Underground Coal Solutions

Similar documents
Open Cut Coal Solutions

Deswik.IS Interactive Scheduler

Deswik.Sched Gantt Chart Scheduling

Underground Metals Solutions

Deswik.OPS Operations scheduling & tracking

Deswik.MDM Mining Data Management

UNDERGROUND METALS MODULE SUMMARY VERSION 1.5

MODULE SUMMARY Open Pit Metals

3D Modelling & Mine Planning Software. Comprehensive tools provide a competitive advantage from exploration to rehabilitation.

MineScape Geological modeling, mine planning and design

THE FALL AND RISE DRAGLINES

Long Term Planning for Open Pit Mines

IMPACT OF IN-PIT CRUSHING AND CONVEYING ON PIT SHELL OPTIMIZATION. Marc Johnson, Regional Manager - South America

Version Comparison. Getting Started Project Planning. Feature Key:

Exploration and mine design. Intuitive Mining Solutions

GEOVIA GEMS Course Catalog Africa

MAINTENANCE AND SUPPORT

Oracle Enterprise Data Management Cloud

SIMUL8-PLANNER FOR COMPOSITES MANUFACTURING

Commodity XL Metals and Mining

SITE MASTER SCHEDULING:

ebecs Manufacturing Accelerator for Microsoft Dynamics

3. MINING SYSTEM AND RESOURCE RECOVERY

Global Transfer Agency Solutions for the Asset Management Industry

Mathcad : Optimize your design and engineering process.

Our Technology Partners

Software Engineering (CSC 4350/6350) Rao Casturi

increasing mining efficiency and productivity How innovative technology and industry experts advance operational excellence

Sage 200c Standard & Professional pre-release What s New. Partner briefing July 2017

ORACLE HYPERION PLANNING

Sage 200c Business Intelligence Datasheet

Efficiently Develop Powerful Apps for An Intelligent Enterprise

OneStream XF CPM 2.0: SmartCPM. An agile platform for financial insight and reporting

Gain visibility, control, and strategic advantage with next generation spend management.

UNDERGROUND MINE DESIGN AND SCHEDULING INFORMATION TECHNOLOGY IN MINE PLANNING

Integration and Infrastructure Software. Process Integration from IBM. Optimizing resources to improve productivity.

Mathcad : Optimize your design and engineering process.

Top coal caving. Tuesday 23rd October 2012: 11.45am. Chief Executive Officer. M GPO Box 358 Brisbane Qld 4001

CRU Phosphates Optimising processing costs through the assessment of geological and mining cut-off grades. Tim Lucks. Presenter: Location:

Helping you keep our pets healthy and active

SERVICES MINING PROJECTS

OPTIMIZING THE WORLD'S MOST COMPLEX MINING ASSETS FOR OVER 15 YEARS.

e7 Capacity Expansion Long-term resource planning for resource planners and portfolio managers

Spreadsheet Simulation. Development and Learning Benefits. MPS Interactive Systems Limited. All rights reserved.

Estimating and Reporting of

Highwall Mining. Extend Mine-able Reserves

Springfield Public Schools Civil Engineering and Architecture Major Instructional Goals Learner Objectives

Priority for MRP. Run MRP based on actual orders, forecasts or static requirements. Run MRP simulations until you re satisfied with the plans

Engineer to Order In Microsoft Dynamics NAV

WHITE PAPER RETHINKING THE PROCUREMENT VALUE EQUATION

INCREASING THE EFFICIENCY OF HORIZONTAL IN-SEAM DRAINAGE. Global Methane Forum, March 28-30, 2016

Innovative technology 35 years mining experience

QUARTERLY REPORT March 2011

Experience the commitment. CGI Exploration2Revenue TM Business Suite. Optimize your upstream back office

Introduction to SEND Assurance Tool

Capital Harness. The de facto software solution for the electrical wire harness industry

Release Notes. Datamine NPV Scheduler Products Version 4.26 Public Release

Underground Coal Gasification (UCG) - A Transformational Technology

How ERP Will Become the New System of Engagement

New generation of Operational Lease Management


QMASTOR Coal and Mineral Supply Chain Management

Competitive Advantage from Production and Supply Chain Excellence Satyendra Dubey, Honeywell

FURTHER GROWTH FOR BALAMARA WITH AWARD OF SIGNIFICANT NEW COAL CONCESSION AT MARIOLA

HYDRA Shop Floor Scheduling

Mastering Microsoft Project 2010

SOLUTIONS FOR SAP. Simplifying Pricing. Manage complex pricing with ease and efficiency.

For personal use only

THE FUTURE OF PROCESS HAS BEGUN

Selecting an FRx replacement

INTERNET OF THINGS WITH CUMULOCITY AND THE DIGITAL BUSINESS PLATFORM

TDWI Analytics Fundamentals. Course Outline. Module One: Concepts of Analytics

Underground Coal Gasification (UCG) - A Transformational Technology

Ventilation and Gas Extraction Techniques of High Gas Seams in Kazakhstan

Igloo. Financial modeling software for managing risk

Microsoft Dynamics 365 for Financials. CAPABILITIES GUIDE Fall 2016

Benefits. + + Consistent quality to recipe specification. + + Increase asset utilization and operational efficiency

OneStream XF CPM 2.0: SmartCPM. An agile platform for financial insight and reporting

Amberg Tunnel. Measuring gives you perspective. Why choose Amberg Tunnel surveying solutions?

Mining information systems and the importance of appropriate architectural designs as key enablers for MIS deployments

Company Info: Based in Stamford, CT, USA Thousands of users world wide Holds patent on API Wizard dynamic technology

Evident. measuring for success

Insights into the mechanics of multi-seam subsidence from Ashton underground mine

A New Way to Extract More Value from Your Production Supply Chain. with Production Accounting and Reconciliation (PAR)

Evaluation of Bench Height Selection for Limestone Resource Optimization A Case Study. N K Sharma, R Mazumder, D K Panda, A K Dubey

Bisan Enterprise. Governmental Edition. A New Dimension in Financial Management Applications

RETHINKING THE PROCUREMENT VALUE EQUATION

ALFABET 9.12 WHAT S NEW IN. With Alfabet 9.12 you can: Risk mitigation planning & management ALFABET

Strategic mine planning of surface mining projects incorporating sustainability concepts

Transforming the B2B contact center

From CAD to CEO with Autodesk and ARCHIBUS/FM

ZE believes that the only way to grow is to act honestly, with integrity, and with the customer s best interests in mind.

The Aspen Fidelis Reliability Difference: Minimize Risk, Maximize Profitability

OBJECTIVES & COURSE OUTLINE COM116 ADVANCED EXCEL REPORTING 17 - CPE HOURS COURSE OBJECTIVES

Furniture and Fixtures

Scale New Heights with an Intelligent Digital Core: The 1709 Release of SAP S/4HANA

Business Process Operations. SAP Solution Manager 7.2 SP3

The Integrator s Guide to Controller Replacement: Plan Your Strategy

BUILDING SURVEYING WE ARE ARE COMMITTED TO KEEPING THE BREADTH OF YOUR PORTFOLIO S ASSETS COMPLIANT AND SAFE FOR ALL OCCUPANTS AND PURPOSES.

Civil Engineering and Architecture TEKS/LINKS Student Objectives One Credit

Transcription:

Underground Coal Solutions

INTEGRATED PLANNING TOOLS FOR UNDERGROUND COAL OPERATIONS Strong technical solutions tailored to specialized industry needs Deswik has developed a fresh and innovative range of unique tools that span the value chain from receipt of a geological model through to reporting for costing. Our software incorporates design and scheduling features across the core platform and associated modules, including: Comprehensive core functionality for underground coal operations at both long and short-term planning horizons: - 3D mining reserve solids with integrated Gantt scheduling - Complex grid manipulation - Polygon zone interrogation - Detailed process management via Deswik workflows. Deswik.AdvUGC, with advanced underground coal tools such as: - Underground design toolbox for gridded roadway panels and longwalls - Easy reconciliation tools for compliance auditing - Advanced scheduling functions including backwards pass resource leveling, objective targeting and resource path importing. Deswik.Agg to aggregate complex seam and ply grids or solids into working sections, including Longwall Top Coal Caving (LTCC) horizons. Deswik.Blend to optimize complex blending and material flow from pit to product. Our integrated planning tools give our software the proven capability and reputation of taking a project from the design stage to a schedule faster than ever before.

A complete solution Providing the best framework for underground coal mine planning Design, reserve and schedule short, medium and long term. Accurately model and schedule in 3D LTCC, variable cut horizons, stone drivage, and all interactions with surface mining and infrastructure. Undertake economic analysis including cash margin ranking. Create a master site schedule and use critical path analysis tools on both production and outbye projects with Deswik.Sched. 3D Design environment Powerful automated design tools for rapid centreline layouts. Best-in-class solids creation for true 3D representation of development and longwall reserves. Geological data from any source Interrogate complex seam quality models, including multiple ply and seams, with ease. Work interchangeably with grid models, block models, implicit models and hybrids. Import grids and models from all major geological packages. Integrated scheduling Remove or minimize planning horizon interfaces by using a common platform for short, medium or long term scheduling. Convert design data directly into schedule tasks and easily update with design changes or survey updates. Gantt chart based scheduling is easy to work with and is more readily understood by all stakeholders. Superior reporting Simple and powerful reporting from both schedule and 3D environment improves communications and stakeholder buy-in. Save time communicating your plans with fast, professional plotting tools including full CAD-style annotation and presentation. Defined constraints Transfer surface constraints to the seam using polyline projections. Create longwall subsidence zones and project them onto the topography. Visually assess the true impact of seam faulting and dip in a 3D environment. Zone interrogation Create influence polygons around known seam structures and account for abutment zones with increasing support requirements. Generate effective hazard mapping with transferable effects on schedules. Resource-based rates Build machine production rates with easy-to-understand formula builders with de-rating factors for, structure and faulting, gas and water, seam dip and thickness. Use proximity de-rating for congruent resources, such as super-panelling. Scheduling constraints Create hammock tasks to stretch between moveable boundary tasks. Apply time variant fields to reduce scheduling rates over specific periods.

Deswik.AdvUGC Advanced functionality tailored to the specialized demands of underground coal operations Underground coal design toolbox Automates centreline creation for longwall panels and gridded roadways such as mains, gateroads and development panels. Generates the metadata required to process design lines into 3D reserve solids via the Deswik.IS. Auto development designer Uses rule-based processing to modify design lines for irregular and special development. Automates standard polyline manipulation tools as well as formula-based attribute assignment. Process tunnel as-builts Generate as-built solids from any combination of floor, roof or rib line survey pickups. Able to generate from a single rib pickup line using a nominated cut height and survey pickup height. Process CMS Import CMS polylines or triangles and stich them together to create a closed solid. Rapidly generate shells around CMS point cloud data. As-built reconciliation Detailed reporting of reconciliation between as-built and design solids from a 3D perspective. Calculate overbreak and underbreak incrementally against design centrelines. Advanced resource leveling Access to features such as backwards pass leveling, multi-field or sink rate targeting and time usage models. Short term manual scheduling via interactive resource paths or import resource paths from other packages. Margin calculator Wizard based calculation of Net Present Value and incremental, cumulative and maximum cumulative margins from reserve solids. Import, export and run multiple scenarios against defined costs and revenues as required. Calculate Stereonets Import strike azimuth and dip data to generate geotechnical Stereonets directly in the Deswik.CAD design space. Supports Schmidtt, Wulff, Rose and observation diagrams.

Deswik.Agg Simplifying complex aggregation processes to create fit for purpose Run-of-Mine (ROM) reserves Work with grids or solids to create mineable working sections at the block or deposit level. Auditable, rule-based approach delivers the flexibility to tailor aggregation settings to any deposit. Set rules for thickness, material type or quality and apply different loss and dilution factors (roof, floor or edge). Ensure mined horizons satisfy constraints by incorporating pre and post requisite testing. Manage and run multiple rule sets simultaneously for rapid scenario generation and comparison. Assess effect of equipment selection by defining multiple equipment types with different loss and dilution parameters. Transparent pivot-style reporting interface highlights factors influencing aggregated ROM tonnages between scenarios. Graphical side-by-side comparison shows the physical impact of different aggregation constraints. Generates final mined working section grids or solids with all calculated aggregation values. Auditable outputs are suitable for downstream planning processes such as margin ranking and production or dump scheduling. Deswik.Blend Optimize your product value with material flow modeling Material flow modeling and targeting that closes the planning gap between pit production and blended product. Blend production outputs from any mining complex, including both surface and underground feeds and multiple plants. Outputs are balanced across defined periods against the competing priorities of product quantity targets, product specifications and maximizing the value mix for multi-product scenarios. Integrated seamlessly within Deswik.Sched eliminating any manual transfer of data. A new dimension in underground coal mine planning

An Integrated Platform Dynamically link your mine designs and schedules Deswik.IS Interactive Scheduler Deswik.CAD Design & Solids Modeling Deswik.Sched Gantt Chart Scheduling Deswik.AdvUGC Advanced Underground Coal Our industry-leading consulting solutions include Mine Planning, Design and Scheduling Equipment Selection and Optimization Geological Services Technical Due Diligence, Peer Reviews and Audits Software Implementation Scoping, Pre-Feasibility and Feasibility Process Mapping and Improvement Mergers and Acquisitions Support www.deswik.com e: info@deswik.com