BECx Design Phase Specification Review Workshop. Design Phase. Construction Risk Management. Building Enclosure Coordination Process

Similar documents
BUILDING ENCLOSURE COMMISSIONING PLAN PROJECT NAME

Risk Management for the Building Enclosure. Why Whole Building Commissioning. Building Enclosure Impact on Occupant Satisfaction 5/4/2016

Finding Value in Building Enclosure Commissioning

Building Enclosure Commissioning of a Student Athletic Facility

Build it Right the First Time: Building Envelope Commissioning/ Retro-Commissioning

Practices for Installing

Introduction. ED02 White Paper Paul Meyer, PE, LEED AP BD+C, CEM, CBCP Senior Vice President, Commissioning WSP Parsons Brinckerhoff 1

Performance Testing for Quality Assurance and Commissioning

Building Enclosure Pre-construction Meeting

Designing and Constructing a High-Performance Building Envelope for Multi-Unit Affordable Housing

SECTION STAINLESS STEEL WALL PANELS

SECTION QUALITY REQUIREMENTS

Quality Control of Air Barriers During Construction

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

Guideline for Building Envelope Commissioning: New Buildings

Audio Sessions. Session 5 MEETINGS. Construction Contract Administration Education Program

The Air Barrier Pre-Installation Meeting

NIBS Guideline

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

2004 MASTER FORMAT SECTION Façade Panels

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Commissioning: What Architects Need to Know

Student Services & Classroom Addition

Building Envelope Commissioning and Building Diagnostic Test: Case Studies Course Number: CXENERGY1506

SECTION AIR AND VAPOR BARRIERS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Accella Polyurethane Systems, LLC

NOTICE TO BIDDERS OF RECORD

Commissioning the Building Envelope

Air Barrier and shelf angle design, detailing, and lessons learned

Cardinal Commercial Products ALUMINUM STOREFRONT SYSTEM SERIES CF450 GUIDE SPECIFICATIONS SECTION ALUMINUM ENTRANCES AND STOREFRONT SYSTEMS

Architectural Building Envelope Consulting Group

SECTION STRUCTURAL INSULATED PANELS

SECTION EXTERIOR SOLID PHENOLIC RAINSCREEN PANELS

ReCote Finish System over Concrete

QUALITY REQUIREMENTS

Gensler 2014/06/16 Hertz Global Headquarters ISSUE FOR BUILDING PERMIT Estero, Florida SECTION

EXHIBIT 6 Preconstruction Work

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 07 Thermal and Moisture Protection 8400 Firestopping

SECTION FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR PERMEABLE

Success Via Vigilance Breaks

Commissioning at NYP. Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015

Communications Contractor QA/QC Plan Sample

APPENDIX D CONSTRUCTION PHASE CRITERIA

SECTION EXTERIOR GRILLS AND SCREENS

ADDENDUM. Ocean County College Purchasing Department. MEP & Envelope Commissioning Services Ocean County College Bid # 16/17 Q-12

FTA-DOT QA/QC Plan Sample Selected pages (not a complete plan)

Window Installation Instructions Fixed Systems with Subframes

SECTION FOAMED-IN-PLACE INSULATION

DESIGN AND CONSTRUCTION STANDARDS OUTLINE SPECIFICATIONS

Building Enclosure Performance for Existing and New Buildings

Window Installation Instructions Hung Window Systems with Receptor Pan

Window Installation Instructions Series 1000 Steel Replica Window

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

603 Summit Avenue, Suite 102 Greensboro, N.C Voice/FAX (336)

EXPERTS PREVENTING CONSTRUCTION DEFECTS THROUGH EFFECTIVE QUALITY CONTROL. Gregory Pestine, P.E. Civil Engineer Robson Forensic, Inc.

A. Section includes fluid applied, vapor permeable membrane air barriers.

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS

Why test a system that has already been tested? Typical Manufacturers information for window to wall interface and basis for reported test results.

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS

Building Enclosure Commissioning

SECTION PORCELAIN TILE WALL SYSTEM. (Porcelanosa Venis Urbatek)

SECTION COPPER WALL PANELS. ***This section has been updated to IBC. Verify for specific project conditions.***

Guideline Exterior Enclosure Technical Requirements for The Commissioning Process

Fire Protection Contractor QA/QC Plan Sample

Commissioning at NYP. Joseph Lorino, PE, LEED Corporate Director April 1, 2014

Commissioning Under the Influence

SECTION CLADDING SUPPORT SYSTEMS

Exterior Elevated Elements Inspection Guidelines

COMMISSIONING PROCESS FOR BUILDINGS AND SYSTEMS ASHRAE STANDARD 202

BUILDING ENCLOSURE AIR TIGHTNESS TESTING Course Number: BCLUNA018-01P

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

P-196 MARINE CORPS RESERVE VEHICLE MAINTENANCE FACILITY NWS CHARLESTON, SC SECTION DESIGN AND CONSTRUCTION QUALITY CONTROL 11/07

1 P a g e w w w. s m o k e c o n t r o l. c o m. a u

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

SECTION THERMAL INSULATION

SECTION CONTRACTOR QUALITY CONTROL

Energy Rating Index Performance Path Fact Sheet Development

ROOF BALLAST MATERIALS ARCHITECTURAL CONCRETE PAVING SLABS SRS LEVELING BLOCK SYSTEM INSTALLATION PART GENERAL 1.

PART 1 / GENERAL SECTION ALUMINUM PLATE PANEL SYSTEM. ALPLY Insulated Panels. Alply TECH WALL Aluminum Plate System 2002

Building Enclosure Commissioning: Who, What, When, Why, and How?

MSBA OWNERS PROJECT MANAGER ROUNDTABLE

SECTION SOUND CONTROL DOORS

PROJECT LOCATION SECTION COPPER METAL PLATE WALL PANELS

Oil and Gas Contractor QA/QC Plan Sample Selected pages (not a complete plan)

GENERAL NOTES ON SAMPLE PROJECT CLOSEOUT CHECKLIST

SECTION Arisfor WallGuard

SRP-AirOutshield UV Issued:

A62 UT PRE-CONSTRUCTION MEETING AGENDA

What Contractors Need to Know about LEED Commissioning & IAQ Management

Special Inspections Program Procedures - IBC Section 1704 Special Inspections - Index:

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS DAVIS, CALIFORNIA

Master Specification WALLTITE Eco v.3 by BASF Canada Inc. Section SPRAY POLYURETHANE FOAM INSULATION Page 1

RFP for Building Enclosure Consulting Services Proposal Request No Answers to Questions Asked as of 11/01/2017

Master Specification ENERTITE by BASF Canada Inc. Section SPRAY POLYURETHANE FOAM INSULATION Page 1

Master Specification WALLTITE ECO v.2 by BASF Canada Inc. Section SPRAY POLYURETHANE FOAM INSULATION Page 1

SECTION ALUMINUM WINDOWS

Insulation manufacturer to submit dew point analysis free of charge for typical wall section. Analysis by:

[Project Name] Section [ ]

A. Remove Table of Contents and insert new attached Table of Contents.

A62 PRE-CONSTRUCTION MEETING AGENDA

Transcription:

BECx Design Phase Specification Review Workshop Building Enclosure Commissioning: Train the Trainer Iowa State University, Ames Iowa May 10 12, 2016 Presented by William R. Nash Design Phase Pre Design Design Construction Occupancy & Operation Phase Building Enclosure Coordination Process Building Enclosure Coordination Process (BECP): The process by which the design and constructed performance of building enclosure materials, components, assemblies and systems are verified to meet defined objectives and requirements of the project as established by the Owner. Building Enclosure Risk Management Components of a Building Enclosure Coordination Program BE Assessment during estimating of contract documents BE Shop drawings / submittal review BE Mock Ups / Performance Testing BE Subcontractor Coordination of Shop drawings for interfacing materials BE Field Performance Verification Testing BE Non Conformance Process BE warranty walk thru at 10 months Construction Risk Management Risk Assessment Unfavorable consequence Unwanted outcome Variability Ambiguity Perception Lack of certainty Weather Inexperienced workmen Sequence of Installation Hazards Market Schedule QC Testing QA audits Damage by other trades 1

Causations of Non Performing Building Enclosures Project Specifications should clearly delineate process requirements for the CM/GC for site specific execution planning, safety, mock ups, submittals, non conformances, self audits, field performance testing and scheduling for the co ordination of the building enclosure. Causations of Non Performing Building Enclosures Owners and Design Professionals make assumptions in reference to CM/GC field processes which are absent as requirements within the project specifications to verify the daily performance of the Construction Manager /General Contractor/ Subcontractors specific to the co ordination,installation, and first level performance verification and documentation of the building enclosure performance. Construction Discussion What are the risks posed by Construction to building enclosures? Value Engineering / getting to budget Preconstruction Meeting scheduling, attendees, agenda Installation of air barrier prior to roof installation Installation of enclosure without continuity to the waterproofing, windows, doors, storefront, curtainwall, parapets, roofing, roof curbs Substrates (exterior sheathing, concrete masonry units, concrete) not prepared for waterproofing, air barrier, window installation Schedule driven decisions to not perform an enclosure mock up or first work Construction Managers / General Contractors with no experience with building enclosure coordination programs Non experienced building enclosure installation subcontractors Damage to the installed building enclousre by other trades How do you deliver the performance defined in your project documents plans and specifications? Site Management Leadership Project Specific Performance Plan Non Conformance Prevention and Control Testing, Inspection and Documentation The future: what is the path forward for construction? How is the functional performance of the building enclosure likely to increase in importance? 1. Net Zero 2. LEED Version 4 3. Code Requirements adoptions statewide, within individual jurisdictions, IBC, IECC, commissioning 4. Outcome based Project Specifications/ Performance 5. Technology Means and Methods; Materials Primary BE Coordination Program Principles 1) Determine Owner Expectations and Project Performance Requirements 2) Assemble the generic Building Enclosure Coordination Process 3) Generate a Site Specific Building Enclosure Coordination Plan Assemble the plan for the specific project, per the plans and specifications inclusive of Mock up, Inspection, Testing, and Non Conformance Process, 2

Prequalification Keys to BE project success Construction Manager / General Contractor MEP Coordination Program Building Enclosure Coordination Program (BE Coordination Program) Keys to a Building Enclosure that performs : Commitment of the construction team to deliver a building enclosure that performs per the contract documents. Clearly identify the Responsibility and Accountability of the Construction Team in a Responsibility Matrix Training for the recognition of building enclosure interfacing materials issues for the project field personnel and management as well as the self perform workforce and subcontractor. 13 Questions For The Construction Team Are project design and construction teams proactive with the verification and assurance of the building performance for the six sides of the box for the building enclosure? Zelda Says The building enclosure poses multiple risks to the management of a building project. While there are proactive construction management and construction firms that have implemented internal programs and processes to co ordinate the building enclosure inclusive of peer review, mock ups, and field performance testing there remain those projects that construct buildings with issues. These projects provide headline news of non performance and litigation. Questions For The Construction Team What are the enclosure process components found in the tool boxes of successfully proactive Owner, A/Es, CMs, GCs, and Subcontractors? BECP Team Coordination Goals Design: Eliminate Detailia Absentia Eliminate Detailia Dementia Construction: Require subcontractor first level QC Coordination of interfacing material trades Minimize delay impacts of defective work Operation and Maintenance: Provide a roadmap for operational budgets, periodic inspections, and documentation of the building enclosure performance 3

Title 2 Ten (10) Items that Architects, Engineers, Construction Managers, General Contractors, and Design Builders should implement within their projects to minimize building enclosure risks and assure that their projects are proactive for the delivery of enclosure performance. 1.Require the CM/GC to provide the implementation of a Building Enclosure Co ordination Process (BECP) Require the CM/GC to provide a BECP and a specific individual responsible for the coordination of the building enclosure interfaces with subcontractors and manufacturers 2. Integrated specifications Cross link the individual specifications across all specification divisions 2. Integrated Specifications Continued Division 1 provide sections for Mock Up, Performance Testing, Site Specific Performance Plan, Construction & Temporary Protection, Scheduling with tasks included for the building enclosure: Submittals, shop drawings, building enclosure trade installation activities, mock ups, lab testing, field performance testing Temporary protection of the installed enclosure materials Shop Drawings integrated to demonstrate the continuity of the air, water and thermal barriers Compatibility of materials regarding waterproofing, air barrier, roofing sealants, and fenestration 3. Responsibility Matrix Utilize to perform a Gap Analysis of the specifications and provide a roadmap for the building enclosure first level QC, performance testing, documentation 3. Performance Verification Specifications 14000 Provide specific listings of Responsibilities for each member of the Construction Team 4

4.Performance Specifications 5.Coordinated Shop Drawings Owners, A/E, CM, GC, CxA, BEC, Subcontractors for the substrates concrete, concrete masonry units, light gauge metal framing, exterior sheathing, waterproofing, air barrier, windows, doors, storefront, curtain wall, parapets, roofing, equipment curbs, wall and roof penetrations, manufacturers, and Independent Testing Agency Require the submittal of coordinated shop drawings specific to the project. The coordination between trades is similar to above ceiling coordination for Mechanical, Plumbing, Electrical, Fire Protection, and Communications 6. CM/GC Responsible for 1st level Performance Control Verification 7. Pre Construction Meetings Require the CM/GC to create and implement a non conformance process to inspect, document, track and require formal submittals for approval prior to field repairs and requiring mock ups of field repair work. Require Pre construction meetings to be scheduled after the shop drawings are approved and a minimum of 4 weeks prior to the start of construction activity 8. Require Site Constructed Mock Ups That Are Field Performance Tested 9. Field Performance Testing and Documentation by the CM/GC Utilize a separate Mock Up specification placed in Division 1 The project specifications provide requirements for field testing, locations, frequency, scheduling and the acceptance metrics. 5

10. A 10 Month Warranty Walk Through for the Building Enclosure Utilize the enclosure issues log and punch lists to discuss the current enclosure observed performance with a walk through attended by the Owner, Facility Maintenance Personnel, Construction Manager, General Contractor, subcontractors, and Manufacturer s technical representatives. 6