TECHNICAL INFORMATION SHEET NUMBER 1a

Similar documents
0331 Brick and block construction

BRICKWORK 3.5 BRICKWORK 1 GENERAL

Building Construction 7. Dr Nabil El-Sawalhi Associate professor Engineering Projects Management

APPROVALS. Jabwall has been approved for this application since 1979, and was the first partial-fill insulation product to gain BBA approval.

Garage Conversions. Technical Issues

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10

Definition of Wall. A continuous, vertical structure Thin relatively to its length and height

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES

Measuring Walls in Accordance with ARM4 - An Introductory Demonstration

TW50. Insulation STANDARD DETAILS FOR 50 MM INSULATION BOARD IN A 100 MM CAVITY. Low Energy Low Carbon Buildings. Wall lining. Inner leaf blockwork

CONCRETE BLOCK MASONRY

Guidance on U Values from Domestic Heating Design Guide

SOUTH AFRICAN NATIONAL STANDARD

TIVOLI CARPARK SITE DEVELOPMENT, LITTLE COLLINS STREET, MELBOURNE BRICK AND BLOCK CONSTRUCTION

COUNTY GOVERNMENT OF SIAYA: PROPOSED ECD BLOCK

CHAPTER 8. Concrete Work

Concrete Soffit Direct Fix

CASE 1 : SINGLE FAMILY HOUSE. VIA / TCU 3rd semester workshop A2015. Building. Component Technical Course. VIA/ TCU workshop A2015

Wall lining Inner leaf blockwork. K106 Cavity Board. Flexible sealant STANDARD DETAILS FOR 115 MM INSULATION BOARD IN A 125 MM CAVITY

Part 6 Superstructure (excluding roofs) Chapter 6.5. Steelwork

PAGE 415. Part 9. External works. 9.1 Garages. 9.2 Drives, paths and landscaping

EcoHome-Insulation.com. Aluminium Foil Bubble Insulation. General Purpose Insulation. Dry Lining. Cavity Wall. Insulation System.

Construction Technology Revision Guide

CALL TO TALK TO THE SAS TEAM

FOREST PLACE 59 UNITS ERF 5586 PARKLANDS

CONCRETE BLOCKS Lignacite

9/24/2015. Aalto! / ENG + ARC. Asuinrakennusten rakenneratkaisut. Requirements : Sound insulation requirements : Thermal insulation requirements :


Leaving Certificate Revision Notes. Airtightness. Potential air leakage paths (the numbered points in section 2.1 give a description for

Aircrete blocks product guide

Product Manual. Underfloor Heating (UK) Floor Construction. Industrial - Commercial - Domestic

Part E robustdetails. robustdetails. September 2015 Update Pack. Dear Colleague,

Warm climate - Passivhaus system

Cool temperate climate - Passivhaus system

CONCRETE BLOCKS Lignacite


Floors Walls Roofs. Jabfill Premium. APPLICATION: Full-fill Cavity Wall Insulation PRODUCTS: Vencel Resil Limited

BEAM & BLOCK SYSTEM. 108mm. 175mm Deep (160mm) Wide Beam. 160mm

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.

Unit 8 Walls & Partition

Construction and the Built Environment. Unit 1: The Construction Industry for the 21st Century [GCB11] MONDAY 14 MAY, AFTERNOON

Vento Render Build Manual

HOME SYSTEMS CONSTRUCTION PROCEDURE

SPECIFICATION FOR PRECAST/ COMPOSITE CONCRETE FLOORS/ ROOF DECKS SECTION E60

A handbook of thermal bridging details incorporating Porotherm blocks

A Handbook of thermal bridging details incorporating aircrete blocks

Clay and clay products

PART A: JOB PROCDRE FOR PLASTERING

Hidden Strength. Ancon AMR Masonry Reinforcement. Minimise wall thickness. Maximise structural performance.

Civil Engineering Construction Chapter 5

PRE CAST CONCRETE LINTELS SILLS & COPINGS

155 & 220 Beam Flooring Systems

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR

All floors must have sufficient strength and stability in order to support various loads. Such as? People Furniture Equipment Machinery Partitions

A Handbook of thermal bridging details incorporating aircrete blocks

TECHNICAL SPECIFICATION FOR MATERIAL

DICTATOR Lift Shaft System

The Passive Fire Protection Handbook

Garage Conversion - Between and Under Joist Applications

Brick Works (cont.) Building in bricks: Factors affecting the stability of brick building: Properties of bricks:

TECHNICAL INFORMATION SCREED

GENERAL SPECIFICATION

Primo Brick Cube Build Manual

Hemp Mortars St Astier Limes and Mortars telephone:

THE CONSTRUCTION OF BUILDINGS

ANNEXURE B SECTION 1

GypLyner IWL Independent wall lining system

/501 Level 3 Plastering (Solid) Version 1.0 November Sample Marking Scheme

WARMFLOOR. Installation Guide.

SSS003: Substrate Specification Sheet 3 - Brick, Block and Concrete

An introduction to Part L U-values

Michael Dyson Associates Ltd

11/09/2018 LBP licence classes

Xtratherm Thin-R Partial Fill Cavity Wall Board (XT/CW Grade)

CF PROJECT DETAIL PRODUCTS AND INFORMATION CAN BE AMENDED WITHOUT PRIOR CONSENT TO MAINTAIN THE COMPANY POLICY OF CONTINUED IMPROVEMENT J ONES

Jabfill High Performance (HP)

Part 5 Substructure and ground floors. Chapter 5.2. Suspended ground floors

Multi-layer Insulation Blanket for Walls

WALL SYSTEMS ( Ref: The Building Illustrated, Ching, Francis DK )

50948-RHN Putney. 06 January This document includes: F30. Accessories/ sundry items for brick/ block/ stone walling. Code Section Revision Dated

9.0 TECHNICAL ANALYSIS

DESIGN & SPECIFICATION CONSIDERATIONS DESIGNING FOR MOVEMENT

850 SOLID LIGHTWEIGHT READYBLOCK

CHAPTER 7: Superstructure

Compiled by: Civil Works Department, SSA Punjab.

HOLLOW CORE FLOORS SPEED AND STRENGTH

Installation Instructions DEKO PV 1090

Selecting floors and ceilings

WARMFLOOR. Installation Guide.

*X227/12/01* X227/12/01 BUILDING CONSTRUCTION HIGHER NATIONAL QUALIFICATIONS 2014 FRIDAY, 6 JUNE 9.00 AM AM

MAINTENANCE PLAN Wing Village Hall, Morcott Road, Wing, Oakham LE15 8SA

Carried to collection

Northlights using VELUX Modular Skylights

CONSTRUCTION SMARTSCREEN

roofing ROOFING Design of the base ROOFING DETAILS

WRITE- UP ACOUSTICAL ANALYSIS OF BODE AKINDELE SCHOOL OF MANAGEMENT TECHNOLOGY BUILDING. ARC/10/1094 AJAYI, Olorunfemi J.

OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total

DECKING INSTALLATION GUIDE

maintenance-free free from painting easy to install Fixing Guide Cedral Click

104 References Comply with applicable portions of current editions of the following Australian Standards:

Transcription:

BASIC BUILDING REQUIREMENTS FOR THE CONSTRUCTION OF TRADITIONAL SQUASH COURTS Building Requirements The dimensions of a singles or doubles court is shown on the attached diagram. Width and length of the finished sizes are subject to +/-10mm when measured 1000mm above the finished floor level. In order to provide a suitable basic structure when constructing a court, a number of factors should be considered by the designer and builder. The Floor All new squash court floors must comply with European Standard EN14904. The floor will require a level base incorporating a damp proof membrane to avoid the possibility of moisture from the concrete oversite slab affecting the timber floor. Wall Construction The inner skin of the cavity wall should consist of either Fletton common bricks or equal clay bricks 21N/mm² or dense aggregate concrete blocks minimum 7N/mm². It is usual to use 210mm brickwork or 200mm concrete blockwork in cement lime mortar. Flint lime, sand lime or calcium silicate bricks and lightweight aggregate blockwork should be avoided. Joints to be left flush. Walls should be constructed of the same materials throughout. Avoid constructional steel or concrete columns in the same finished plane as this will lead to cracking of the playing surface materials. Court walls shall be vertical to within 5mm in a height of 2m and straight to within +/-15mm in the length of any wall. Wall Insulation If the courts are to be heated, the addition of insulation clipped to the cavity face of the inner skin should be considered. See England Squash Technical Information Sheet No. 5. Ventilation Air bricks should be provided at low level on the front wall of the court. This is to allow air into the court through holes corresponding to the air bricks formed in the tin, the out of court area at the base of the front wall. An extractor fan to provide 4 air changes per hour should be sited at the rear of the court. See England Squash Technical Information Sheet No. 9. 1

Out of Court Area Wall surfaces above the playing surfaces may be left as fair faced work for decoration in a light colour. The Door England Squash recommend that for all new build traditional brick built squash courts, the Standard wooden solid core door at 915mm width should be fitted as this will allow access for wheelchair users. Alternatively, for normal use, a door with a clear opening size of 800mm to comply with current Building Regulations. The access door of the court is sited on the centre line, or middle third of the back wall. The frame is set flush with the playing surface. A flush door with a solid core is painted and hung on concealed hinges SOSS pattern. A check action closer and door viewer is fitted. Glass Back Wall Where a glass back wall is to be installed, the supporting channels are set into the side walls. Fins are supported on metal angles bolted into the concrete floor slab which should be thickened to allow for the bolts. The door width should be 914mm to allow access for wheelchair users or a door with a clear opening size of 800mm to comply with Building Regulations. Viewing Gallery Where a solid back wall is used, a viewing gallery over the access corridor should be provided for spectators and referee/marker. Ceiling The ceiling of the court should preferably be flush with no projecting beams. The ceiling and/or underside of the roof, if exposed, should be painted a light colour. Playing Surfaces These are defined with concave or angled out of court battens 50mm wide. A number of playing surface materials are available and these are applied by specialist contractors who are approved by the manufacturer of the wall surface materials. Normal plasters are not suitable for squash courts. Playing surfaces are left undecorated. Floors Either maple or beech strips of a consistently light colour, secret nailed to semi-sprung battens at 300mm centres for maple and 411 mm for beech. Strips are laid the length of the court. The floor surface is left unsealed with a slight nap to provide shoe traction for the players. Lighting For lighting requirements for squash courts, please see TechInfoSheet No.8 Heating A temperature for a squash court and access areas should be between 15ºC-20 ºC. Position for heating will depend on the site and location of the court. 2

Alternative Wall Systems There are a number of prefabricated wall systems available that can be used to form a squash court. For details of these systems please contact the England Squash Please note that the information for the maintenance and provision of squash courts contained in the England Squash Technical Information Sheets apply to courts built in the United Kingdom only. England Squash 3

4

5

6

7