Currituck County Moyock Mega-Site Market Feasibility Study March 28, 2016

Similar documents
SUSTAINABLE COMMUNITIES STRATEGY

Chapter 4: Transportation and Land Use

Draft Alternatives and Screening Criteria

LAND USE POLICIES BY COMMUNITY DESIGNATION

TRANSPORTATION RELATIONSHIP TO OTHER ELEMENTS OF THE PLAN AND COUNTY REGULATIONS VISION FOR TRANSPORTATION PLANNING ROAD NETWORK SECTION 7

Land Use INTRODUCTION

Los Angeles County Sustainability Summit Your Community: Smart Growth and Community Development

Database and Travel Demand Model

4: Transportation and Land Use

Business Item: Community Development Committee. Proposed Action. Background. Rationale. Funding. Known Support / Opposition

Community Development Committee

Airports in the Region Case Study

12 Evaluation of Alternatives

APPENDIX A - PLANS AND POLICY REVIEW FEBRUARY 2017

10. GENERAL PROJECT DESCRIPTION SPECIFIC PROJECT DESCRIPTION

11 Joint Development Regulatory Context and Methodology

EXHIBIT A SCOPE OF SERVICES FOR MODAL DEVELOPMENT (MD) SUPPORT - CONTINUING. Financial Project Nos

RURAL CENTER COMMUNITY ROLE COUNCIL ROLE RURAL CENTER ALL COMMUNITIES

Contents i Contents Page 1 A New Transportation Plan Community Involvement Goals and Objectives... 11

Charlottesville Albemarle MPO:

Once known as warehousing and distribution, the process

SUBURBAN EDGE COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES SUBURBAN EDGE

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009

EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050

DIVERSIFIED RURAL COMMUNITY ROLE COUNCIL ROLE DIVERSIFIED RURAL ALL COMMUNITIES

NORTH I-75 MASTER PLAN Summary Report

Fairfield Corporate Commons

URBAN CENTER COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES URBAN CENTER

APPENDICES. Table 46: Quantified Objectives (October 2013 to October 2021) New Construction Rehabilitation Conservation/Preservation

Ballard-Interbay MIC Summary Statistics

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES

Transportation and Utilities

COMPREHENSIVE PLAN GOALS / POLICIES

Chapter Six Future Transportation and Land Use

CHAPTER 5: TRANSPORTATION

APPENDIX A: Transportation Planning Rule

Chapter #9 TRAVEL DEMAND MODEL

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES

EIGHT PLANNING FACTORS

Revenues and expenditures increase based on the tax district increase due to increases in real estate assessments in CY 2016 compared to CY 2015.

COASTAL STRATEGIES FOR DRAINAGE RESILIENCE

MULTI-MODAL TRANSPORTATION SYSTEM

The Little Canada Comprehensive Plan consists of the following sections:

FAIRFAX COUNTY PARK-AND-RIDE DEMAND ESTIMATION STUDY

GRAND NIAGARA Proposed Secondary Plan

DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA

-NA- Population level in 2000 = 3,716

Municipal Class EA Process

City of Spring Lake Park Comprehensive Plan Update

City of Charlottesville MEMO

SCS Scenario Planning

COUNTY OF PRINCE WILLIAM 5 County Complex Court, Prince William, Virginia (703) FAX (703) Internet

MEMORANDUM #4. DATE: November 4, Warrenton TSP Project Management Team. Ray Delahanty, AICP, DKS Associates Kate Petak, EIT, DKS Associates

STAFF REPORT. Permit Number: Ryan. Kitsap County Board of Commissioners; Kitsap County Planning Commission

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS

2040 Long Range Transportation Plan

APPENDICES. Table 46: Quantified Objectives (October 2013 to October 2021) New Construction Rehabilitation Conservation/Preservation

Summary of transportation-related goals and objectives from existing regional plans

CSU Channel Islands Parking and Transportation Demand Management Study

STAFF REPORT. Permit Number: Port Orchard Airport. Kitsap County Board of Commissioners; Kitsap County Planning Commission

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

North Woodbridge Urban Mixed Use Master Zoning Plan

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination

65 East Project (P18-045) Addendum to an Environmental Impact Report

PREMIER DEVELOPMENT LAND (For Sale or Lease)

Regional Travel Demand Management Plan

3. STATION SPACING AND SITING GUIDELINES

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

State Road (S.R.) 12 (Florida Arts Trail PD&E)

1.0 Introduction to Transportation Planning

Chapter 1: 2035 Virginia Surface Transportation Plan

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY

Adapting to Rising Tides

13 November 12, 2014 Public Hearing

City of Hamilton Bayfront Industrial Area

THE REGION S PLAN POLICY FRAMEWORK. August 2015

New York Metropolitan Transportation Council. Plan Regional Transportation Plan A Shared Vision for a Sustainable Region

Governor Baldacci s Transportation Bond Proposal

What is the Transportation Policy Plan (TPP)?

Site Criteria Evaluation Matrix

2016 MAJOR GENERAL PLAN AMENDMENT

41 st & Fox Station Area Property Owner Meeting August 16, 2018

transportation, infrastructure, & flood control strategy FINAL DRAFT June 20, 2008

Developing New Revenue Streams For Transit

CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING AREA

INDUSTRIAL OUTPARCELS AVAILABLE WITH RAIL ACCESS BUILD TO SUIT OPTIONS. The Moser Group, Inc.

Woodlake General Plan Draft Environmental Impact Report

PUBLIC HEARING LOOP 9

ATTACHMENT A. Detailed Study Scope. I-66 (Inside) Multi-modal Study Scope

Policy Research CENTER

ACTIVE TRANSPORTATION ADVISORY COMMITTEE. Memphis MPO March 30, 2015

DRAFT ORDINANCE. B. Applicability

Alternatives Evaluation Methodology

Transportation Category. New Location and. Green Vehicles. Reduced Parking Footprint. Bicycle Facilities. Access to Quality Transit

SOUTHEAST FLORIDA REGIONAL COMPACT CLIMATE CHANGE. Sustainable Communities & Transportation Planning

North Side Transfer Zone. Public Open House April 16, 2014

GMA Periodic Update Policy/Text Requirements

Regional Performance Measures Annual Progress Report TPO Board - 2/4/2016 Presentation by: Chris Wichman, Senior Planner

LARKSPUR SMART STATION AREA PLAN. Public Workshop December 3, 2013

Transcription:

Currituck County Moyock Mega-Site Market Feasibility Study March 28, 2016

Presentation Outline Project Background Demographic and Economic Data Review Competitive Market Analysis Feasibility Assessment Preliminary Environmental Screening Public Facilities Assessment Conclusions and Recommendations Next Steps

Project Background Moyock Mega-Site - + 3,000 Acres Economic Development Opportunity Competitiveness of site within Hampton Roads Region Identification of similar scale developments Summary of development demand Preliminary screening of Environmental constraints Assessment of existing infrastructure Identification of infrastructure needs/improvements Next Steps

Moyock Small Area Plan Future Land Use

Moyock Mega-Site Property Limits

Demographic and Economic Data Review Analysis Geographies Metropolitan Statistical Area (MSA) Currituck County Economic Anchors Port of Virginia Shipbuilding Manufacturing Defense Tourism

Demographic and Economic Data Review Regional loss of over 3,000 jobs since 2004 Construction comprised 35% of 10-year losses Stabilization and recovery since Recession Strong and shifting sectors Currituck makes up less than 1% of MSA total Nearly 40% employed residents commute to VA

Demographic and Economic Data Review Nearly 150,000 new regional residents since 2000 Currituck added 6,900 new people; ½ growth in Moyock area Key characteristics Getting older More prosperous Smaller households dominate, but size is increasing

Demographic and Economic Data Review Currituck housing stock is over 80% singlefamily detached (MSA is 60%) Single-family recovery Multi-family opportunities: Changing demographics Evolving preferences Not just Millennials 1.2% 2.2% 14.6% 0.1% 81.9% Single-Family Detached Townhouse Multifamily Mobile Home Other

Demographic and Economic Data Review Retail Follows population growth Retail development has been slow to recover in region Low vacancy and stabilized rents likely to encourage development Office Three buckets: corporate, professional service, and entrepreneur

Demographic and Economic Data Review Office (continued) Regional vacancy has been gradually increasing No new office space completed in last five years in Portsmouth/Suffolk/Chesapeake Submarket Industrial Six new buildings completed in region in last five years (1.7 million square feet) Extremely limited supply of shovel ready sites that could accommodate large users (+1.0 million sq.ft.) Competition?

Competitive Market Analysis Purpose Mix of existing mixed- and single-use and planned Selected Developments Greenbrier (Chesapeake, VA) Rock Creek Center (Guilford County, NC) Lincoln County Industrial Park (Lincoln County, NC) Chatham Park, Pittsboro, NC Kingsley Park North, Fort Mill, SC Wendell Farms, Wake County, NC Harbour View (Suffolk, VA)

Competitive Market Analysis Harbour View Residential Single Multi-Family Office Retail Medical Services Research and Development Warehouse/Distribution Institutional

Competitive Market Analysis Access to infrastructure Having Flexibility is key Mixed-use success Residential is not just supporting use Varied levels of public participation The long game

Feasibility Assessment Determines future housing and retail demand Considers historic growth and future capacity 70% increase in 30 years equates to estimated 2045 population of 42,800 in Currituck Population Forecast, Currituck County, 2015-2045 45,000 42,803 Population 40,000 35,000 30,000 25,012 25,000 20,000 28,334 30,954 33,773 36,713 39,432 15,000 10,000 5,000 0

Feasibility Assessment Determines future office and industrial demand Focuses on capture of regional growth; third-party sources undercount potential Region expected to exceed 1.0 million jobs by 2045 Employment Forecast, Virginia Beach MSA, 2015-2045 Employment 180,000 160,000 140,000 120,000 100,000 80,000 60,000 40,000 20,000 0 2015 2045

Demand Summary Land Use Type Measure 30 Year Demand Low High Residential Units 2,500 3,000 Retail Square Feet 250,000 500,000 Office Square Feet 150,000 300,000 Industrial Square Feet 750,000 1,000,000 Demand for a variety of development opportunities Based on stakeholder input and regional and county projections for new residents and jobs Considers the Mega-Site s: Current and future transportation and utility infrastructure Proximity to existing job centers and economic anchors

Preliminary Environmental Review Wetlands Evaluation Threatened and Endangered Species Historic Resources FEMA Flood Hazard Areas Hazardous Materials

Preliminary Environmental Review

Preliminary Environmental Review Wetlands Evaluation Total Site Area 3,392 acres Wetlands/Buffers FEMA Floodplains Combined Wetlands/Floodplains* Net Developable Area 770 1,279 acres 483 acres 1,005 1,521 acres 1,871 2,387 acres *Combined area accounts for overlap of wetland and floodplain features which occupy much of the same geographic space

Water Public Facilities Assessment Supply/Treatment Plenty of capacity Protect prime acreage Water Distribution Some off-site upgrades my be required Water storage required on-site On-site distribution infrastructure required

Wastewater Public Facilities Assessment Treatment/Disposal System currently has capacity County is has planned for future capacity Additional capacity will be required Collection On-site collection system infrastructure required

Stormwater Public Facilities Assessment + 240 acres required for treatment/attenuation Utilities Coordination with area Utility Providers will verify development demand

Public Facilities Assessment Developable Acreage Total Site Area 3,392 acres Wetlands/Buffers FEMA Floodplains Combined Wetlands/Floodplains* Net Developable Acreage Road rights-of-way/utility Easements (10% of Net Developable Acreage) Stormwater (10% of Net Developable Acreage) Total Developable Area 770 1,279 acres 483 acres 1,005 1,521 acres 1,871 2,387 acres 187 239 acres 187 239 acres 1,497 1,909 acres

Public Facilities Assessment Land Use Types and Densities Land Use Yield Area (acres) Residential (Low Density-2units/acre) 1,500 units 750 Residential (Medium Density-8 units/acre) 1,200 units 150 Residential (High Density-15 units/acre) 300 units 20 Retail (10k sf/acre) 500,000 sf 50 Office (12k sf/acre) 300,000 sf 25 Industrial (10k sf/acre) 1,000,000 sf 100 Total 1,095

Public Facilities Assessment Transportation Network Roadways Overall good connectivity Aviation Exceptional resource with 5,000 ft. runway Railroad Active line (C&A) Access to/from Port operations in Hampton Roads

Public Facilities Assessment Transportation Considerations Aviation Continued implementation of Airport Layout Plan Update Railroad Keep idea of rail access as an option for opportunity site Multi-modal considerations Transportation Demand Strategies (TDM) Bike and Pedestrian Accommodations Roadways Anticipated increase in traffic volumes on network Will require additional capacity and safety enhancements Continued coordination with NCDOT

Public Facilities Assessment

Public Facilities Assessment Transportation Considerations

Conclusions and Recommendations Market Considerations Create a vision for the Mega-Site through master planning Ensure flexibility Protect prime acreage Diversify residential product Establish branding and market the site Determine level of public participation Policy incentives Financial incentives Offer shovel-ready sites based on master land use plan PERSISTENCE AND PATIENCE IS KEY

Conclusions and Recommendations Water Prepare a Master Water Distribution System Plan for the site upon adoption of a Moyock Mega-Site Master Land Use Plan Evaluate the adequacy of the existing water infrastructure near the site, specifically the water main near/along NC-168, and determine if upgrades or additional infrastructure is required Wastewater Revise the Moyock Sewer District boundary and subsequent sewer district planning boundary to encompass the Moyock Mega-Site Acquire additional land near the Moyock Regional Wastewater Treatment Plant to allow for future expansion beyond what is currently planned Prepare a Master Wastewater Collection System Plan for the site

Conclusions and Recommendations Stormwater Integrate expected stormwater management measures into the Master Land Use Plan Integrate the existing sand mines into the Master Land Use Plan to the extent possible and if feasible given the time remaining on the sand mining operations Upon adoption of a Master Land Use Plan for the Mega-Site, evaluate the adequacy of the existing downstream drainage infrastructure and determine if upgrades or additional infrastructure is required Utilities Share the Master Land Use Plan with the private utility service providers and confirm their ability to serve the site given the proposed land uses and potential demand

Conclusions and Recommendations Transportation Infrastructure Develop a Transportation Corridor Overlay District for NC-168 Establish a Mega-Site main entrance to/from NC-168 Establish a Mega-Site main entrance to/from South Mills Road Improve South Mills Road from a two-lane undivided facility to a four-lane divided facility The County should continue to enhance safety, services, and accommodations at the airport as outlined in the Airport Layout Plan Update. Rail location will influence land bay layout as well as location of certain types of land uses in proximity to one another Coordinate with rail access providers early

Conclusions and Recommendations Transportation Infrastructure Alternative Transportation Demand Management (TDM) strategies should be considered to mitigate traffic congestion: Public Transit: Express or Bus Rapid Transit services between regional activity/employment centers Park and Ride incentives Carpooling: two or more people traveling in a car Vanpooling: eight to 15 people traveling in a van Bicycle and pedestrian accommodations that enhance local mobility With the development of the Moyock Mega-Site Master Plan, consider a Complete Streets policy for the roadway network

Master Planning Next Steps Program around Market Feasibility Demand (ex. 750 ac = 1,500 lots) Develop a constraints map with buildable area Convert demand to acreage by product type Study where product types want to be on site based upon need for access, visibility, and adjacency to compatible land uses

Next Steps

Next Steps

Next Steps Transportation Framework Site Access Street Hierarchy Use road network to set up development parcels Plan for Stormwater Amenities and Utility Corridors Phasing Strategies

Next Steps Market demand and timing natural order to development Infrastructure costs - capital projects versus developer funded Build in Flexibility Plan for Catalyst Projects opportunity sites

Thank You