Exterior Stucco and Siding Installation

Similar documents
GLOBAL PROPERTY INSPECTIONS TECHNICAL BULLETIN

OCS ONE COAT STUCCO A custom blend of Portland cement, sand, extenders, fiber reinforcement and modifiers.

DuPont RainVent Batten Installation Guidelines

GA APPLICATION OF GYPSUM SHEATHING

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board

R-Matte Plus-3: Insulation for the Building Envelope

WHATEVER THE CHALLENGE, PHILLIPS HAS YOU COVERED.

GAF EnergyGuard Polyiso Wall Sheathing

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

Finestone Stucco System

Stone and Masonry Veneer

DuPont Tyvek Wall Underlay Install Guide

The better way to build TM. Installation Manual NAILBASE PANELS

WeatherSmart Air Barrier Installation Guide

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS DAVIS, CALIFORNIA

Inspection Fundamentals: Stucco & EIFS

Insulation. First Revison October DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS

INSTALLING WATER-RESISTIVE BARRIERS & FLASHING

Discussion of the Stucco Identification of All Panels

Finestone Stucco Ultra Wall System

DuPont. Tyvek Sheathing Membrane Installation Guidelines. Version 2. Canadian Version

DIVISION 7 THERMAL AND MOISTURE PROTECTION

Installation Guidelines

BULLETIN FROM THE FIRST COAST CHAPTER ICC~BOAF

Code Compliance Research Report CCRR-0231

Sentry Stucco Ultra Wall System

Residential Building Inspections

SPECIFICATION GUIDELINE

SPECIFICATION GUIDELINE

Senergy Platinum CI Stucco Typical details for an impact resistant cement plaster stucco system featuring Neopor GPS Plus Rigid Insulation Board

B.01. Lincoln Property Company 100 Lowell Road North Reading, MA 01864

SPECIFICATIONS MODERRA MORTARLESS MASONRY VENEER

DIVISION: FINISHES SECTION: PORTLAND CEMENT PLASTERING REPORT HOLDER: SUPERWALL MANUFACTURING, INC.

Galvanized Steel Bead Accessories for Stucco and Plaster Installations ALABAMA METAL INDUSTRIES CORPORATION. Contract Number:

LP SmartSide Perfection Shingle

12 - V0 CFP-12 PANEL INDEX. Delta Series CONCEALED FASTENED PANELS BUILDING PRODUCTS VERTICAL PANELS

HouseWrap Applications System R-Value: R-4.17 Horizontal Heat Flow Only

Zinc Alloy Bead Accessories for Stucco and Plaster Installations ALABAMA METAL INDUSTRIES CORPORATION

SECTION PORTLAND CEMENT PLASTER (STUCCO) WITH ACRYLIC FINISH

DuPont Tyvek Water- Resistive and Air Barriers Installation Guidelines

A. Meet at Project site <insert number> days before starting installation.

DuPont Tyvek Air Barrier Installation Guidelines. Canadian Version. Version 2

FACE CFP - HORIZONTAL PANELS - OPTION 'B'

SC-01 Cross-Section. Cement Board Substrate Master Wall Mesh and Base Coat Superior Finish

Product Guide Specification

DIVISION: FINISHES SECTION: PORTLAND CEMENT PLASTERING REPORT HOLDER: PROWALL BUILDING PRODUCTS, INC.

FORTIFIED Home High Wind. Bronze New Roof Requirements

SECTION ASPHALT SHINGLE ROOFING SYSTEMS. Display hidden notes to specifier by using "Tools"/"Options"/"View"/"Hidden Text".

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage

Revised January buildingscience.com. Water Management Details. Housewraps/Flashings/Windows buildingscience.com

Proud of its Heritage, Preparing for its Future

SECTION Fiber Reinforced Stucco 1

DIVISION: FINISHES SECTION: PORTLAND CEMENT PLASTERING REPORT HOLDER: ULTRAKOTE PRODUCTS, LLC

RESIDENTIAL RE-ROOFING PERMIT APPLICATION

Installation Standard For TILE-LINED ROMAN BATH TUBS IAPMO IS (10) Wall Finish. (3) Test Required. (2) Waterproof. Tile. (8) Concrete Shell

REPAIR OF WOOD FRAMED STRUCTURES WITH BRICK MASONRY VENEERS. Prepared for FEMA

Structalath Twin Trac 316 System Section Corporate P.O. Box 397 Fortson Georgia FAX Technical

Magnum Board Coatings

Thin Architectural Splitface Block Veneer Specification Guide

NOVAWRAP ASPIRE Q & A

2018 British Columbia Building Code Public Review of Proposed Changes

DIVISION 9 SECTION 09220

Introduction Observations

SRP-AirOutshield UV Issued:

Wall bracing panel requirements

Acrocrete Platinum CI Stucco Typical details for an impact resistant cement plaster stucco system featuring Neopor rigid insulation board

Building Division Informational Handout

DIVISION: FINISHES SECTION: PORTLAND CEMENT PLASTERING REPORT HOLDER: SOMAR INDUSTRIES LTD LUCKETT COURT EL PASO, TEXAS 79932

Multi-Institutional Academic Health Science & Research Center Evansville, IN

WEB BASED APPLICATION SPECIFIC INSTALLATION INSTRUCTIONS

Section Metal Lath and Accessories

Beginning of the Course

JC Code & Construction Consultants, Inc. Advanced Training: The FBC & ASTM C 1063

Finestone Platinum CI Stucco Typical details for an impact resistant cement plaster stucco system featuring Neopor rigid insulation board

ORDINANCE NO BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BOULDER, COLORADO: CHAPTER 98 - Baled Straw Structures SECTION PURPOSE

APPLICATION INSTRUCTIONS REALSIDE TM

Thermasheath -3. Insulation for the Building Envelope ROOF WALL SPECIALTY

DIVISION: FINISHES SECTION: PORTLAND CEMENT PLASTERING REPORT HOLDER: AMERICAN EAGLE MATERIALS, LLC

Attachment of Exterior Wall Coverings Through Polyiso to Wood or Steel Wall Framing

City of Long Beach Department of Development Services Building and Safety Bureau. Design Limitation for Wood Shear Walls

application instructions

ICC-ES Evaluation Report Reissued November 2014 This report is subject to renewal November 2016

General. Moisture. Secondary Water-Resistive Barrier. Storage. Gaps & Sealants. Stud Spacing. Flashing, Windows, Doors & Openings

Thermasheath -3. Insulation for the Building Envelope ROOF WALL SPECIALTY

WATERGATE COMMUNITY ASSOCIATION 8 Captain Drive Emeryville, California Office: / Fax: WINDOW REPLACEMENT GUIDELINES

WARRANTY PROVIDER ACCEPTED A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS

Garage/Accessory Structures

7-) MCISTIJUE CONDENSATION IN!BARNS

2002 Advanced Building Products, Inc., P.O. Box 98, Springvale, Maine TEL: ; FAX: ; WEBSITE:

DUPONT TYVEK MECHANICALLY FASTENED AIR AND WATER BARRIER INSTALLATION GUIDELINES FOR BUILDINGS GREATER THAN 4 STORIES AND HIGH PERFORMANCE

INSULATION RETROFIT DESIGN ENERGY SOLUTIONS CENTRE YUKON GOVERNMENT

EPA Seal and Insulate with ENERGY STAR Insulation Product Certification Report: GAF EnergyGuard Polyiso Insulated Sheathing Board Insulation

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: FIBER CEMENT SIDING REPORT HOLDER: KMEW CO., LTD. EVALUATION SUBJECT:

City of Republic Community Development Department. Residential Roofs REVISION DATE: JANUARY 2017

MARQUIS Tualatin FIBER-CEMENT SIDING June 15, rev

SECTION TEMPORARY ROOFING MEMBRANE INSTALLATION. A. Areas of the roof deck for asbestos abatement.

TECHNICAL INFORMATION

SSL-175. Specifications

DuPont Tyvek Water- Resistive and Air Barriers Installation Guidelines

Transcription:

Exterior Stucco and Siding Installation CITY OF NEWARK, CALIFORNIA BUILDING INSPECTION DIVISION 37101 Newark Boulevard, Newark, CA 94560-3796 510-578-4261 Fax 510-578-4307 e-mail: building.inspection@newark.org GENERAL The standards described cover the Building Code requirements for the installation, repair, and replacement of exterior wall materials on residential buildings. The specified materials covered are lap sidings (lumber, vinyl, aluminum, steel, and cementations), plywood sidings, and stucco. PERMITS A building permit is required prior to the installation of exterior siding or stucco. A building permit is not needed for small repairs to existing exterior sidings and stucco, provided the repairs are limited to no more than ten square feet of wall area. Building permits can be obtained from the Building Inspection Division located at 37101 Newark Boulevard. Permits can be issued to a property owner, a tenant if written permission is given by the property owner, or a contractor with one of the following licenses: B C35 C43 D41 General Contractor Lathing and Plastering Contractor (for stucco installations) Sheet Metal Contractor (for aluminum or steel sidings) Limited Specialty Contractor, Siding and Decking (for aluminum, vinyl, steel, lumber, or plywood sidings) INSPECTIONS There are two or three inspections needed, depending upon the material. Stucco and plywood siding installations require only two inspections. Lap siding installations require three inspections. First Inspection Sidings the first inspection occurs after the weather resistant barrier has been installed and all penetrations have been sealed, but before any siding has been installed. Stucco the first inspection occurs after the weather resistant barrier and the lath have been installed and all penetrations have been sealed, but before the scratch coat is applied. Second Inspection Plywood Sidings the second inspection occurs after the plywood and all of its trim have been installed but before electrical cover plates have been installed. The cover plate can be installed after the inspection is completed but no further inspection is needed. Lap Sidings the second inspection is a progress inspection and occurs while the siding is being installed. Stucco the second inspection occurs after the final plaster coat has been installed but before any electrical cover plates have been installed. The cover plate can be installed after the inspection is completed but no further inspection is needed. \\nwknas2\vol1\shared\pubwrks\bldginsp\bldg Insp Masters\B-128-ExteriorStuccoSidingInstallation.doc 7/11 Page 1 of 5

Third Inspection Sidings the third inspection occurs after the siding has been installed, all penetrations have been sealed, but before electrical cover plates have been installed. The cover plate can be installed after the inspection is completed but no further inspection is needed. PLYWOOD SIDING Plywood siding material must be approved for exterior siding use. All approved plywood sidings will have a stamp on the back surface specifically identifying the allowable use. A sample of a plywood siding approval stamp is shown in Figure A. Approval stamps must have the words RATED SIDING in it. Plywood labeled Rated Sheathing along with an Exterior rating are for underlayment applications and cannot be used for exposed exterior siding applications. Plywood sidings should be nailed to studs with 8d box or common hot dipped galvanized nails spaced six inches along edges and twelve inches in the field. Do not use sinkers (coated framing nails) or other nongalvanized nails or fasteners as they will quickly rust. Electrogalvanized nails can be used, but they, too, will rust over time if the siding is not painted on a regular basis. LAP SIDING Lap sidings are horizontally placed panels, generally 4 inches to 16 inches high and made of lumber, sheet steel, sheet aluminum, composite board (such as Masonite), or vinyl. Manufactured lap sidings shall be installed following the manufacturer s printed instructions. Printed instructions must be on the job site and available to the inspector. VINYL SIDING Vinyl lap siding is considered an exterior cladding and does not itself provide a weather resistant barrier. In some installations vinyl siding will actually channel water behind the siding. As such, vinyl siding must be installed over a fully functional weather resistant barrier. For overlay installations the only acceptable existing weather resistant barrier system is stucco. The existing stucco must be in good condition with all cracks and penetrations properly sealed. Any wood trim must be removed and the stucco patched prior to installing vinyl siding. Existing wood siding cannot be used as a weather resistant barrier for vinyl siding. If a project includes existing wood siding, the wood siding shall be removed and an approved weather resistant barrier installed prior to installing vinyl siding. STUCCO Stucco, also known as cement plaster, shall be installed in three coats following the standards outlined in Section 2508 of the California Building Code. Joining new stucco to existing stucco requires the new lath and backing paper overlap the existing lath and backing paper two inches. This requires that approximately three inches of existing plaster at the new joint be broken out leaving the lath and backing paper intact and exposed. The new and existing backing papers are then lapped and the new and existing lath is lapped (see Figure D for splicing detail). \\nwknas2\vol1\shared\pubwrks\bldginsp\bldg Insp Masters\B-128-ExteriorStuccoSidingInstallation.doc Page 2 of 5

Wire lath shall be installed over at least one layer of a weather resistant barrier. When stucco is installed on solid plywood sheathing, two layers of weather resistant barrier material shall be installed. There are commercially available laminated weather resistant barrier materials in which one layer of laminated paper is the equivalent of two layers of nonlaminated paper. Wire lath shall be held off the weather resistant barrier approximately ¼ inch. This can be accomplished using furring nails to attach the lath to the backing surface. Self-furring lath can also be used but special care must be taken so that fasteners are installed at the line wires or furring bumps, and that the lath is installed with the correct side against the backing. Weep screeds shall be installed at the sill plate for all new stucco installations, including additions to existing stucco systems (see Figure C for weep screed detail). UNDERLAYMENT FOR SIDINGS Sidings shall be installed over a weather resistant barrier such as Kraft waterproof building paper, 15 or 30 pound asphalt-saturated organic felt, or an approved housewrap such as Tyvek. During construction, special care must be taken to avoid tearing the weather resistant barrier. If torn, the weather resistant barrier must be repaired. Of the materials mentioned, Tyvek is the most durable. Kraft paper is the least durable. All penetrations, such as pipes or electrical outlets, in the weather resistant barrier shall be sealed (see Figure B for more detail on sealing penetrations). WEATHER FLASHING AT WINDOWS Windows shall be flashed as required by the manufacturer s printed instructions. Regardless of the type of manufacturer and as a minimum, all windows shall be flashed as shown in Figure E. The flashing material can be Kraft waterproof building paper or 15 or 30 pound asphalt saturated organic felt. There are also commercially available pre-made flashings with self-sticking backs, which aid in installation. Most flashing strips are approximately six inches wide. Special care must be taken when installing plaster over existing wood siding so that the flashing around existing windows maintains remain waterproof. \\nwknas2\vol1\shared\pubwrks\bldginsp\bldg Insp Masters\B-128-ExteriorStuccoSidingInstallation.doc Page 3 of 5

Maximum spacing of framing members A P A THE ENGINEERED WOOD ASSOCIATION 16 oc RATED SIDING 303-18-S/W 11/32 INCH GROUP 1 SIZED FOR SPACING EXTERIOR 000 PS 1-95 PRP-108 FHA-UM-64 Stamp must be labeled "SIDING" Wood sill plate Lath and weather resistant barrier lapped over the weep screed Stucco Weep screed Min. 4" to soil Min. 2" to pavement Figure A Typical Plywood Siding Stamp Concrete Figure C Stucco Weep Screeds Backing paper and lath at stucco installations Seal between paper and penetrating object Stucco tight against penetrating object Cover plate at electrical outlets Existing stucco Min. 2" lap of paper and lath New stucco Penetrating object such as pipes or electrical outlets Weather resistant barrier Seal between siding and penetrating object Siding Figure B Sealing at Wall Penetrations F:\Shared\PUBWRKS\BLDGINSP\BldgInspMasterDrawings\B-128-Drawing Lap old and new lath to tie together - no paper between lath layers Break out 3" of existing stucco leaving both paper and lath Figure D New to Old Stucco Lap \\nwknas2\vol1\shared\pubwrks\bldginsp\bldg Insp Masters\B-128-ExteriorStuccoSidingInstallation.doc Page 4 of 5

Install window unit after side flashings have been installed. Do not nail top flange to framing unless specifically called for in manufacturer's printed instructions Install third flashing over top nailing flange and side flashings after window unit is installed. Window unit 1 st Step 2 nd Step Install first flashing sheet at the bottom of the window opening before window unit is installed Install second flashings at sides of window opening before window unit is installed. Side flashing must extend past and over the top of the bottom flashing. Figure E Flashing Windows F:\Shared\PUBWRKS\BLDGINSP\BldgInspMasterDrawings\B-128-Drawing 3 rd Step Weather resistant barrier slid under window flashing