PR (rev ) Page 1 of 22 DIVISION OF THE STATE ARCHITECT DEPERTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

DEFINITIONS: The following definitions apply to terms used in this document:


Building Excellence IV Capital Levy Projects Under Construction

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District

APPLICATION AND CERTIFICATE FOR PAYMENT

Incorporated Village of Lawrence

Seattle Public Schools Building Excellence IV Projects Under Construction

Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC)

DOCUMENT BID DOCUMENT

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

INSPECTION REQUIREMENTS Page 1 of 5. JOB SITE ADDRESS posted during entire construction process.

Building Excellence IV Capital Levy Projects Under Construction

City of Rohnert Park Building Department Inspection Descriptions

ORANGE VISTA HIGH SCHOOL PHASE I

NEW MIDDLE SCHOOL PROJECT

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 18, 2016

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

ORANGE VISTA HIGH SCHOOL PHASE I

BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample

CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS

Building Excellence IV Capital Levy Projects Under Construction

B. RESIDENTIAL MASTER PLUMBER $ $ $

Proud of its Heritage, Preparing for its Future

Chino Valley Unified School District Monthly Construction Update

RESIDENTIAL PROJECT INFORMATION

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Capital Projects Update

Commercial Submittal Packet

Update on FCPS Construction/Renovation Projects. July 2016

Plan Check No. Checked by: An Appointment Is Required for Verification

City of Lorena 107-A S. Frontage Road Lorena, Texas Phone: (254) Fax: (254)

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1

ATTACHMENT 4. New Eastside Regional Park Phase 1. BIM (Building Information Modeling) 3D Design & Modeling Program Requirements

Update on FCPS Construction/Renovation Projects. December 2015

SYLVAN. inspire MIDDLE SCHOOL. which is to. instruction and programs. in a safe, caring, and. collaborative learning community.

City of Redlands. Incorporated Cajon St., Ste. 20 Redlands, CA Tenant Improvement

City of Westerville Guide to Commercial Inspections

Application. Village of Morton Grove Department of Buildings 6101 Capulina, Morton Grove, IL Phone: 847/ Fax: 847/

Site Specific Hazardous Material Abatement Work Plan

Construction Update. April 2016

City of Willow Park 516 Ranch House Road Willow Park, Texas Phone: (817) * Fax: (817)

Capital Projects Progress Report. January Presented by

Update on FCPS Construction/Renovation Projects. November 2015

Supplemental Plan Check List for Unreinforced Masonry (URM) Retrofit

Delco Activity Center Site Summary

Residential Plan Submittal

Wissahickon School District Natatorium & Central Plant Project. Project Update March 27, 2017

OWNER-BUILDER? A HOMEOWNER S GUIDE TO BUILDING PERMITS AND INSPECTIONS FOR PROJECTS IN ARROYO GRANDE, CALIFORNIA

The addendum consists of six (6) pages of 8½ x 11 text and three (3) 30 x 42 drawings*. End of Addendum 1

City of Galax BUILDING PERMIT APPLICATION

Photos by Susie Fitzhugh. BEX IV Projects Update: Arbor Heights, Genesee Hill, Pinehurst, Thornton Creek

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)

Carter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications

Application for Commercial Plan Review and Building Permit. Address:

TOWN OF ROTTERDAM BUILDING DEPARTMENT RESIDENTIAL ACCESSORY BUILDINGS AND STRUCTURE PERMIT APPLICATION Ext 395

Requests for Information pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 2018

GREENVILLE ISD BID PACKAGES AND UPDATES 2014 Bond Program OCTOBER 2015

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

RIVERSIDE CHURCH OF CHRIST. Lafayette, LA

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003

Residential Building Inspections

PROJECT COMPLETED. Bayside High School. Comprehensive Additions and Renovations

Resolution : 102 Change Orders #3 and #11 through #25 to Manning Squires Hennig Contract (John Walton Spencer School 16)

DOCUMENT B. 2. The low bidder shall submit this Expanded Subcontractors Listing to the Owner within 24 hours after the bid opening.

Building with Ducts in Conditioned Spaces Conditioned Attics

CIRCLE K SUB-CONTRACTOR BID FORM

PERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS

Heritage High School

The following information is required when submitting a building permit application:

Program Update. Data and Telecom Cabling-VPA, New Gym, & Physical Science. Physical Science Complex-Roof Replacement

Oconomowoc Area School District Facility Construction Update July 27, 2018

Full Time Job Title: Tile Setter Job Number: 3303 Hours/Days: Monday-Friday Salary: $20.00/hr Location:

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:

CITY OF FATE SINGLE FAMILY BUILDING PERMIT PACKET. Adopted Codes:

FIELD COPY ATTACHMENT

QUESTIONS & ANSWERS FOR B SOUTHWEST SERVICE CENTER BOOKING REMODEL 02/20/2019

Borough of Doylestown Building and Zoning Department

City of Warrenville, IL

Capital Projects Progress Report. September Presented by

Inspection Procedure Handout

CITY OF ANDERSON BUILDING AND CODES 601 South Main Street

CITY OF GLEN COVE Building Department

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

PROJECT STATUS REPORT Downer Elementary School - Period Ending: 1/23/2013 Scope: Downer Construction Status: Architect: HY Architects Project Ma

Dilley ISD 2013 Bond Program Project Update Report September 16, 2015

Project Manual Index of Specifications Shenandoah Schools Concession Building

BOND CONSTRUCTION UPDATE

City Of Mendota Construction Procedures

SECTION ALTERNATES

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

TRUCKEE HIGH SCHOOL POOL RENOVATIONS TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT

Cheldelin Middle School

FOR IFB #PC436 Exterior Improvements at Colton Public Housing Complex

J~e~~r Senior Director of Construction Services Facilities Design and Construction UNIVERSITY OF CALIFORNIA, SAN DIEGO.

Transcription:

DSA Inspectors Arcadia USD Arcadia HS Campus Enrichment Inspection Report Apr 2014 Architect DSA Application No. A03-111889 33 Narcissa Drive, Rancho Palos Verdes, CA 90275 (626) 786-4331 Info@KnowlandInc.com

This form shall be completed by the Project Inspector, in accordance with California Code of Regulations, Title 24, Part 1, Section 4-337and submitted to the DSA. School District/Owner: Arcadia Unified School District DSA File #: 19 - H32 Project Name/School: Arcadia High School Campus Enrichment DSA App. #: 03-111889 From: Kenneth Burr DSA Project Inspector Certification #: Cert 5654, Class 1 Building #(s) (As identified on the plans): C, D, E, F, G, H, K, O, P, W, and Rally Court (site) Report #: 43 Page 1 of 2 Date of Report: 5/5/2014 DSA 152 Card #(s): N/A REPORTING PERIOD DATES From: 4/1/14 To: 4/15/14 Construction project is estimated to be 78 % complete at this time. (List above all building numbers and inspection card numbers for which this report applies.) PROVIDE THE FOLLOWING INFORMATION FOR THE REPORTING TIME PERIOD: (Continues on Page 2) STATUS OF CONSTRUCTION WORK: Bldg B Electrical and plumbing rough in has begun Bldg P (East Portion - Cafeteria) Demo and abatement is ongoing Bldg O oranamental fencing is being installed Bldg U framing, electrical, HVAC and Plumbing is ongoing Site-work site utilities are ongoing, Main walkway canopy north half is complete OUTSTANDING DEVIATION NOTICES: (List Notice Numbers used on forms DSA 154.) Notice issued for storefront window system being installed without approval from DSA on the deferred approval RESOLVED DEVIATION NOTICES: (List the Notice Numbers used on forms DSA 154.). Issued 03/21/13 Page 1 of 2 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Report #: 43 Page 2 of 2 Date of Report: 5/5/2014 DSA App. #: 03-111889 PROVIDE THE FOLLOWING INFORMATION FOR THE REPORTING TIME PERIOD (Continued from Page 1) QUESTIONS OR UNUSUAL CONDITIONS: (List any questions or unusual conditions encountered.) PROBLEMS OR NON-COMPLYING CONDITIONS: (List any problems or non-complying conditions and how they were resolved.) [1] All Addenda are approved [2] Storefront Deferred Approval Submittal not DSA-Approved. A/E review comments returned to GC and sub-contractor 4.18.13. INSTRUCTIONS RECEIVED FROM THE ARCHITECT OR REGISTERED ENGINEER: (List any.). OFFICIAL SITE VISITORS: (List any and whom they represent. May include, architects, registered engineers, school district representatives, DSA field representative, etc.). Weekly Owner/Architect/Contractor meetings. Owner s Rep and Architect in attendance. Submit completed form electronically to the DSA Regional Office with construction oversight authority for the project: DSA OAKLAND oakfielddoc@dgs.ca.gov DSA SACRAMENTO sacfielddoc@dgs.ca.gov DSA LOS ANGELES lafielddoc@dgs.ca.gov DSA SAN DIEGO sdfielddoc@dgs.ca.gov Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

This form shall be completed by the Project Inspector, in accordance with California Code of Regulations, Title 24, Part 1, Section 4-337and submitted to the DSA. School District/Owner: Arcadia Unified School District DSA File #: 19 - H32 Project Name/School: Arcadia High School Campus Enrichment DSA App. #: 03-111889 From: Kenneth Burr DSA Project Inspector Certification #: Cert 5654, Class 1 Building #(s) (As identified on the plans): C, D, E, F, G, H, K, O, P, W, and Rally Court (site) Report #: 44 Page 1 of 2 Date of Report: 4/18/2014 DSA 152 Card #(s): N/A REPORTING PERIOD DATES From: 4/16/14 To: 4/30/14 Construction project is estimated to be 78 % complete at this time. (List above all building numbers and inspection card numbers for which this report applies.) PROVIDE THE FOLLOWING INFORMATION FOR THE REPORTING TIME PERIOD: (Continues on Page 2) STATUS OF CONSTRUCTION WORK: Bldg B Electrical and plumbing rough in has begun Bldg P (East Portion - Cafeteria) Demo and abatement is ongoing Bldg O oranamental fencing is being installed Bldg U framing, electrical, HVAC and Plumbing is ongoing Site-work site utilities are ongoing, Main walkway canopy north half is complete OUTSTANDING DEVIATION NOTICES: (List Notice Numbers used on forms DSA 154.) Notice issued for storefront window system being installed without approval from DSA on the deferred approval RESOLVED DEVIATION NOTICES: (List the Notice Numbers used on forms DSA 154.). Issued 03/21/13 Page 1 of 2 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

DSA 155 PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13 Report #: 44 Page 2 of 2 Date of Report: 4/18/2014 DSA App. #: 03-111889 PROVIDE THE FOLLOWING INFORMATION FOR THE REPORTING TIME PERIOD (Continued from Page 1) QUESTIONS OR UNUSUAL CONDITIONS: (List any questions or unusual conditions encountered.) PROBLEMS OR NON-COMPLYING CONDITIONS: (List any problems or non-complying conditions and how they were resolved.) [1] All Addenda are approved [2] Storefront Deferred Approval Submittal not DSA-Approved. A/E review comments returned to GC and sub-contractor 4.18.13. INSTRUCTIONS RECEIVED FROM THE ARCHITECT OR REGISTERED ENGINEER: (List any.). OFFICIAL SITE VISITORS: (List any and whom they represent. May include, architects, registered engineers, school district representatives, DSA field representative, etc.). Weekly Owner/Architect/Contractor meetings. Owner s Rep and Architect in attendance. Submit completed form electronically to the DSA Regional Office with construction oversight authority for the project: DSA OAKLAND oakfielddoc@dgs.ca.gov DSA SACRAMENTO sacfielddoc@dgs.ca.gov DSA LOS ANGELES lafielddoc@dgs.ca.gov DSA SAN DIEGO sdfielddoc@dgs.ca.gov Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

Arcadia High School Week of April 04, 2014 Top right termite damage to header in the cafeteria Top left Ductwork delivery to the library Bottom Right laying out for circle soffit Bottom left framing block for circle soffit

Arcadia high School Week of April 11, 2014 Top Right duct being installed in the library Top Left framing the circle soffit Bottom Right framing the circle soffit Bottom Left trenching for the storm drain at the library

Arcadia High School Week of April 18, 2014 Top Right waste and vent lines in the restrooms by student store Top Left site demo south side of J Bottom Right circle soffit framing in the library Bottom Left restroom walls in the library

Arcadia High School Week of April 30, 2014 Top Right site water valves south side of J Top Left water valves and gas linne under storm drain Bottom Right ductwork installed with flexes attached Bottom Left circle soffit framing with recessed lighting

Campus Enrichment Project Daniel Alberico Phone: none DSA #4269 Fax: none Cell: (818) 402-7163 Email: Danielalberico@att.net April 1, 2014 Overcast, 65 Project: Arcadia High School-Campus Enrichment A#03-111-889 File No. 19-H32 180 Campus Dr, Arcadia, Ca 91007 Construction Manager: Building Companies Nino and Moore Building Companies D: 7-Carpenters on framing crew at the library installing steel beams for the Hvac roof units, forming for bathroom curbs and epoxing allrthread bolts. 2- Miller Demolition workers at building P continue demolition at the restrooms in building P and start demolition of shear wall on west side of building. 2-Murry company Plumbers continue roof drain installation. 3- Insulation workers installing wall insulation at building B. 4- TSI steel workers installing steel beams at roof for Hvac units. SPECIAL INSPECTION: Nino and Moore Steel Inspector on site at building U repair to existing beams Per RFI #83. MEETINGS: none none : DSA field Engineer-Natu Patel on site and issued Field Note #9 and jobwalk. KNOWLAND CONSTRUCTION SERVICES 2181 E. FOOTHILL BOULEVARD, SUITE 203, PASADENA, CA 91107

Campus Enrichment Project Daniel Alberico Phone: none DSA #4269 Fax: none Cell: (818) 402-7163 Email: Danielalberico@att.net April 2, 2014 Clear, 65 Project: Arcadia High School-Campus Enrichment A#03-111-889 File No. 19-H32 180 Campus Dr, Arcadia, Ca 91007 Construction Manager: Building Companies Nino and Moore Building Companies D: 5-Carpenters on framing crew at the library installing roof blocking, misc, forming for bathroom curbs. 2- Miller Demolition workers continue demolition of building U masonry screen wall on the north-west corner of building. 2-Murry company Plumbers installing gas line, and roof drain strubs on the north side of building U. 3- Drywall workers start installing drywall at building P. 4- TSI steel workers installing steel beams at roof for Hvac units. SPECIAL INSPECTION: none MEETINGS: none none : none KNOWLAND CONSTRUCTION SERVICES 2181 E. FOOTHILL BOULEVARD, SUITE 203, PASADENA, CA 91107

Campus Enrichment Project Daniel Alberico Phone: none DSA #4269 Fax: none Cell: (818) 402-7163 Email: Danielalberico@att.net April 3, 2014 Clear, 65 Project: Arcadia High School-Campus Enrichment A#03-111-889 File No. 19-H32 180 Campus Dr, Arcadia, Ca 91007 Construction Manager: Building Companies Nino and Moore Building Companies D: 5-Carpenters on framing crew at the library installing roof blocking, misc, forming for bathroom curbs, rebar. 2- Miller Demolition workers completed demolition of building U masonry screen wall on the north-west corner of building. 2-Murry company Plumbers installing gas line, and roof drain strubs on the north side of building U. 3- Drywall workers continue installing drywall at building P. 4- TSI steel workers installing steel beams at roof for Hvac units. SPECIAL INSPECTION: none MEETINGS: none none : none KNOWLAND CONSTRUCTION SERVICES 2181 E. FOOTHILL BOULEVARD, SUITE 203, PASADENA, CA 91107

Campus Enrichment Project Daniel Alberico Phone: none DSA #4269 Fax: none Cell: (818) 402-7163 Email: Danielalberico@att.net April 4, 2014 Clear, 65 Project: Arcadia High School-Campus Enrichment A#03-111-889 File No. 19-H32 180 Campus Dr, Arcadia, Ca 91007 Construction Manager: Building Companies Nino and Moore Building Companies D: 5-Carpenters on framing crew at the library installing soffits, misc, forming for bathroom curbs, rebar. 2- Miller Demolition workers removing demolition of building U masonry screen wall on the north-west corner of building. 2-Murry company Plumbers installing roof drain lines at building U. 3- Drywall workers continue installing drywall at building P. 4- TSI steel workers installing steel beams at roof for Hvac units. SPECIAL INSPECTION: none MEETINGS: none none : none KNOWLAND CONSTRUCTION SERVICES 2181 E. FOOTHILL BOULEVARD, SUITE 203, PASADENA, CA 91107

Date: 4/7/2014 6 Framers framing soffits and wall sin building U 7 Electrical roughing in conduits in building B and conduits in the walls at U 3 Plumbers roughing in waste and vent lines in the student store 5 Demo demoing walls in the cafeteria

Date: 4/8/2014 6 Framers framing soffits and wall sin building U 7 Electrical roughing in conduits in building B and conduits in the walls at U 3 Plumbers roughing in waste and vent lines in the student store 5 Demo demoing walls in the cafeteria 4 Painters painting canopy east side of the finger buildings

Date: 4/9/2014 6 Framers framing soffits and wall sin building U 7 Electrical roughing in conduits in building B and conduits in the walls at U 3 Plumbers roughing in waste and vent lines in the student store 5 Demo demoing walls in the cafeteria 4 Painters painting canopy east side of the finger buildings 3 SS erecting the supports on the underside of library roof for hvac supports

Date: 4/10/2014 6 Framers framing soffits and wall sin building U 5 Plumbers roughing in waste and vent lines in the student store 5 Demo demoing walls in the cafeteria 4 Painters painting canopy east side of the finger buildings 2 Glazers installing blackout windows in the finger buildings

Date: 4/11/2014 5 Framers framing soffits and wall sin building U 5 Demo demoing walls in the cafeteria 4 Painters painting canopy east side of the finger buildings

Date: 4/14/2014 5 Framers framing soffits and walls in building U 5 Demo demoing walls in the cafeteria 4 Painters painting canopy east side of the finger buildings 1 Lather placing expanded metal in plaster patch areas 3 Plumbers waste and vent in the student store, welding gas line for U 6 Electrical conduits and boxes rough in the library

Date: 4/15/2014 5 Framers framing soffits and walls in building U 4 Demo demoing walls in the cafeteria 4 Painters painting canopy east side of the finger buildings 1 Lather placing expanded metal in plaster patch areas 4 Plumbers waste and vent in the student store, welding gas line for U 8 Electrical conduits and boxes rough in the library 2 HVAC setting controls on the rooftop units

Date: 4/16/2014 5 Framers framing soffits and walls in building U 2 Concrete floating bottoms of windows in U to level the aluminum frames 4 Painters painting canopy east side of the finger buildings 4 Plumbers waste and vent in the student store, welding gas line for U

Date: 4/17/2014 5 Framers framing soffits and walls in building U 2 Concrete floating bottoms of windows in U to level the aluminum frames 4 Plumbers waste and vent in the student store, welding gas line for U

Date: 4/17/2014 5 Framers framing soffits and walls in building U 3 Concrete floating bottoms of windows in U to level the aluminum frames

Date: 4/21/2014 4 Graders grading the restroom and the student store 4 SS erecting the equipment screen on the roof of the library 6 Framers framing soffits, walls and window infills in the library 3 Utility trenching for gas and water on the south side of building J 7 Electrical roughing in conduits in the library and trenching and placing conduits under slab in P

Date: 4/22/2014 4 Graders grading the restroom and the student store 3 SS erecting the equipment screen on the roof of the library 7 Framers framing soffits, walls and window infills in the library 3 Utility trenching for gas and water on the south side of building J 7 Electrical roughing in conduits in the library and trenching and placing conduits under slab in P 5 Paint painting classrooms in building B

Date: 4/23/2014 4 Graders grading the restroom and the student store 3 SS erecting the equipment screen on the roof of the library 9 Framers framing soffits, walls and window infills in the library 3 Utility trenching for gas and water on the south side of building J 8 Electrical roughing in conduits in the library and trenching and placing conduits under slab in P 5 Paint painting classrooms in building B

Date: 4/24/2014 4 SS erecting the equipment screen on the roof of the library 9 Framers framing soffits, walls and window infills in the library 8 Electrical roughing in conduits in the library and trenching and placing conduits under slab in P

Date: 4/25/2014 4 SS erecting the equipment screen on the roof of the library 9 Framers framing soffits, walls and window infills in the library

Date: 4/28/2014 4 SS erecting the equipment screen on the roof of the library 6 Framers framing soffits, walls and window infills in the library 4 Demo sealing columns in the library with exposed mastic 3 Plumbers sewer and water tie in at student store 5 Electrical rough in at U and P

Date: 4/29/2014 4 SS erecting the equipment screen on the roof of the library 6 Framers framing soffits, walls and window infills in the library 4 Demo sealing columns in the library with exposed mastic 3 Plumbers sewer and water tie in at student store 5 Electrical rough in at U and P

Date: 4/30/2014 4 SS erecting the equipment screen on the roof of the library 6 Framers framing soffits, walls and window infills in the library 4 Demo sealing columns in the library with exposed mastic 4 Plaster scrath coat at the patches and breezeway in building B 5 Electrical rough in at U and P