The table below summarized the currently estimated total cost for the project.

Similar documents
AECOM (805) tel 1220 Avenida Acaso (805) fax Camarillo, CA 93012

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged.

LJA Engineering, Inc.

Forsyth County Procurement

1.00 LS $150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150,000.

Engineer s Report Drainage District #93 Main Tile Improvements Wright County, Iowa MEC Figure 1: Wright County Drainage District #93

SUWANNEE RIVER WATER MANAGEMENT DISTRICT INVITATION TO BID NO. 17/ AE POT SPRINGS RESTORATION PROJECT. Addendum #1 October 11, 2018

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/16 HIGHWAY: COUNTY: 05/03/2012 ESTIMATE PAID: AWARD DATE: 05/31/2012 ESTIMATE PERIOD:

EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02

Taxiways P and P7 Drainage Improvements Re-bid CONTRACT NO ADDENDUM NUMBER ONE

SITE PLAN FOR THE HURRICANE ISLAND REACH DREDGED MATERIAL MANAGEMENT PLAN WITH INTEGRATED ENVIRONMENTAL ASSESSMENT

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT

SITE PLAN FOR THE HURRICANE ISLAND REACH DREDGED MATERIAL MANAGEMENT PLAN WITH INTEGRATED ENVIRONMENTAL ASSESSMENT


Specification No. FC 6-126

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S

ADDENDUM 1. Request for Proposals City of Minot, North Dakota Structure Demolition and Site Restoration Project, # Round 3.

Bethel Bank Stabilization

COST ESTIMATE STREET IMPROVEMENTS (Off Site)

C I T Y O F S A N A N G E L O

ADDENDUM NO. 1 APRIL 24, 2017

ADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013

Exhibit "A" Romoland/Homeland MDP Utility Relocations Project PROJECT COST ESTIMATE


Stonegate at Rush Creek Project No Change Order No.1

10:00 AM, Wednesday, April 8, 2015

Timber Sale Appraisal More Cow Bell Sale FG W

UPPER REPUBLICAN NRD ROCK CREEK Drop Structure #1 DUNDY COUNTY, nebraska

Mainelli Wagner & Associates, Inc.

ENGINEER S REPORT MAIN TILE IMPROVEMENTS DRAINAGE DISTRICT NO. 131 WRIGHT COUNTY

LINTZ FARM BURT COUNTY

Project Planning and Development Process

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

Today s Date: April 15, 2015 Bid Opening Date: April 22, 2015

Replace BID SCHEDULE with attached revised BID SCHEDULE.

5th ELEMENTARY SCHOOL SITE PREPARATION PROJECT NUMBER: 9833 COLLEGE COMMUNITY SCHOOL DISTRICT CEDAR RAPIDS, IOWA

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

Information for File # TAW

SECTION May 17, 2013 PROPOSAL/BID FORM ADDENDUM No.1

Oatka Creek Stream Stabilization and Habitat Restoration Project Narrative

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

BID FORM (LUMP SUM CONTRACT)

Date: Monday, March 7, Honorable Mayor and City Council. Lee Glaesemann, Staff Engineer

Jacobi, Toombs, and Lanz, Inc.

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

BID FORM. TxDOT CSJ No. 1507JNCTN. Project Description: T-Hangar Development Project. Bid by: Name of Bidder. Address: Address:

PRE-BID CONFERENCE AGENDA. Lime Sludge Drying Beds Maintenance. for Lewis & Clark Regional Water System, Inc. Tea, South Dakota

Parks and Open Space 5201 St. Vrain Road Longmont, Colorado Fax:

TRACTOR ROAD IMPROVEMENTS HIGHLANDS COUNTY

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co

TRENCHLESS CULVERT REHAB-2017

GRADING GUIDELINES. Kern County Engineering, Surveying & Permit Services Department Floodplain Management Section January 1, 2011

Appendix D - Evaluation of Interim Solutions

TABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (1 OF 2)

ADDENDUM NUMBER ONE (1) December 6, The following Addendum shall be incorporated into the Contract Documents for the above referenced project.

November 29, CITY OF PLANT CITY Purchasing Division (813)

City of Grand Island

BASE BID FORM FY 2015

Department of Transportation Mitchell Region Office

County of Georgetown, South Carolina

761, , ,

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form

ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS. All Plan Holders and Prospective Bidders

JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS

Attached please find the revised Plan Sheet C3 Proposed Conditions Plan.

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505)

**BID OPENING DATE CHANGE Bid Open Date: Thursday, March 29, 2018 at 11:00 AM

MILL CREEK LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #

HERNANDO COUNTY BOARD OF COUNTY COMMISSIONERS DEPARTMENT OF PUBLIC WORKS ENGINEERING SERVICES

ARLINGTON COUNTY, VIRGINIA

ADDENDUM 3 Contractor Questions Essex County Courthouse Square Drainage Improvements IFB Responses Issued March 30, 2016

EATON COUNTY DRAIN COMMISSIONER BURNS DRAIN

Alydsko pip eline. MPR1Ik SPCO March 6, 2014 LetterNo

Project Status Update

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1,

College Station, TX. Legislation Details (With Text)

LEVEE DEFICIENCY CORRECTION PROCEDURES

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

DRAINAGE PLAN AND REPORT OLD DENVER ROAD

BOARD AGENDA FACT SHEET

NOTICE TO BIDDERS ADDENDUM NO. 2

REPORT TO MAYOR AND COUNCIL

SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO.

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. November 15, 2018.

Monitoring Report SD-7: Environmental Stewardship

A new Proposal Form is being issued with this Addendum, the following is an explanation of the changes, disregard originally issued form.

COACHELLA VALLEY WATER DISTRICT GUIDELINE K-2 SLOPE (BANK) PROTECTION DESIGN GUIDANCE

BAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

Section C-111 ADVERTISEMENT FOR BIDS WINSTON-SALEM/FORSYTH COUNTY UTILITY COMMISSION IDOLS ROAD REGIONAL LIFT STATION

Mainelli Wagner & Associates, Inc.

Old Mill School Stream Restoration

SECTION BID FORM. Garfield Street Drainage Improvements

Minnesota EAW Supplement

Bruce Powers, Park Analyst / Project Manager Parks & Recreation Department

TRANSPORTATION INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL

ITEM DESCRIPTION EST. QUANT. UNIT UNIT PRICE P

LOS ANGELES RIVER 7 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

Your cooperation in this matter is greatly appreciated. If you have any questions or need further assistance you may contact:

Transcription:

MEMORANDUM TO: FROM: SUBJECT: Programs, Projects, and Operations Subcommittee Eric Williams, Natural Resources Planner Bids for Elkhorn River 240 th Street Bank Stabilization Project DATE: January 7, 2016 Following the 2010 Elkhorn River flood, the Papio-Missouri River NRD and Sarpy County cooperated through an Interlocal Agreement on stream bank stabilization work along the Elkhorn River in order to prevent a portion of 240th Street from being threatened and/or lost to foreseeable and continued Elkhorn River Bank Erosion. This project is generally located along the Elkhorn River southwest of 240th Street and Harrison Street (see attached map). Construction will include a pilot channel to re-align a sharp bend in the river at this location, along with bank stabilization measures to help establish and maintain the new channel. On December 30, 2015, bids were opened for the construction of the Elkhorn River 240 th Street Bank Stabilization Project. The bid tab and recommendation letter from FYRA Engineering are attached. Nine bids were received and including the bid alternative for additional rip rap projection, ranged from $399,625.90 to $1,080,864.50. Niewohner Construction from Onawa, IA was the low bidder. The engineers estimate for the construction of this project was $626,844. FYRA has verified the unit prices in the bid, reviewed the work history for the contractor to confirm they are able to construct the project according to specifications. The work is anticipated to begin in mid to late January, with construction completed in the spring 2016. The table below summarized the currently estimated total cost for the project. Cost NRD Sarpy County Design $ 256,276 Land Rights $ 199,065 Construction $ 399,625 Total $ 854,966 $ 427,483 $ 427,483 The Interlocal Agreement between the District and Sarpy County specifies that the total cost of approximately $ 855,000 be shared evenly between the two parties, thus about $ 427,500 each. This is well below the $ 650,000 maximum provided in the Agreement. It is recommended that the Subcommittee recommend to the Board that, upon the acquisition of necessary rights-of-way, the General Manager be authorized to execute a contract with Niewohner Construction for construction of the Elkhorn River 240 th Street Bank Stabilization Project for the total bid amount, including the alternate, of $399,625.90, subject to changes deemed necessary by the General Manager and approval as to form by District Legal Counsel.

Agenda Item: 9.a. NORTH SCALE 0 200' 400' ENGINEER'S SEAL PARCEL LINE (TYPICAL) ACCESS ROUTE DATE ROCK WINDROW BANK PROTECTION BY BURIED TREE REVETMENT BANK PROTECTION (TYPICAL) BURIED ROCK BANK PROTECTION (TYPICAL) REVISIONS ANTICIPATED FUTURE RIVER BED ANTICIPATED FUTURE RIVER BED LIMITS OF CONSTRUCTION DESIGNED BY: DRAWN BY: CHECKED BY: QA / QC BY: PROJECT NO.: DATE: SHEET NO. 2014 SARPY COUNTY, NEBRASKA S 252ND ST 450' WIDE CHANNEL DESIGN CONCEPT S 240TH ST PILOT CHANNEL EXCAVATION PAPIO-MISSOURI RIVER NATURAL RESOURCES DISTRICT ELKHORN RIVER 240TH STREET BANK STABILIZATION NO. ROCK WINDROW BANK PROTECTION SEM DEJ SEM MKS 001-12-02 06.19.2014

December 31, 2015 Eric Williams Papio-Missouri River NRD 8901 S. 154 th Street Omaha, NE 68138 Re: Elkhorn River Bank Stabilization Project Dear Eric: The bid opening for the above-referenced project was held at the P-MRNRD on December 30, 2015. Nine bids were received for the project and all were found to be responsive. The results of the bids are attached to this letter in the form of a bid tabulation sheet. The low bid of $399,625.90 included the bid alternate for additional riprap protection and was received from Niewohner Construction of Onawa, IA and was significantly below the engineer s estimate of $626,844. After a review of the bids, the unit prices appear to be reasonable. Niewohner Construction has a solid reputation and has successfully done work for the P-MRNRD in the past. They are ready to get working immediately and have an aggressive schedule planned to complete the work this winter, ahead of the required completion dates. Given the above, my recommendation is to award the project to Niewohner Construction and begin the contracting process upon Board approval. Please feel free to contact me if you have any questions. Sincerely, Michael K. Sotak, P.E. 3925 S. 147 th Street, Suite 117 Omaha, NE 68144 Tel: 402.502.7131 Fax: 402.932.6940 www.fyraengineering.com

Elkhorn River 240th Street Bank Stabilization Project Niewohner Construction McArdle Grading Valley Corp GENERAL BID ITEM DESCRIPTION: QUANTITY UNIT UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION MOBILIZATION/GENERAL 1 LS $10,000.00 $10,000.00 $72,000.00 $72,000.00 $20,311.85 $20,311.85 COMMON EXCAVATION 59,391 CY $1.90 $112,842.90 $4.50 $267,259.50 $2.67 $158,573.97 FILL FOR ACCESS ROUTE EMBANKMENT 823 CY $6.00 $4,938.00 $10.00 $8,230.00 $4.19 $3,448.37 TOTAL CLASS B RIPRAP 3,973 TN $43.00 $170,839.00 $85.00 $337,705.00 $52.49 $208,542.77 CLASS C ROCK RIPRAP 300 TN $45.00 $13,500.00 $75.00 $22,500.00 $52.49 $15,747.00 TREE REVETMENT 20 EA $350.00 $7,000.00 $2,450.00 $49,000.00 $3,604.47 $72,089.40 CLEARING AND GRUBBING 26 AC $1,200.00 $31,200.00 $8,000.00 $208,000.00 $4,719.17 $122,698.42 SEEDING - COVER CROP 23 AC $150.00 $3,450.00 $750.00 $17,250.00 $820.30 $18,866.90 WILLOW STAKING 200 EA $5.00 $1,000.00 $20.00 $4,000.00 $19.23 $3,846.00 24" DIA CLASS III RCP AND FLARED END SECTION 80 LF $49.00 $3,920.00 $175.00 $14,000.00 $167.05 $13,364.00 BASE BID SUBTOTAL: $358,689.90 $999,944.50 $637,488.68 BID ALTERNATE BID ITEMS TO ADD TO BASE BID: QUANTITY UNIT UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION CLASS B ROCK RIPRAP 952 TN $43.00 $40,936.00 $85.00 $80,920.00 $50.45 $48,028.40 ALTERNATE BID SUBTOTAL: $40,936.00 $80,920.00 $48,028.40 TOTAL BID: $399,625.90 $1,080,864.50 $685,517.08 RECOMMENDATION

Elkhorn River 240th Street Bank Stabilization Project Sudbeck Homes Road Builders, Inc. Yost Excavating GENERAL BID ITEM DESCRIPTION: QUANTITY UNIT UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION MOBILIZATION/GENERAL 1 LS $8,950.00 $8,950.00 $52,000.00 $52,000.00 $22,500.00 $22,500.00 COMMON EXCAVATION 59,391 CY $0.95 $56,421.45 $3.00 $178,173.00 $2.45 $145,507.95 FILL FOR ACCESS ROUTE EMBANKMENT 823 CY $2.99 $2,460.77 $15.00 $12,345.00 $4.50 $3,703.50 TOTAL CLASS B RIPRAP 3,973 TN $45.05 $178,983.65 $60.00 $238,380.00 $37.15 $147,596.95 CLASS C ROCK RIPRAP 300 TN $51.13 $15,339.00 $60.00 $18,000.00 $37.15 $11,145.00 TREE REVETMENT 20 EA $1,376.36 $27,527.20 $4,900.00 $98,000.00 $1,500.00 $30,000.00 CLEARING AND GRUBBING 26 AC $5,203.68 $135,295.68 $4,300.00 $111,800.00 $1,250.00 $32,500.00 SEEDING - COVER CROP 23 AC $575.00 $13,225.00 $2,000.00 $46,000.00 $650.00 $14,950.00 WILLOW STAKING 200 EA $9.48 $1,896.00 $150.00 $30,000.00 $15.00 $3,000.00 24" DIA CLASS III RCP AND FLARED END SECTION 80 LF $57.77 $4,621.60 $100.00 $8,000.00 $78.00 $6,240.00 BASE BID SUBTOTAL: $444,720.35 $792,698.00 $417,143.40 BID ALTERNATE BID ITEMS TO ADD TO BASE BID: QUANTITY UNIT UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION CLASS B ROCK RIPRAP 952 TN $45.05 $42,887.60 n/a - $37.15 $35,366.80 ALTERNATE BID SUBTOTAL: $42,887.60 $0.00 $35,366.80 TOTAL BID: $487,607.95 $792,698.00 $452,510.20

Elkhorn River 240th Street Bank Stabilization Project Hendrickson Transportation Sibbernsen Excavating Bayshore Construction GENERAL BID ITEM DESCRIPTION: QUANTITY UNIT UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION MOBILIZATION/GENERAL 1 LS $51,700.00 $51,700.00 $37,000.00 $37,000.00 $21,000.00 $21,000.00 COMMON EXCAVATION 59,391 CY $3.00 $178,173.00 $2.35 $139,568.85 $3.50 $207,868.50 FILL FOR ACCESS ROUTE EMBANKMENT 823 CY $3.00 $2,469.00 $7.00 $5,761.00 $8.50 $6,995.50 TOTAL CLASS B RIPRAP 3,973 TN $50.00 $198,650.00 $46.00 $182,758.00 $53.50 $212,555.50 CLASS C ROCK RIPRAP 300 TN $55.00 $16,500.00 $46.00 $13,800.00 $53.50 $16,050.00 TREE REVETMENT 20 EA $1,500.00 $30,000.00 $2,000.00 $40,000.00 $1,350.00 $27,000.00 CLEARING AND GRUBBING 26 AC $5,000.00 $130,000.00 $4,000.00 $104,000.00 $1,800.00 $46,800.00 SEEDING - COVER CROP 23 AC $1,200.00 $27,600.00 $750.00 $17,250.00 $800.00 $18,400.00 WILLOW STAKING 200 EA $40.00 $8,000.00 $15.00 $3,000.00 $10.00 $2,000.00 24" DIA CLASS III RCP AND FLARED END SECTION 80 LF $62.50 $5,000.00 $125.00 $10,000.00 $85.00 $6,800.00 BASE BID SUBTOTAL: $648,092.00 $553,137.85 $565,469.50 BID ALTERNATE BID ITEMS TO ADD TO BASE BID: QUANTITY UNIT UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION CLASS B ROCK RIPRAP 952 TN $50.00 $47,600.00 $46.00 $43,792.00 $53.50 $50,932.00 ALTERNATE BID SUBTOTAL: $47,600.00 $43,792.00 $50,932.00 TOTAL BID: $695,692.00 $596,929.85 $616,401.50