Meeting Vietnam s Energy Demands in a Sustainable Way

Similar documents
Trung Son Hydropower. Project Overview and Description

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. VN-Trung Son Hydropower Project

New Approaches for Medium-Scale Hydropower Development in Vietnam

NEPAL LOOKS TO VIETNAM FOR BEST PRACTICES IN HYDROPOWER DEVELOPMENT

E2248 v9. Appendix A: EIA of Resettlement Sites

Environmental Management Plan

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region

10 Project Cost Estimation

Environmental and Social Review Summary. Hoi Xuan Hydropower Project

Lam Du Son Vice President of EVN, Vietnam

MOIT FiT Circular No. 02 Decision No. 39

Nam Theun 2. TNC workshop April 2014

FLOOD MANAGEMENT IN THE RED THAI BINH RIVER BASIN VIET NAM

E2248 V6. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

ENVIRONMENTAL MANAGEMENT PLAN

Current Status of Energy in Viet Nam: Tran Thuc

Cao trình đập bê tông trọng lực vị trí I

2.16 NAM POT HYDROPOWER PROJECT

2.6 NAM FA HYROPOWER PROJECT

2.32 XESET 2 HYDROPOWER PROJECT

2.24 VIENGPHOUKA THERMAL PROJECT

JOBS AROUND THE WORLD

Current Status of Energy in Viet Nam. Assoc. Prof. Dr. Tran Thuc Director, Institute of Meteorology and Hydrology

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region

Study on Economic Partnership Projects in Developing Countries in FY2013. Final Report SUMMARY. February 2014

TRUNG SON HYDROPOWER PROJECT MANAGEMENT BOARD VIETNAM TRUNG SON HYDROELECTRIC PROJECT ENVIRONMENTAL ASSESSMENT EXECUTIVE SUMMARY

ENVIRONMENTAL MANAGEMENT PLAN (EMP)

ASIAN DISASTER REDUCTION CENTER Visiting Researcher Program (FY2017B)

Case Presentation: Law for Benefit sharing on hydropower projects in Viet Nam - & - Linking national benefit sharing to Transboundary benefit sharing

Climate change adaptation from small and medium scale hydropower plants: A case study for Lao Cai province

2.29 XE KONG 5 HYDROPOWER PROJECT

Implementation Status & Results Vietnam Second Transmission and Distribution Project (P084871)

VIETNAM ELECTRICITY TRUNGSON HYDROPOWER COMPANY LIMITED ENVIRONMENTAL MANAGEMENT PLAN

Feasibility Study on Pakbeng Hydropower Project

Report of contruction and camp management of Trung Sơn hydropower project TABLE OF CONTENTS 1. GENERAL... 7

PHASE 2 IMPLEMENTATION PLAN

Environmental and social impacts of smallscale. Issues and Challenges. Glenn Morgan (LCSEN) World Bank Water Week February 18, 2009

D ÁN TH Y I N TRUNG S N TRUNG SON HYDROPOWER PROJECT THI T K K THU T TECHNICAL DESIGN MÔ HÌNH V N HÀNH H CH A OPERATION MODEL OF RESERVOIR

CAMBODIA ENERGY SECTOR

Agroecological zoning for extension of climate friendly agriculture in some provinces of Northwest Vietnam

Electricity of Vietnam EVN Hydropower Project Management Board- HPMB Trung Son Hydroelectric Development Project

82 nd Annual meeting of ICOLD Bali, Indonesia, June 2 nd to 6 th, 2014 ICOLD «Ad Hoc Committee on Prospective and Challenges»

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

Climate Change: Impacts and Opportunities for the Red River Basin and Delta, Vietnam

Broad aims of the SEA. SEA SUMMARY OVERVIEW REGIONAL MITIGATION ASSESSMENT WORKSHOP Ho Chi Minh City June The context for the SEA

C. Project Description [from section 3 of PCN] The proposed project would comprise of the following three components:

Field Research Fellowship Program for Biodiversity Conservation. Nurturing a New Generation of Vietnamese Conservationists

Building software for optimal calculation of electricity system and results of optimal calculation and operation of Vietnam's electricity system

SECOND MISSION ENVIRONMENTAL AND SOCIAL PANEL OF EXPERTS (POE) TRUNG SON HYDROPOWER PROJECT MANAGEMENT BOARD (TSHPMB) FINAL REPORT.

FLOOD MANAGEMENT IN THE RED THAI BINH RIVER BASIN

Executive summary of research results and recommendations. Research team of GRET Hanoi, March 31 st, 2008

Socialist Republic of Viet Nam FY2016 Ex-Post Evaluation of Japanese ODA Loan Project Energy Efficiency and Renewable Energy Promoting Project

Environmental Safeguards Framework (ESF)

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

Joint Collaboration in Research and Educational Exchange Between Thuyloi & Kyoto Universities

SALINITY INTRUSION TREND IN RIVER AND CANAL SYSTEMS AND SOME PREVENTION METHODS IN BEN TRE PROVINCE

COMPLIANCE REPORT ASSESSING APPLICATION OF ARTICLE 11 b (6) OF EMISSIONS TRADING DIRECTIVE TO HYDROELECTRIC PROJECT ACTIVITIES EXCEEDING 20 MW

Comparing alternative PDPs for the Greater Mekong Subregion

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Promoting Poor Women s Participation in Water Resources Management in Periurban Hanoi

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

National Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR

Completion Report. People s Republic of China: Hebei Zhanghewan Pumped Storage Project. Project Number: Loan Number: 1922 August 2014

AN OVERVIEW OF TANAHU HYDROPOWER PROJECT. Presented by: Achyut Ghimire TANAHU HYDROPOWER PROJECT TRADE TOWER, THAPATHALI, KATHMANDU

STAKEHOLDERS, PARTICIPATION AND BENEFIT SHARING: APPROACH TO MIDDLE YEYWA

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Kabeli Transmission Project

Vietnam Ex-Post Evaluation of Japanese ODA Loan Project Da Nhim Power System Rehabilitation Project

VGS Monitoring Report Longhe 1.03MW Hydro Power Project (GS 482)

Using Traditional Swidden Agriculture to Enhance Rural Livelihoods in Vietnam s Uplands

2622-BAN: Natural Gas Access Improvement Project, Part A: Ashuganj and Elenga Compression Station

VIE: Northern Power Transmission Expansion (Sector) Project

DAM SAFETY in Vietnam CHALLENGES AND ISSUES

CURRENT STATUS & DEVELOPMENT PLAN FOR GRID SMALL HYDRO POWER IN VIETNAM - BARRIERS & MEASURES TO OVERCOME BARRIERS IN THE FUTURE

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1

1. Introduction. Pham Xuan Phu 1, and Ngo Thuy Bao Tran 2

Vietnam enacts key power sector restructuring reforms

7. LANGUAGES/ DEGREE OF PROFICIENCY English Excellent

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

Profiles of 12 proposed Mainstream developments in the LMB

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6042. Date ISDS Prepared/Updated: 01/26/2011 I. BASIC INFORMATION. A. Basic Project Data

Grafton Hydro, LLC. 55 Union Street, 4 th Floor Boston, MA, USA Tel: Fax: October 9, 2015

THE DAMS NEWSLETTER. At the beginning of 2007 only eight years remain to face up to the challenges that. Country Profile: Vietnam, new ICOLD member

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016

Bhutan: Rural Renewable Energy Development Project (Part D Biogas Plants)

Sri: Sustainable Power Sector Support Project

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5136 Project Name

BURUNDI, RWANDA, TANZANIA

Project Site. China. Hanoi. Myanmar Laos. Thailand Vietnam. Cambodia Ho Chi Minh. Malaysia

SUMMARY 2013 EDITION

NORTHERN POWER TRANSMISSION EXPANSION PROJECT

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6558 Project Name. Danang Sustainable City Development Project (SCDP) Region

MEKONG SITE VISIT TO LAOS FIRST TWO MAINSTREAM DAM PROJECTS. Letters from the EXECUTIVE SUMMARY OF THE SECOND LETTERS FROM THE MEKONG ISSUE BRIEF

Alternative visions for the Mekong Delta and the basin national and regional energy development

ENVIRONMENT ASSESSMENT TOOLS FOR IMPROVING THE SUSTAINABILITY OF DEVELOPMENT IN THE MEKONG REGION

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Assessing Water Quality for International Hydropower Projects

The LMB Sustainable Hydropower Development Strategy. Regional Power Trade Coordination Committee 24 Nay Pyi Taw, 20 June 2018

Improving Water Security for the future through IWRM and better Water Governance in the Red Thai Binh river basin (Vietnam)

Implementation Status & Results Vietnam VIETNAM WATER RESOURCES ASSISTANCE (P065898)

Transcription:

TRUNG SON HYDROPOWER PROJECT Meeting Vietnam s Energy Demands in a Sustainable Way Photo by: World Bank

1 Photo by: Mai Ky/World Bank, 2012

OVERVIEW Trung Son Hydropower Project (TSHPP) is a US$411.57 million medium-sized hydropower development located in Northwest Vietnam that will supply least-cost electric power for domestic consumption in an environmentally and socially sustainable manner. The project will also contribute to the climate change agenda in Vietnam by avoiding CO2 emissions of about 1 million tons per year (net) taking into account the additional low emissions from its reservoir. TSHPP will enable Vietnam to add an additional 260MW of electricity-generating capacity to service power expansion and meet energy demands of Vietnamese society as the country continues its economic growth, while ensuring key conditions like energy security and climate change are contemplated. The project responds to and is circumscribed into the integrated hydrological basin studies conducted as part of developing the Energy Master Plan for Vietnam and its subsequent revisions and is part of a broader World Bank energy assistance strategy for the country. Trung Son Hydropower Project was approved by the World Bank Board of Executive Directors on April 26th, 2011, and is the first World Bank investment project under IBRD lending conditions to the Government of Vietnam. The World Bank is providing financial support in the form of a loan of US$330 million payable with a 27 year maturity and a grace period of 6 years. Trung Son Hydropower Project 2

CHALLENGES Vietnam s annual growth rate of 7-8% during the period of 1996-2010 has led to an increasing demand for power. Electricity consumption in Vietnam has been growing at 15% annually for the past several years. Chronic power shortages are affecting the agricultural, industrial and services sector, while many houses still have no reliable supply of electricity. To meet this demand estimated at an installed capacity of 39GW by 2020, compared to 15.8 GW in 2008 the Government is developing a range of power sources, including hydropower. As climate change impacts create increasing national concern, a series of hydropower plants that provide clean, renewable and lowcost energy have been planned. Vietnam is keen to improve the social and environmental performance of these projects, and Trung Son Hydropower Project is an opportunity to show the progress Vietnam has made in developing a legal and policy framework that complies with the Bank s safeguards policies. The World Bank has a history of involvement in Vietnam s power sector dating to the early 1990s. The US$330 million IBRD loan for TSHPP includes support for equipment, civil works and technical assistance. A sum of US$26 million is reserved for improved resettlement, livelihood development, support for ethnic minorities and environment protection. Through the project, the World Bank will also provide technical support to Vietnam Electricity (EVN), the state-owned power utility, in improving the performance of its hydropower projects in dam safety and operations as well as in adopting international standards in social and environmental practices. THE WORLD BANK 3 Photo by: Mai Ky/World Bank, 2012

Challenges Vietnam s annual growth rate of 7-8% during the period of 1996-2010 has led to an increasing demand for power. Electricity consumption in Vietnam has been growing at 15% annually for the past several years. Chronic power shortages are affecting the agricultural, industrial and services sector, while many houses still have no reliable supply of electricity. To meet this demand estimated at an installed capacity of 39GW by 2020, compared to 15.8 GW in 2008 the Government is developing a range of power sources, including hydropower. As climate change impacts create increasing national concern, a series of hydropower plants that provide clean, renewable and low-cost energy have been planned. Vietnam is keen to improve the social and environmental performance of these projects, and Trung Son Hydropower Project is an opportunity to show the progress Vietnam has made in developing a legal and policy framework that complies with the Bank s safeguards policies. The World Bank has a history of involvement in Vietnam s power sector dating to the early 1990s. The US$330 million IBRD loan for TSHPP includes support for equipment, civil works and technical assistance. A sum of US$26 million is reserved for improved resettlement, livelihood development, support for ethnic minorities and environment protection. Through the project, the World Bank will also provide technical support to Vietnam Electricity (EVN), the state-owned power utility, in improving the performance of its hydropower projects in dam safety and operations as well as in adopting international standards in social and environmental practices. Trung Son Hydropower Project 4

APPROACH TSHPP implementation is being undertaken by the Trung Son Hydropower Company (TSHPCo), a wholly owned subsidiary of EVN. It is responsible for ensuring the entire project is implemented according to both Government and World Bank requirements as well as international best practices. The TSHPCo has a dedicated website (http: //www.trungsonhp.vn) where all relevant information on the project is publicly available and regularly updated. Photo by: Mai Ky/World Bank, 2012 PROJECT LAYOUT THE WORLD BANK 5

TSHPP includes the development, construction, and operation of the power plant using water from the Ma River and releasing it into the same basin. The project dam site is located 48 km from the border with Lao PDR in Son La, Thanh Hoa and Hoa Binh provinces in northwestern Vietnam. The main features of the project include: 84.5 meter-high dam on the Ma River; 13.13 square-kilometer reservoir; Powerhouse containing four 65 MW Francis turbines (260 MW installed capacity) each designed for a maximum water head of about 72 m; 65 kilometer-long 220-kV transmission line to the Vietnamese national grid; Over 20 kilometer access road connecting the road system to the project site; Social, environmental and community relations programs to mitigate project impacts to impacted populations of about 10.000 people. Of these, over 7,000 people are directly impacted in the main projects area. Trung Son Hydropower Project also has a robust, multi-layer monitoring and evaluation framework consisting of the following elements: Project Technical Advisory Panel (PTAP) to advise on technical construction, operations, and dam safety issues during the construction phase of the project. Panel of Environmental and Social Experts (POE), to advise on environmental and social issues as well as the independent grievance process. Independent Monitoring Consultants (IMC) to independently review activities by both contractors and TSHPCo. Regular World Bank Supervision to monitor technical, fiduciary, procurement, social and environmental safeguards compliance. Trung Son Hydropower Project 6

7 Photo by: Mai Ky/World Bank, 2012

BENEFITS THE WORLD BANK The project s development objective is linked to supply of the least-cost electric power in a safe and environmentally and socially sustainable way. Direct benefits include: Improvement in living conditions for over 2,000 people that will be relocated; Livelihood restoration activities for over 7,000 people whose household are affected by the project; US$2 million for specific environmental programs that go further than the EMP, including US$700,000 for the protection of 3 natural biodiversity preserves in the Project areas; Continuous consultations with villagers on their preferences related to the social change; Employment opportunities for Vietnamese workers during construction years; Improved road access for villagers and surrounding areas, including 25 km access road connecting the Project site; Increase Vietnam s power supply with an additional 1019GW a year; while CO2 emissions of about 1 million tons per year will be avoided; Provide flood control benefits through a water storage capacity of 112 million m3. Photo by: Mai Ky/World Bank, 2012 Trung Son Hydropower Project 8

WORLD BANK CONTRIBUTION The World Bank is providing financial support in the form of a loan of US$330 million payable with a 27 year maturity and a grace period of 6 years. The loan includes support for equipment, civil works and technical assistance. The project is composed of four components and the IBRD funding allocation is distributed as follows: The Dam and Ancillary Construction Component, providing the basis on which least cost electric power is generated. The total cost is estimated at US$262.86 million, of which IBRD will provide US$233.76 million. The Transmission Line Component is the means by which the power generated is moved to electricity consumers. The total cost for this component is US$18.61 million, of which IBRD will provide the full amount. The Social and Environment Impact Mitigation Component ensures the environmental sustainability and socially responsible construction and operation of the Trung Son Hydropower Plant. The total cost for this component is estimated at US$35.47 million, of which IBRD will provide US$16.53 million. The Capacity Development and Scaleup Component scales up the impact of the environmental sustainability and socially responsible construction of the plant by leveraging the knowledge gained to other projects in Vietnam. The total cost is estimated at US$3.0 million, of which IBRD will provide the full amount. THE WORLD BANK 9 Photo by: Mai Ky/World Bank, 2012

To w a r d the Future The TSHPP is a good example of a welldesigned, medium-scale hydropower project prepared according to international good practices in technical design incorporating comprehensive environmental, social and dam safety elements. Given Vietnam s plans to develop other medium scale hydropower projects in the coming years, the first hydropower project that the World Bank is financing in Vietnam can serve as a good practice example upon which subsequent projects can be developed and implemented. In addition, the Trung Son Hydropower Project can become an example of how hydropower can help support Vietnam s development in an economically, environmentally and socially sustainable way. Trung Son Hydropower Project 10

IBRD 37776 104 30 E 104 30 E VIETNAM CHINA TRUNG SON HYDROPOWER PROJECT M a 104 45 E 104 45 E 105 00 E 105 00 E 6 S O N 20 45 N L A Map 2: Area of Project Activities HANOI XUAN NHA Quanh H O A PROJECT DAM SITE Trung Son Hydro Project Site DEAD LEVEL (150 meter contour) PROJECT ROAD TAN XUAN Trung Son Hydro Project Site Co Me Village Reservoir tail at 160m level is 9.5km from international boundary COMMUNE BOUNDARIES TAM CHUNG Muong Lat Kil Ma oc Cha L PROVINCE BOUNDARIES Co Luong Village Lal TT. MUONG G LLAT LA A Hydrological gauging station DISTRICT BOUNDARIES CAMBODIA a TEN TAN 20 30 N MUONG LAT INTERNATIONAL BOUNDARIES 104 30 E 104 45 E 104 45 E 2 4 6 8 104 45 E 20 45 N a 10 Kilometers 105 00 E Fusegate and Emergency Spillway Co Me to Co Luong Access Road Khu BTTN Hang Kia-Pà Cò Quan C o Me V illa g e h H O A Khu BTTN Xuân Nha LAO PEOPLE S DEM. REP. 0 105 00 E 105 00 E L A 20 30 N 15A QUAN HOA 6 S O N n H O A u LAO PEOPLE S DEM. REP. i O M MOC CHAU T H A N H TRUNG N LY nl Sa This map was produced by the Map Design Unit of The World Bank. The boundaries, colors, denominations and any other information shown on this map do not imply, on the part of The World Bank Group, any judgment on the legal status of any territory, or any endorsement or acceptance of such boundaries. e Ho u Lip Houa yh en NATURE AREAS 35kV line M BORROW PITS Mai Chau 15A 35kV line (Second Rural Energy Project, Cr. 4000 VN) MAIN ROADS 35 kv TRANSMISSION LINES 110/35kV Substation TRUNG G SON Can TEMPORARY ROAD/USED ONLY DURING CONSTRUCTION PHASE OF THE PROJECT THAILAND 20 45 N MAI CHAU Pu Song LAO PEOPLE S DEM. REP. FUTURE RESERVOIR (160 meter contour) E B I N H CORE RLDP PROJECT AREA Ng hia u LAO PEOPLE'S DEM. REP. MOC CHAU 20 45 N B I N H MAI CHAU Mai Chau Construction Camp Pen Stocks Powerhouse 15A Trung Son Hydro Project Site Borrow Pit Ma Co Me Village Spillway 1 50m M a Dea Co Luong Village d Le Trung Son Dam 260MW capacity height 84.5 m crest length 513 m Construction Camp ve l Muong Lat Ma T H A N H 20 30 N MUONG LAT H O A Co 20 30 N Khu BTTN Pù Hu e M ge id Br 15A QUAN HOA M a LAO PEOPLE S DEM. REP. 0 2 4 6 8 Quanh 10 Kilometers 104 45 E 0 250 500 Meters Borrow Pit 105 00 E DECEMBER 2010 2012 The World Bank The International Bank for Reconstruction and Development The World Bank Group 1818 H Street, NW Washington, DC 20433, USA October 2012 For more information about the Trung Son Project, please visit: http://www.worldbank.org/en/country/vietnam and http: //www.trungsonhp.vn World Bank Vietnam Country Office contacts: 8th Floor, 63 Ly Thai To, Hanoi, Vietnam vietnam@worldbank.org THE WORLD BANK