Silvan Dam and Revisions to Adapt for Latest Developments in High CFRD Design and Construction

Similar documents
NUMERICAL MODELING OF CONCRETE FACE ROCKFILL DAM AT SEISMIC IMPACT

Mitigation Measures Evaluation for Concrete Faced Rockfill Dams. Juan E. Quiroz Mehdi Modares REC Conference - IIT

Bayardo Materon Bayardo Materon & Associates, Sao Paulo, Brazil

CONSIDERATIONS ON THE SEISMIC DESIGN OF HIGH CONCRETE FACE ROCKFILL DAMS (CFRDs) Bayardo Materón - Gabriel Fernandez

Discussions on the Technical Issues of the Construction of 300m High CFRD. Xu Zeping. (China Institute of Water resources and Hydropower Research)

Characteristic study on seepage field of dam under cutoff wall construction defects and freeze in winter

Redi Rock Specification and Installation Manual

Earth Brickwork Concrete Plain Radial Drum Roller Flap. fixed. Weirs Barrages. mobile. rockfills. Gravity butress Arch Arch-gravuty Cupola.

DESIGN OF TEMPLETON OVERPASS FOR THE CANADA LINE. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng.,P.Eng., SNC-Lavain Inc.

6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, October 2012

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Important Role of Filters in Hydraulic Soil Structures Hamid Fallah Apr. 19, 2013

CHAPTER 8 SEEPAGE CONTROL IN EMBANKMENTS

Mechanical and Hydraulic Behavior of Cut off-core Connecting Systems in Earth Dams

CFRD 07 DESIGN CRITERIA AND CONSTRUCTION (TOPICS FOR DISCUSSION)

CURRICULUM VITAE. Born in Campina Grande, Paraiba- Brazil, on February 19, Public Profile:

REQUIREMENTS FOR CONCRETE MIX DESIGN

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Selection of Type of Dams and Reservoirs - Osamu Arai, Kyohei Baba,and Tosho Hirose

STUDY ON CEMENTED-ROCKFILL DAM

EARTHQUAKE SAFETY OF EXISTING DAMS

Grouting Bilfinger Spezialtiefbau GmbH

Q93 SAFETY. Gerald Zenz. Graz University of Technology Institute of Hydraulic Engineering and Water Resources Management

Coupled Stress-Seepage Numerical Design of Pressure Tunnels

SECTION CAST-IN-PLACE CONCRETE

CBC Aids WVDEP with Fresh Water Reservoir - Chief Logan State Park

Introduction to Masonry Materials and Assemblages

Abstract. 1. Main features of the Cua Dat scheme. Hong Giang VNCOLD. Hanoi Vietnam. the Northern Central The reservoir storage purposes: - water

GEOTECHNICAL ENGINEERING AND DAMS

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

Design and Build a Dam

Plastic concrete cutoff walls have been used for

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

ICBO Evaluation Service, Inc Workman Mill Road, Whittier, California

TUG - Institute of Hydraulic Engineering and Water Resources Management 1

Seepage Analysis through an Earth Dam (KHASA-CHAI Dam) as a Case Study

Management of Design and Construction for Civil Works under EPC contract in one Oversea Wind Farm Project

Guidelines for Design. High Concrete Face Rockfill Dam

NUMERICAL ANALYSIS AND INVESTIGATION OF PIPING IN AN EARTH DAM FOUNDATION BY SOFTWARE SEEP / W (CASE STUDY OF KERMANSHAH EZGELEH EARTH DAM)

Water Resources. Associate Prof. Ahmed Moustafa Moussa Lecture -1 Lecture 4

The Rio Grande project - Argentina

PAVEMENT INFORMATION NOTE. THE REASONS and EFFECT of CRACKING in LMC SUBBASES

REINFORCED CONCRETE MASONRY SECTION

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY

Anchorplex retaining wall construction guide

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS

INNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18)

Dam Safety and Low Cost Spillway Designs

Karkheh Storage Dam Cutoff Wall Analysis and Design

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems

Seismic Design and Safety Aspects of Bottom Outlets, Spillways and Intake Structures of Large Storage Dams

Nenskra dam is a 135 m high asphalt-core rockfill

Building. Anchorplex. Retaining Wall Systems

THE ASPHALT CORE EMBANKMENT DAM: A VERY COMPETITIVE ALTERNATIVE

Design of Izmir Bay Crossing Bridge

TENSILE STRESSES IN CONCRETE DAMS

Chapter 1. Introduction to Engineering Ground Modification. The Need for Engineered Ground Improvement

What s Gray, Gets Hard, and Holds Up Your Home?

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016

MONITORING AND DEFORMATION ASPECTS OF LARGE CONCRETE FACE ROCKFILL DAMS

Importance of tailings properties for closure

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE

DESIGN OF MONTESINHO DAM AND EMBANKMENT MONITORING DURING CONSTRUCTION

Keeyask Generation Project. Physical Environment. Supporting Volume. Environmental Impact Statement

DAMS AND OTHER HYDRAULIC STRUCTURES

Ground Improvement for Mitigation of Failure Risks to Existing Embankment Dams

Mangla Dam Raising: Effectiveness of Seepage Reduction Measures for Sukian Dyke

Wmega Retaining Wall Specification

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

Compaction and Jet Grouting

Revision Nalcor Doc. No. MFA-SN-CD-0000-GT-DC C1 Date Page SLI Doc. No EC Dec-2013 ii DESIGN CRITERIA - GEOTECHNICAL

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

Review on Seismic Design of Concrete Gravity or RCC Dams with Design Examples

A Brief History of Dams in Iraq. The Case of Mosul Dam Presented to Al-Diwan, April 10, 2016 by Mosaid Al-Hussaini, Ph.D, PE

In-plane testing of precast concrete wall panels with grouted sleeve

BELMURO WALL SYSTEM INSTALLATION GUIDE

Roller Compacted Concrete for M30

Technical Data Sheet NEC/GRAN/95:01

Use of sand drains for improving characteristics of loessail soil: a case study

Ministry of Forests, Lands and Natural Resource Operations

THE CONSTRUCTION PHASES OF THE NEW NAGA HAMMADI BARRAGE COFFERDAMS

Research on the Key Technology of Hinge Joint Diseases Treatment without Traffic Interruption for Plate Girder Bridge

The Study of Reservoir Immersion of a Hydropower Station

Krystol Internal Membrane (KIM ) Guidelines and Procedures - NZ

Modular Sediment Barriers (Instream)

Water Control Structures Selected Design Guidelines Alberta Environment Page 13-1

THE SUMMARY OF SAFETY MONITORING AND OPERATION ABOUT RCC GRAVITY DAM IN CHINA

Seismic Design and Performance Criteria for Large Storage Dams

LECTURE 35. Module 10 : Improvement of rock mass responses 10.4 UNDERGROUND SUPPORTS. Steel Arch support and steel ribs & laggings

ROAD AND RAILWAY CONSTRUCTION

freestone eco Prestige & quality DIY vertical wall Large blocks - 10/m 2 Smooth surface finish No concrete footings

LIGHT COMPACTION INTRODUCTION

TG 10c SOUTH AUSTRALIAN WATER CORPORATION

Material properties of Tailings from Swedish mines

MagnumStone Specifications Gravity

Transcription:

Silvan Dam and Revisions to Adapt for Latest Developments in High CFRD Design and Construction Ö. Özen, H. Küsmez, A. Akman Dam and Tunnel Projects Director, İLCİ Holding & TR COLD Member, Ankara, Turkey Division Director, Department of Dams and HEPPs, General Directorate of State Hydraulic Works, Ankara, Turkey Deputy General Director, ES Engineering and Consultancy Co. Ltd. & TR COLD Member, Ankara, Turkey ABSTRACT The concrete faced rockfill dam (CFRD) is one of the most popular and reliable dam type that has been constructed for the last 50 years, recently to heights well above 200 meters. Turkey, one of the leading countries in construction of rockfill dams and hydro potential development, has numerous successful examples of CFRD up to height of 150 meters. The success in the adaptation of CFRD dams is urging the dam owners to choose CFRD type for important projects in Turkey. Being the most important component of Silvan Irrigation Project, located in Diyarbakır-Turkey with an investment value of $ 3.50 billion and with an estimated annual income of $ 520 million, Silvan Dam will be one of the most assertive one of its type in the region with a height of 175.50 meters, dam body and reservoir volumes of 8.5 million m 3 and 7.3 billion m 3, respectively. After completion, the dam will provide most of the irrigation water for Silvan Irrigation Project which comprises of 8 dams, 242 000 meters of irrigation channel, 2 tunnels with a total length of 18 400 meters, 1 hydro power station and 21 pumping stations. Due to its importance, the Owner (State Hydraulic Works of Turkey), has decided to revise the dam body design before its construction with the participation of the Contractor and his Engineer by taking into consideration latest developments in CFRD design, construction and experience. This paper focuses on the steps taken for the enhancement of the 175.50 meter high CFRD dam s plinth and face slab design, dam zoning and parapet wall to minimize the leakage and other risks related to the safety of the dam. The advantages of the revised design are discussed by comparing with the previous design. Keywords: CFRD, Plinth, Face Slab, Rockfill 1. INTRODUCTION Located in Diyarbakır, Turkey, Silvan Project is one of the largest components of GAP (Southeastern Anatolian Project) and it is the last step to complete GAP. The project is comprised of 8 dams, 1 hydropower station, 242 000 meters of irrigation channel, 2 tunnels with a total length of 15 360 meters and 21 pumping stations. The investment value of the project is $ 3.50 billion with an annual income of $ 520.00 million. Silvan Dam, being the most important component of Silvan Project, will be one of the most assertive one of its type in the region with a height of 175.50 meters, dam body and reservoir volumes of 8.50 million m 3 and 7.30 billion m 3, respectively. After completion, the dam will provide most of the irrigation water for Silvan Irrigation project. Due to its importance, the Owner (State Hydraulic Works of Turkey), has decided to revise the dam body design before its construction with the participation of the Contractor and his Engineer by taking into consideration latest developments in CFRD design, construction and experience. 2. SILVAN DAM SCHEME AND GENERAL LAYOUT Silvan Dam is located in Silvan District of Diyarbakır, Turkey, 900 meters downstream of the junction of Kulp and Göderni creeks. It is the most important component of Silvan Project and the main purpose of the Dam is to provide water for irrigation; i.e., it will be the main source of water for Silvan Irrigation Project. The Dam location and the whole scheme layout is shown in Figure-1 (Özen, Üzücek and Dinçergök, 2014).

Hydropower'15 Silvan Stage 3 (581 km2) P5 Pumping (322 km2) Silvan Stage 2 (600 km2) Silvan Dam Babakaya Tunnel Silvan Stage 4 (381 km2) Silvan Stage 1 (60 km2) Channel Ambar Dam Main irrigation channel SİLVAN Silvan Tunnel Başlar Dam Pamukçay Dam Kuruçay Dam Bulaklıdere Dam Karacalar Dam Kıbrıs Dam Storage dams (401 km2) DSİ 10. BÖLGE MÜDÜRLÜĞÜ 1 Figure-1 General layout of Silvan Project The water for irrigation will be taken from the reservoir by Babakaya and Silvan Tunnels. Since the completion of the Silvan Irrigation Project is to be planned to be completed in 4 stages of 6 years, a power house is designed to make the project more feasible. Within completion of each stage, the conveyed water from the reservoir will be increased and the energy production from the powerhouse will decrease to 88.41 GWh from 681.00 GWh. The most significant component of Silvan Dam Scheme is the 175.50 m high concrete face rock fill dam with a dam body volume of 8.50 million m3 with a crest length of 440 meters. The dam body will create a reservoir of 7.30 billion m3. Construction of the Silvan Dam project has commenced in the late 2012 and scheduled for completion at the end of year 2017. The following figure shows the layout of the scheme. Figure-2 General layout of Silvan Dam

3. DESIGN AND DESIGN REVISIONS OF THE CFRD BODY 3.1. EMBANKMENT ZONING CFRD dam type is considered to be safe for most of the weak and strong rockfill materials. For CFRD design it is often assumed that the dam settlements will not exceed 1% of the compacted fill height where horizontal deformations are less than 50% of settlements (Straubaar, Gunsteren and Mall, 2011). For the embankment zoning of the CFRD 2D and 3D deformation and stability analyses are carried out and the ICOLD recommendations are followed. The previously designed embankment zoning has been slightly revised The final typical section shown in the following figure is determined after various analyses. Figure-3 Typical section of Silvan Dam The following table shows the materials planned to be used for the dam embankment construction. Table-1 Dam embankment materials Definition Zone Placing Compaction Transition zone between 2B and 3B. 3A Compacted in 0.40m layers 6 passes of 10t vibratory roller D max=400mm Rockfill zone. D max=600mm 3B Compacted in 0.90m layers 4 passes of 10t vibratory roller 25% of water Rockfill zone. D max=800mm 3C Compacted in 1.00m layers 4 passes of 10t vibratory roller 25% of water Rockfill protection zone. 3D Placed by mechanical - D max=1000mm equipment. Sand and gravel sized particles for 2B Compacted in 0.40m layers 6 passes of 10t vibratory roller support zone for the face slab. Filter zone of sand and gravel around 2A Compacted in 0.15m layers 4 passes of 10t vibratory roller perimeter joint. External sealing zone with Fine 1A Compacted in 0.20m layers 4 passes of 10t vibratory roller grained cohesionless silt with isolated gravel and cobbles sized rock particles to 150mm. Protection zone to zone 1A with mix of silts, clays, sands, gravels and cobbles. 1B Compacted in 0.30m layers 4 passes of 10t vibratory roller

3.2. PLINTH Main purpose of the plinth is to connect the face slab to the foundation and to provide a minimum hydraulic gradient. The dimensions of the plinth is determined based on the reservoir head and ground conditions. There are many formulations for the determination of the dimensions of the plinth. The plinth design of the Silvan Dam has been revised such that the amount of excavation is minimized. For this purpose an external plinth platform of 4 or 5 meters is selected and the rest of the plinth width is obtained by adapting an internal plinth. This method has been adopted for CFRD construction and it decreases the excavation amount and time, thus the construction costs. The following figure shows how the external plinth width effects the excavation amount, schematically. Figure-4 Effect of internal plinth on excavation amount The following table compares the previous and revised design criteria and gives the related justification for the revision. As can be inferred from the following table, the external plinth width has been decreased significantly which has caused the excavation amount and the consolidation grouting amount significantly. Table-2 Comparison of previous and revised plinth design criteria Previous design Revised Design Explanation Plinth thickness (m) t=0.3 + 0.003H t=0.4 + 0.0025H The owner has t: plinth thickness t: plinth thickness requested slightly H: Reservoir head (m) H: Reservoir head (m) increased plinth thickness for strength and constructability. Plinth width / Reservoir head 1/18 1/12 Detailed geotechnical investigations has proved that the ground is more erodible than the previous studies. Max-min plinth thickness (m) 0.40 ~ 0.80 0.50 ~ 0.85 The plinth thickness has increased due to revised plinth thickness formulation. Max-min plinth width (m) 5.85 ~ 10.95 (external 6.10 ~ 7.29 (external The internal plinth plinth) plinth) concept has been 4.50 ~ 9.60 plinth platform 4.00 5.00 plinth platform adapted to decrease 0 (internal plinth) 1.14 ~ 7.14 (internal plinth) the excavation amount. The following figure compares the previous plinth and revised plinth section, the details are not shown for ease of understanding.

Figure-5 (a) previously designed plinth main dimensions (b) revised plinth main dimensions The following table shows the effect of reducing the external plinth width on related construction items. The decrease in the external plinth dimension has caused the excavation and consolidation grouting works amount to decrease significantly. The amount of concrete is the same. However, is shall be remembered that the revised plinth width is higher than the revised one and it can be concluded that under the same conditions, the concrete amount would be decreased by 35%. The overall effect of the decrease on the related construction items has caused the construction time of the dam body about 8%. -0,60-0,50-0,40-0,30-0,20-0,10 0,00 0,10-0,33 Excavation 0,04 Plinth Concrete -0,50 Consolidation Grouting -0,33 Rock Anchor -0,08 Construction Time Figure-6 Percentage change in construction item amounts The plinth layout has been revised according to the current geological investigations. Also the geometrical layout of the plinth is revised such that, all the plinth segments are concave, which in theory, will cause the face slab to behave more similar to the design theory. The following figure shows the layout of the previous plinth and Figure-8 shows the revised layout. As can be seen from the layouts, the convex parts of the previous plinth layout has been revised, such that all the plinth sections are concave. Also it was taken into consideration to revise the plinth such that the plinth types are minimized and the longest plinths lines are obtained for ease of construction.

Figure-7 Previous plinth layout and convex sections 3.3. FACE SLAB For the determination of the face slab thickness current guidelines are used. The minimum design thickness of the face slab is selected as 30cm at the top and the thickness of the face slab is calculated by using the formula; t(m)=0.30 + 0.003H where H is the reservoir head in meters. According to this calculation the slab has a minimum thickness of 30cm at the top and 82cm at the maximum cross section. The previous design has also used the same formulation as used for the revised design. Panel widths for the face slabs are determined as 15 meters. Starter slabs are considered in the areas where the face slab is connected to the plinth. Figure-8 shows the general layout of the face slabs and the plinth for the revised design. Figure-8 General layout of face slabs and the plinth for revised design The face slab concrete is designed to be workable, crack resistant, impermeable and durable. The strength of the concrete is 25 MPa with a water cement ratio of 0.5. The allowable slump of the concrete is 3~7 cm. The concrete

of the face slab will also include air entraining admixture and water reducing agent. The setting time of the concrete will be 3~5 hours. The most salient revision made to the face slab is related with the reinforcement pattern and amount. In the previous design 0.4% reinforcement and 0.35% reinforcement at the middle of the slab in two directions was foreseen for the perimeter and the other parts of the face slab, respectively. However, this pattern is revised so that the reinforcement will be in two layers in two directions with a reinforcement ratio of 0.5% for the perimeter area (25 meters from the plinth line) in both directions, 0.35% for horizontal and 0.4% for vertical direction, for the rest of the face slab. The following table compares the reinforcements for previous and revised design and the following sketch shows typical section for the previous and revised design. Table-3 Reinforcement ratios for previous and revised design Perimeter Other than Perimeter Horizontal Vertical Horizontal Vertical Previous Revised Previous Revised Previous Revised Previous Revised % reinforcement (total) 0.40 0.50 0.40 0.50 0.35 0.35 0.35 0.40 Double or single layer Single Double Single Double Single Double Single Double Vertical reinforcement Horizontal reinforcement (a) (b) Figure-9 General arrangement for reinforcements (a) previous design (b) revised design Spalling reinforcement is used at the vertical joints where additional reinforcement is needed due to high stresses as proposed by current guidelines. 3.4. JOINTS 3.4.1. PERIMETER JOINT The purpose of perimeter joint is to connect the face slab to the plinth and to create a water tight barrier while allowing for anticipated movements between the plinth and the slab. Three barrier system is adapted for the previous and the revised design. Three barrier system is an extensively used system especially for high CFRDs. It is composed of a lower water barrier (usually copper water stop), middle barrier (PVC water stop) and upper water barrier (a mastic joint sealent). The following figure shows a typical detail for the perimeter joint used for both the previous and the revised design. To provide water tightness between external and internal plinth a YI type water stop is used. For ease of construction and to maintain concrete quality around the water stop, the water stop is placed at the bottom of the concrete with a concrete pad.

Figure-10 Perimeter joint 3.4.2. VERTICAL AND HORIZONTAL JOINTS The details for vertical and horizontal joints for the previous and revised design are kept principally the same. The locations of the vertical tension joints are determined by performing 3-D finite element analysis. According to the analysis results the locations of the vertical tension joints are determined to be between km 0+000.00 & km 0+135.00 at the right bank and km 0+300.00 & 0+430.00 at the left bank, respectively. The tension joints are designed with a bottom water copper water stop and a top mastic joint sealant system. An asphaltic bond breaker is applied at the concrete surface at the joint. The compression joints are designed with a copper water stop at the bottom, a compression wood filler between the slabs and a surface mastic sealant system at the surface. Figure-11 shows the general details for the vertical tension and compression joints, respectively. Figure-11 General details of (a) vertical tension (b) vertical compression joints The horizontal construction joints are used in case there is a corruption at the concreting works, in places where the starter slabs and the concrete face slabs intersect or in case the concrete face slab is planned to be poured in stages. The reinforcement is continuous at the starter slabs. The following figure shows the general details of the horizontal construction joints.

Figure-12 General details of horizontal construction joints 3.5. PARAPHET WALL The shape, construction method and the details for water tightness for the parapet wall are kept principally the same both for the previous and the revised design. Generally accepted and applied joint details between the face slab and the paraphet wall are used. The top elevation of the paraphet wall is increased 1.0 meters after detailed fetch analyses combining with settlement analysis during MDE earthquake; i.e., the free board has been increased 1.0 meters after current guidelines and recommendations, since the most likely failure mechanism of a CFRD which is founded on rock is the erosion by overtopping flow. Figure-13 shows the typical section of the paraphet wall and the crest. Figure-13 General details of horizontal construction joints 3.6. FOUNDATION EXCAVATION Due to its height and being in an earthquake region, the foundation excavation of the Silvan Dam has been further developed once compared with the previous design. The plinth excavation has been deepened so that the excavation reaches more component rock A platform with a width of 30 meters is created behind the plinth so that the deformation of the face slab due to the difference between the elasticity of the dam body fill and the rock is minimized for crack development minimization. For approximately half width of the dam width from upstream, the excavation is extended to the slightly weathered rock For the downstream area, the excavation is stopped once the moderately weathered rock is reached The geometrical irregularities will be excavated so that a smooth excavation surface is obtained. The following figure shows the cross section of excavation at the bottom and half height of the dam body.

Figure-14 Excavation cross sections of the dam body 4. CONCLUSIONS The design revisions of Silvan Dam has taken into consideration latest developments in CFRD design and construction. The construction time and cost is minimized by applying the internal plinth concept. The deformation and settlement behaviour of the dam body and the face slab is enhanced by applying special excavation geometry. The free board of the dam body has been increased to prevent erosion due to overtopping. The joint details and opening are calculated based on latest numerical analysis methods. REFERENCES ICOLD 2010, Concrete Face Roskfill Dams: Concepts for Design and Construction, International Commission on Large Dams, Paris-France Özen, Ö., Üzücek, E., Dinçergök, T., 2014, Silvan Project Implementation by Participation and Impacts on the Society, Economy and Environment, International Symposium on Dams in a Global Environmental Challenges, Bali-Indonesia Straubar, R., Gunsteren, E., Moll, S., 2009, Design Considerations of a High Rockfill Dam Nam Ngum 2 CFRD Lao PDR, 1 st International Symposium on Rockfill Dams, Chengdu-China Wieland, M., 2009, Concrete Face Rockfill Dams in Highly Seismic Regions, 1 st International Symposium on Rockfill Dams, Chengdu-China