IntegratedManagementSystemin constructioncompany-effectivetool ofquality,environmentandsafety levelimproving

Similar documents
EXPERIENCES CONCERNING THE INTEGRATED MANAGEMENT SYSTEM IMPLEMENTATION IN CONSTRUCTION COMPANY AND BUILDING

Integrated Management System Manual

ISO 9001: 2015 Quality Management System Certification. Awareness Training

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17

Perry Johnson Registrars, Inc. Licensed Copy #2 RECYCLING INDUSTRY OPERATING STANDARD. Prepared for ISRI Services Corporation

ISO 13485: :2015 CLIENT TRANSITION CHECKLIST

INTEGRATED MANAGEMENT SYSTEM

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

DECISION TO ACCREDIT

The Three-in-One. Implementation Workbook. **** Integrating ISO 9001:2015 ISO 14001:2015 OHSAS 18001:2007. Management Systems

FO-5 PR-1, FO-1,2 PR-1 EM-6 PR-1, FE-1, NA-1 FO-10 FO-7, EM-2 EM-2. ISO Environmental Management Systems - Specification Yes.

AESOP 15604; ISSUE 2; STATUS PENDING APPROVAL; AUTHORITY CARL BLAZIK This document is the property of NSF ISR. Page 1 of 9

ENVIRONMENT, HEALTH & SAFETY MANAGEMENT SYSTEM MANUAL

ENVIRONMENTAL MANUAL Page 1 of 7. Section 4 - General Requirements of System (4.1)

ISO 14001:2015 Transition Review / Audit Checklist Page 1 of 6

UNIVERSITY OF NAIROBI

HSE INTEGRATED MANAGEMENT SYSTEM MANUAL & QUALITY POLICY

Occupational Health & Safety Management Systems Requirements

ISO 9001:2015 Gap Analysis Check Sheet

OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEMS REQUIREMENTS WITH GUIDANCE FOR USE (ISO 45001:2018)

Procedure 14 Internal Audits

Quality Without Complexity. CDG Certification

QUALITY MANAGEMENT SYSTEM ***** OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM ***** MANUAL

ASSESSMENT AND CERTIFICATION OF SHIP RECYCLING MANAGEMENT SYSTEMS

QMS Team: MR and all HODs (Internal Auditors) MR March 10. Quality policy Define quality policy The Steering committee Objectives and targets

Continual Improvement

Giza Cable Industries. Quality & Occupational Health and Safety Manual ISO 9001 : 2008 & OHSAS : 2007

IMPORTANCE OF AUDITING ISO 9001: 2015

QHSEM. Quality, Environmental & Occupational Health and Safety Manual

1. Quality Right First Time for product and services will ensure fulfillment of external and internal Customers satisfaction. 2. It is a coordinated a

QUALITY MANUAL BAGLIETTO S.R.L.

ENVIRONMENTAL SECURITY IN COMPANY

ISO 45001:2018 Migration Self-Assessment Guide. How ready are you for ISO 45001?

ISO Overview. Global Partner for a safe world

ISO Standards in Strengthening Organizational Resilience, Mitigating Risk & Addressing Sustainability Concerns

An EMS is a management tool to improve environmental performance by providing a systematic way of managing an organization s environmental affairs.

BROOKHAVEN NATIONAL LABORATORY SBMS Interim Procedure

Table of Contents. Project Agreement Schedule 14

Quality and Medical Devices: ISO 13485:2003

S. Fomichov, A. Banin, I. Skachkov, V. Lysak, O. Gaievskiy, N. Yudina. Quality Management System. Standard. Management Systems

OHSAS TO ISO MIGRATION TERRY FISHER, OHSMS ASSESSOR

Conducting Quality Audit based on ISO 9001:2015

Agru America, Inc. Quality & Environmental Management Manual Agru America, Inc.

Our Ref. April 28, 2005 Page 1/9. 1. Introduction References Certification... 4

25 D.L. Martin Drive Mercersburg, PA (717)

INTEGRATING ISO 9000 METHODOLOGIES WITH PROJECT QUALITY MANAGEMENT

Conducting Quality Audit based on ISO 9001:2015

Rules for the certification of Occupational Health and Safety Management Systems

Health & Safety Policy

OPERATIONS MANUAL ISO 9001 Quality Management System

SUPPLIER SURVEY FORM Instructions

ISO 9001:2015. Quality Management System. Manual

Supplier Quality System Survey

ICM Certification (P) Limited

Environmental nonconformity, corrective & preventive action

Fulcrum (North Sea) Limited. IMS Manual. FUL-MN-001 Rev0

Stanley Industries, Inc. ISO 9001:2008 Quality Policy Manual

HUGHS LIMITADA- SHEQ HSE RESPONSIBILITIES

Integrated Management Systems. John Marsden Marsden International (UK) Ltd

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy

Clause Map IATF 16949:2016 to ISO/TS 16949:2009

Correlation Matrix & Change Summary

ENVIRONMENTAL MANUAL. Page 1 of 26 Uncontrolled when printed NCH Env Manual Vers 11.0 date 01/02/18

Elements of a Biosolids Management Program

CORPORATE MANUAL OF INTEGRATED MANAGEMENT SYSTEM

Humantech Environmental Management System Manual

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing

ISO 14001:2015 Gap Analysis Check Sheet

IMPACT OF MANAGEMENT SYSTEMS PERFORMANCES ON TECHNOLOGICAL CHANGES

Environmental Management Systems

Quality Management System Plan

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS

Enwon (Australia) Pty Ltd

<Full Name> OHS Manual. Conforms to OHSAS 18001:2007. Revision Date Record of Changes Approved By

Transition plan for Global Certification Pty Ltd ISO Bruce Smith

Form C General Information

QUALITY SYSTEM MANUAL

Checklist for ISO14001:2004 (compared with 14001:1996) Standard Clause/Section

UNIT 10 CLAUSE-WISE INTERPRETATION OF ISO 22000: 2005

ISO 22000:2005 Standard INTERNATIONAL STANDARDS REGISTRATIONS

Integrated Manual. Quality, Occupational Health & Safety and Environment. Code of Document: Issue No: Date of the next review: Eng. A.F. Kahale.

PROMOTE A SAFE WORKING ENVIRONMENT WITH ISO 45001: THE NEW OCCUPATIONAL HEALTH AND SAFETY STANDARD

HACCP audit checklist

trinity ISO 45001:2018 A New Standard for OH&S Management System 4/27/2018

From ISO 14001:2004 to ISO 14001:2015

Environmental Instruction

Table of Contents INTEGRATED MANAGEMENT SYSTEM GUIDANCE

Risk Management as Methodology of Continual Quality Improvement in Enterprise

P. 1. Identify the Differences between ISO9001:2000 與 ISO9001:2008 ISO9001:2008 ISO9001:2000 版本的異同. 5 January 2009 ISO 9000 SERIES

CHAPTER 8 INTEGRATION OF QMS AND LMS

Current Quality. Culture. Mini Paper IE 361

Conduct a More Effective Management Review. Rob Packard, Consultant

Occupational Health and Safety Management System. OHSAS 18001:2007 OH&S Manual

ISO 45001:2018 CLIENT GAP ANALYSIS TOOL (TR006)

Quality Systems Manual

JONES LANG LASALLE LIMITED PROPERTY MANAGEMENT DEPARTMENT

CDG Certification Limited

Awareness to ISO 9001:2000

Occupational health and safety management systems Specification

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual

Transcription:

IntegratedManagementSystemin constructioncompany-effectivetool ofquality,environmentandsafety levelimproving Jozef Gašparík Slovak University of Technology in Bratislava, Faculty of Civil Engineering jozef.gasparik@stuba.sk Keywords management, system, quality, environment, safety Contribution Presents the structure of integrated ManageMent system (ims) according to international standards ISO 9001:2008, ISO 14001:2004 and STN OHSAS 18001:2009, which consists of 3 management systems focused to quality, environment and safety of building processes. The purpose of paper is to describe basic steps concerning the development of IMS. Paper analises basic processes of IMS like company vision, IMS planning, implementing, monitoring, revive and improving. The paper presents documents concerning the IMS as result of IMS standard analysis. Special part of contribution is IMS planning and brief steps of environment and safety risk evaluation and management. This methodology was successfully implemented into 20 Slovak construction companies. Author, on the bases of practical experiences, during the process of IMS development and implementation in construction firms and buildings, informs about effects influenced by this management system during the process of building planning and realization. INTRODUCTION One of the most important factor for construction company to be successful on market is assuring :the quality and reliability of buildings, health and safety of all employees, the quality of environment on site and in region, where building is construct. The key for effective management of all these aspects is development and implementation of effective Integrated Management System (IMS) in construction company (FIG.1). In contribution there is presented structure of Integrated Management System (IMS) according to international standards ISO 9001, ISO 14001 and OHSAS 18001, which consists of 3 management systems: Quality Management System (QMS) according to ISO 9001:2008, Environmental Management System (EMS) according to ISO 14001:2004 and Health Protection and Safety Management System (HPSMS)according to STN OHSAS 18001:2009. Author on the bases of practical experiences during the process of IMS development and implementation in construction firms and buildings informs about effects 15

influenced by this management system during the process of building planning and realization. Development, implementation and improvement of effective integrated management system (IMS) in construction companies can lead to quality production improving, safety of all employees of construction company, application of all national and international standards concerning the environmental aspects and finally to customer satisfaction. It is essential, that IMS must be understand and implement by all employees. IMS is not aim, but way to satisfaction of construction company clients, better work conditions of company employees, success on market and reputation in own country and abroad. EMS ISO 14001:2004 QMS ISO 9001:2008 AREA OF INTEGRATION Figure1:IntegratedManagementSystem HSMS STN OHSAS 18001:2009 DevelopmentofIMS During the process of IMS development is useful start with QMS according to requirement of ISO 9001, because most of the documents required by this standard is possible implement also for next two management systems: EMS and HPSMS. The basic processes of EIMS are in table 1. The whole process of IMS development starts by input audit of existing company system (FIG 2). This audit can be provided by trained employee in all three management systems, or by external qualified expert. The result of this input audit is level of confidence of existing management system of construction company to requirements of ISO 9001, ISO 14001 and OH- SAS 18001. The key person in whole process of IMS development and implementation has director of construction company (Szalayova, 2004). This person is responsible for vision of his company defined in IMS by: quality policy, environmental policy, health and safety policy. All employees of construction company must be inform about these policies and try to keep it in practice. Director of company determines one person of top management for function: manager of IMS. This person is responsible for development, implementation and improvement of IMS. Manager of IMS must be trained in all three management system before starting his or her work at this very important function. During the process of IMS planning is useful start with QMS and analyse of all processes according to ISO 9001 (Jarsky, 1996), create interaction of these processes, approve quality documents and forms of future records (see table 2). The most important steps concerning the development of EMS are : design of register of environmental aspects and impacts in all important areas of company: administrative building, machine park, buildings etc. (example of environmental aspects emissions to air, releases to water and land,, waste and by products etc.) determination of environmental aspects and impacts with high and middle level of risk, setting of environmental targets for aspects with high and middle level of risk, determination of programme, how to meet environmental targets. During the process of HSMS we can go by similar way: design of register of dangers and threatens in all important areas of company: administrative building, machine park, buildings etc. (example of dangers and threatens mechanical, physical, chemical, biological etc.) determination of dangers and threatens with high and middle level of risk, setting of health and safety targets for dangers and threatens with high and middle level of risk, determination of programme, how to health and safety targets fulfil. 16 organization, technology and management in construction an international journal 1(1)2009

IMSdocumentation The basic document of integrated management system is IMS manual, in which are described these information: profile and basic information about construction company, organization vision including quality, environmental, health and safety policy, organizational structure with presentation of all key employees in cluding representative person for IMS, brief description and interaction of QMS processes with reference to related documents (procedures, internal instructions, QMS documents and records etc.) brief description of elements and processes of EMS and HSMS with reference to related documents (procedures, internal instructions, EMS and HSMS documents and records etc.) In organizational instruction are except of organizational structure said competences (responsibilities and authority) of all company members in area of all three management systems. All, by ISO 9001 required work procedures, like control of documents and records, internal audit, control of nonconformity, corrective and preventive actions, can be implemented for all management systems. In table 2 there is list of documents and records required by ISO 9001:2008. Those documents and records, which can be used also for next two management systems, are signposted by symbol IMS. For EMS are useful except of IMS manual procedures concerning the environmental aspects related to building processes and site conditions. For HSMS is useful health and safety building manual, in which are described necessary health and safety preventive actions for building employees. The basic documents concerning the quality, environment, health and safety monitoring on building is inspection and test plan, in which are described these information: brief description of quality, environment, health and safety tests, N. Basicprocessesof IMS QMS (ISO 9001:2008) SUBPROCESSES EMS (ISO 14001:2004) HSMS (STN OHSAS 18001:2009) 01. Constructioncompanyvision Quality Policy Environmental Policy Health and safety Policy 02. IMSPlanning 1. QMS processes analysis 2. Interaction of QMS processes 3. Legislation 4. Quality targets 5. Quality Plans 1. Analysis of environmental aspects and impacts 2. Registration of law and other requirements 3. Risk evaluation 4. Environmental objectives and targets 5. Environmental programme 1. Identification of dangers and threatens 2. Registration of law and other requirements 3. Risk evaluation 4. Health and safety objectives and targets 5. Health and safety programme 03. Implementationand operatingofims 1. Resources, roles, responsibility and authority of employees 2. Competence, training and awareness of employees 3. Communication 4. Documentation 5. Control of documents 6. Operational (building) control 7. Emergency preparedness and response 04. Checking,correctiveand preventiveaction 1. Monitoring and measurement 2. Evaluation of compliance 3. Nonconformity, corrective action and preventive action 4. Control of records 5. Internal audit of IMS 05. Managementreview Management review of IMS 06. ImprovingofIMS Continually improvement of IMS due to its analysis Table1ModelofIMS QMS Quality Management System EMS Environmental Management System HSMS Health and Safety Management system IMS Integrated Management System 17

quality, environment, health and safety criterion (legislation, law, notices, European and state standards), the result of tests (conformity or non-conformity to criterion) name, datum and signature of persons responsible and competent for test realization and evaluation. IMS INPUT AUDIT Conformity to ISO YES Certification audit Imsplanningandrisk evaluation NO One of the most important document on building site is Project Quality Plan (PQP) and its part Inspection and Test Plans (ITP). The content of these documents is in Figure 3. The most important steps concerning the development of EMS and HSMS are described in chapter 2.Risk evaluation R depends on probability of incidence of environmental aspect and impact (EMS) and dangers and threatens (HSMS): CREATION of IMS documentation IMS training process of top and middle management IMS implementation R = PxC (1) Training of IMS internal auditors where: R environmental or safety risk P probability of incidence of environmental aspect and impact (dangers and threatens) see table 3 C consequence to environment and to health of employees see table 4 IMS INTERNAL AUDIT Conformity to standards: ISO 9001,14001,.18001 YES Certification audit CORRECTIVE and PREVENTIVE ACTION IMS CERTIFICATION AUDIT Figure2:BasicstepsconcerningtheIMSdevelopment 18 organization, technology and management in construction an international journal 1(1)2009

N. Document or record Document or record description Responsible person 01. D IMS 4.01 List of documents and records IMS MANAGER 02. D 4.02 Interaction of QMS processes IMS MANAGER 03. R IMS 4.03 Distribution list of documents and IMS MANAGER 04. R IMS 4.04 Declaration about document study IMS MANAGER 05. D- IMS 4.05 List of internal and external operating documents IMS MANAGER 06. D IMS 4.06 Overview of organization readings IMS MANAGER 07. R IMS 4.07 Document remark IMS MANAGER 08. R IMS 4.08 Overview of document changes and revision IMS MANAGER 09. D 5.01 Strategy of quality management and improvement Director, IMS MANAGER 10. D IMS 5.02 Quality, environmental, health and safety policy Director, IMS MANAGER 11. D IMS 5.03 Quality, environmental, health and safety targets IMS MANAGER 12. D IMS 5.04 Decree (certificate) for IMS manager IMS MANAGER 13. R IMS 5.05 Records of management consultation IMS MANAGER 14. R IMS 5.06 IMS management review IMS MANAGER 15. D IMS 6.01 Competences of organization employees Personnel manager 16. D IMS 6.02 Plan of employee training Personnel manager 17. R IMS 6.03 List of trained people Personnel manager 18. R IMS 6.04 Evaluation of training process effectiveness Personnel manager 19. R IMS 6.05 Records from internal training process Department manager 20. D IMS 6.06 Infrastructure of organization Economist, Director 21. R IMS 7.01 Contract review Director 22. R 7.02 List of material needs Site manager 23. R IMS 7.03 Selection and evaluation of material and work suppliers Purchaser 24. R IMS 7.04 Evidence list of monitoring and measuring devices 25. R IMS 7.05 Evaluation of software topicality Person responsible for metrology Employee working with software 26. R IMS 7.06 Inspection and test plan Site manager 27. R IMS 7.07 Building effectiveness evaluation Site manager 28. R IMS 8.01 Timetable of IMS internal audit IMS MANAGER 29. R IMS 8.02 Report from internal audit IMS MANAGER 30. R IMS 8.03 Corrective action IMS MANAGER 31. D IMS 8.04 Preventive action IMS MANAGER 32. D IMS 8.05 Monitoring and measurement of IMS processes Department manager 33. R IMS 8.06 Evaluation of organization by customer IMS MANAGER 34. R IMS 8.07 Records concerning the complaints, environmental problems and work injuries IMS MANAGER 35. R IMS 8.08 Analysis of IMS readings IMS MANAGER D -document R record Table2ListofIMSdocumentsandrecords(Gašparik,2005) 19

PROJECTQUALITYPLAN 1. Building Characteristics 2. Building Site Characteristics 3. Organization of building processes 4. Building process participants and their competences 5. Description of building quality assurance system 6. Inspection and Testing plans: Building process indication Identification of testing or inspection needed for building process Person responsible for inspection process Testing method description Quality criterion (standards, regulations) Result of test (conformity or non conformity) Name of person responsible for testing, datum and signature Records (certificates, audit opinion etc.) Figure3:ProjectQualityPlan Probability P(points) low 1 middle 3 high 9 Table3Probability P ofincidenceofenvironmentalaspectandimpactor dangersandthreatens(example) Consequencetoenvironment Minimal (non important) Small influence to environment Important influence to environment Temporary transcendence of limits Very important influence to environment Seriously damage of environment Consequencetohealthandsafetyof companyemployees Small hurts Ability not to work max. 1 day Small hurts with treatment Ability not to work (1 day-2 weeks) Health damage without permanent consequence Ability not to work (2 weeks- 6 months) Heavy damage of health, death Ability not to work (more than 6 months) C(points) Table4Consequence C toenvironmentandtohealthofemployees(example) On the value of risks we can determine risk categorization and management see table 5. Index Risk R (points) CATEGORIZATIONOFRISK I. 1-14 Insignificant risk Not required II. 15-80 Plumbless risk Is required III. 81-135 Seriously risk Is necessary Table5Riskcategorizationandmanagement(example) RISK MANAGEMENT 1 3 9 15 IMSimplementationand operation Before IMS implementation and operation there is necessary to assurance training of top and middle management of construction company in all three management systems to better understand requirements of ISO 9001, ISO 14001 and OHSAS 18001. The trained members of top and middle management in IMS through internal training process give necessary information to other employees. There is important during the IMS implementation and operation to understand IMS documentation in all function of organization and managing and keeping of all required records through the year. IMS must be implemented and operate in all buildings and plants. Another important feature during the implementation and operating of IMS is fulfilling of IMS programme, which arise front out of determination of aims of all three management systems. The requirement of EMS and HSMS is to prepare employees of company to possible emergency situation. InternalauditofIMS after some time of IMS implementation and operating (min. 3 months) is necessary before external audit by certification body to do internal audit of IMS according to ISO 19011:2002 Guidelines for quality and/or environmental management systems auditing. Construction company shall ensure that internal audits of IMS are conducted at planned intervals to: determine whether IMS conforms to requirements of ISO 9001, ISO 14001 and OHSAS 18001 and has been properly implemented and is maintained, provide information on the results of audits to management. 20 organization, technology and management in construction an international journal 1(1)2009

Internal audit of IMS can be done by trained internal auditors in all three management systems or by external qualified auditor. For nonconformity finding out by internal audit must be receive corrective actions. The last step before certification process of IMS is its management review. The top management of company shell review of IMS at planned intervals (min. once a year) to ensure its continuing suitability, adequacy and effectiveness. Reviews shall include assessing opportunities for improvement and the needs for changes to IMS including the quality, environmental, health and safety policy, objectives and targets. EffectsinfluencedbyIMS developmentand implementation By the process of integration of 3 management system into one we can reduce documents about 40 % (see table 1 and 2) against three separated management systems. Practically all procedures required by ISO 9001 for QMS we can implement for IMS (control of documents, control of records, corrective and preventive actions, internal audit etc.). In a case of internal and external audit of IMS in departments and buildings we can do it at the same time take into account quality, environment and safety aspect. Another effects of IMS development and implementation: continually satisfaction of external and internal customers, building quality assurance right the first time with the aim of minimization of finance loss due to corrective actions during the building process realization, minimization of reclaims during the building guaranty time, respect of valid technical standards (EN, ISO, national) involving them into technological procedures and inspection and test plans, increasing the culture of building management and realization by application of modern information technology, consistent respect of valid legislation documents concerning the environments and safety, elimination or minimization of problems concerning the quality, environment and safety by effective application or preventive actions, prevention of ecological accidents and problems during the building realization, prevention of fatal accident or long term incapacity to work of construction company employees, order on building site, waste separation and recycling, prevention of land and ground water contamination, air and noise protection, elimination of dustiness etc., consistent application of health protection and safety of all persons (employees, suppliers, visitors) in building site by application of personal protective work tools. CONCLUSION Development, implementation and improvement of effective integrated management system (IMS) in construction companies can lead to quality production improving, safety of all employees of construction company, application of all national and international standards concerning the environmental aspects and finally to customer satisfaction. It is essential, that IMS must be understand and implement by all employees. IMS is not aim, but way to satisfaction of construction company clients, better work conditions of company employees, success on market and reputation in own country and abroad. REFERENCES SZALAYOVÁ,S., Management of quality in construction firm, In proccedings of 4th international conference TECHSTA 2004, CVUT Praha, 2004 GAŠPARÍK J.: Manažérstvo kvality v stavebnej organizácii, ES STU Bratislava, 2005 JARSKÝ, Č.: Computer Modelling of Planning, Management and Maintenance of Structures. Zborník z medzinárodnej konferencie Developments in Building Technology. Bratislava: Stavebná fakulta STU, 1996. 21