Construction of Treet - How and Why

Similar documents
Mjøstårnet Construction of an 81 m tall timber building. Rune Abrahamsen, CEO, Moelven Limtre AS

Some Structural Design Issues of the 14-Storey Timber Framed Building Treet in Norway

Mjøstårnet - Construction of an 81 m tall timber building

Mjøstårnet - 18 storey timber building completed

Cross Laminated Timber (CLT)

Value Benefits of Modular Construction in Building Extensions

Modular element system in high-rise wooden buildings: challenges, advantages and perspective

Building Systems by Stora Enso. 3 8 Storey Modular Element Buildings

The Building Standard Law of Japan

INTRODUCTION DESIGN AND CONSTRUCTION RESEARCH & DEVELOPMENT MARKETING AND PERSPECTIVES CONCLUSIONS

CLT solid wood panels*

FINNFOREST GLULAM INDIVIDUALLY DESIGNED WOOD SOLUTIONS

INFLUENCES OF ADVANCED COMPOSITE MATERIALS ON STRUCTURAL CONCEPTS FOR BRIDGES AND BUILDINGS. Introduction. Bridges

Elite Garments Ind. Ltd.

WOOD USE IN NONCOMBUSTIBLE BUILDINGS

Renovation of Buildings using Steel Technologies (ROBUST)

Eindhoven University of Technology MASTER. Tall timber buildings. de Jong, R.L. Award date: Link to publication

Timber-based hybrid structures: why? Roberto Crocetti Novana AB

CANADIAN DESIGN GUIDE TO TALL WOOD BUILDINGS

The Tallest Wood Building in the World UBC Brock Commons Student Residence Base 3D Model to Product Delivery

A Canadian research network to increase the use of wood in multi storey buildings (NEWBuildS)

Steel reinforced timber structures for multi storey buildings

Modular System Advantages

Building Design Data

Development of High Performance Structural Timver Systems for Non Residential Buildings in New Zealand and Australia

Newton Group CANADACAR SYSTEM. Basic Construction of the CANADACAR System. CANADACAR Module Format

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

Simplified Building Schematic for Typical Floor (Levels 9 through 22):

ArcelorMittal Europe - Long Products Sections and Merchant Bars. Office Building ArcelorMittal in Esch Alzette

Introduction. This Part One will address; Type 1 Fire Resistive and Type 2 Noncombustible buildings.

CLT Structural Design Sylvain Gagnon, Eng. February 8, 2011 Vancouver

CHAPTER 6 TYPES OF CONSTRUCTION

S p a c e e l e v a t o r. Structure selection and design Prof Schierle 1

Timber Grows Up Architects and engineers, drawn to wood for its environmental attributes, push the material to new limits. By Joann Gonchar, AIA

Copyright Materials. Learning Objectives. Design is in the Details: Solutions to Common to Mid Rise Design. Challenges

Shaft Wall Solutions for Wood-Frame Structures. Ricky McLain, PE, SE WoodWorks Wood Products Council Boston & Waltham Workshops, December 6 & 7, 2017

Container City I & II Trinity Bouy Wharf London England

ADVANCED TIMBER STRUCTURES

Analysis and experimental studies of building glass facade

Building bridges - from Scandinavia to the USA

Timber Building in the City of Tomorrow

Framing Methods Structural Components

Statement of Special Inspections

Innovation Construction CIC: B2B Event on MiC

Building Knowledge: Research Highlights

Plywood on Steroids: Exploring Potential Building Code Amendments to Enable 6 Storey Mid-rise Wood-Frame Buildings

Modular Wood Framing Goes Vertical

Industrialized building systems

Updated references to SEI/ASCE 7 to the 2016 edition once it is available.

Office Building-G. Thesis Proposal. Carl Hubben. Structural Option. Advisor: Dr. Ali Memari

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL CASES WHERE THE CE MARKING IS NOT POSSIBLE ON THE BASIS OF EN

Connections between CLT elements and future challenges for CLT in practice

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle

Sabah Shawkat Cabinet of Structural Engineering 2017

Experimental investigation of cable-stayed timber bridge

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3%

Shaft Wall Solutions for Wood-Frame Structures. Ricky McLain, PE, SE WoodWorks Wood Products Council Charlotte WSF, November 2, 2017

Sound insulation of newly-built residential housing stock of Estonia

Stadthaus, 24 Murray Grove, London Eight storeys of apartments featuring cross-laminated timber panels

Norwegian Timber Bridges Ulrich Hundhausen

STANDARD DETAILS. v2018.1ct. Better Partners. Better Products. Better Outcomes.

HEAVY STEEL CONSTRUCTION

Less is more optimized ribbed CLTs the future

Building Enclosures for 5&6 Storey Mid-rise Buildings Lessons Learned & Best Practices

Volumetric CLT housing Early volymetric module buildings :

SECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents.

Tall wood buildings!

Timber bridges in Scandinavia

Short report about 6 to 9-storey timber buildings in Switzerland and Italy

New Main Hospital, Site Park, and Underground Garage Construction Progress Update #16

3.4.2 DESIGN CONSIDERATIONS

6/4/2013. Fire Resistance Considerations - Prof Andy Buchanan & Andrew Dunn. Building Regulations

BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS

The HKIE Structural Examination Written Examination 2016

The HKIE Structural Examination Written Examination

WoodWisdom-Net Seminar Edinburgh 4-5 April 2017 HCLTP Hybrid Cross Laminated Timber Plates

Learning Objectives. Copyright Materials. Timber over non-combustible Podium Structures. High Performance and Low Cost.

Exterior Wall Solutions Building Shell

Statement of Special Inspections 2013 CBC

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

By: DX Arquitectos + DEL SANTE Arquitectos

Code Compliance and Product Selection

General Building Information

Multiboard Australia is committed to leading the way in setting new standards with cutting edge technology within construction, building and design.

2018 IBC Chapter 6 Types of Construction

Analysis of a Multi-Tower Frame Structure connected at different levels using ETABS

Building elements. Guideline for SINTEF Technical Approval

Panel System. Industrial Wood Construction Puu Atsushi Takano

Thesis Proposal. Matthew R Peyton

SENIOR THESIS PROPOSAL STRUCTURAL REDESIGN USING STEEL FRAMING

New Innovative Wood Products Challenges and Opportunities

Multi-storey buildings

SECTION COLD-FORMED METAL FRAMING

9/24/2015. Aalto! / ENG + ARC. Asuinrakennusten rakenneratkaisut. Requirements : Sound insulation requirements : Thermal insulation requirements :

MULTI-STOREY RESIDENTIAL BUILDINGS IN CLT INTERDISCIPLINARY PRINCIPLES OF DESIGN AND CONSTRUCTION

Structural Timber Systems

Application of Modular Construction in High-Rise Buildings

Building Envelope

Interior FRT Wood. References of Previous Model Building Codes

STRUCTURAL DESIGN OF REINFORCED AND PRESTRESSED CONCRETE MEMBERS

Transcription:

BOB HISTORY AND MISSION BOB IS A CORPORATE HOUSING ASSOCIATION - Founded in 1941-65.000 members - Real Estate Management of more than 23.000 apartments - 80 employees Construction of Treet - How and Why BOB HAVE CLEAR GOALS - BOB shall take a leading role in urban development, focusing on energy efficiency, sustainability and outdoor environment Vancouver, 2016-01-22 Ole Herbrand Kleppe. Project chief. BOB. Bergen, Norway Rune Abrahamsen. CEO. Moelven Industries, Moelv, Norway Where is Bergen? 2016 International Wood Symposium. 3 Vancouver 1

THE TREE WHY????? 5 terje.gilje@bob.no - styresamling okt 2011 12.02.2016 THE TREE TIME SCHEDULE THE TREE - Masterplan started in 2005 - The idea of a timber building launched in 2007 (12 storeys) - Masterplan approved in 2009 - Design engineering started in 2010 - Detailed engineering startet in 2012 - Building permit given in 2013 - Ground and concrete works started early May 2014 - Residents moved in December 2015 Project goals - Sustainable, cost efficient urban high rise wooden house - Industrial process - Prefabrication - Lets make LEGO! 2

Prefabrication. Quicker installation - To reduce work on site and reduce building time, we wanted to prefabricate as much as possible. Timber frame modules Moelven Industries Each modular apartment complies with the passive house standard. Double walls and floors = super acoustics 96 m roof span Moelven Industries Moelven Industries What is Moelven, in a nutshell? Moelven is an enterprise that for more than 100 years has supplied wood-based products and services through honest work, in a responsible and timely manner. Moelven produces at 50 locations in north Europe and employs 3,400 people. Moelven is at the forefront, uses opportunities and will without a doubt exist for another 100 years. At least. Timber, production Offices Wood, production Offices Glulam, production Offices Building modules, production Offices Furnishing, production Offices Electro Offices 3

CONCEPT PHASE IN 2010 CHOSEN CONCEPT Timber bridges 2005 Kjøllsæterbrua, Rena. 156 m long. 5 spans. Designed for heavy military traffic. Continuous timber truss. World s strongest timber bridge Steien bridge. Being constructed now Road bridge. 89 m span. Network arch bridge 4

Inspiration from timber bridges - Technology developed for timber bridges over the last decades opens many doors. - The experience gained from bridges can be used for tall buildings - Treet - Inspiration from timber bridges = Innovative structural system - 550 m 3 glulam made of Norway spruce - 385 m 3 CLT produced by the German manufacturer Merk - The building stands on top of a concrete garage piled to the bedrock - Light weight building > tension anchorages. - Drawn in Revit. 3D. BIM CLT in the building Dimension 120mm 200mm Element widths up to 3 m Length up to 20 m 365 m3 Norway spruce 2016 International Wood 19 Symposium. Vancouver 5

CLT in the building What is a tall timber building? - WCTE 2016 in Vienna: Mini-symposium on tall timber buildings - We will only include buildings with a timber lateral load resisting system (not those with concrete shear cores or steel towers)» - The Treet project complies with this - A building where the majority of structural building components is made of wood is a timber building, I would say 2016 International Wood 22 Symposium. Vancouver Building modules Modules are stacked up to four levels high, and are only connected to the main structure in the lowest module in each stack Single level modules in the power storeys Unique structural system - Calculated using the software Robot - Glulam carries all vertical and horizontal loads - 71 mm max horizontal deflection (Level 14) - CLT is used in the staircases, elevator shaft (15 st.), some inner walls and balconies, but is not structurally connected to the glulam - Prefabricated timber frame building modules are stacked inside the cabinet rack 2016 International Wood 24 Symposium. Vancouver 6

Concrete slabs Prefab. concrete slabs on top of levels 5, 10 and 13./14. have several functions: - Foundation for modules - Adds mass to the structure which improves the dynamic behavior - Temporary roof during construction Block glued glulam - Large glulam sections are block glued - Typical column: 405x650 and 495x495 mm - Typical diagonal 405x405 mm. - Glulam quality GL 30c and GL 30h according to EN 14080 - We could have made these slabs of wood. That would not have been smart 2016 International Wood 25 Symposium. Vancouver 2016 International Wood 26 Symposium. Vancouver Built 1150 Durability 67.3 m tall Built 1052 Maintenance and exposure of wood - To limit the need for maintenance a permanent weather protection system was chosen. - The north and south façades are glassed in to protect the timber structure - The east and south façades have metal cladding - In this way the timber can be regarded as protected 2016 International Wood 27 Symposium. Vancouver 7

Maintenance and exposure of wood Typical plan - To limit the need for maintenance a permanent weather protection system was chosen. - The north and south façades are glassed in to protect the timber structure - The east and south façades have metal cladding - In this way the timber can be regarded as protected 2016 International Wood Symposium. 30 Vancouver Structural fire design - Timber is not preaccepted for highrises in Norway. However, Norwegian regulations open up for alternate materials as long as required documentation is produced FIRE CONCEPT - Structural fire design of timber was done according to the Eurocode 1995-1-2. Reduced cross-section method. - Timber can burn. In this project the glulam is so thick that we allow it to burn for 90 minutes without failing. No extra gypsum is used on the glulam. Modules are also R90. - Calculations show that a fire within an apartment will self-extinct before the fire can spread - All steel connections are hidden inside the timber. In this way it will not fail within the required fire resistance time - In addition there are sprinklers, pressurized escape stairs, fire elevator and painted surfaces to improve fire safety 8

Fire protection of connection slots Seismic design - The light weight building system can handle seismic loading quite well - The bottom stack of modules is designed for a moderate seismic load - The main building is not designed for seismic effects - The local ground acceleration is small 2.5mm intumescent strip - Intumex L Expands 20 times at 150 degrees Celsius Serviceability Lack of information on dynamic values. Testing was needed! Norwegian University of Science and Technology, NTNU, performed the tests. The Estonian company Kodumaja provided modules. Non destructive testing of similar modules. Impact hammer and accelerometers. Summary of findings, accelerations Values found from testing was used in the design Residents in the top floors might in rare cases feel vibrations, but it is very unlikely that they will become uncomfortable. The chosen structural solution for "The tree" using glulam truss works and stacked prefabricated building modules gives a robust design and most probably insignificant effects from vibrations caused by wind exposure. The building will be monitored in the future to find actual accelerations and damping values. These experiences will be shared Storm in late December. No reports of people feeling uncomfortable 9

ASSEMBLY PROCEDURE THE TREE 2 LASTEBÅT MODULER 9 8 7 6 = 1-4 3 4 5 =1-4 1 FACTS - 62 apartments - 5.830 m2 (net area) - 14 storeys high (15 with basement) - 52,8 meters high (from the sea side) - Elevator shaft in CLT 15 storeys high 10

11

12

THE TREE ECO FACTS - Treet is storing 2.000 tonns of CO 2 - Passive house (low energy demands for heating) - Shared electrical car - Only 25 parkingplaces for 62 apartments 13

THE TREE THE TREE Major challenges Tolerances - Climate in Bergen - Logistics - 25 mm between modules and glulam - Deviations during construction can not occur - GeoSurvey measured all installations - Moelven preassembled all frames in factory - Shrinkage of modules after installation Time-lapse from construction http://www.sweco.no/no/norway/nyheter/2014/webcam_treet/ Thanks for the attention so far. Let s have lunch! 2016 International Wood Symposium. 55 Vancouver 2016 International Wood Symposium. 56 Vancouver 14