CONSTRUCTION WASTE MANAGEMENT PLAN

Similar documents
I. CONSTRUCTION WASTE MANAGEMENT PLAN II. CONSTRUCTION INDOOR AIR QUALITY MANAGEMENT PLAN

St. Monica Food Pantry Construction Waste Management and Disposal SBA-13105

SECTION CONSTRUCTION WASTE MANAGEMENT. 1. Section Sustainable Project Requirements. 2. Section Temporary Facilities and Controls.

SECTION GREEN BUILDING POLICY IMPLEMENTATION

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. A. This Section includes administrative and procedural requirements for the following:

Construction Waste Management

SECTION CONSTRUCTION WASTE MANAGEMENT. A. Section includes administrative and procedural requirements for Construction Waste Management.

City Department: 1. Project Name: 2. Project/Job Number: 3. Reporting Period: 4. Project Street Address: 5. City & County (if not in SF):

Construction Waste Management and Disposal

Alameda County Waste Management Authority Model Specification Update March 2004 SECTION CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

ATTACHMENT N LEED PROJECT PROCEDURES

DOCUMENT CONSTRUCTION WASTE MANAGEMENT

BUILDING DEMOLITION REQUIREMENTS

CONSTRUCTION WASTE MANAGEMENT PLAN

SECTION DEMOLITION WASTE MANAGEMENT AND DISPOSAL

- SUPPLEMENT HISTORY TABLE Title 15 - BUILDINGS AND CONSTRUCTION. Chapter RECYCLING AND DIVERSION OF CONSTRUCTION AND DEMOLITION DEBRIS

Construction Waste Management Plan (CWMP)

1. Division 01 Section General Requirements Temporary Facilities and Controls.

CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT Building and Safety Division Construction Waste Management Plan (CWMP) (Provide During Plan Review)

APPENDIX B CONSTRUCTION WASTE MANAGEMENT SAMPLE SPECIFICATION

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

Exhibit J. Construction Waste Management Plan. The Lawson Hills Master Planned Development Development Agreement

Construction Waste Management

Appendix M-2 Example Specification Language for Construction Waste Management

Construction and Demolition Material Recovery Facility Feasibility Study

sectlon requirements for the work in those Sections. Construction Waste Ma nagement SUMMARY Section Page 1 of 9

1. Have you attached a copy of the site plan including the location and design of the recycling and trash enclosure(s)? X Yes No (4.1 4.

Section 34 Brieser Construction SH&E Manual

LEED NC Green Building Rating System For New Construction & Major Renovations. Version 2.2

City of San Clemente Building Permit Applicants. Construction & Demolition Debris Recycling Requirements

MATERIALS AND RESOURCES

Making the Case for Construction Waste Management

CITY OF ALISO VIEJO CONSTRUCTION AND DEMOLITION DOCUMENTATION

WASTE MANAGEMENT & DIVERSION GUIDE

Impact Barrier QT LEED Sheet

CONSTRUCTION AND DEMOLITION (C&D) DIVERSION REQUIREMENTS

INDUSTRY TECHNICAL NOTE

SECTION (SECTION 01351) CONSTRUCTION WASTE MANAGEMENT

Venable Hall Demolition recycling and waste management

Construction & Demolition Recycling Program Building Contractor s Resource Guide & FAQ s (Revised December 2016)

Construction / Demolition (C&D) Recycling Program

Michael J. Talbert Hazen and Sawyer, P.C WestChase Blvd. Raleigh, NC (919)

C&D Recycling Market Overview and Identification

Construction and Demolition Diversion Capacity Study for Hennepin County

ENVIRONMENTAL IMPACT ANALYSIS I. PUBLIC UTILITIES: SOLID WASTE 1. ENVIRONMENTAL CONDITIONS. a. Physical Setting

ARCHITECTURE/ ENGINEERING

LEED-2009 Green Building Rating System. New Construction & Major Renovations

Construction Waste on Campus

Get the Green Edge. Construction/Demolition Recycling for a Competitive Advantage

CONSTRUCTION AND DEMOLITION (C & D) Waste Management Plan Form:

Construction & Demolition (C&D) Waste Diversion in California

HOUSE OF REPRESENTATIVES STAFF ANALYSIS

Construction and Demolition (C&D) Waste Management Plan Program Requirements

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: MARCH 30, 2004 CMR:166:04

City of Tustin Construction and Demolition Debris Recycling Requirements

CITY OF RIO VISTA Construction and Demolition Waste Management Plan and Disposal Report

University Campus Perspective;

Construction and Demolition Debris Recycling and Reuse Requirements. Steps For Meeting Ordinance Requirements

ORDINANCE NO. IT IS ORDAINED by the City Council of the City of San Carlos as follows:

City of South San Francisco Construction and Demolition Waste Management Plan Information for the Applicants

DUKE UNIVERSITY CONSTRUCTION & DESIGN STANDARDS

Construction and Demolition Waste Management at UVM

City of Brisbane Construction and Demolition Debris Recycling and Waste Reduction Plan

Builder Agreement. Access to build in Mountainside Village constitutes agreement to abide by the following:

CITY OF ALISO VIEJO CONSTRUCTION AND DEMOLITION PERMIT

MANDATORY COMMERCIAL RECYCLING DIVISION 7. CALIFORNIA INTEGRATED WASTE MANAGEMENT BOARD

Dem-Con Recovery & Recycling

CITY OF CHICAGO DEPARTMENT OF ENVIRONMENT. CONSTRUCTION or DEMOLITION SITE WASTE RECYCLING RULES AND REGULATIONS

LEED Building Design & Construction Contribution NC v4.0 (April, 2017)

Donald G. Kirby Manager, Product Marketing

2012 ACI-NA Environmental Achievement Award Entry Form One Project per Entry Form

TITLE I SWA CODE DEFINITION OF TERMS

Construction and Demolition Waste Management and Recycling Guide For Contractors to Lincoln Public Schools

LEED with COLD FORMED STEEL

Oconee County Solid Waste

2015 Demolition, Land-clearing, and Construction Waste Composition Monitoring Program

Management of Construction and Demolition Debris

CONSTRUCTION AND DEMOLITION DEBRIS MODEL ORDINANCE ORDINANCE NO.

Model Construction Site Recovery Project Case Study. NIST MEP Environmental Program

Salt Lake City Corporation CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT PLAN

Economic Impact of Recycling in Alabama and Opportunities for Growth. Alabama Department of Environmental Management. Land Division Solid Waste Branch

Demolition Waste and Recyclable Materials Bylaw, 2017, No

Demolition Waste Management Plan Guidelines

Construction & Demolition Waste Management Plan Resource Guide for Contractors

Construction & Demolition Waste Management Plan Resource Guide for Contractors

Balco, Inc. Type EV, Exterior Vertical Expansion Joint Covers

Balco, Inc. Elastomeric Expansion Joint Covers

A study on construction and demolition wastes from buildings in Seberang Perai

DEMOLITION WASTE MANAGEMENT PLANNING

Just the Facts and the Data

CONSTRUCTION AND DEMOLITION PERMIT APPLICATION PACKAGE

GRC 20 th Annual Conference

Refuse Derived Fuel (RDF) Processing Facility 2012 Annual Report Solid Waste Permit Program

Standard Operating Procedure: Waste Management

Northeast Recycling Council

ADDENDUM # 1 TO INVITATION FOR BID

Transcription:

CONSTRUCTION WASTE MANAGEMENT PLAN Project: Construction Manager: Location: Prepared by: PREMIER FACILITY MANAGEMENT (PFM) Date: I. OBJECTIVES The objectives of this plan are to: 1. Recycle, reuse or salvage at least 75%, by weight, of the waste generated as a result of demolition and construction activities for the Project. 2. Comply with the criteria and documentation requirements of the Materials and Resources (MR) credits (MR-2.1 & 2.2); Construction Waste Management, Divert Construction Waste from the landfill requirement 75%, of the U.S. Green Building Council s LEED Rating System. II. PROJECT DESCRIPTION BUILDING SITE has been awarded the General Construction contract to perform renovations to. The project is located at under the jurisdiction of. Premier Facility Management researched the most economical way to haul and dispose of the C+D and recyclable material for LEED reporting. For the demolition of the existing structure, Premier plans to recycle/re-use as much of the material as possible resulting in lowering the cost as well as the carbon footprint. This is a Non-LEED Project utilizing LEED Waste Management Practices and Reporting. III. PLAN IMPLEMENTATION, OVERSIGHT AND ENFORCEMENT The Construction Waste Management Plan will be managed by the Premier Facility Management however, specific salvage and recycling activities will be performed by designated contractors (if applicable), as detailed in Section IV below. Premier Facility Management will provide oversight, coordination, and enforcement of all waste management activities on site. PFM will assemble copies of all tickets, receipts or other submittal information related to waste removal, salvage, and recycling. Page 1 of 6

PFM will compile a log of the salvaged and recycled materials throughout the new construction phases. The log will track the total amount of salvaged and recycled materials (by weight), the amount of material sent to landfills (by weight), and the overall salvage/recycling rate for the project. The log will be updated and presented to the Architect/Design team for review on a monthly basis. PFM will designate one individual on-site to coordinate and address issues that may arise related to the project s demolition/construction waste management activities. IV. WASTE MANAGEMENT MEASURES DURING DEMOLITION AND CONSTRUCTION During the construction phase, all salvage and recycling activities will be undertaken by Premier Facility Management. The targeted materials, sorting methods, and required submittals are described below. Per Section III above, PFM will oversee and enforce designated waste recycler's salvage and recycling efforts, and will collect copies of all tickets, receipts or other submittal information. PFM will use the designated waste recycler submittals to update the project waste recycling log also described in Section III above. V. LIST OF TARGETED MATERIALS FOR RECYCLING Materials to be recycled or salvaged shall be non-hazardous only. Redirection of materials may include donations to charitable organizations or reuse on-site. 1. Acoustical Tile (New Construction) 2. Cardboard, and packaging (New Construction) 3. Concrete, Masonry, etc. (New Construction) 4. Glass (New Construction) 5. Gypsum Wallboard (New Construction) 6. Insulation, Batt and Rigid Foam (New Construction) 7. Metals: (banding, stud trim, ductwork, piping, rebar, roofing, other trim, steel, iron, galvanized sheet steel, stainless steel, aluminum, copper, zinc, lead, brass, and bronze). (New Construction) 8. Paper (New Construction) 9. Plastics (New Construction) 10. Wood, Clean Dimensional (New Construction) Materials that do not need to be tracked include but are not limited to: 1. Hazardous Materials 2. Land clearing debris 3. Excavated Soil Page 2 of 6

VI. SORTING METHOD: All construction and demolition (C&D) waste material (commingled waste) will be gathered in central locations and placed into the appropriate containers to be picked up by and then transported to for sorting and recycling. typically recycles % of C&D waste. PFM will provide all tickets from declaring their recycling rate (per load) and list all the materials they received, that will go for processing or accepting the recycled or salvaged materials. ON-SITE CONTAINER EXAMPLES: 30 Yd Containers: Mixed C&D 30 Yd Containers: Clean Wood 20 Yd Containers: Concrete/Masonry 40 Yd Containers: Metal Trailers (Optional): Cardboard/Paper/Plastic/FF&E VII MATERIAL/EQUIPMENT PROTECTION MEASURES PFM will manage each material to obtain a maximum sustainability. Some materials will be loaded into open top containers, where other materials may be loaded into full size trailers to help reduce carbon footprint and minimize cost to the owner. Delicate materials such as Cardboard, Sheetrock, Light bulbs, etc. may need to be stored indoors until a bulk amount is achieved for a pick up. VIII COMMUNICATION PLAN Premier Facility Management will designate for any questions and concerns regarding waste removal from the jobsite. can be reached at 973-305-6646 (office) or (cell) or emailed at. PFM will also attend weekly/or monthly meetings to discuss waste removal plans with all subcontractors and overall job progress. Dispatch (7am-3:30pm): IX DOCUMENTATION TO BE PROVIDED Construction Waste Management Report tabulated spreadsheet summarizing recycling results to date. Monthly Reports; Weight tickets and receipts from companies listed below. Waste diverted to-date calculation (see below). Page 3 of 6

X SUBMITTALS: PFM will provide calculations and supporting documentation to demonstrate end-of-project salvage/recycling rates meeting the requirement of at least 75% diversion from landfill. 1. PFM will record and document the total weight (in tons) of all demolition waste materials sent to the MRF recycling facility. 2. PFM will record and document the total weight (in tons) of all demolition waste materials recycled or salvaged. 3. For materials separated for recycling off-site, PFM will obtain a letter from the processor (offsite recycling company) stating the average percentage of mixed C&D waste they recycle, along with a listing of the receiving facilities/companies that will be purchasing or accepting the recycled or salvaged materials. 4. PFM will submit monthly Waste Management Progress Reports, containing the following information: 1. Project title, name of company completing report, and dates of period covered by the report. 2. A total to-date diversion rate. 3. Copies of on-site logs, weight tickets and receipts. CM will save the original documents for the duration of the project plus three (3) year(s). 4. Report on the disposal of all jobsite waste, including: A. Reused or salvaged materials. For each material, the following information will be provided: 1. Amount of material salvaged (in tons) 2. The dates removed from the jobsite 3. The Receiving Party B. Donation to a Third-Party (Charitable Organization). For each material the following information will be provided: 1. The amount of material salvaged (in tons) 2. The date(s) donated Page 4 of 6

3. Receipt of Acceptance from recipient Recycled materials (sorted on-site). For each recycled material, the following information will be provided: 1. The number of dumpsters or other containers removed 2. The volume (in cubic yards) and weight (in tons) of each dumpster. 3. The dates the dumpsters/containers were removed from the jobsite 4. The Receiving Party C. Recycled materials (sorted off-site). The following information will be provided: 1. The number of dumpsters or other containers removed 2. The volume (in cubic yards) and weight (in tons) of each dumpster 3. The dates the dumpsters/containers were removed from the jobsite 4. The Receiving Party 5. The type and amount (in tons) of recycled material recovered from the commingled waste D. Landfilled materials. The following information will be provided: 1. The number of dumpsters or other containers removed 2. The volume (in cubic yards) and weight (in tons) of each dumpster 3. The dates the dumpsters/containers were removed from the jobsite 4. The identity of the transfer station or landfill 5. Tipping fees E. Hazardous Waste: No information needs to be provided. Page 5 of 6

FINAL CALCULATION OF DEMOLITION & CONSTRUCTION WASTE DIVERSION Final project-wide C&D waste diversion rate shall be calculated as follows: Total C & D Waste x Tons Total waste generated by demolition and construction Total Recycled + y Tons Materials diverted from landfills, by salvage, reuse and recycling Diversion Rate y/x % Percentage of project s waste diverted from landfills V. MEETINGS AND COMMUNICATIONS The Construction Waste Management Plan will be reviewed at the kick-off meetings prior to the mobilization and start-up of each trade s work. Ongoing Plan issues will be recorded via project meeting minutes as the project progresses. Per Section III above, PFM will designate one individual on-site to coordinate and address issues that may arise related to the project s demolition/construction waste management activities. Respectfully, Page 6 of 6