Protection (WEP)

Township of Huron-Kinloss Ripley Drinking Water System Water Quality Summary Report 2017

Delaware River Basin Commission

GROUNDWATER REDUCTION PLAN MONTHLY OPERATIONS REPORT MONTH REPORTED: FEBRUARY, 2019

Koeberg Nuclear Power Station. Water Resilience Strategy. Presenter: Velaphi Ntuli Date: 14 February 2018

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

Gilleland Creek Intensive Bacteria Survey Addendum. March 18, 2010

Joanna B. Nadeau Dr. Sharon B. Megdal Candice Rupprecht

EL DORADO IRRIGATION DISTRICT

Measure What You Manage. Michael Cowley, CPMM President CE Maintenance Solutions, LLC

Microgeneration Installation Standard : MCS 024 SOLAR DOMESTIC HOT WATER ENERGY CALCULATION. to be used in conjunction with MIS 3001:

Using data to improve asset

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works

Source Water Protection Integrating with Existing Watershed and Water Management Frameworks

Partnership for Safe Water: Distribution System Optimization Program. Adam Feffer San Jose Water Company November 8, 2017

Scott Valley Siskiyou County, California: Voluntary Private Well Water Level Monitoring Program Spring 2006 January 2016

Audit Follow-Up. Water Infrastructure (Report #0919 issued September 30, 2009) As of March 31, Summary

Large Quantity to Small Quantity Generator

SUSTAINABLE SOLUTIONS AND COST-SAVING APPLICATIONS FOR SMALL WATER SYSTEMS: CASE STUDIES

TITLE PAGE OPERATION AND MAINTENANCE PLAN FOR:

MASTER COMPETITIVE SERVICE AGREEMENT MANAGEMENT OFFICE SUMMARY REPORT May 2008

Cedar River Watershed Habitat Conservation Plan

Alderpoint County Water District. Municipal Service Review

Transcription:

Annual Report December 2010 November 2011 Bradley Cole 2/7/2012 CH2M HILL annual report to the Board of Directors of the Pine-Strawberry Water Improvement District. This annual report provides an overview of activities related to the District s water facilities from December 2010 to November 2011.

Executive Summary CH2M HILL is pleased to present the Pine-Strawberry Water Improvement District (PSWID) with this annual report, providing an overview of activities related to the District s water facilities from December 2010 November 2011. Our goal is to provide you with an overview of daily operations, system capabilities and improvements, permit compliance, cost containment, and historical trends compared to present capacities. The team leadership and dedication to quality service is supported by specific accomplishments in this report. We discuss specific actions employees in the Pine-Strawberry Water Improvement District initiated to sustain continued exemplary service to the PSWID. We would like to convey our appreciation to the Board of Directors and citizens for their support. CH2M HILL understands the importance of being an innovative, resourceful, and flexible partner so that we can provide the best solutions to meet your community s specific needs. During the first year of this Agreement, our team worked with the Board of Directors, engineers, and contractors on different projects involving the Pine-Strawberry Water Improvement District s water system. Here are several examples of projects our employees, the Board, engineers and contractors supported: Daily operation and maintenance (O&M) of the District s water system Daily management of the District s water system Daily customer service, billing and collections functions Upgraded 4 boosters stations with new pumps, motors, and variable-frequency drives Installed nearly 2,000 feet of pipe, well piping, booster station and booster building for the Milk Ranch Well 1 project Installation of the Milk Ranch Well 2 project Installation of 13 backup generators at key water production and distribution facilities 2

Scope of Services and Project History In 2010, the Board of Directors approved a contract for CH2M HILL to provide operations, maintenance, and management services to its recently acquired water system in the communities of Pine and Strawberry. The Pine-Strawberry Water Improvement District (PSWID) provides potable water service to approximately 3,200 water customers (population 8,000) located in northwest corner of Gila County and is comprised of a little more than 10 square miles of service area. The service area is a rural, mountainous and wooded region served exclusively by ground water. The PSWID owns 23 water production wells (15 in Pine; 8 in Strawberry) at various production capacities. The PSWID also employs 10 water production wells owned by other private entities (5 in Pine; 5 in Strawberry) that pump directly into the PSWID water distribution system or storage facilities. These other wells are commonly referred to as Water Sharing Agreements (WSA). The PSWID does not treat its water except to add chlorine to maintain a residual disinfection level in the distribution system. The chlorine is added at certain water wells through pellet chlorinators. The PSWID has 20 storage tanks with a total of 1.318 MG of storage. The Pine service area has a total of 10 storage tanks with a storage volume of 1,022,118 gallons (77% of total). The Strawberry service area has a total of 10 tanks with a storage volume of 296,378 gallons (23%). The PSWID has approximately 180,939 linear feet of water mains (34.27 miles). The water mains range in size from 2-inch to 8-inch and 93% of the water mains are sized 4-inch or smaller. In order to effectively and efficiently operate the PSWID facilities, CH2M HILL has developed a control strategy to operate the PSWID facilities as well as recently implemented a Computerized Maintenance Management System (CMMS) to track and record maintenance activities on key PSWID assets. 3

Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Gallons Water Production Facilities During the first year of the Agreement (December 2010 through November 2011), the PSWID production facilities produced 104,003,230 gallons of water. This represents a 14% increase in production over the same period prior year. Production averaged 8,666,936 gallons per month, 284,940 gallons per day, and 198 gallons per minute. This production increase was achieved while maintaining a steady customer count of approximately 3,200 customers. The peak production month was September 2011 where 11,869,300 gallons were delivered to the water system. This equates to a daily average of 395,643 gallons or an average of 275 gallons per minute. The smallest production month was March 2011 where 5,536,230 gallons were delivered to the water system. This equates to a daily average of 178,588 gallons per day or an average of 124 gallons per minute. Of the total 104,003,230 gallons produced in the first year of this Agreement, 59,948,750 (58%) gallons were produced in the Pine service area and 44,054,480 (42%) in the Strawberry service area. The PSWID owned wells produced 53,989,460 (52%) gallons during the first year and the Water Sharing Agreements (WSA) produced 50,013,770 (48%) gallons. The production ratio of PSWID to WSA owned wells will change when both the Milk Ranch Wells 1 & 2 come online in the first half of 2012. It is expected that the PSWID reliance on the WSA wells will be dramatically reduced. Exhibit 1 Monthly production by service area 14,000,000 12,000,000 10,000,000 8,000,000 6,000,000 4,000,000 2,000,000 0 Monthly Production Strawberry Pine Contract Year by Month 2010-11 4

Regulatory Reporting On behalf of the Pine-Strawberry Water Improvement District, CH2M HILL submitted the following reports required by regulatory agencies. Arizona Department of Water Resources Annual Water Use Report the Annual Water Use Report is submitted each year and includes such information as water pumped or diverted, water received from other suppliers, water delivered to customers, and effluent used or received Adjudication submitted Statement of Claimant that describes the Districts ground water rights. This is essentially a claim or assertion of rights to pump water from the ground in the Verde River Watershed Arizona Department of Environmental Qualilty System Water Plan, 5-Year Update 2012 the system water plan included updates of three elements, 1) a water supply plan, 2) a drought management plan, and 3) a water conservation plan Annual Consumer Confidence Reports reporting to customers and ADEQ 2010 results of water quality monitoring Monthly water quality testing reporting results of required water quality sampling 5

Standard Operating Procedures/Programs The Pine-Strawberry Water Improvement District is a new water utility and had not yet developed key plans, procedures or documents that will guide it through its daily activities. During the first year of this Agreement, CH2M HILL staff has developed or is in the process of developing the following: Standard Operating Procedures SOP Backflow Prevention & Cross-connection Control SOP Meter Reading SOP PRV Testing & Inspection SOP Tank Maintenance & Inspections SOP In Development Valve Maintenance SOP In Development Fire Hydrant Maintenance SOP In Development Main Flushing SOP In Development Disinfecting Water Mains SOP In Development Loss of Pressure in Water Mains Plans Plan Control Strategy Plan Drought Management Plan Plan Water Conservation Plan Plan Water Supply Plan Plan In Development Energy Management Plan Plan In Development Emergency Operations Plan Plan In Development Wellhead Protection Plan Plan In Development Monitoring Plan Information Documents Document: Welcome Letter from District Manager Document: 10 Ways to Conserve Water Document: Winterize Your Home Document: New Water Conservation Stages Document: Diagram for Required Customer Side Connection to Meter Document: How to Contact the PSWID 6

Safety The team continues to build on our exemplary safety record and further develop our on-site Health and Safety Program. We are focused on our goal of Target Zero. Zero Injuries and Illnesses (world class safety) Zero Adverse Impacts (environmental stewardship) Zero Errors, Omissions, and Defects (perfect first-time quality) We place high priority on safety and provide the necessary equipment and training to comply with federal and state regulations. This protects project personnel and the general public from injury, and both CH2M HILL and the PSWID from liability. Conduct weekly safety tailgate meetings Provided arc flash training to individuals who work with and around high voltage cabinets Extensive training and deployment of a lock-out/tag-out and electrical safety program Developing an emergency response plan 7

Community Involvement Each year our employees prepare a written, formalized community involvement plan. Our goal is to continue to grow as a civic-minded organization, sensitive to the needs of the community. During the first year of our involvement with the PSWID, our employees participated in the following events: Fire on the Rim Mountain Bike Race; donated ten (10) hours to staff various positions on race day Stuffed envelopes/mailed Pine-Strawberry Fuels Reduction fundraising letter to 230 paperless customers and to 2,956 customers as bill stuffers Pine / Strawberry Food Bank; donated five (5) turkeys to the food bank Considering the size of our workforce, we are proud of our accomplishments and appreciate the opportunity to contribute to the community. We expect to find additional community involvement opportunities in the upcoming year. 8

Water System Work Activity Routine water system work activity for the 2010 2011 contract year included: Table 1 System Work Activity Activity Tasks Completed Leaks Repaired 53 Meter reads performed / bills issued 38,390 Customer service tickets completed 1,115 Meters changed out 89 New meters installed 28 Utility locate tickets performed (AZ Blue Stake) 256 With the addition of the key standard operating procedures and the other plans and programs highlighted prior and the utilization of the Computerized Maintenance Management System, our focus has shifted from a historically reactive mode of maintenance to a preventative and predictive mode of maintenance. This shift provides the added benefit of not only increased maintenance activity but most often the ability to spot problems before they occur and extends the life of the assets in the field. 9

Goals Employees at the Pine-Strawberry Water Improvement District project participated in establishing and accomplishing goals for our 2010 2011 Annual Project Business Plan. Our mission focused on exceeding the District s expectations, providing a safe working atmosphere for our employees, and preserving the environment. We met all of last year s goals, and now are focused on new ones. Remain accident-free from known safety hazards Hold weekly safety team meetings, totaling 10 hours of safety training for each associate Identify unsafe conditions and correct all safety review findings Maintain 100-percent permit compliance Increase state certifications for all eligible employees by 20% Maintain a meter reading error rate of less than one percent Continue to implement CH2M HILL s sustainability plan Participate in community involvement 10

Summary In conclusion, the 2010 2011 contract year brought about many challenges for CH2M HILL and the Pine-Strawberry Water Improvement District. Together, we met those challenges. A few of our successes are highlighted below. Implemented a Computerized Maintenance Management System to ensure key equipment is being maintained Developed and implemented standard operating procedures and programs that will guide local staff in their daily operations Repairing leaks as they occur & replacing equipment when needed Recommending and making improvements to the production and distribution system Providing meter reading, billing and collection services to the District Meeting water quality regulatory requirements and filing reports, as needed We appreciate the opportunity to serve the communities of Pine and Strawberry and its citizens, and we look forward to a continued partnership for many years to come. 11