RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

Similar documents
Project that requires RR design, materials & costs. RR will draft design & cost est. for crossing agreement. End ALJ hearing date set

SS David L. Seago, P.E. Assistant Director of Construction Dallas District CST Conference

Rail 101 Highway-Rail Crossing Program & Project Coordination

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

Annual CSAH Needs Update for 2017

Texas Department of Transportation Book 2 Technical Provisions. Grand Parkway Project. Attachment 2-2. Work Breakdown Structure Requirements

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP &

Annual CSAH Needs Update for 2018

TRB Summer Conference June 15-18, 2008 Baltimore, Maryland DOT Practices for the Identification and Abatement of Asbestos in Bridges - TxDOT

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

Constructability Guidelines

STRUCTURE AND BRIDGE DIVISION

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

Construction Cost Estimation Preparation Manual (Metric Units)

September 2007 Thomas Bohuslav Texas Department of Transportation

STATE AID GUIDE FOR: Updated: December 16, 2005

I-91 Viaduct Public Information Briefing

Rail Division. Riding the Rails

DOCUMENT ADDENDA AND MODIFICATIONS

JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018

Highway / Utility Guide

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

District No.: Applicant: Type of Work:

ADDENDUM. DATE: 10/12/15 BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: BID DATE: 10/27/15 ADDENDUM No: 1

SCHEDULE OF QUANTITIES AND PRICES

MetroLink Operations 700 South Ewing Street Saint Louis, Missouri

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

Roadway Surfaces and Traffic Control Elements

Chapter 3: Permit Procedures and Requirements

Railroad Technical Memorandum for the North Meadows Extension to US 85 and Interstate 25

Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE:

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR & BR

CONSTRUCTION PLAN CHECKLIST

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Review of Plans and Specs from a Constructability Perspective

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

study for 2018 include:

NOTICE. Registration Form and Notice of Needed Revisions

NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR & BR

STAFF REPORT. To: Planning Commission Meeting date: December 14, 2016 Item: UN Prepared by: Robert Eastman. To allow a vehicle impound yard

COST ESTIMATE STREET IMPROVEMENTS (Off Site)

CITY OF EL CERRITO PUBLIC WORKS DEPARTMENT

UNIT PRICE LIST January 2009

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 7/07/2015

CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel

2017 Highway Safety Improvement Program Call

APPLICATION FOR RIGHT OF WAY PERMIT

Acknowledgment: Each bidder shall indicate in the place provided for the same on the Proposal Form his acknowledgment of receipt of this Addendum.

Maine Turnpike Authority

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

Right-of-Way Permit Process

CITY OF TACOMA Department of Public Utilities Tacoma Power

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

MAY 11, 2017 T-MC-107A & T-MC-107B1

SPECIAL SPECIFICATION Description of Project, Scope of Contract, and Sequence of Work

Grade Separation Inspection and Rating

SCRRA RIGHT-OF-WAY ENCROACHMENT PROCESS

Coordinating Minnesota s Transportation Assets and Climate Change and Extreme Weather Vulnerability

SECTION MAINTENANCE OF EXISTING CONDITIONS

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

ANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019:

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

Maintains the status quo even though deteriorated. To keep at original condition or use.

PROSEPECTIVE BIDDER S INQUIRIES

Improvement Plan Cost Estimate

Highway 12 SP , Willmar Wye Soils Borings, Soils Tests, and Reporting

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 10/31/2018

I-91 Viaduct Public Information Briefing

Addendum No: 1. Closing Time: 2:00 P.M., December 14, 2018 Opening Time: 2:01 P.M., December 14, 2018 CITY OF WACO

345 Foothill Road (310) Beverly Hills, CA FAX: (310) July 7, 2016

SUBDIVISION CHECKLIST. Subdivision Name. Prior To Review. Preliminary plan approved by Planning Commission / Council as required.

Internal Audit Report. Rail Project Management TxDOT Office of Internal Audit

PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR

Table Related Arlington County Standards, Specification and Policies

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

Project Planning and Development Process

September 14, 2017 TxDOT PAVED Transportation Summit Waco September 14, 2017

Grade Separation Inspection and Rating

NYSDOT TRANSPORTATION MAINTENANCE DIVISION PAVING PROJECT QUALITY ASSURANCE ASSESSMENT Rating Guidelines (Revision #1)

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

Sandstone Curb Replacement Standards

EINRIP. Specification and Construction Issues

PARKING REQUIREMENT TOTAL PARKING REQUIRED PER CITY OF ALBUQUERQUE ZONING CODE: BUILDING DATA LEGEND SITE FURNISHINGS VICINITY MAP 7.31.

PUBLIC WORKS DEPARTMENT GENERAL NOTES

SECTION MEASUREMENT AND PAYMENT

District 2 System Preservation Projects for FY 17 and FY 18

COUNTY OF SUTTER ENCROACHMENT PERMIT

Maine Turnpike Authority

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

ADDENDUM NO. 1. Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road

SECTION 9000 MAINTENANCE SERVICES

Transcription:

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND New procedures for Railroad Right-of-Entry Agreements & Bid Documents (SP Item 007) Bridge Division Webinar - July 18, 2013

GUIDE TO RAILROAD PROJECT DEVELOPMENT - UPDATES Rail and Bridge Divisions have completed work on the June 2013 updates Updated RR Req t. sheets will be available on RRD Intranet site. Updated Guide available via email to sher.neely@txdot.gov Guide will be updated approx. every 6 months The Guide has been restructured and expanded to include: 17 Sections New Sections discussing CDA Design-Build, Exhibit A Plan Sets & Other Supporting Document samples have been added 2

GUIDE TO RAILROAD PROJECT DEVELOPMENT - UPDATES Rail and Bridge Divisions have completed work on the June 2013 updates Guide will be updated every six months Exhibit A Plan Sets & Other Supporting Document samples have been added Section 3 Design Build Projects (NEW!) Section 10 Exhibit A Content Requirements (NEW!) Scope of Work & Schedule Matrix (NEW!) Section 11 Railroad Requirements for Highway Overpass Plan Sheet Sample (NEW!) Section 12 Highway Railroad Bridge/Culvert Structures Box and Pipe Culverts Under Railroad Live Load Influence (NEW!) Type Selection Report + Samples for Highway Underpasses (NEW!) Section 13 Track Work Design (NEW!) Section 14 Special Provision to Item 007 & New RR Right-of-Entry SOP (NEW!) 3

GUIDE TO RAILROAD PROJECT DEVELOPMENT - UPDATES Section 1 Overview of Responsibilities Districts, Divisions, Railroads, & TxDOT Consultants Section 2 Section 3 Project Development Process with Railroads GUIDE TO RAILROAD PROJECT DEVELOPMENT - UPDATES Design Build Projects (NEW!) Section 4 Construction Project Agreement Approval Timeline 4

GUIDE TO RAILROAD PROJECT DEVELOPMENT - UPDATES Section 5 Construction Project Status Tracking Section 6 Project Development Information (PDI) Form Sample PDI Section 7 Exhibit A Plan Set Submittal to Railroad Sample Letters Section 8 Letter of Authorization (LoA) Sample LoA 5

GUIDE TO RAILROAD PROJECT DEVELOPMENT - UPDATES Section 9 Types of Agreements & Documents Needed Section 10 Exhibit A Content Requirements (NEW!) Scope of Work & Schedule Matrix (NEW!) Section 11 Railroad Requirements General Notes Overview & Instructions For Non-Bridge For Bridges Railroad Requirements for Highway Overpass Plan Sheet Sample (NEW!) 6

Matrix for Scope & Schedule for Work on RR ROW Task Contractor Supplied Railroad Supplied Contractor Installed Railroad Installed Description Main Line Ballast X X Shifts & Shoofly Other Ballast X Vestibulum X Vestibulum Shifts & Shoofly Remove Existing track, Xing Pklanks & Gates X X By RR Signal Crew Cutover new RR Signal House X By RR Signal Crew Shift Shoofly Track back to Original Alighment (Contractor to supply ballast) X X Shift existing RR Track to Shoofly (total XXX track foot Shift) Many projects require detailed coordination at the beginning of the Project Development Stage: Hwy Underpass Replacement, New highway underpass, highway overpass over rail yard, roadway and track realignment, Open Cut or Jack and Bore 7

Railroad Requirements Sheets Sheet 1 Project Specific 8

Railroad Requirements Sheets Sheet 2 (Static) Updates 9

Railroad Requirements Sheets Sheet 3 (Static) Updates 10

GUIDE TO RAILROAD PROJECT DEVELOPMENT - UPDATES Section 12 Highway - Railroad Bridge/Culvert Structures Project Development, Plan Review, & Agreement Procedures Railroad Grade Separations - Exhibit A Prep Guide Box & Pipe Culverts Under Railroad Live Load Influence (NEW!) Design Conformance To Railroad Guidelines Report + Samples for Highway Overpasses Type Selection Report + Samples for Highway Underpasses (NEW!) Railroad Cost Participation Guidelines Theoretical Structure Estimate Form Sample Theoretical Structure Plan Sheet Samples 11

GUIDE TO RAILROAD PROJECT DEVELOPMENT - UPDATES Section 13 Track Work Design (NEW!) Adding new track construction special specification for TxDOT let projects Section 14 Section 15 Section 16 Section 17 Special Provision to Item 007 (NEW!) Railroad Insurance Requirements New Contractor s Right of Entry Agreement SOP Design Summary Report (DSR) Railroad Right of Entry Agreements Glossary of Railroad Terms 12

New Procedure for Railroad Right of Entry Agreement Initiated by Complaints from AGC Scope of New Procedural Changes: 1. Streamline ROE agreement process-bundle in new specs 2. Improve coordination for railroad flagging & clearly define flagging requirements 3. Address AGC insurance limit and indemnity concerns 4. Define NON-INVASIVE types of project work vs. INVASIVE types of work activities on RR ROW 13

Non-Invasive Project Work Non-Invasive Construction/Engineering not requiring ROE; however, required RR Protective Liability Insurance and flagging of trains; only Letter Agreements are required: Seal coat, fog seal, crack seal pavement maintenance Sign Work minor repairs Painting - grade separations painting/maintaining highway underpass substructures (bearings down) and/or roadway striping Spot Pavement Repair (pot hole repair) - not within 25 feet of near rail Concrete, rip-rap, landscaping repair not within 25 feet of near rail Safety End Treatment (SET) not within 25 feet of near rail Sign bridge overhanging into RR ROW not within 25 feet of near rail Civil Survey Non-Invasive Bridge Inspection use of cameras, binoculars and other nonmotorized equipment only for a short time period. Any construction or maintenance operation outside RR ROW that could result in interruption of train service. (e.g. overhead crane in vicinity of tracks). 14

Invasive Types of Project Work Invasive Construction & Maintenance Project work utilizing heavy equipment within Railroad ROW requiring ROE, insurance and flaggers: Roadway approach surface work including asphaltic concrete pavement overlay, and milling Spot pavement repair/maintenance within 25 feet of near rail Sidewalk and curb and gutter repair or ADA (ramp) work that does not include RR signal work. Painting Highway Overpass structure Concrete, riprap, landscaping repair/maintenance within 25 feet of near rail Metal beam guard fence rail repair within 25 feet of near rail Concrete traffic barrier (CTB) replacement/repair within 25 feet of near rail Safety end treatment (SET) replaced within 25 feet of near rail Sign bridges overhanging into RR ROW within 25 feet of near rail Traffic Management System (TMS) Fiber Optics jack and bore under track Drainage Improvement Grade Separation new or modifying existing, reconstruction, relocation At grade crossing new or modifying existing, reconstruction, relocation Preemption (signal interconnect) Raised medians within 25 feet of near rail Pedestrian crossing new or modifying existing, reconstruction, relocation Track Relocation Core Drilling & Civil Survey s with extensive time on or above the RR ROW Fracture Critical Highway Overpass Inspection 15

New Procedure for Railroad Right of Entry Agreement Anticipated Outcomes of New Procedure: Improve Project Coordination and Foster Communication Reduce approval time Eliminate processing errors Lower Risk to Project Stakeholders Improve Worker Safety 16

Right of Entry Agreement Flowchart RR Company sends executed C&M Agreement to RRD w/ ROE Agreement and cover letter (invoice) Commission awards contract RRD emails (.pdf) ROE Agreement with cover letter to CST CST designates contractor on ROE Agreement Contract Letting CST sends contract and ROE Agreement to contractor to execute 17

Right of Entry Agreement Flowchart Contractor partially executes contract and ROE Agreement and returns to CST with insurance attached. CST checks and verifies that ROE Agreement and RR Insurance are executed properly Typically 15 days CST forwards approved invoice to FIN for payment CST sends ROE Agreement and insurance to RR Company w/cover letter (includes Assurance Statement and payment status) Typically 30 days FIN pays RR Company RR Company executes ROE Agreement and returns to CST 18

Right of Entry Agreement Flowchart CST attaches copy of ROE Agreement to district package CST executes contract and sends original contract and ROE Agreement to contractor CST monitors RR insurance coverage period until project is complete As the exception and not the standard, DE must confirm no work in RR ROW. Contractor begins work CST and RRD to concur. When required, AE sends RR Work Order to RR Company with cc: to FIN and District RR Coordinator (prepare at precon) AE sends letter to RR Company notifying them that project is complete and requests Final Invoice. AE sends cc: to RRD and FIN to close files. Project Complete AE sends letter to RR Company notifying them that project is complete and requests Final Invoice. AE sends cc: to RRD and FIN to close files. 19

Implementation of New ROE Procedure Still coordinating a lot of moving parts: Spec prov to Items 003 and 007 New Statewide Spec for Railroad Work Spec Committee Approval AGC Final Approval Will Pilot new procedure on several projects in FY 14 Letting Schedule 20