Suojatuote PROxA Weather Protection System Installation Manual. Suojatuote Pro Oy Rastaansiipi 15 D Oulu Suomi

Similar documents
UNI Roof Catalogue CTG001-

Layher. Keder Roof and Keder Hall. More Possibilities. The Scaffolding System. Layher Keder Roof and Keder Hall Instructions for Assembly and Use

The Layher Cassette roof

Rolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004:

2 USG003- Important Note:

Erection and Use. Instructions for. WACO Roof Covering System 600.

USER S MANUAL 750. wit h HAKI Trak Sheet ing Roll-Out Met hod

USER S GUIDE for HAKITEC 750. TEMPORARY ROOF with HAKI Trak Sheeting ( Hand-Built )

Allround Scaffolding. Layher Allround Bridging System Instructions for Assembly and Use. Modular truss system for wide spans

Custers. Camino CHIMNEY SCAFFOLDING ASSEMBLY AND USER S INSTRUCTIONS. Nov. 2003

user s guide for ( Hand-Built )

TEMPORARY ROOFING SYSTEM USER GUIDE

There s no bad weather

distribution Modular Scaffolding

Rolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004:

USER S MANUAL HAKI PUBLIC ACCESS STAIR

TRAD HIRE & SALES SCAFFOLDING SUPPLIER USER GUIDE ALTRIX TEMPORARY ROOFING SYSTEM FOCUSSED ON SERVICE

scaffoldings/ coverings

Safety on Heights: Our Policy

TAKING YOU TO NEW HEIGHTS IN SAFETY... kwikstage

TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS. Combisafe International AB

USER S MANUAL HAKI PUBLIC ACCESS STAIR

Industrial Aluminium Towers

LAYHER PROTECTIVE SYSTEMS CATALOGUE

Lattice Beam User Guide USG001-

USER S MANUAL. HAKI Loading Tower

COMPONENT SCHEDULE SINGLE WIDTH SPAN TOWERS WITH LADDER FRAMES TO BSEN RUNG STARTER FRAMES

Modular Scaffolding MEKA 48

USER S MANUAL HAKI CONTINENTAL

USER S MANUAL HAKI COMPACT STAIR TOWER

INSTRUCTION MANUAL MOBILE ACCESS TOWER

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use

USER S MANUAL HAKI COMPACT STAIR TOWER

Industrial Aluminium Towers

Span 300 Manual. DESIGNATION EN1004 CEN 1298 IM - en. CEN designation of this instruction manual EN 1298 IM en

TD TD

TAKING YOU TO NEW HEIGHTS IN SAFETY...

Industrial Aluminium Towers

RAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017

LAYHER PROTECTIVE SYSTEMS CATALOGUE

Industrial Aluminium Towers

USER S Manual. HAKI Bridge System (HBS)

MAXIMO MXH Heated Formwork The cost-effective solution for concreting operations at low temperatures. Product brochure

TD Nom Name: Stairway Steps Weight: 156 kg Standard: EN Material: Galvanised Steel Dimensions: mm

Reliant Holdings Ltd Safety Management System

This User Guide provides you with step by step instructions to ensure your system is erected easily and safely.

TD Nom Name: Stairway 70-9 Steps Weight: 95 kg Standard: EN Material: Steel - Powder Coated Dimensions: mm

PROLYTE MPT-TOWER MANUAL ASSEMBLY INSTRUCTIONS

USER S MANUAL HAKI UNIVERSAL

USER S manual HAKI UNIVERSAL. International version

Allround Scaffolding

Generation Hop up brackets to be removed and boards moved to lift above.

LAYHER EVENT SYSTEMS CATALOGUE

LADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE

PROLYTE ST-TOWER MANUAL ASSEMBLY INSTRUCTIONS

Note. Floor beams can also be made from wooden beams put through the holes in the longitudinal beam and boards nailed to it.

USER S MANUAL HAKI UNIVERSAL

JUMBO 4MM FACADE SCAFFOLD

Erection manual. Tube-Lock Concept. van Thiel United b.v Page: 1 of 15

USER S MANUAL HAKI STAIR TOWER

DEPAUL UNIVERSITY. Scaffolding Program. Environmental Health & Safety. April 2017

DICTATOR Lift Shaft System

TD CA TD CA

SpeedyScaf System. Layher SpeedyScaf System. Catalogue Edition Quality management certified according to ISO 9001:2008 by German TÜV-CERT

USER S MANUAL HAKI UNIVERSAL ALUMINIUM

Cut costs, improve safety, increase efficiency: Scaffolding for shipyards and offshore. Layher. More Possibilities. The Scaffolding System.

PERI PD 8 The cost-effective shoring for slab tables and high loads

SOUTH AFRICAN NATIONAL STANDARD

Construction Safety Education Forum. 6 March Scaffolding. Dimitri Barlas, State Coordinator Construction Work Health and Safety Division DRAFT

Span 300 Instruction Manual

Multidirectional_scaffolding MP

INSTRUCTIONmanual. BoSS COMPACT SIDE CANTILEVER TOWER SCAFFOLD 3T Method - Through the Trap Door

GRIDFLEX The flexible slab formwork with safe accessible grid elements

Mounting the shell walls or VE-element consisting of two concrete panels forming permanent formwork for casting of walls

July Climbing Scaffold with retractable formwork Instructions for erection and use

ASSEMBLY INSTRUCTION ROLLING TOWER RT 1400 & RT 1400XR ROLLING TOWER RT 750 & RT 750XR STAIR TOWER ST 1400 FOLDABLE TOWER FT 750 & FT 750XR

Modular Scaffold MEKA 48

MevaFlex Assembly and Operating Instructions

ASSEMBLY, DISASSEMBLY, AND USER INSTRUCTIONS

Safety Documents > Safety Manual > Scaffolds

Assembly and users manual. Pallet racking Alfa

Concrete Framing Systems - Walls and Columns

LADDERSPAN 3T USER GUIDE. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

ASSEMBLY.

Leveling Foot RB210. Leg Extender RLT66

Span 400 Instruction Manual

LAYHER ACCESS TECHNOLOGY CATALOGUE

Rack-in-a-BoxTM INSTALLATION MANUAL

BRIO Modular scaffolding

SECURE. UNIVERSAL. MOUNTING. Tilt Kit Installation Manual

MANUAL HALLSYSTEM COPYRIGHT 2016 SAFETYRESPECT AB Art no ENG

Safety First Mobile Towers - 3T Method

Mobile Tower 3T Method (Through The Trapdoor) Please read this guide carefully. Please note that diagrams are for illustrative purposes only.

INDEX. introduction 4. access scaffolding 5. selflock system 16. wall system 17. column boxes 29. slab system 31. props 36. contact details 40

MiniMax USER GUIDE. Mobile Aluminium Trade Quality Access Tower System. 3T - Through The Trapdoor Method

Solcellspaket - Poly (4.2 kwp Jinko 265W Poly) System Plan. Created with Solar-Planit by Mikael Johansson Futura Energi AB in Simrishamn.

Smarter. Safer. Leaner.

BoSS Climalite Camera and lighting tower

MANUAL MOUNTING SYSTEM FOR BITUMEN / EPDM

MOUNTING SYSTEM FOR PITCHED ROOF WITH TILES. mounting system for pitched roof with tiles for solar panels in landscape setup. Rev

Transcription:

Suojatuote PROxA Weather Protection System Installation Manual Suojatuote Pro Oy Rastaansiipi 15 D 10 90650 Oulu Suomi

General The Weather Protection System is a temporary roof system that protects from rain, snow, wind and cold weather. The PROxA weather protection system is a keder system which can be installed as a piched roof or shed roof. The angel of the pitch is 20 degrees. The system is modular which makes it easy and quick to install. All parts of the system are made of aluminium. The system consists of module components such as: lattice beams, ledgers, diagonals and ridge beams. The components are connected to each other with claws. The system has been desinged according to european standards EN12810 / EN12811. With this system it is possible to create a safe roof with a span of up to 40 meters. NOTE: A competent engineer has to supervise the installation. All parts have to be visually inspected before installation. Damaged parts have to be replaced with new parts. 2/12

Installation 1. Mounting the beams Mount the beams together at ground level, this way you will decrease work that is done on high level. The lattice beams and the keder cover rails are mounted to each other by nuts and bolts. The spigots are connected with either locking pins or nuts + bolts. The size of the bolt is M10x80mm. Connecting two lattice beams together requires 2 spigots and 8 pcs of locking pins. 2. Mounting the ridge beam The ridge beam is connected in the same way as the lattice beams. It is locked in place with locking pins. 3/12

3. Mounting a section After the ridge beam and lattice beams have been connected they will be locked to each other by ledgers and diagonals. By following this procedure one section will be created. Mount a double ledger at every other vertical mounting point (2m distance from eachother) and a normal ledger at every other vertical mounting point. Diagonals will be mounted at every mounting point. This section is called a supported section. A section can be mounted entierly on top of a scaffold or by lifting it upwards at the same time when it is mounted from below. 4/12

4. Installation of sections The sections are normally installed with a crane. The sections are mounted at ground level and lifted into position one by one. The system can also be mounted directly on the scaffold but this will increase the work at high levels and is much more dangerous. Mounting the sections requires a space on ground which is slightly larger than one section. It is important that the sections that are lifted with a crane are supported sections. The intermediate sections (a section between 2 supported sections) only needs legders at 2 meter distance (no diagonals or double ledgers are required). To minimize work at high levels all material used for the intermediate section can be lifted up at the same time as the supported section is lifted in place. Material can be connected with the claw to the supported section. After the supported section is fastened into position the intermediate section ledgers can be mounted into position. Pulling ropes for mounting the cover sheet can also be installed on the supported section before lifting so that you don't later have to climb over the section to fit the rope. 5/12

5. Locking the section in place Sections are locked into place by using scaffold couplers. It is important that the locking position on each section is the same so that no crosstensions will appear in the system. This will make it difficult to install the cover sheets. The supported sections and the whole system in general is flexible. The flexibility has to be removed by making sure that the whole section weight is sitting on the scaffold before tightening the couplers. Fasten one end of the section while the crane is still holding the weight of the section. Then lower the section so that the whole section weight is sitting on the scaffold before tightening the couplers. Installation of the roof continues by alternately installing a supported section and an intermediate section. 6/12

6. Lifting sections Note that a section has to be attached at 4 points when lifting. The attachment points have to be at a beam connection point and as close as possible to a double ledger. Take care not to damage the cover rails. It is only allowed to use lifting lines when lifting sections, chains or cables will damage the aluminium. Lifting can only be done when wind speed is less than 10 ms (3ms if the cover sheet is still mounted on the section). 7/12

7. Mounting the cover sheet The cover sheet is very sensitive to wind and thus can only be mounted when the wind conditions are good. It is good to reserve 4 people for cover sheet installation (especially at larger roofs). 2 persons to pull the cover sheet and 2 persons to feed the cover sheet from the other end. Check that the cover sheet is clean and suitable for the target site. Feed the cover sheet keder rods into the cover rails. Install the pulling bar. The pulling bar is mounted into the cover sheet pockets so that the pulling bar is visible from both ends and will rest on top of the cover rails. Tie the pulling ropes to the pulling bar. Start pulling the the cover sheet into position. You have to pull slowly and evenly from both sides. When the cover sheet is in place it is locked into position with ratchet straps or similar. The gable end is installed with the same principle. 8/12

8. Bracing and anchoring Each section have to be braced in all directions up,down, side and lengthwise. Normally bracing is done in the following way: side bracing; by anchoring the section to the scaffold (the scaffold is anchored to the wall) lengthwise; sections are braced between eachother and the system is braced with ratchet straps (the whole roof can be considered as one big supported section) up/down; each beam of the roof will be anchored to the wall with a ratchet strap Wedge anchors and concrete screws can be used when anchoring to walls. The anchors have to be fastened to the plinth, vaults or concrete (tiles or bricks are not strong enough). The anchoring need is 40 Kg / m2 (of roof). 2000 kg/4000 kg ratches straps must be used. 9/12

9. Supports, loads and spans A temporary roof must stand wind- and snowloads. Windload is 40kg/m2 and snowload 25 kg/m2. The system has to be anchored so that it can stand stormy winds (21 m/s). The force applied to gables and the roof is 40 kg/m2. Support for 40m spanwidth 1. 6m tension bar 2. 20m tension wire 3. Tension support diagonals 4. End support Span Height of section Weight of section Max load / m2 15 m 3.6 m 488 kg Yli 100 kg / m2 20 m 4.3 m 520 kg 100 kg / m2 25 m 5.3 m 625 kg 70 kg / m2 30 m 6.4 m 878 kg 65 kg / m2 (1) 35 m 7.0 m 909 kg 65 kg / m2 (2) (4) 40 m 8.0 m 1042 kg 65 kg / m2 (3) (4) 1) Needs a 6m tension bar 2) Needs a 6m and a 20m tension wire 3) Needs a 6m, 20m tension wire and tension support diagonals 4) Needs end supports Water, snow and ice that has accumulated on the roof must be removed at regular interwalls. 10/12

10. Components PROxA weather protection components are described below. Picture Description Spigot for connecting the beams Ridge beam Lattice beam 2m (1m also exists) Lattice beam 3m Eave beam 11/12

Diagonal Ledger Double ledger Coupler Cover rail (aka keder rail) PE based reinforced cover sheet. 12/12