INSTALLATION MANUAL PIPE SUPPORT

Similar documents
ALCO Cable Gland Tutorial

NOTE: Components must be stored at 12 C (min) for at least 24 hours prior to use.

Armor Plate 360 MP ( Multi-Purpose ) Pipe Wrap For External Corrosion and Mechanical Damage

1850 x 40/50mm Raised Shower Tray Kit

Installation Instructions

Division 07 Thermal and Moisture Protection Thermal Protection Blanket Insulation Page 1 of 17

Armor Plate Pipe Wrap

Wabo FireShield Model: FSH

Construction Standard No: 8.3.3

Film Installation Tools

adjustable fusion shower pan surface mounted on subfloor installation guide

INSTALLATION INSTRUCTIONS

adjustable fusion shower pan on wood joists installation guide

Adhesive Solutions for. Challenging Applications.

TECHNICAL DATA SHEET

DIVISION 7 THERMAL AND MOISTURE PROTECTION SECTION PENETRATION FIRESTOPPING

Perry Fiberglass Products, Inc. LEADERS IN FIBERGLASS REINFORCED PLASTIC PIPE PRODUCTS

For wooden fabricated underlay e.g. plywood, care must be taken to store the material in an area where it will not become damp or contaminated.

Special tools and occupational health and safety

GUIDE TO DUKKABOARD AQUA 77

Perry Fiberglass Products, Inc. LEADERS IN FIBERGLASS REINFORCED PLASTIC DUCT PRODUCTS

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 protecting Membranes 90 System Components.

Pipe Supports Comparison

SEMPEO SQA Unit Code FP46 04 Finishing surfaces by applying coatings or coverings

INSTALLATION INSTRUCTIONS BRAVO FIBERGLASS SD-AB SERIES FOR DOUBLE WALL FRP SUMPS ONLY FOR RETROFITTING ALL FLEXIBLE ENTRY BOOTS

Self Adhesive EPDM TRAINING MANUAL

EUROTEAM. EUROTEK TK joint tape Polysulphide joint tape for building construction. construction chemicals

National Occupational Standards Developer s pack for Passive Fire Protection (Construction)

SealArm Tape TPE. Building & Joint Sealants T E C H N I C A L D A T A S H E E T. Uses. Features and Benefits

Application Guidelines

GV Standard Ridgeglaze Operation and Maintenance Manual

BRANZ Appraisal Certificate # 461 (2010) Internal wet areas.

Duct Wrap Flexible Wraps

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components.

Wabo ElastoFlex - EFJ/EFJ-C Horizontal Expansion Joint System

Resin Bound Installation Guide

ARTEX AND PLASTER. 2 - Choosing the right product

fusion shower pan on wood joists installation guide

Economically Priced Insulation For Domestic Heating & Plumbing Economically priced insulation for domestic heating and plumbing

TECHNICAL DATA SHEET

Sikadur- Combiflex SG. High Performance Crack, Construction and Expansion Joint Waterproofing System

SEMPEO SQA Unit Code H Carrying out pipe fitting activities

INSTALLATION INSTRUCTIONS F-SERIES D-INR-S SPLIT RETROFIT FOR REPLACING BOLTED FLEXIBLE ENTRY FITTINGS FOR FIBERGLASS PIPE AND STEEL CONDUIT ONLY

Making Shell Blinkers

RENOVATE BUILDING 18-C FTFA SECTION GYPSUM BOARD 05/11

COMPOSITES - CASE STUDIES OF PIPELINE REPAIR APPLICATIONS. By Andrew J. Patrick, Clock Spring Company, L.P., Huntingdon, UK

Application Guide. PaveCoat

Application Guidelines

INSTALLATION INSTRUCTIONS B-407-RB SERIES SINGLEWALL RETROFIT TANK SUMP

STRAIL - installation instructions. Subject to technical changes / December STRAIL level crossing systems & STRAILastic track damping systems

Sheet Insulation - Rectangular ducts. Installation Manual

Division 07 Thermal and Moisture Protection Thermal Protection Blanket Insulation Page 1 of 11

Gas Protection System Components

HOW TO APPLY ENERGY SEAL AND/OR WOODSMAN

Fitting instructions

Endotherme Mat ES-5A-12

SECTION POLYETHYLENE TAPE WRAPPING FOR PIPE

Mounting Screw. Channel Filler. Light Angle Adjustable Screw. LED Board Vertical stud and blocking Locking Nose. Driver.

Part of the Sikaplan WT Membrane System

General Applications Before applying, mix the pre-measured catalyst* into Liquid Roof by following label directions.

J41 Reinforced bitumen membrane roof coverings

Rainscreen Ventilated Fire Barrier

FIRE STATION 55 June 14, 2010

Jointofeu Series Fire Barriers I Installation Instructions

Instructions for On-Site Coating of Vinyl Windows

Acetone is flammable; refer to the manufacturer s instructions for complete safety information.

Installation Instructions

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

Division 15 INSULATION Section 15100

Maintenance of Wood, Plastics and Composites. Wood Restoration

Finish for topped and smooth surfaces, with or without chips. Pore and cavity filler, joint filler, adhesive for tiles etc.

JAN Firestopping Standard Details

A. Submit submittal packages in accordance with Standard Specification Section

Warning. Warning. (2) Bondo knives one 4 and one 6 (can be purchased locally at automotive stores) 4 putty knife Acetone

assembly and installation guide

TECHNICAL SPECIFICATIONS

Color Clear Black Black Clear Black. Viscosity seconds seconds Water Thin (DIN Cup) (Ford Cup) Water Thin 50 MPa*s

C. Trenching, Backfilling, and Compacting: STD SPEC G. Polyethylene Sheet or Tube Encasement: STD SPEC

1. PREPARATION 2. INSTALLATION 3. FINISHING 4. MAINTENANCE

Highway Bridge Pier Column Emergency Repair

L'ISOLANTE K-FLEX. LNG applications Manual

Dayco 1351 Stewart Place Springdale, AR Fax:

Operations and Maintenance Manual - Content

PITTWRAP CW PLUS JACKETING Product Datasheet

Semstone Construction Details

APPLICATION INSTRUCTIONS FOR MUFFL-JAC ACOUSTICAL JACKETING ON HOT PIPE INSULATION

3M Plastic Primer P591. Color Clear Black Black Clear Black Clear. (Ford Cup) Solids (%) VOC (g/l)

Product Data Sheet Sikadur -31 CF Normal Product Description Uses ruction Const Characteristics / Advantages

1 PVC or ABS drain with strainer

Construction. High performance joint sealing system. Product Description. System Data Sheet Edition _1. 1 Sikadur Combiflex SG system 1/8

10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING FINISHES 2

Special Provision No. 541S01 October OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced with the following:

POLYGUARD RD-6 A FAIL SAFE PIPELINE COATING SYSTEM FOR REHABILITATION OR GIRTH WELDS ON CATHODICALLY PROTECTED PIPELINES

SECTION 07530CP EPDM MEMBRANE ROOFING

What is Dulux Professional DryErase?

Prime Shower Enclosure & Base Kit

PITTWRAP B100 JACKETING Product Datasheet

Technowrap composite repairs for the maintenance of piping, pipelines, vessel or structural integrity Simon R. Frost, Walker Technical Resources

KoolthermTM. Installation Guide. HVAC & Building Services Pipe Insulation

Transcription:

INSTALLATION MANUAL PIPE SUPPORT Clock Spring Company L.P. 621 Lockhaven Dr. Houston, Texas, 77073 Phone: 281-590-8491, 800-471-0060 Fax. 281-590-9528 http://www.clockspring.com 1

Full Snap Wrap Kit Installation Guide The following pictures provide the full contents of a Snap Wrap repair kit supplied as standard. Adhesive, Filler and activators Snap Wrap Sleeves Inside, second and final Layer

The Snap Wrap pre-manufactured sleeves consisting of uni-direction fibres for the inside & second layer and bi-directional fibres for the final layer. Procedure for installing a repair are as follows:- Before starting, put on your PPE:- coveralls, safety footwear, safety glasses, hearing protection, gloves, hardhat and vapour mask (if in a poorly ventilated area as per the MSDS/COSHH guidance) Suitable work table covered with polyene and waste bag taped to one corner Pipe work identified for the repair to be installed Pipe work has been surfaced prepared to SA2.5 (maximum bond strength) o Or ST3 (giving 70% of maximum bond strength) o Or ST2 (giving 25% of maximum bond strength) Defect identified and will be in the centre of the installed sleeves Take the inside sleeve (marked on edge as inside) and position it on the pipework to ensure it is the correct diameter for the pipe At this point clamp the sleeve tight with gloved hands Whilst it is on the pipe check down the edge to determine any noticeable gaps (ovality) whilst on the pipe in addition to the defect location This will give you a good indication at what clock face positions to apply dollops of filler in the next few stages of the first layers install Ensure the sleeve is positioned with the defect in the middle of this layer Take the wooden blocks from the kit and tape at the six O clock position Take the second block and tape at the 12 O clock position See example photo below:- Remove sleeve, prepare filler and adhesive

Preparation of Filler The filler has two main purposes for use in the repair. To directly fill any defects and noticeable areas of wall loss And to ensure that the pipe is symmetrically round. (not all pipe work has a uniform symmetry) Follow the guidance on the Adhesive packaging to determine the approximate weight of Activator (red packet) required to be mixed with the adhesive in relation to the temperature working time. For example:- 450g of adhesive requires 20g of activator for a temperature range of 10C to 17C. Giving a working time of 45mins. Using a clean mixing area (clean piece of card board can be used) approximately put the required amount of adhesive onto the mixing area. Rather than mix up the complete content of the filler, you can separate the content into approximately two equal haves by:- Using the supplied black plastic mixing tool Separating the filler, whilst still contained in the silver foil is the best way to achieve a half quantity. Note that you should use the back of the spreaders edge and draw from the centre to the edge. (see arrow above). Cut open the silver foil at the centre and empty the contents on to the mixing area Cut open the red activator and empty the required amount onto the mixing area, again the spreader can help to release it from the polyene packaging Mix both the filler and activator until it is a uniform colour

Now apply suitable amounts of mixed filler onto the defect area Apply additional quantities of mixed filler at regular points circumferentially around the centre of the pipe. For example 6, 9, 12 and 3 O clock positions Adhesive Preparation Similar to the filler instructions regarding quantity of activator (Blue) to the adhesive quantity on the back of the tin. Open the tin lid using the supplied tool Put the required quantity of activator directly into the tin Either using the supplied mixing stick or mixing rod (can be used in an air drill chuck or similar mechanical device) and mix to one uniform colour Use the black tool provided to ensure any additional residue on the inside of the tin sides is also mixed in Checking that all the adhesive and required quantity of activator have been mixed to one uniform colour (Light blue with No Streaks ), pour into the supplied orange roller tray Using the roller, apply the mixed adhesive to the complete area of the pipe work where the inside sleeve will be installed

Check and ensure there are no dry spots/missed areas Any mixed compound (adhesive and filler) waste and packaging can be placed in the black general waste bag. Keep your work area neat and tidy. Unused adhesive and filler not opened can be returned to stores after the repair has been completed. Please also note that an exothermic reaction takes place when activator is mixed with the adhesive/filler and generates heat as a result. Do not put the lid back on mixed adhesive as a build up of pressure, due to the heat generated, will expand in the tin. If there is limited access to the pipe work surface, you can apply the mixed adhesive using the supplied brushes Take the inside sleeve and install on the pipe work Ensure the edge butts up against the two wooden blocks The longitudinal edges of the sleeve should be at 180 degrees from the defect position Apply sufficient mixed filler to the longitudinal seam of the installed sleeve (this ensures that the void is in-filled) Apply further mixed adhesive to the complete surface of the first installed sleeve Again, ensure there are no dry spots/missed areas Where the sleeve joins itself infill with additional mixed adhesive (use the paint brush if require. Install the second sleeve, with its join at 90 degrees from the inside sleeves join Again, apply sufficient mixed filler to the longitudinal seam of the installed sleeve (this ensures that the void is in-filled) Apply further mixed adhesive to the second layers surface Again, check to ensure there are no dry spots/missed areas Install the final outside sleeve to the pipe work and again ensure its longitudinal seam is 90 degrees from the previous layers seam You will notice that excess adhesive and filler will start to be squeezed out of the ends and seams of the layers Excessive adhesive and filler should be removed using the spreader to keep the repair neat and tidy Next procedure is the installing of the supplied steel bands Note that during the install of the sleeves, the layers may have moved away from the blocks and should be pushed back into position

Position the first steel band in the centre of the repair and use the tightening tool At this stage it does not need to be tightened up fully Position the remaining four steel bands equally distant from the centre band Again tighten the two adjacent bands from the centre band first, but not fully tightening The out most bands should be position about 5mm from the edge of the repair Tighten the two outer bands sufficiently similar to the other bands Check again to ensure the sleeves are still butted up to the blocks Excessive adhesive and filler will continue to ooze from the extremities of the installed sleeves and should be cleaned off From the centre band out wards, continue to tighten the bands Again excess will continue to ooze and clean accordingly

Over the next five minutes, continue to tighten all bands centre outwards Once fully tightened, the repair is near to completion At this point the wooden blocks can be removed With the supplied brush, achieve a 45 degree taper of adhesive on the full circumferential edges of the sleeves. Deficient adhesive can be reapplied to provide a neat and tidy edge After two hours, remove the steel banding The completed installation of the Snap Wrap can be coated as required. Finally clear up the work area. Any mixed filler/adhesive can be disposed of as general waste. For completeness, any unused adhesive/filler should be mixed with their corresponding activator and can then be disposed of as general waste once cured.

QA/QC Process It is mandatory for the QA/QC checks to be carried out and photographic evidence of the repair to be taken. Pictures should be taken of the defect area before the work scope starts and throughout the repair procedure, showing:- 1. applied filler and adhesive before the first layer is installed 2. When the second application of adhesive is applied 3. Install of the second layer 4. Application of adhesive on the second installed layer 5. Install of the final layer 6. Position of the temporary steel banding 7. Cleaning up and tapering of the repair edges 8. Final picture of the completed repair The attached is the QAQC sheet to be completed by the installer. Note:- This document requires all the fields to be completed. Where there is uncertainty in the completion of the document, you should contact Clock Spring/NCompassPiping for clarity and support.