OKO House by YOUMEHESHE architects

Similar documents
BaleHaus by White Design Architects

Passivhaus Introduction

lighthouse Martin Rose Sheppard Robson

Project name SOLAR HOUSE 80/50 Project summary

SOLCER HOUSE ENERGY POSITIVE - LOW CARBON - LOW COST

Project Description. Projected build start date 12 Apr 2010 Projected date of occupation 28 Feb

Passivhaus Projects and Benefits

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 01 Aug Energy target.

Project Description. Projected build start date Projected date of occupation. Dungannon, County Tyrone, Northern Ireland

Project Description. Projected build start date 03 May 2010 Projected date of occupation 06 Aug

Project Description. Projected build start date Projected date of occupation. Existing external wall construction.

Interim NZEB Performance Specification Calculation Methodology

Sustainable Building and Services A two-day comprehensive course March 2014, London

Design specifications for the Future Creating a masterpiece

Glaciers are melting, sea levels are rising, cloud forests are drying, and wildlife is scrambling to keep pace.

Engineers Ireland Cork Region CPD lecture series

Mid Street - Achieving Code Level 5

Existing Earth and Ocean Sciences (EOS) Building

Building Better Buildings BPE Case Study Dungannon Passivhaus

Project Description. Projected build start date 01 May 2010 Projected date of occupation 01 Nov Belfast, County Antrim, Northern Ireland

Project Description. Projected build start date 19 Apr 2010 Projected date of occupation 30 Sep

Design Standard Sustainability

Case Studies of Successful Code for Sustainable Homes Projects.

Nearly Zero Energy Buildings (NZEB) Seán Armstrong, Housing/Building Standards Section, DHPCLG

Passive House: Overview

Passive House: Overview

The Renner Residence 2009 Mike and Elida Renner

Proposed development of 74 no. residential units at Craddockstown Road, Cradockstown Demesne, Naas, Co. Kildare

Sustainability. Good Sustainable Design requires understanding combined with vision; it is attainable through architect-led design.

SOLAR PHOTOVOLTAIC ENERGY

CREATIVE SPACES INFORMATION PACK THREE SUSTAINABLE DESIGN

CREATIVE SPACES 2013 INFORMATION PACK THREE SUSTAINABLE DESIGN

Principles of Green Architecture

Energy Statement. Gainsford Road. For Pocket Living. XCO2 energy. May 2016

Project Description. Projected build start date 18 Mar 2013 Projected date of occupation 11 Nov 2013

CB04. Outback House. Case Study. Creative Spaces Australia. by Casey Brown Architecture

2010 Advanced Energy Conference. Innovative Pathways Toward Low Carbon Society: Policy and Technologies

OSU Cascades Net Zero Campus. Recommendations

Passive House Project documentation

TAP-YTL 2010: Sustainable Architecture & Urban Planning

36 BTrd / DP Architects ArchDaily

Domestic Green Deal Advice Training

These discounts are available on our residential, buy-to-let, housing co-operative and part residential mortgages.

BRE Lighthouse. 2. Background and Context:

Extra 6. Sustainability. The Sigma Home. December 2009

27/10/15. Rod Hughes Architect Director 2030 architects ltd. Penrith

Passive Design Solutions. Passive House The Road to Net-Zero

Project Description. Projected build start date 31 Jan 2009 Projected date of occupation 31 Aug

Project Description. Projected build start date 05 Jul 2010 Projected date of occupation 25 Sep

Project name Fulford Passivhaus, York Project summary New-build singe-family detached house for individual clients. Certified as Passivhaus Plus.

Project Description. Projected build start date 23 May 2016 Projected date of occupation 27 Feb 2017

ENERGY EFFICIENCY REPORT PROPOSED STUDENT ACCOMADATION FASSUAGH AVENUE, CABRA, DUBLIN 7

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 31 May Aberdare, Rhondda Cynon Taff, Wales

Welsh Future Homes. Developer: United Welsh Housing Association. Project Description. Architect: bere:architects. Location: Ebbw Vale, Wales

Urban Revitalization Plan For Responsible and Sustainable Growth and Development City of Adel, Iowa

The Elithis Tower is an experimental and demonstration. Elithis Tower in Dijon, France. nzeb case studies

Renewable & Low Carbon Technologies

Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles

Passive House Object Documentation

Sustainable buildings design, construction and refurbishment standard

City Building. City Building (Glasgow) LLP. RSBi (formerly Blindcraft) Building to a Higher Standard. Building to a Higher Standard

Welcome to Helios House

Built for sustainability Built for the environment Built for fuel efficiency Built for life

Project Description. Projected build start date Projected date of occupation 01 Jun Low Energy Buildings

LITTLEPITS PASSIVHAUS PLUS

GETTING TO CODE LEVEL 3 THE EASY WAY 1 AUGUST 2011.

Colorado Mountain College: Sustainable Design Standards

Deliverable Report Deliverable No.: D2-07 Work Package No: 02 CONCERTO INITIATIVE SERVE

New Rules for Mariana Trusson

Appendix B. Certification of Intent to Comply

Building Concepts for a mid-century energy-neutral society

Project Description. Projected build start date 15 Aug 2011 Projected date of occupation 19 Dec Existing external wall construction

UT Zero-Energy House Screen House University of Tennessee, Knoxville Arc 572 I Spring 2008

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Low Carbon Energy Feasibility Study

BUILDING REGULATIONS PART L 2011 PROVISIONS & COSTS (STANDARD 3-BED SEMI-D, CIRCA 120 SQM)

Scottish Court Service. Carbon Trust Standard Case Study

Advanced Design and Building Information Modeling February. Would you like to develop a BIM model of this project? no

PASSIVE HOUSE OBJECT DOCUMENTATION

The calculation procedure will continue to be known as SAP 2005 but the SAP version number is incremented from 9.80 to 9.81.

Sustainability Statement

PassiveDesign.org. Passive Construction. Name:...

NEW ZEALAND SOLAR DECATHLON

LISNAHULL TERRACE, DUNGANNON IRELANDS FIRST CERTIFIED SOCIAL PASSIVE HOUSING SCHEME. Case Study

SAP WorkSheet: New dwelling design stage

Low-rise Superblock, Pedestrian Clusters

BPE Case study of Pippin Close and Barnlea Close

Powerhouse the unique and the ingenious Powerhouse Kjørbo facts and figures Powerhouse economy and motivation Q & A

> Performance requirements: Part L UK vs Energiesprong vs Passivhaus.

Zero Energy Building Example in Estonia. Tõnu Mauring

The Embassy of the Kingdom of the Netherlands, Amman - Jordan

lighthouse by Potton Copyright Notice

Near zero energy building with steel solutions case study. Jyrki Kesti, Technology Director, Ruukki Construction

PassiveDesign.org. Principles of Passive Design

Single Family Homes - over 3,000 sqft. Parfitt Residence

Project Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec

FOR ADDITIONS and REMODELS Before filling out this application, read Green Building & Green Points Guideline Booklet for more in-depth information.

CE306. Essex Energy Village, Colchester: a case study

DISCOVERIES AT NET ZERO. Michael Leckman Diamond Schmitt Architects Chris Piche Integral Group

Modelling impacts of changes to energy standards in Scottish building regulations

Transcription:

OKO House by YOUMEHESHE architects The OKO House The OKO House is a modular pre-fabricated design aimed initially at the European and North American housing market and to be developed for other global locations. It will be constructed from benign materials produced locally to the site of fabrication and perform to very low/'zero' energy standards. Ideally the house should be CO2 neutral. The house sets out to meet and exceed the performance criteria for standards set-out in the Code for Sustainable Homes' achieving the maximum six star rating, allowing for specific site constraints. It will also meet the minimum criteria for Passivhaus UK' design and have overall low primary energy consumption and CO2 emissions. In addition to this the house will accommodate the requirements of Lifetime Homes' and have a low impact on its site and surroundings. 1 OKO House

OKO House Energy Performance Key Energy Performance Targets The total primary energy use targets for all appliances, domestic hot water and space heating and cooling is for a reduction to a minimum of 85% primary energy use of a standard UK home. The overall target value for primary energy use is for equal to or less than 58 kwh/m2/yr, with a space heating to utilize a maximum of 15kWh/m2yr for a European house located within latitudes 40-60 north. Whilst being grid connected for water and electricity, the house will use renewable energy technologies and passive solar design techniques to provide heat and power. The house will use 100% dedicated low energy light fittings with a minimum efficacy of 40 lumens per circuit Watt. All white goods and appliance will have a minimum A' rating. C02 Emissions Target CO2 emissions from the house are for a maximum of 4kg/m2yr which equates to a 95% reduction in comparison to a standard UK home. C02 emissions during construction, comparative to a conventional UK house, will also be reduced through the pre-fabricated method of construction. The use of timber construction for the frame and cladding of the house will act to sequester a large proportion of the embodied energy for the production of the house? Site and Orientation The building/s will be orientated on the chosen site to make maximum use of Passive Solar Design principles with northern hemisphere sites using large south facing windows to allow solar gains modify the internal thermal environment. North facing windows will be of a comparatively reduced size to control heat loss. 2 OKO House

OKO House Building Elements Façade The houses will be timber clad using appropriate locally sourced FSC timber with registered chain of custody (CoC). All components of the exterior shell insulated to achieve a U' value that does not exceed 0.14W/ m2/k. Air-leakage through unsealed joints will be less than 0.6 times house volume per hour c. less than 1m3/hr/m2@50Pa. Windows Windows (glazing and frames combined) will have U' values of not exceeding 0.80 W/m2/K with solar heat gain co-efficient of around 50%. They will be Low-e', triple-glazed, insulated and use FSC timber. MHRV Most of the perceptible heat in the exhaust air is transferred to the in-coming fresh air (with a heat recovery rate of over 80%). Please recommend specification. Materials All materials include internal fittings, furnishings and structure will be benign and locally sourced from near to the site of fabrication. Wherever timber is used CoC (Certified chain of Custody) FSC or equivalent timber will be used. This is will also be the case for composite timber materials. All materials will have low or no VOCs and be produced by certified ISO14001 manufacturers. All insulation materials used will have a GWP (Global Warming Potential of 5 or less). 3 OKO House

OKO House Ecology Thermal Mass The ground floor slab will be made from recycled concrete and aggregates and act as a thermal heat store. Renewable Energy Water heating will be from evacuated tube solar collectors using a heat store and photovoltaic pump system, supplemented with biomass heating in the Winter months. Electrical supply from mono-crystalline PV panels/ or Concentrating Collector Panels with battery storage, supplemented with accredited green grid supply. Space heating will be provided by Passive Solar Design principles, a biomass boiler, Solar Thermal or GSHP (ground source heat pumps) depending upon the intended location of the house. Transport Dedicated, sheltered cycle storage will be provided and external power socket for electric car charging. Ecology and Biodiversity The house has an option of a green roof panel or roof garden area depending upon the exact version of the house chosen. 4 OKO House

OKO House Resource Management Water Low use water appliances with combined water use of no more than 80 litres per person per day. Combined rainwater and greywater recycling will provide water for WCs. Rainwater harvesting will also provide water for garden areas as applicable. Do you have specification information for relevant systems? Waste Dedicated recycling space will be provided in the homes and wherever possible materials used within the home will be made from recycled or re-used materials. The materials ill also be recyclable or re-useable. Occupancy Comfort There are a number of different versions of the house available for different site requirements and conditions. The houses are designed in accordance with the requirements of Lifetime Homes'. The houses will be safe and secure and an Occupancy User Guide will be provided. Metering and Monitoring Smart meters will be provided to monitor real-time energy use and production of energy from renewable energy technologies Construction and Demolition The houses will be 100% recyclable/re-usable. The houses will be built using a Considerate Contractors scheme or equivalent. 5 OKO House

OKO House Development Why Passivehouse Solutions? Passivehouse Solutions offer full project support and supply chain management for your OKO House development. This includes the provision of UK manufactured Passivhaus FSC Windows and doors. Mechanical Ventilation with Heat Recovery (MVHR). Biomass. CHP. Photovoltaics Solar Thermal with Phase Change Material Heat Stores. Wind Turbines. Please contact us for further information. 6 OKO House