Mark Sweater Ltd. Structural Inspection Report Observations & Actions Authors: Dariusz Tomiak Checked by: Dariusz Tomiak Approved by: Dariusz Tomiak

Lida Textile & Dyeing Ltd. Structural Inspection Report

ABA Fashions Ltd. Plot #9, Block F, Tongi, Gazipur-1710 ( N, E) 08 MARCH 2014

Libas Textiles Ltd (9500)

Babylon Casualwear Ltd Aboni Fashions Ltd Suravee Garments Ltd

Suman Fashion Garments Ltd. Nipunika Ltd. Cha-72/1/B, Moddha Badda, Holland Centre, Progoti Sarani, Dhaka ( N, E) 09 March 2014

Apparel Gallery Ltd.

Dew Fashions Ltd. Le-Nouveautex Ltd. House-65,Board Bazar, Gazipur, Dhaka ( N, E) 22 June 2014

S B Design Ltd. Famous Design Ltd. 246/1/F, West Agargaon, Sher-E-Bangla Nagar, Dhaka-1207 ( N, E) 17 February 2015

Al Islam Textile Ltd.

Purna Fashions Ltd. RH Attire Ltd

Tanzila Textile Ltd.

Sonnet Textile Industries Ltd.

Abanti Color Tex Ltd. Plot-S, A-646, Shashongaon Enayetnager, Fatullah, Narayangonj ( E, N) 28 June 2014

Fakir Knitwears Ltd. Kayempur, Fatullah, Narayanganj-1400, Bangladesh ( N, E) 19 December 2013

Panwin Designs Ltd. Baniachala (Bagher Bazar), Bhabanipur, Gazipur , rd May 2014

Saasco Tex (BD) Ltd Muksudpur Apparels Ltd Expo Dress Ltd Julfikar Fashions Ltd

Warn Knit Fashion Sun Knitwear Ltd. ARS Printing Chanmari, Near New Court, Fatullah, Narayanganj 1400, Bangladesh ( N, 90.

Badhan Knit Fashions Ltd

Camlet Fashions Ltd. Simco Fashions Ltd Fine Craft Ltd Ayesha & Galeya Fashions Ltd

Kuliarchar Sweater Industries Ltd.

Masco Cottons Ltd. 44, Redwan Complex, Gazipura Bustand, Tongi, Gazipur ( N, E) 25 January 2015

GMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh ( , ) 22 March 2014

Elite Garments Ind. Ltd.

Alif Apparels Ltd. (9813) Goldstar Garments Ltd. (9844)

4A Yarn Dyeing Ltd. Kaichabari, Savar, Dhaka-1340, Bangladesh ( , ) 25 March 2014

BUILDING INTEGRITY DEA SUMMARY REPORT

Graphic Textiles Ltd.

Posh Garments Ltd Ltd

Star Garments (Pvt Ltd.)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

IMPRESS FASHION LTD. Dag No. 2224, Matuial, Konapara Katherpool, Jatrabari, Dhaka-1362 ( N, E) 27 August 2015

Natural Sweater Village Ltd

Echotex Ltd. Chandra, Mouchak, Shafipur, Gazipur, Dhaka ( N, E) 6 February 2014

Mondol Fabrics Ltd. Nayapara,kasimpur, Gazipur ( N, E0) 8th March 2014

Aman Graphics and Design Ltd. Nazimnagar, Hemayetpur, Savar, Dhaka ( E, N) 29 April 2014

Amity Design Ltd. House #7&9, Road #9 Block #D, Section #11 Mirpur Dhaka 1216, Bangladesh (23.820N, E) 03.MARCH.2014

A-One Polar Ltd. Bhulta,Rupgonj,Narayangonj. ( , ) 27th April 2014

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

Shin Shin Apparels Ltd. (9615) Dag RS. 228, JL 73, Gorat, East Norshinghapur, Zirabo, Savar ( N, E) 27.MAY.2014

Structural Safety Inspection

ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA Tel: Fax:

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

A.M. Design Ltd. Diakhali, Beron, Jamgara, Ashulia, Bangladesh ( N, E) 3 May 2014

GK Garments Ltd (10378) Global Fashion Garments Ltd (10380) Global Outerwear Ltd (9991) Savar Shirts (10394)

Epcot Apparels Ltd Epcot Jeans Ltd Chandana, Joydebpur, Gazipur ( N, E) 11 May 2014

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

New Era Fashions Mfrs (BD) Ltd

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

Pimkie Apparels Ltd. (9205) Plot #328, Bloc #F, Tongi Industrial Area, Tongi ( N, E) 27.May.2014

BUILDING INTEGRITY SUMMARY REPORT

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

Cassiopea Fashions Ltd. Cassiopea Apparels Ltd.

Avant Garde Fashion Ltd. Ring Shine Textiles Ltd.

BUILDING INTEGRITY SUMMARY REPORT

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

HELA Clothing Bangladesh Ltd

K.L. Fashion Ltd. (10982) 75/1, Master Bari, Tongi, Gazipur ( N, E) 01.July.2014

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

Pandora Sweaters Ltd.

KDS IDR Ltd. CDA Plot # 15 (P)+16, Mohora I/A, Chandgaon, Chittagong ( N, E) Survey Date: 11 th March 2015

Tanaz Fashions Ltd. & Zayantex Ltd. L Usine Fashion Ltd (Unit 1)

BUILDING INTEGRITY DEA SUMMARY REPORT

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

BUILDING INTEGRITY SUMMARY REPORT

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

EH Textiles Ltd EH Fabrics Ltd

Amena (Pvt.) Ltd. (9817) Abdul Latif Market, Ahalia,Sector #5,Road #9-C,Uttara ( N, E) 15.June.2014

BUILDING INTEGRITY SUMMARY REPORT

Project Seismic Vulnerability Assessment For SFCC District Building 33 Gough Street San Francisco, California 94103

BUILDING INTEGRITY SUMMARY REPORT

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation SCI Project Number:

STRUCTURAL ASSESSMENT REPORT HOFFMAN BRICKWORKS FORMER BRICK PRESS BUILDING CORNER DAWSON STREET AND BRICKWORKS DRIVE BRUNSWICK, VICTORIA PREPARED BY

VOLUNTARY - EARTHQUAKE HAZARD REDUCTION IN EXISTING HILLSIDE BUILDINGS (Division 94 Added by Ord. No. 171,258, Eff. 8/30/96.)

The designer shall also submit additional information required by the University as described and underlined below.

BUILDING INTEGRITY DEA SUMMARY REPORT

Technical Guidance Document TGD-021-6

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

Utah Knitting & Dyeing Ltd #9533. Boran, Monipur, Mirzapur, Gazipur 03.May.2014

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

Comparative Cost Analysis of Possible Seismic Retrofitting Schemes for Multi-Story Unreinforced Masonry Building

L Usine Fashions Ltd. (Ref. 9258) 36, Gazipura, Sataish Road, Tongi, Gazipur-1712, Bangladesh ( N, E) 08.MARCH.

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No

Structural Condition Assessment

PRESENT STATUS OF APPLICATION OF STRENGTHENING AND REPAIRING TECHNIQUES FOR COLUMN JACKETING AND ITS OUTLOOK IN BANGLADESH

North Bay Courthouse Seismic Structural Retrofit with Precast Concrete Shear Walls

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

Transcription:

Revision: Issue 2 Date: 23 rd June 2014 Cherry Pvt. Ltd. Florence Fashions Ltd. Ultimate Ltd. Chandand Fashion Ltd. Joy Fashion Ltd. Structural Inspection Report Authors: Adrian Ryan, Cathal Mac an tsearraigh Checked by: Aidan Madden Approved by:peter Flynn 284, Ibrahimpur, Dhaka Cantt., Dhaka (23.794264N, 90.38766E) 05 MARCH 2014 Category Red 1

Executive summary On 05th March 2014 Mr. Adrian Ryan and Mr. Cathal Mac an tsearraigh of Arup carried out a visual structural survey of the Cherry (Pvt) Ltd. factory at the address and coordinates given on the cover page of this report. We met with Mr. Md. Shahjahan Molla (Factory and Compliance Manager) and Mr. Humayun Kabir (Factory Director) and inspected accessible parts of the buildings. The factory is located on one floor of the building (level 1). This 10 storey building over partial basement with an additional masonry and steel shed at roof level was constructed in phases and completed in 2004. Cherry Pvt have occupied the building since 2002. Other building occupants include Florence Fashion (Levels 10, 3, 4 & 5), Ultimate (Levels 7&8), Chandand Fashion (Level 6), and Joy Fashion (Level 2 & part of 1, Ground and Basement). There are multiple shop units at Level 0. Basement contains plant, dormitory, storage and weaving areas. We were shown copies of Elevations and Plans approved by RAJUK (2000) A revised floor plan (Level 1) approved by Department of Customs and Commission on Rates (2001) A Soil Investigation reports dated April 2000 for the building. Garment Factories inspected within the building generally consist of light factory spaces including offices, sewing, cutting, finishing, incoming and finished goods storage. 2

Executive Summary (Continued) The information shown on the factory architectural layout plan provided is missing horizontal extensions to the building and does not reflect significant modification to the slab edge and column arrangements constructed at the South End of the building. The soils report provides allows for use of either piled or isolated spread footings at the columns. No structural details for the foundation solution selected and partial basement were available for inspection. We do have some important concerns that need to be addressed immediately, which give rise to our recommendation for full evacuation of the building and an immediate Detail Engineering Assessment (see actions below). The principal reason for our concern is that columns appear to be stressed to levels that require immediate action and review. We would recommend that the Detail Engineering Assessment for this building be completed within 6 weeks of receiving the report. A high level and non exhaustive list of other key concerns are: The addition of structures at roof level which use roof slabs as a transfer structures. This adds loading to highly stressed columns. Significant Horizontal extension of the building and signs of distress in same. Cracking of primary beams at a number of levels. 3

Executive Summary (Continued) Further actions with associated priorities and timeframes are given at the end of this report. Please note that these actions should be completed as soon as practically possible and certainly within the timeframe noted. We have reviewed the property from an outline seismic perspective and would consider that the building along with many others in the Dhaka region to have a significant risk in a major Seismic event. Our Limitations and Assumptions are also noted at the end of this report. 4

5 Building Extents

N 10 storey building with one basement (car park). RAJUK approved drawings for a 10 storey building in February 2000. Building completed in 2004. Building Extents 6

East Facade West Facade North Facade 7

Steel fabricated truss roof 8 10 9 8 7 6 5 4 3 2 1 GF Building Extents Basement Storage 9 th Floor to Roof Florence Apparels Ltd. 08 th to 07 th Floor Ultimate Fashion Ltd. 6 th Floor Chandan Fashion Ltd. 3 rd to 5 th Floor Florence Apparels Ltd. 2 nd Floor Joy Fashion Ltd. 1 st Floor Cherry Pvt. Ltd. Ground Floor Retail / Market

River adjacent to west elevation 9 Horizontal extensions to west face of building

Concrete Frame Prayer Room Additional Canteen Area with Lightweight roof Lightweight steel fabricated trussed roof supported by unreinforced brick walls 10 Vertical extensions to Building

11 Structural Systems

N Main structure comprises R.C. beam and column frame with two way spanning R.C. slab Lightweight roof and masonry extensions at roof level. Moment frame stability system. 10 storey building with one basement and 1 storey shed on top. Max Observed Grid: 7.095 m x 5.790 m Typical Internal Column: 530mm square Down stand beam size: 410mm Beam width: 320mm Slab thickness: 155mm

13 Observations

14 Columns appear to be Highly Stressed

Brick Aggregate Evident Cursory calculations indicate column working stress is at high risk level. Floors to be evacuated as noted earlier Engineer is to perform detailed calculations and concrete tests to prove column size and (if required): - Reduce loads further by removing additional structures - Reinforce columns 15 Columns appear to be highly stressed

16 Vertical Extension

Concrete Frame Prayer Room Lightweight steel fabricated trussed roof supported by unreinforced brick walls Additional Canteen Area with Lightweight roof Vertical Extension Areas 17

18 Vertical Extension Areas

Level 10 Building A A Level 9 Buildings C B B C 19

20 Horizontal Extension

21 Horizontal Extension

22 Horizontal extension on cantilever structure over river Evidence of distress on cantilever e.g Façade Cracking

23 Typical Beams Carrying Increased Floor Areas

View A Primary beam supporting secondary beams View A 24 Typical Beams Carrying Increased Floor Areas Column moved off Grid Typical Beam size used as primary beam to support other floor beams Cracking of beam evident

25 Cracking of beam evident on a number of floors at both interface of beam and adjacent to column

26 Possible Foundation Settlement

Change in Render Basement -1 Elevation of East Facade Basement under white painted structure No basement under freshly plastered section Cracking and step changes at ground floor Possible differential settlement of foundations 27 Foundation Settlement

View A Approx. Basement Extents View A: Approx 400mm Step View B Differing Ground Floor levels & Façade Render 28 Foundation Settlement

29 High Loading

6.3kPa Loading on 9 th Floor 2.7kPa 30 High Loading

5kPa 6kPa High loading on various floor plates Particular concern on cantilever edges (+ façade load) Raised flooring in Toilet Blocks throughout building, up to a depth of 450mm 31 Sample of High Loading (Various Floors)

32 Priority Actions

Problems Observed 1. Columns appear to be highly stressed 2. Vertical extension on roof 3. Horizontal extension on west face 4. Typical Beams Carrying Increased Floor Areas 5. Foundation Settlement 6. High Loads 33

Item 1 and actions Highly stressed columns Priority 1 (Immediate - Now) Priority 2 (within 6-weeks) Priority 3 (within 6-months) Remove all live loading from all floors A Detail Engineering Assessment of Factory to be commenced, see attached scope Verify insitu concrete stresses either by cores or existing cylinder strength data for columns or cores from 4 non-critical columns. Detail Engineering Assessment to be completed Provide calculations showing the structural adequacy of all columns, taking into account the loading plans and all built structure including additions beyond the original design. Provide concrete strength tests. Produce and actively manage a loading plan for all floor plates within the factory giving consideration to outcome of DEA. Carry out strengthening as required. Continue to implement load plan 34

Detail Engineering Assessment This Schedule develops a minimum level of information, Analysis and testing expected as part of a Detail Engineering Assessment. The Building(s) have been visually assessed and it is deemed necessary that a detailed engineering assessment be carried out by a competent Engineering Team employed by the factory Owner. This Request should be read in conjunction with the BUET developed Tripartite Guideline document for Assessment of Structural Integrity of Existing RMG Factory Buildings in Bangladesh (Tripartite Document), the latest version of this document should be referenced. T his document also gives guidance on required competency of Engineering Team. We expect that the following will be carried out: 1. Development of Full Engineering As-Built Drawings showing Structure, loading, elements, dimensions, levels, foundations and framing on Plan, Section and Elevational drawings. 2. The Engineering team are to carry out supporting calculations with a model based design check to assess the safety and serviceability of the building against loading as set out in BNBC-2006, Lower rate provisions can be applied in accordance with the Tripartite Guidelines following international engineering practice, justification for these lower rate provisions must be made. 3. A geotechnical Report describing ground conditions and commenting on foundation systems used/proposed. 4. A report on Engineering tests carried out to justify material strengths and reinforcement content in all key elements studied. 5. Detailed load plans shall be prepared for each level showing current and potential future loading with all key equipment items shown with associated loads. 6. The Engineering team will prepare an assessment report that covers the following: As-Built drawings including Plans at each level calling up and dimensioning all structural components Cross sectional drawings showing structural beams, slabs, floor to floor heights, roof build-ups and Basic design information of the structure Highlight any variation between As-built compared to the designed structure Results of testing for strength and materials Results of geotechnical assessment and testing/investigation Details of loading, inputs and results of computer modelling Commentary on adequacy/inadequacy of elements of the structure Schedule of any required retrofitting required for safety or performance of Structure Any proposals for Retrofitting to follow guidance developed in the Tripartite Document 35

Item 2 and actions Undocumented vertical extension to roof area Priority 1 (Immediate - Now) Priority 2 (within 6-weeks) Priority 3 (within 6-months) See Item 1 Detailed Engineering Assessment to be completed as per Item 1 Create controlled loading plans for all floors, designating where storage can be placed and can not be placed. Carry out strengthening as required. Continue to implement load plan. Building engineer to check, collect information and produce accurate and complete as-built documentation soonest. 36

Item 3 and actions Undocumented horizontal extension on west face of building Priority 1 (Immediate - Now) Priority 2 (within 6-weeks) Priority 3 (within 6-months) See Item 1 Detailed Engineering Assessment to be completed as per Item 1 Create controlled loading plans for all floors, designating where storage can be placed and can not be placed. Carry out strengthening as required. Continue to implement load plan. Building engineer to check, collect information and produce accurate and complete as-built documentation soonest. 37

Item 4 and actions Typical Beams Carrying Increased Floor Areas Priority 1 (Immediate - Now) Priority 2 (within 6-weeks) Priority 3 (within 6-months) See Item 1 above. Detailed Engineering Assessment to be completed Sections of plaster finish to beams to be removed to investigate if cracks penetrate to the structural beams. Provide calculations showing the structural adequacy of typical beams supporting other beams, taking into account the loading plans and all built structure including additions beyond the original design. Provide concrete strength tests for beams Building Engineer to prepare Allowable Floor Loading Plans. 38

Item 5 and actions Differential settlement of foundation Priority 1 (Immediate - Now) Priority 2 (within 6-weeks) Priority 3 (within 6-months) None required. Detailed Engineering Assessment already instructed to be carried as per item 1. As part of this, confirm if building is founded on pads or piled foundations. Ensure building information is updated to reflect as-built. Building Engineer to confirm by calculations and records of site construction that foundation bearing is adequate. Building Engineer to verify integrity built structure under factory design loading. Monitor the differential movements of the cracks in the joint between basement and ground, to insure structural integrity of the structure. 39

Item 6 and actions High loads observed at various locations throughout building, particularly in cantilever areas and storage areas. Priority 1 (Immediate - Now) Priority 2 (within 6-weeks) Priority 3 (within 6-months) See Item 1 actions. Detailed Engineering Assessment to be completed as per item 1 Create controlled loading plans for all floors designating where storage can be placed and can not be placed. Carry out strengthening as required. Continue to implement load plan. 40

Survey Limitations and Assumptions This report is for the private and confidential use of Accord for whom it was prepared together with their professional advisors as appropriate. It should not be reproduced in whole or in part or relied upon by third parties for any use without the express written permission of Arup. This report can be used in discussion with the supplier or factory owner as a means to rectify or address any observations made. The report is not comprehensive and is limited to what could be observed during a visual inspection of the building. This Report is not intended to be treated as a generalised inspection and does not cover the deterioration of structural members through dampness, fungal or insect attack, nor does it deal with problems and defects of a non-structural nature. Other non structural aspects of the building such as fire safety have not been assessed in this survey. Except as otherwise noted, drains and other services were not viewed or tested during our inspection and are therefore similarly excluded from this Report. We have not inspected any parts of the structure which are covered, unexposed or inaccessible and we are therefore unable to report that any such part of the property is free from defect. External inspection of the façade walls has generally been carried out from ground level only by visual sighting. No opening up works were carried out (except as noted) and we rely on the Architects and Engineers drawings provided to us for our views on concealed parts of the structure and in particular foundations. Strengths of materials and components are untested and we recommend that the factory owners Building Engineer carries out insitu testing over and above those suggested to satisfy themselves with the material strengths and component details. Recommendations, where given, are for the purpose of providing indicative advice only, are not exhaustive, relate solely to identifying key and obvious structural defects as identified in this presentation, and do not take the form of or constitute a specification for works. We take no responsibility for the works as constructed. This report does not interfere with the factory owners Building Engineers responsibility for the structural performance of this building, The Building Engineer remains fully responsible for the structural adequacy of the building. This report does not comment in detail on the future seismic performance of the building and only highlights the fact that the building may experience significant damage or collapse in a seismic event along with many others in the Dhaka region. The observations in this report are based on the Engineering Judgement of the lead surveyor/engineer at the time of the survey. We assume in making these observations that no covering up of faults defects, filling or plastering over cracking or significant repair work has been carried out by the building owner. Any future alteration or additional work by the building owner will void this report. 41