The United States Air Force Design-Build Plus User s Guide

Similar documents
TABLE OF CONTENTS. Appendix A DoDEA UFC High Performance Sustainable Building Compliance Checklist...9. Version 2.0 August2017 Page 2

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

SECTION QUALITY CONTROL

SEC ESTABLISHMENT OF PANEL ON CONTRACTING INTEGRITY.

Chapter 4 State Requirements for Educational Facilities Section 4.1

REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System

UNIFIED FACILITIES CRITERIA (UFC) INACTIVE UNACCOMPANIED ENLISTED PERSONNEL HOUSING (UEPH) COMPLEXES

Volume II- Project Development Processes

EXHIBIT 6 Preconstruction Work

Template for ToR for Transaction Advisory Services

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services

TEXAS BOARD OF NURSING CONTRACT PROCUREMENT AND MANAGEMENT HANDBOOK JULY 2018

EJCDC Contract Documents for America s Infrastructure Buy online at the ACEC Business Resource Center

Student Government Office Renovations Design/Construction Administration Services Code Item 305

DEFENSE ACQUISITION UNIVERSITY FE Intermediate Facilities Engineering

EJCDC Contract Documents for America s Infrastructure Buy online at

ATTACHMENT D SCOPE OF SERVICES

ENGINEERING AND CONSTRUCTION BULLETIN. Expires: 4 Mar Aug No Issuing Office: CECW-CE Issued: 4 Mar Aug 2017, Rev 1

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services

Oversight Procedure 34 -Project Schedule Review. Competent scheduling is necessary for sound project planning and control of costs and risks.

Ohio Department of Transportation. Conflict of Interest Waiver Process Guidance Concerning Review of Conflict of Interest Waiver Requests

Ft Carson DPW SRM Program Support

EJCDC Contract Documents for America s Infrastructure Buy online at

Subject: Statement of Qualifications for Public Safety Building Design

Rick Carr, Arcadis U.S., Inc. Tim O Malley, The O Malley Group Bill Brannen, Mohave Educational Services Cooperative

Public Works Audit Preliminary Findings: Temporary Inmate Housing & City Hall Elevator Overhaul

DEPARTMENT OF THE ARMY ER U.S. Army Corps of Engineers CECW-CE Washington, DC Regulation No March 2017

Construction Project Delivery Methods

Construction Family of Documents

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement

STATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist

STATE OF MARYLAND DEPARTMENT OF GENERAL SERVICES

NC State University OESAD GUIDELINES Contract Year

PLEASANT GROVE CITY FIRE STATION AND POLICE AND COURTSBUILDINGS

Fairview Park City Schools Facilities Advisory Committee Meeting: 4/12/2017

STATE UNIVERSITY CONSTRUCTION FUND

REQUEST FOR QUALIFICATIONS ARCHITECTURAL DESIGN SERVICES

APPENDICES DESIGN REQUIREMENTS. Appendix A. Performance Criteria for Design Projects

Metro. Board Report SUBJECT: METRO EXPRESSLANES OPERATIONS AND MAINTENANCE TECHNICAL OVERSIGHT SUPPORT

Request for Proposals- Final RFP & Responses to Questions 10/26. Updates since Issuance in Red

SECTION REQUEST FOR PROPOSAL TO DESIGN BUILD (TITLE OF PROJECT) (PROJECT NO.) (LOCATION)

COAA EPCM CONTRACT PHILOSOPHY. COAA EPCM Contract Committee

SECTION CONTRACTOR QUALITY CONTROL

Diocese of San Diego BUILDING AND RENOVATION GUIDELINES. Table of Contents. Building and Renovation Committee Bylaws 2

PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Building Commissioning Services

REQUEST FOR PROPOSALS (RFP)

Independent Government Estimates A Fact Sheet

Subcontract Management Certification Program (ScMCP ) SUBCONTRACT MANAGEMENT TECHNICAL COMPETENCIES. SUBCONTRACT MANAGER (ScM)

Archdiocesan Procedures For Building and Renovation Projects

Archdiocesan Procedures For Building and Renovation Projects

Safety Analysis of Electronically Controlled Pneumatic Brake Equipment for Passenger Trains

PHASE 4 - Post-Award. Type of Feedback Type of Contract Feedback Category Feedback

AMERICAN INSTITUTE OF ARCHITECTS (AIA) DOCUMENT SUMMARY

REQUEST FOR PROPOSALS: CEO COMPENSATION AND EVALUATION SERVICES. Issue Date: April 30, Due Date: June 6, 2014

Third Party Contracts Quality Management Plan (TPCQMP) Revision 00 Issue Date: August 6, 2018

Environmental Planning & Coordination Organization

Procurement Under the New Requirements 1

Request for Proposals Triennial Performance Audit of Public Transit Systems and The Council of Governments in San Joaquin County

Session no. B LEAD WITH LEED

Effective Technical RFP Development: A Guide for Jurisdictions and Other Organizations December 19, 2016

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1)

Long Beach City Auditor s Office

MEMORANDUM FOR CHIEF ACQUISITION OFFICERS SENIOR PROCUREMENT EXECUTIVES. Improving the Management and Use of Interagency Acquisitions

Public Private Partnership Success Stories The Virginia Experience

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

Construction Documents Education Program

Request for Proposal: Due October 29, 2018, 2:00 pm

Centerwide System Level Procedure

VFA SAMPLE RFP (DETAILED FACILITY CONDITION ASSESSMENT)

1.0 ABOUT THE NU GUIDELINES

Information Technology Independent Verification and Validation

CHAPTER 3: DESIGN. TN Higher Education Designers Manual October 2018 Page 1 of 12

Amendment 01. Issued: August 18, For. RFP 18-KG-0725(BF): Professional Design Services for Douglass Valley Elementary School

Design Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright

ConsensusDocs. Catalog. Updated Docs Inside

Career Center Advance Planning/Design Services Code Item 321

Request for Proposals. 42nd Avenue Pump Station Rehabilitation. Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403

L.20; L.25; L.9; L.12;M.1; K; A]...

PUBLIC NOTICE REQUEST FOR QUALIFICATIONS SUBMISSION

REQUEST FOR PROPOSAL KIPDA REGIONAL FREIGHT PLAN MARCH 30, 2018

Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO

Audit and Risk Management Committee Charter

NAVAL POSTGRADUATE SCHOOL

ConsensusDocs. ConsensusDocs CONTRACTS CATALOG. Updated Docs Inside. ou Ah. ead o f the Cur v. e K

NYS PROCUREMENT BULLETIN PREFERRED SOURCE GUIDELINES

REQUEST FOR QUALIFICATIONS ARCHITECTURAL

REQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) SERVICES

THE NUCLEUS INNOVATION AND RESEARCH PARK PARKING GARAGE

Distribution Restriction Statement

RFP Feasibility Design Services: Clinical Education & Assessment Center Expansion Questions & Answers: February 13 th, 2018

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES. For the renovation of existing apartment buildings. August 15, 2016

Educational Sessions for Strategic Property Planning

ENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project

Exhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

JOB ORDER CONTRACTING / JOC A LEAN Best Management Practice for Efficient Construction Project Delivery

Transcription:

The United States Air Force Design-Build Plus User s Guide

Design-Build Plus User s Guide Section I. Introduction II. III. IV. References Executive Summary Roles and Responsibilities V. Project Development with Design-Build Plus (DB+) VI. VII. VIII. IX. Design-Build Plus Team Members Design-Build Plus Contractor Selection Criteria Preparation of DB+ Statements of Work for Concept Definition Preparation of Government Fee Estimates for Concept Definition X. Cost Analysis During Concept Definition XI. XII. Project Definition and RFP Development Checklist Level of Detail for DB+ RFP Development Appendix 1 Appendix 2 Design-Build Plus Process DB+ Roles & Relationships 2

I. Introduction The purpose of this guide is to familiarize the Air Force community, Program Managers, Base Civil Engineers, Chief Engineers, Project Engineers and Contracting Officers with the Design-Build Plus project delivery process. This User s Guide illustrates the process for implementing the Design-Build Plus contract vehicle. II. References III. Executive Summary USAF Project Manager s Guide for Design and Construction (latest edition) A-E Services Acquisition Guide (AFCEE) Current DB+ IDIQ construction services contract Construction Management Guide (AFCEE) Design-Build Plus (DB+) is a new acquisition method based on proven successes of the current Design-Build process. DB+ is an Air Force Center For Environmental Excellence (AFCEE) Indefinite Delivery Indefinite Quantity (IDIQ) contract vehicle. DB+ has been tailored to support MILCON Air Force military family housing (MFH). It can also accommodate other light commercial construction projects such as dormitories, transient lodging and administration facilities. It s use is currently limited to the continental United States (CONUS), Hawaii and Alaska. The process can be applied to the following project categories: MILCON Minor Construction Renovations The most significant difference between Design-Build and DB+ execution strategies is that a DB+ construction contractor is selected early in the planning and development stages to participate and contribute to the Concept Definition Phase of the project. DB+ contractors are selected using Fair Opportunity Consideration clauses contained in FAR 16.505 that have been incorporated into the master DB+ IDIQ contract. 3

The addition of a pre-qualified Design-Build construction contractor to the DB+ process during the Concept Definition phase of development to perform various studies and constructability reviews produces a much more refined Request For Proposal (RFP) document; i.e., the final concept design is based on current, extensive field investigations and construction experience which greatly reduces the uncertainties that lead to contract cost growth. The DB+ contractor receiving the RFP will have a greater overall understanding of the Air Force s project requirements The process may, depending upon complexity of the project, reduce the time line from Design Instruction (DI) to award of the Task Order for final design and construction. The DB+ IDIQ contract also provides the incentive of potential follow-on work to those DB+ contractors who produce the best work, reduce construction costs, exceed schedule expectations and provide a high quality facility. IV. Roles and Responsibilities The Design Agent (DA) or Air Force Project Manager (often, but not necessarily the same individual) is responsible for acquisition, funds allocation and the overall success of the process for the design or Title I Services through Concept Definition. This individual must be well organized and have a thorough knowledge of the DB+ process. They must monitor all activities and work aggressively to keep the process running smoothly. Their most important task is ensuring there is open and continual communication among all key players. The Design Agent (DA) The government organization that is responsible for the initiation and completion of design. The project manager for the DA will coordinate the A-E Statement of Work (SOW), development of the Request For Proposal (RFP) or Invitation For Bid (IFB), award of design contract, development of the design schedule, coordination of design review meetings and final delivery of Construction Contract Documents to the contracting authority that will award construction. Depending on the program, the DA may be either the Air Force Center for Environmental Excellence (AFCEE), the United States Army Corps of Engineers (USACE), or the Naval Facilities Engineering Command (NAVFAC). For Operations and Maintenance (O&M) projects and occasionally for Military Construction (MILCON) projects the base may act as the Design Agent. 4

Air Force Project Manager (AFPM) There are project managers at all levels; however, for DB+ purposes, this title will only apply to the PM at the MAJCOM, with the exception of Medical MILCON when the AFPM is at AFCEE. The AFPM is responsible for all aspects of the project from start to finish. The AFPM issues the Design Instruction (DI) and controls the funding, with the exception of Medical MILCON projects. The Programming Contracting Officer (PCO) is the AFCEE Contracting Officer responsible for awarding Task Orders (TO) for both design and construction. Separate Task Orders go the A/E for Title I services for Concept Definition as well as to the DB+ contractor for site specific studies and services in support of Concept Definition. A separate Task Order is issued for DB+ services for final design documents and construction in response to the RFP. At this point, the PCO normally transfers remaining contract administration responsibility to the Administrative Contracting Officer (ACO). The Administrative Contracting Officer (ACO) is the AFCEE Contracting Officer responsible for contract administration and management of the design and construction Task Orders. The ACO issues Notices to Proceed for design phases and construction based on authority delegated by the PCO. ACO authority is typically conferred to a Contracting Officer at the Base. The Construction Agent (CA) is the Air Force representative responsible for acquisition of construction and construction management (Title II) services. Advises CM of status and issues. The Construction Manager (CM) is the Air Force representative responsible for management of the construction program and its associated funds. The Major Command (MAJCOM) acts as the agent for the base and ultimately the end user. The MAJCOM prepares the Design Instruction, manages project changes and manages funds associated with the construction effort. It is responsible for oversight of the project from start to finish. The MAJCOM delegates execution authority to the CA for use of the DB+ process. The Base Project Manager (BPM) is the base-level representative on the DB+ team.. The BPM is responsible for coordination of base-level requirements, including those of the end user, and related information with the DB+ team. This individual is often appointed Contracting 5

Officer's Representative (COR) during construction in addition to serving as BPM. The Contracting Officer's Representative (COR) is the base-level representative appointed by the ACO to work directly with them regarding contract matters during construction. This may be accomplished by an A/E firm providing Title II services. The Title I Architect-Engineer (A/E) is responsible for development of Concept Definition in the form of predefined levels of design with cost estimates for use in the RFP. The Title II Architect-Engineer (A/E) (when authorized by the Project Management Plan) is responsible for detailed Title II Construction Management of the project. This includes participation in design reviews of construction documents prepared by the DB+ contractor's A/E designer, and surveillance and reporting of actual construction. This A/E can be but does not have to be the same A/E that provided Title I Concept Design services. The DB+ Contractor is an experienced construction contractor who will have as support a design firm and a varying number of specialized consultants engaged for the purpose of accomplishing work under the DB+ IDIQ contract. A DB+ contractor provides input/validation during Concept Definition. A DB+ contractor also responds to the RFP and upon award of a Task Order, completes design and construction documents and constructs the facility. The DB+ contractor receiving the RFP is normally the same DB+ contractor that participated in Concept Design but it does not have to be that same firm. DB+ contractors are selected for CD phase work and for the construction effort based upon Fair Opportunity Consideration guidelines as found in FAR 16.505 and incorporated into the master DB+ IDIQ contract. The End User is the organization that will occupy or use the completed facility. Their participation during the Concept Definition phase is critical to project success. The user works closely with the BPM and BCE technical staff to define all of the specific user requirements and priorities for the proposed facility. 6

V. Project Development with Design-Build Plus 1. DESIGN INSTRUCTION (DI) Establishes project requirement and Fiscal Year (FY) of appropriation Prepared and issued by MAJCOM Signifies funding availability Provides the START POINT of the project execution time line 2. PROJECT MANAGEMENT PLAN Developed by MAJCOM or AFCEE (DA) Establishes key roles and responsibilities for each phase of design and construction Delegates DA role and acknowledges varied project execution platforms available inclusive of DB+ 3. DESIGN AGENT PREPARES STATEMENTS OF WORK (SOW) AND CURRENT WORKING ESTIMATES (CWE) FOR TITLE I AND DB+ CONCEPT DEFINITION SUPPORT SERVICES: A/E selected from existing AFCEE, MAJCOM, or Base contracts DB+ contractor selected under Fair Opportunity Consideration guidelines and based on input from Base and MAJCOM Contracting Officer issues Task Orders to the selected A/E firm and DB+ contractor Respective Task Orders negotiated and signed by CO Title I A/E and DB+ contractor are now on board for Concept Definition Phase 4. CONCEPT DEFINITION PHASE Accomplish required field investigation such as site survey, soil borings, utility surveys, etc. (DB+ contractor) Hold on-site charrette to begin design process (Title I A/E, Government and DB+ contractor) Develop Initial design submittal and cost estimate (Title I A/E) Review of Initial design and cost estimate (Government and DB+ contractor) Develop Pre-Final design submittal and cost estimate (Title I A/E) Review of Pre-Final design and cost estimate (Government and DB+ contractor) 7

The DB+ contractor must be excluded from the process of drafting and reviewing the RFP document to avoid conflict of interest issues Develop draft Request For Proposal (RFP) (Title I A/E and Government) Review of draft RFP (Government) Prepare final RFP (Government) 5. CONTRACTING OFFICER ISSUES RFP TO DB+ CONTRACTOR Selection of DB+ contractor to receive the RFP is based on Fair Opportunity selection criteria This will usually be the same DB+ contractor that participated in Concept Definition but not always. Poor performance or problems arising during Concept Phase could cause selection of a different DB+ contractor to receive the RFP The DB+ IDIQ contract also affords the opportunity to obtain competitive proposals from each of the DB+ contractors on those occasions when it is in the best interest of the government. 6. CONTRACTING OFFICER RECEIVES RESPONSE TO RFP Technical proposal Price proposal Evaluation by Contracting Officer with technical review support Contracting Officer conducts negotiations if necessary 7. CONTRACTING OFFICER ISSUES TASK ORDER TO THE DB+ CONTRACTOR BASED ON THE APPROVED PROPOSAL TO COMPLETE DESIGN WORK AND CONSTRUCT THE FACILITY 8. PARTNERING If authorized by, and in accordance with guidance from the Project Management Plan (PMP), the formal partnering session may be held in conjunction with the pre-design or the preconstruction conference Partnering is particularly useful when Title II construction management services will be performed by an A/E other than the A/E used for Title I services for Concept Definition 9. CONSTRUCTION MANAGEMENT If requested by the MAJCOM, the DA and the remainder of the DB+ team that produced the 8

VI. DB+ Team Members Concept Design and RFP remains involved throughout the remaining design reviews and construction of the project Construction Management services can be accomplished with contract A/E or AF resources If the MAJCOM authorized use of a contract A/E for Title II Services, the CA prepares a Statement of Work (SOW) and CWE. This step must begin early enough to permit the Title II contract to be in place close to the award date of the Task Order for construction to the DB+ contractor. A/E is selected from existing contracts. Note that the A/E selected for Title II Services does not have to be the same A/E used for Concept Definition Contracting Officer negotiates if necessary and signs the Task Order for Title II Services 10. COMPLETE DESIGN DOCUMENTS AND CONSTRUCT FACILITY DB+ contractor s A/E now completes the drawings and specifications based on the approved RFP response and the requirements of the RFP. This process is similar to a conventional Design-Build project The DB+ Team is defined by AFCEE based on MAJCOM requirements. The government members are typically the DA, AFPM, MAJCOM PM, BPM and the Contracting Officer. The A/E selected to provide Title I Services for Concept Definition Phase is a member. The DB+ contractor selected to provide specific services in support of the Concept Definition Phase is a member. Note that this DB+ contractor participates in concept design and cost reviews as required by the SOW. He must be excluded, however, from participation in the actual drafting and final preparation of the RFP to avoid appearance of a conflict of interest. The A/E selected to provide Title II Construction Management Services may be a member of the DB+ Team. Note that the A/E selected for Title II Services can be but does not have to be the same A/E that provided Title I Concept Definition 9

VII. DB+ Contractor Selection Criteria services. The Title I A/E is selected for it s design and programming strengths. That firm s Title II (Construction Management) expertise may not be equally as strong. AFCEE, MAJCOM, and the Base have extensive experience with firms that specialize in Title II work. Construction Management may also be provided by AF in-house resources. DB+ affords the opportunity to maximize resources to accomplish the project. The DB+ Contractor that receives the Task Order to complete the design and construct the facility is a member. Each contractor under the current DB+IDIQ contract has the potential to receive varying percentages of the program ceiling amount depending largely on their performance on previous task orders under this contract. The selection of all DB+ contractors is based on Fair Opportunity Consideration criteria (FAR 16.505) as follows: Past performance on earlier tasks under this multiple award contract Enhancements provided in past and current projects Customer satisfaction and input on previous work for MAJCOM or base Quality, timeliness and warranty of deliverables Compliance with small business plans, local laws and regulations Availability of labor and resources (capacity to perform), bonding capacity Proximity to the proposed work site and current or past work on base Price or Cost (using matrix of contractorspecific costs)economy and efficiency as a logical follow-on to an already issued Task Order under the contract Urgency of need for the services The current listing of DB+ Contractors can be found on the AFCEE Contracting Web Site. 10

VIII. Preparation of DB+ Statements of Work for Concept Definition The Design Agent (DA) Project Manager prepares the DB+ Statements of Work (SOW). The SOW for the Title I A/E Services for the Concept Definition phase typically addresses the following topics: Surveys, investigations and charrette requirements Preliminary Submittal requirements (drawings, cost analysis, marked-up draft specifications and preliminary design analysis) Advanced Final Submittal requirements (drawings, specifications, cost analysis, draft SOW for DB+ RFP, and design analysis) Final Submittal requirements (100% Concept Definition drawings, specifications, final cost analysis, and SOW for RFP in final form) Cost analysis requirements Other unique requirements The SOW for the DB+ contractor will include, but is not limited to the following: Requirements for investigations, studies, surveys and reports in support of the Concept Definition phase. These typically include but are not limited to topographic surveys, soils investigation and analysis, soil borings, utility surveys, hazardous material surveys, verification of existing conditions and available data Perform constructability reviews and cost validations on Title I Concept Definition submittals Support design review conferences and make recommendations regarding construction, building systems and technology IX. Preparation of Government Fee Estimates for Concept Definition A. Title I A/E SERVICES Traditional rules of thumb are of limited use when gauging the level of effort required to complete Concept Design documents for the RFP. A key difference is that the Title I A/E will not create full sets of drawings or specifications. The Title I A/E will, however, provide initial concept designs with cost estimates and design analysis for review and based on that review, final limited concept design drawings with cost estimates and a combination of prescriptive and performance specifications. 11

B. DB+ Contractor The SOW will indicate the specific investigations, finite work elements and deliverables the DB+ Contractor is to accomplish. One of the best cost guides is comparison with similar work elements that have been obtained for other projects at the specific Base. A/E s which have executed previous traditional Title I Services (full design packages) for that Base will have contracted for similar studies and can be a resource for cost parameters. X. Cost Analysis During Concept Definition A. Title I A/E Prepares an initial cost estimate as part of the charrette report Updates the previous cost estimate as more information becomes available as part of the Initial Design submittal Further updates the Initial Design submittal estimate to provide an even more refined cost estimate as part of the Pre-Final Design submittal All cost estimates are in Construction Specification Institute (CSI) format B. DB+ Contractor Prepares a cost estimate, in CSI format, based on Initial Design submittal to validate cost against scope Prepares a cost estimate, in CSI format, based on Pre- Final Design submittal to validate cost against scope C. AFCEE/DCM Prepares a parallel Parametric Cost Estimating System (PACES) cost estimate based on Initial Design submittal Prepares a parallel PACES cost estimate based on Pre- Final Design submittal D. AFCEE/PK Performs a cost analysis of the price proposal portion of the response to the RFP 12

XI. Project Definition and RFP Development Checklist The following table serves as a reference to requirements for Design-Build Plus projects during Project Definition and RFP development. Project Definition and RFP Development Checklist Action 1. Conduct Pre-definition Conference 2. Issue Notice to Proceed under Concept Definition Task Order 3. Define customer requirements 4. Gather information 5. Conduct Charrette 6. Initial Design submittal and Review 7. Pre-Final Design submittal and Review 8. Prepare RFP Documents 9. Prepare RFP draft Statement of Work 10. Review RFP draft Statement of Work 11. Obtain funding 12. Perform final RFP review 13. Issue RFP 14. Conduct Pre-proposal conference 15. Manage inquiries 16. Amend RFP, if necessary Office of Primary Responsibility Air Force Project Manager Contracting Officer Design-Build Plus team (includes DB+ contractor) Design-Build Plus team (includes DB+ contractor) Design-Build Plus team (includes DB+ contractor) Design-Build Plus team (includes DB+ contractor) Design-Build Plus team (includes DB+ contractor) Contracting Officer Title I A/E and Gov t (excluding DB+ contractor) Air Force Project Manager Air Force Project Manager DB+ team (excluding DB+ contractor) Contracting Officer Air Force Project Manager and Contracting Officer Contracting Officer Contacting Officer and Air Force Project Manager 13

XII. Typical Level of Detail for Design-Build Plus RFP Development Typical Level of Detail for Design-Build Plus Request For Proposal (RFP) Development Modified UNIFORM Contract Format Design Element Specifications Narrative Level of completion of RFP drawings 10% 20% 30% 60% 100% Site Prescriptive x------------x Utilities x------------x Floor Plan N/A No x------------x Elevations N/A No x------------x Finishes Prescriptive No x-----x Schedules Prescriptive No x-----x HVAC Plumbing Controls Power Lighting Prescriptive Fire Protection Foundations Floor Framing Roof Framing Details Notes: Specifications must be of such a nature as to allow for quantifiable analysis and costing Prescriptive specifications: define the specific material and/or process to be used in the project specifications: define the use or condition of the end product without providing specific details Narrative specifications: are general specifications defining the concept, content and need of the facility or components Reports: Technical reports should be included to provide Offerors with as much information as possible regarding the existing conditions of the site and any preexisting structures. Examples include reports of geotechnical and environmental findings and as-built conditions of facilities to be demolished The more the DB+ contractor can accomplish beyond a basic 35% design the better 14

15

16