UMPQUA Testing Service. PO Box NE Division St. Myrtle Creek, OR Materials Testing and Quality Control Services.

Similar documents
SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005. CARLSON TESTING, INC Hudson Avenue, NE Salem, OR James Hathaway, PE Phone:

SCHEDULE OF FEES 2016P PROFESSIONAL SERVICES Page 1 of 4

Flood Testing Laboratories, Inc.

Action Recommendation: Budget Impact:

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

Standard Testing & Engineering, LLC

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005. TEAM SERVICES, INC. 717 SE 6 th Street Des Moines, IA Jeff Roberts Phone:

STRATA Certified Laboratory Tests

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

Terracon Consultants, Inc.

Pennoni Associates, Inc.

Laboratory Certification For. Delta Afghan Technical Engineering Services (DATES)

Nelson Testing Laboratories

GeoTesting Express, Inc.

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005. HTS, INC. CONSULTANTS 416 Pickering Houston, TX Terry J. Jackson, P.E. Phone:

IAS Accreditation Number Materials Testing and Inspection 2791 South Victory View Way Boise, Idaho 83709

LABORATORY INSPECTION INFORMATION REQUEST

Laboratory Certification For. Build Afghanistan Engineering Services (BAES) Laboratory

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005. QC LABORATORIES, INC Northwest Freeway Houston, TX Damon Dolat Phone:

Laboratory Certification For. Reno Geotech & Construction Material Testing Company

Following are key codes & standards to remember for Civil Estimators to prepare the tender/bid proposal in correct manner.

1997 UBC Standard Test method for compressive strength of masonry prisms

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

FHWA-Western Federal Lands Highway Division

Special Provision No. 199S64 July 2016

United-Heider Inspection Group Goldencrest Drive, Suite 114, Moreno Valley, CA 92553, USA Martin Lowenthal, General Manager

Laboratory Certification For. National Engineering Services for Rehabilitation of Afghanistan (NESRA)

PAVETEX Engineering, LLC

MIDDLESEX COUNTY COLLEGE 2600 Woodbridge Avenue Edison, New Jersey REQUEST FOR PROPOSAL SQ # 10180

SCOPE OF SERVICES. Project Coordination and Technical Support. December 20, 2018 Project No


FHWA-Central Federal Lands Highway Division

DIVISION 2500 MISCELLANEOUS METHODS OF TEST

SCOPE OF SERVICES. November 19, 2018 Proposal No

Special Inspection (RFP) Request for Proposals Crook County School District Bond Program

DIVISION 2500 MISCELLANEOUS METHODS OF TEST

2501 PART V SECTION 2501 PART V

IAS Accreditation Number Pacific Testing and Inspection, Inc. Address 2417, Harrison Avenue, Centralia, WA 98531

Geotechnics, Inc. East Pittsburgh, Pennsylvania, USA

Seattle Public Utilities Materials Laboratory

Geotechnics, Inc. East Pittsburgh, Pennsylvania, USA

SECTION AGGREGATES

Oklahoma DOT Central Laboratory Test List

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION

Wiss, Janney, Elstner Associates, Inc.

Accredited Laboratory

Accredited Laboratory

NTPEP Evaluation of Rapid Set Concrete Patching Materials for Portland Cement Concrete

THE COUNTY OF TARRANT SECOND CONTRACT RENEWAL AND MODIFICATION

Department of Civil Engineering. Consultancy Experiments and Charges

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

(Please complete the application, print, sign and date. Mail to CMEC at 2779 Apopka Blvd, Ste 1, Apopka, FL 32703)

REQUEST FOR QUOTE (RFQ) DELIVER, PLACE, AND COMPACT DRIVING SURFACE AGGREGATE (DSA)

Accredited Laboratory

Pasadena Unified School District 740 West Woodbury Pasadena, Ca Mr. Frazer Thompson

Beyond Engineering & Testing, LLC.

SPECIFICATIONS FOR FABRICATION OF PRECAST CONCRETE PANELS

APPENDIX A. Agency Application and Audit Checklists

Terminal Tariff No. 1 Charlotte Intermodal Terminal

(Please complete the application, print, sign and date. Mail to CMEC at 2779 Apopka Blvd, Ste 1, Apopka, FL 32703)

GEOTECHNICAL & SEISMIC ENGINEERING, CONSTRUCTION INSPECTION & MATERIALS TESTING SERVICES

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR QUALITY CONTROL AND ACCEPTANCE OF STRUCTURAL PRECAST CONCRETE

I. CONSTRUCTION MANAGEMENT, INSPECTION, AND MATERIALS TESTING (Fee: $117,536)

DRAFT Proposal to Provide Public Works Observation Services for the City of Calabasas Overlay Project

NTPEP Evaluation of Epoxy and Resin Based Adhesive Bonding Systems.

PRI Asphalt Technologies, Inc.

Report of Special Inspections

SECTION QUALITY CONTROL - CONSTRUCTION MANAGER EDITION

CCIL BC/MB/NB/NL/NS/SK Aggregate and Soil Proficiency Sample Program Please read the following instructions carefully BEFORE you start testing!

CCIL BC/MB/NB/NL/SK Aggregate and Soil Proficiency Sample Program Please read the following instructions carefully BEFORE you start testing!

32.02 RESPONSIBILITIES OF THE TESTING AGENCY

2016 ACHD Supplemental Specifications to the ISPWC. ACHD QC-QA Procedure

GENERAL EQUIPMENT. 3 Electronic analytical balance (320gr capacity - 0,001gr readability)

TEXAS, GONZALES & NORTHERN RAILWAY COMPANY

NTPEP Evaluation of Adhesive Concrete Anchor Systems

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1069 PREQUALIFIED AGGREGATE SUPPLIER PROGRAM. April 15, 2016

RFP Attachment C - Fee Rate Schedule

LIST OF DAC (17025) ACCREDITED TESTS CONSTRUCTION MATERIALS TESTING. Determination of sulphate content of soil and ground water testing

Maintenance Agreement for TMS Hosted Systems 2017

MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following:

LIST OF TESTING SERVICES

Discipline Mechanical Testing Issue Date Certificate Number T-1169 Valid Until Last Amended on

Statement of Qualifications

SECTION TESTING LABORATORY SERVICES

QUALITY CONTROL PROGRAM FOR PRECAST CONCRETE PRODUCTS SECTION 1902 QUALITY CONTROL PROGRAM FOR PRECAST CONCRETE PRODUCTS

Laredo I.S.D. Board of Trustees Special Call Meeting Tuesday, June 24, :30 PM Amber Yeary Board Room Houston St.

INVITATION TO BID ON TOWN PAVING PROJECTS

NEW YORK CROSS HARBOR RAILROAD TERMINAL CORP.

City of Bozeman Building Division - Special Inspection and Testing

QUALITY CONTROL PROGRAM FOR PRECAST CONCRETE PRODUCTS SECTION 1902 QUALITY CONTROL PROGRAM FOR PRECAST CONCRETE PRODUCTS

A. ASTM C 150 Standard Specification for Portland Cement. B. ASTM C 595 Standard Specification for Blended Hydraulic Cements.

CITY OF ADA, PURCHASING 512 North Stockton Street Ada, Oklahoma / x256 Fax 580/ BID PROPOSAL.

SPECIFICATIONS FOR ROOF SYSTEM MAINTENANCE AND REPAIR CONTRACT

APPENDIX D CONSTRUCTION PHASE CRITERIA

Standard test method for organic impurities in fine aggregates for concrete. Standard test method for chemical analysis of hydraulic cement

Transcription:

Materials Testing and Quality Control Services 2017 Price List & General Terms and Conditions Page 1 of 7

Labor Rates Hourly Rates Concrete Technicians: (ODOT/ACI Certified QCT & CSTT): ---------------------------------- $50.00 Includes sampling, slump, air content, temperature, sample pickup and deliveries, stripping, logging and reporting. (Grout includes flow cone test) Aggregate Technicians: (ODOT/WAQTC Certified CAgT): ------------------------------------- $50.00 Includes field sampling, sample pickup and deliveries, sample preparation, shipping, handling and reporting of aggregate and soil samples. Compaction Technicians: (ODOT/WAQTC Certified CEBT & CDT): ------------------------ $55.00 Includes visual inspections, deflection tests, and in-place moisture/density tests using Nuclear Densometers. Asphalt Technicians: (ODOT/WAQTC Certified CAT I): ---------------------------------------- $55.00 Includes sampling and testing at client s lab during production of asphalt. Laboratory Technicians: -------------------------------------------------------------------------------- $50.00 Includes sample pickup and delivery, sample prep and reports. Core Drilling: ------------------------------------------------------------------------------------------ $55.00 Includes Asphalt, Shotcrete, Concrete, Microsilica Overlay Coring Bond and Adhesion Testing: ---------------------------------------------------------------------------- $55.00 Bolt Testing: ------------------------------------------------------------------------------------------------ $55.00 Includes rotational capacity, inspection torque, and installer verification. Quality Control Management (Related to Materials Testing Services Only): Quality Control Manager ----------------------------------------------------------------------- $60.00 Concrete/Masonry Special Inspector Services& Sampling: --------------------------------------- $60.00 Roofing Inspector Services: ----------------------------------------------------------------------------- $60.00 Building Inspector: ---------------------------------------------------------------------------------------- $60.00 Nailing Inspector Services: ------------------------------------------------------------------------------ $60.00 Structural Steel/Shop/Field Inspector Services CWI AWS ------------------------------------- $60.00 Ultrasonic testing shear wave & straight beam testing : ----------------------------------------- $60.00 Magnetic particle testing: -------------------------------------------------------------------------------- $60.00 Liquid penetrant testing:-------------------------------------------------------------------------------- $60.00 Fireproofing Inspector Services: ----------------------------------------------------------------------- $60.00 Vehicle Mileage Rate:------------------------------------------------------------------------------------ $0.57/Mile Page 2 of 7

Soil Test Prices Price per Test Per Sample Liquid Limit (AASHTO T 89) --------------------------------------------------------------- $55.00 ea. Plastic Limit (AASHTO T 90) --------------------------------------------------------------- $55.00 ea. Plasticity Index (AASHTO T89,T90) ----------------------------------------------------- $110.00 ea. Consolidation of Soils (AASHTO T 216) ------------------------------------------------ $425.00 ea. Moisture Content (AASHTO T 255/265) --------------------------------------------------- $35.00 ea. Moisture Density Curves: Standard Proctor 4 & 6 mold (AASHTO T 99) --------------------------------------- $180.00 ea. Modified Proctor (AASHTO T 180) ------------------------------------------------------ $200.00 ea. Harvard Miniature (WAQTC TM 9) ------------------------------------------------------ $125.00 ea. One Point Verification (AASHTO T272V) ------------------------------------------------ $65.00 ea. Establishing a Family of Curves (AASHTO T 272) -------------------------------------- $55.00 ea. Oversized Rock Correction (AASHTO T 224) -------------------------------------------- $45.00 ea. Sand Equivalent (AASHTO T 176) --------------------------------------------------------- $65.00 ea. Sieve Analysis (Dry)(AASHTO T 27) ------------------------------------------------------ $55.00 ea. Sieve Analysis (Washed)(AASHTO T 27/11) ------------------------------------------- $110.00 ea. Sieve Analysis (Washed)(FHWA Method) ----------------------------------------------- $110.00 ea. Sieve Analysis (Larger Than 1 Washed or Dry)---------------------------------------- $55.00/hour Specific Gravity of Soils (Fine)(AASHTO T 84) ----------------------------------------- $65.00 ea. Soil Classification (AASHTO M 145) ---------------------------------------------------- $190.00 ea. (Includes Washed Sieve & Plasticity Index) Wood Waste (ODOT TM 225) --------------------------------------------------------------- $50.00 ea. Laboratory Resistivity (AASHTO T288) ------------------------------------------------- $110.00 ea. ph (AASHTO T289) -------------------------------------------------------------------------- $22.00 ea. Organic Content in Soils by Loss on Ignition (AASHTO T267) ------------------------ $65.00 ea. Particle Size Analysis of Soils (Hydrometer Test) (AASHTO T88) ------------------ $110.00 ea. Other Services Priced Upon Request Note: A sample prep charge at the Laboratory Technician hourly rate may be required. Page 3 of 7

Aggregate Test Prices Price per Test Per Sample Accelerated Weathering (DMSO)(FHWA Method) ------------------------------------------- ** Cleanliness Value (ODOT TM 227) --------------------------------------------------------- $85.00 ea. Durability Index (AASHTO T 210) -------------------------------------------------------------- ** Elongated Particles (ODOT TM 229) ------------------------------------------------------- $55.00 ea. Fractured Particles (ODOT TP-61) ---------------------------------------------------------- $50.00 ea. Friable Particles (AASHTO T 112) ---------------------------------------------------------- $70.00 ea. Lightweight Particles (AASHTO T 113) --------------------------------------------------- $95.00 ea. Los Angeles Abrasion (AASHTO T 96) --------------------------------------------------------- ** Moisture Content (AASHTO T 255/265) --------------------------------------------------- $35.00 ea. Oregon Air Degradation (ODOT TM 208) ------------------------------------------------------ ** Organic Impurities (AASHTO T 21) ------------------------------------------------------------- ** Sand Equivalent (AASHTO T 176) --------------------------------------------------------- $65.00 ea. Sieve Analysis (Dry)(AASHTO T 27) ------------------------------------------------------ $55.00 ea. Sieve Analysis (Washed)(AASHTO T 27/11) ------------------------------------------- $110.00 ea. Sieve Analysis (Washed)(FHWA Method) ----------------------------------------------- $110.00 ea. Sieve Analysis (1 and Larger Washed or Dry) ----------------------------------------- $55.00/hour Sodium Sulfate Soundness (5 Cycles)(AASHTO T 104) ------------------------------------- ** Specific Gravity/Absorption (Coarse)(AASHTO T 85) ---------------------------------- $50.00 ea. Specific Gravity/Absorption (Fine)(AASHTO T 84) ------------------------------------- $65.00 ea. Unit Weight (AASHTO T 19) ---------------------------------------------------------------- $50.00 ea. Wood Waste (ODOT TM 225) --------------------------------------------------------------- $50.00 ea. Other Services Priced Upon Request ** Tests with an asterisk under the price column are performed by an outside laboratory. Sample preparation, handling and shipping charges will apply. Please request a price quotation. Note: A sample prep charge at the Laboratory Technician hourly rate may be required. Page 4 of 7

Concrete/Masonry Test Prices Price per Test Per Sample Compressive Strength of Concrete Cylinders ---------------------------------------------- $18.00 ea. Core Drilling ---------------------------------------------------------------------------------- $55.00/hour Compressive Strength of Drilled Cores ----------------------------------------------------- $35.00 ea. Compressive Strength of Grout and Mortar ------------------------------------------------ $18.00 ea. Compressive Strength of Masonry Block --------------------------------------------------- $40.00 ea. Compressive Strength of Prism (C1314)---------------------------------------------------- $40.00 ea. Concrete Shrinkage Test, set of 3 blocks per test (ASTM C157) --------------------- $225.00 ea. Masonry Shrinkage Test ------------------------------------------------------------ Please Contact Lab Preparation of Specimen (Sample Pickup,Capping,Trimming, etc.) ----------------- $47.00/hour Note: There is a $6.00 charge for each unbroken cylinder sample. Asphalt Test Prices Compaction Testing -------------------------------------------------------------------------- $55.00/hour Core Drilling ---------------------------------------------------------------------------------- $55.00/hour Core Correlation Test (ODOT TM327) --------------------------------------------------- $125.00 ea. Other Testing Items ----------------------------------------------------------------- Please Contact Lab Other Test Prices Soil, Groundwater and Stormwater Runoff Analysis -------------------------- Please Contact Lab Chemical, Radiological and Microbiological Analysis ------------------------ Please Contact Lab Note: A sample prep charge at the Laboratory Technician hourly rate may be required. Page 5 of 7

Analytical Services: Chemical, radiological and microbiological analyses of environmental and drinking water samples are available from UMPQUA Research Company. Please contact our lab at 541-863-5201 for more information. Miscellaneous: Time and mileage are charged portal to portal. Fieldwork will include a minimum of ½ hour for equipment setup prior to leaving the lab and ½ hour for cleanup and test reporting after returning to the lab. Per Diem for travel that requires overnight stays will be negotiated. A minimum of one hour at the respective hourly rate, plus actual mileage will be charged for all late cancellations. Labor and test prices will be charged at overtime (1.5 times the base rate) for all work performed in excess of 8 hours per day. Unless prearranged schedules are approved by UTS, the overtime rate will also apply to all work performed before 7:00 AM and after 4:00 PM on Monday through Friday, and for all work performed on weekends and holidays. See page 7 for general terms and conditions. Page 6 of 7

General Terms and Conditions 1. Unless otherwise agreed upon in writing, charges for all services shall be billed by UTS to Client in accordance with this Price List & General Terms and Conditions. Normal business hours are from 7:00 AM to 4:00 PM Monday through Friday, excluding holidays. Labor and test prices will be charged at overtime (1.5 times the base rate) for all work performed in excess of 8 hours per day. Unless prearranged schedules are approved by UTS, the overtime rate will also apply to all work performed before 7:00 AM and after 4:00 PM on Monday through Friday, and for all work performed on Weekends and Holidays. Work performed in reference to project management requirements (i.e. planning, project meetings, specialized reports, work plans, etc.) will be billed at the Quality Control Manager and/or Professional Engineer rate. 2. Proposals prepared by UTS are estimates only. Invoices shall be submitted by UTS to Client on a monthly basis for actual work performed during the preceding month. The total amount billed for a project may vary from proposals or estimates based upon actual project requirements or Client requests, however quoted unit prices will remain firm. Client shall pay UTS invoices in full within thirty (30) days of the invoice date, regardless of Client s receipt of payments from third parties. Client further agrees to pay all accrued interest for past due invoices. Interest shall be calculated at 1.5% per month (18% annually) starting 30 days after the invoice date. UTS reserves the right to withhold final reports, letters of compliance, or any other relevant document until all past due invoices have been paid. 3. UTS s responsibilities shall be limited to the testing and inspections requested by Client in accordance with specifications or project provisions. UTS will not render any engineering judgments or opinions. 4. Client recognizes that the services provided by UTS do not carry a warranty or guarantee of any type. While such services may reduce the risk of construction defects, omissions, or deficiencies, it is the Client s responsibility to ensure the quality and completeness of the project in accordance with applicable plans and specifications. 5. Unless Client requests full-time services, Client understands that services provided by UTS, are on an On-Call basis. Client shall assume responsibility for adequate notification and scheduling of UTS services. UTS will make every reasonable effort to meet Client s schedule, but will not guarantee service availability without direct confirmation with Client. 6. Client agrees that UTS shall not be liable for damages, resulting from errors, omissions, or negligence, beyond the total fee received by UTS from Client. In no event shall UTS be liable for indirect or consequential damages of any kind. 7. In the event Client files a claim against UTS, and Client fails to prove such claim, Client shall pay all of the costs incurred by UTS in defense of the claim, including but not limited to, personnel costs, cause of action, claim or counterclaim, attorney fees, court costs, witness fees, and all other claim related expenses. 8. If Client transfers project responsibilities to a third party, Client shall continue to be responsible for payment of service provided by UTS until the third party has agreed to these terms, or Client terminates UTS services. In the event of termination, Client shall be responsible for payment of all services provided by UTS prior to the termination. 9. This Price List & General Terms and Conditions shall be submitted by UTS to Client before any services are performed. Client agrees that any request for service constitutes acceptance of the fees, terms and conditions stated herein, or as otherwise agreed to in writing. Page 7 of 7