UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ. Original Issue Bamyan MAC Site Services - Phase 1 Bamyan, Bamyan, Afghanistan

Similar documents
UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ. Original Issue Kabul University Project - Site Office Mobilization Kabul, Afghanistan

UNOPS BILL OF QUANTITIES

PND Training Hall Conex Building, Kabul ABSTRACT OF COST

Islamic Republic of Afghanistan Ministry of Interior Affairs Central Prison Directorate

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.

Construction works for Establishment of School in Al-Najaf M 2 2,600 M 2 750

Construction works for Establishment of School in Al-Latifiyah. Al-Latifiyah BoQ for constructing a 6-pre-fab Classroom School

The International Committee of the Red Cross

SINAR AHS BILL OF QUANTITIES Cost code Description Unit Qty 1 SINAR AHS Contractors General Conditions Site Works Setting out works: Rates

CONSTRUCTION OF ELEVATED WATER TANK & WATER WELL VAULT INTERNATIONAL CAMPUS AUGUST 2018

Bill No.1: Preliminaries

SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR

ARCHITECTURAL DRAWINGS

Calculation of requirement of Labour. for construction of IAY/CMRHM

EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT

Issued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS

ELECTRICAL WORKS RELATED TO AC & UPS OF CMP GOC & IAD, LINGAMPALLY, HYDERABAD IN TWO BID SYSTEM THROUGH E-TENDER PRICE BID

Annex II- Lot 2. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 6 Admin Units in localities of Sinar State

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

Description Unit Quantity Rate Kshs. Amount Kshs.

SECTION GROUNDING AND BONDING

Annex III- Lot 3. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 8 Admin Units in localities of Sinar State

SPECIAL SPECIFICATION 3504 Septic Tank System

Annex I- Lot 1. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 7 Admin Units in localities of Sinar State

ADDENDUM 2 - JULY 14, 2015

SPECIAL SPECIFICATION 6664 Level (3) Communications System

SPECIAL SPECIFICATION 6658 Time Warner Communications System

United Nations Development Programme

Estimate FOR THE SEPTIC TANK

United Nations Development Programme

Project Manual Index of Specifications Shenandoah Schools Concession Building

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

CIVIL WORKS Mahesh G. Nair

PRICED BILL OF QUANTITIES

1. Remove worn-out old plaster (or any other finishing).

A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards General 11 a. Future Extensions 11

Technical Specification for Decentralized Wastewater Treatment System (DEWATS)

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES

July Bill No.1: Preliminaries

Mason s Training Programme on Onsite Treatment Systems

CITY OF ROSEVILLE CONSTRUCTION STANDARDS - CST

BILL OF QUANTITIES - PROJECT ELECTRICAL WORK OF PH-I FOR ASSAM RIFLES, DWARKA, NEW DELHI

Tender Schedule for the Work "Construction of Staff qtrs. at Tainda S/S (1no.)

SUPPLY ERECTION TOTAL RATE AMOUNT RATE AMOUNT AMOUNT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt:

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

REVISED PER ADDENDUM No. 1 - Unit Price Bid Schedule

CATCHMENT STRUCTURE 13M X 15M

SECTION 920 SANITARY AND STORM SEWER MANHOLES

CONTAINERIZED STUDIO TYPE HOUSING UNITS JULY 2017

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title

If a new residence s electrical service is not located within 200 feet of existing

THIMPHU CITY CORPORATION BUILDING APPLICATION SECTION

SCHEDULE OF ITEMS & QUANTITIES FOR CIVIL WORKS OF PROPOSED GIRLS/ BOYS TOILET BLOCK

PART 7 Technical Specification for Overhead and Underground Service Connection works for the Year

Section 7: Specifications

Electric Service Standards

General Technical Specification

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2

Bill of Quantity (BOQ)

SECTION MEASUREMENT AND PAYMENT

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

APPENDIX A MEASUREMENT AND PAYMENT

TABLE OF CONTENTS

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL Bill of Quantity : Package2 - Lot 3

VOLUME 4 DIVISION SPECIFICATIONS


T. SUNDUPALLI BRANCH (04427)

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

Scanned by CamScanner

Tender No.:- RITES/CO/B&A/EE/CUK- Gulbarga/External/E-2/2012.

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

Section 70 Airport Transformer Vault and Vault Equipment (FAA L-109)

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD

SPECIAL SPECIFICATION 6666 Charter Communications System

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

TENDER NOTICE CONSTRUCTION OF WASHROOM, SEPTIC TANK AND PREPARED FIBER SHADE FOR WALK THOROUGH GATE IN SECURITY MAIN GATE OF CEMB

2. SECTION MEASUREMENT AND PAYMENT:

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3

2015 Fourth Quarter. (Base Year 2013) Detailed by: Main building materials and. services groups. Construction Cost Index

DIVISION 22 PLUMBING SECTION INTERIOR SANITARY WASTE AND VENT PIPING SYSTEM

UNDERGROUND SERVICES SECONDARY

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

1. Approved Manufacturers: Carlon Electrical Products, Cantex, or approved equal.

Architectural & Structural Design

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS

1. Provide a revised bid form (attached to this addendum 11)

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

TS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE

2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY

EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT

Transcription:

UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ Original Issue Bamyan MAC Site Services Phase Bamyan, Bamyan, Afghanistan Project Components:. Site Services Phase NOTICE TO ALL BIDDERS COMPLETE PROJECT PRICE: This BOQ is part of the complete project documents and must be read together with these documents. Complete project documents include the drawings, BOQ, schedules and specifications. Any discrepancies between these documents are to be brought to the immediate attention of UNOPS Engineer. Prices given by the contractor on this BOQ are to cover any and all additional materials, labor or associated costs to complete the works as documented on the complete project documents. Project No: 0.0 Project Title: Bamyan MAC Site Services Phase Original Issue: April 0, 0 Revision No.: Revision Date: N/A N/A

Project No: 0.0 Project Title: Bamyan MAC Site Services Phase Original Issue: April 0, 0 Pos. Description of Work/Items. General. Preliminaries Section Notes: Read section. Preliminaries in given specifications, and also read relevent Schedules in given Project Schedule documents.. General Requirements Section Notes: Read section. General Requirements in given specifications, and also read relevent 5 6. Contractor Quality Control Section Notes: Read section. Contractor Quality Control in given specifications, and also read relevent. Health and Safety Section Notes: Read section. Health and Safety in given specifications, and also read relevent.5 Environmental Impacts Section Notes: Read section.5 Environmental Impacts in given specifications, and also read relevent Preconstruction work, all site mobilisation activities including paper/ documentation tasks. Post construction works, clean up and hand over. Testing and Operation/Maintenance Manuals: for any Concrete Works rquired in the project. Testing and Operation/Maintenance Manuals: for any Steel Works and Steel Reinforcement Works rquired in the project. Testing and Operation/Maintenance Manuals: for any Soil, Geotechnical Investigations, Water Sources Investigations etc rquired in the project. Testing and Operation/Maintenance Manuals: for any Water Services System rquired in the project. Testing and Operation/Maintenance Manuals: for any Sanitation and Sewer System rquired in the project. Testing and Operation/Maintenance Manuals: for any Elelctrical System rquired in the project. Overall quality control program. Overal health and site safety measures. Climate and air quality, surface and ground water issue, traffice and transportation at site, solid, hazardous and special waists etc. LS.00 LS.00 LS.00 LS LS LS.00 LS.00 LS.00 LS.00 LS.00 LS.00 Subtotal. General /7

Project No: 0.0 Project Title: Bamyan MAC Site Services Phase Component:. Site Services Phase Original Issue: April 0, 0 Pos. Description of Work/Items Accommodation Facility: The cost for all items below includes supplying of materials, making, installation, transportation, spare parts, accessories, auxiliary materials, relocation of any item comes under work such as electrical/ IT cables, ducts, security cameras, airconditioner sets, electrical fittings like switch and sockets etc. to any new location(s) guided by the UNOPS Engineer, removal of any existing structure that needs to be removed, reinstating of all under work and their surrounding areas after the work to their original states, all wildings works, hardware, glazing, wall paintings, door/windows paintings, antirust paintings of all nongalvanized steel surfaces followed by other coats of oilbased painting and any other needed works and materials to complete the job to the full satisfaction of UNOPS Engineer. Also the given costs for all concrete works includes supplying all materials and accessories, shuttering, reinforcing, curing, concrete mix, fixings, any builtin items etc. shown on the drawings, specifications or guided by UNOPS Engineer to complete the work. 5 6 7 8 9 0 General Items Relocation and reinstallation of existing network dish antenna to the new location shown on the drawing or guided by UNOPS Engineer. The cost includes all needed works and materials to the complete job and to full satisfaction of UNOPS Engineer. Reducing the width of the existing stair steps and landing located at the south side of the main building in order to make more space for the nearby road. This job to be done through cutting (sawcutting) the stair steps and landing. The cost includes cutting process, making the damaged surfaces good by applying cement plastering and reinstating of the area to match surroundings. UNOPS Engineer will approve the final job. Providing of new trench for the existing electrical cables. The trench will be about 00mm width and 00mm in depth. The job will be excavation, existing cables installation, laying of warning tape, and backfilling of the trench to 90% compaction. The location of job and trench alignment will be guided by UNOPS Engineer at the site. The cost includes all needed works, materials to full satisfaction of the UNOPS Engineer. PCC blocks (00x00x600mm), M00, for all the containers used in this contract. The containers to be about 500mm higher than the ground level. The cost includes all needed accessories to the complete job. Concrete CMU masonry walls under the four sides of all containers. The foundation for CMU masonry shall be leveled. The cost includes all needed work and materials. Cement plastering on the CMU masonry visible surfaces (as mentioned above). The cost includes all needed work and materials. Backfilling and filling in front of all accommodations, GERKA accommodation, kitchen, laundry any other areas shown or guided by UNOPS Engineer. 00mm thick river boulder filling and compaction where shown or guided by UNOPS Engineer. The cost includes work, materials and compaction. 00mm thick PCC M50 to be applied in front of all containers to provide pavements. See drawing for details. The cost includes all works and materials. Kspan roof (using 0.8mm thick iron sheet) on all containers and the porches. See drawing for locations. This item includes steel framings, steel posts, any type of steel connection and support, gussets, fasteners and other needed accessories and works for complete truss and the Kspan installation. The cost also includes painting (one coat of antirust followed by other coats of oilbased painting) to the satisfaction of UNOPS Engineer. Folded metal side walls of ends of roofs (using 0.8mm thick iron sheet) and as well as for the porches on GERKA accommodation. See drawing for locations. This item includes steel framings, support, gussets, fasteners and other needed accessories and works for complete installation. The cost also includes painting (one coat of antirust followed by other coats of oilbased painting) to the satisfaction of UNOPS Engineer. Septic Tank and Pit LS.00 LS.00 Lin.m 50.00 Cu.m.00 Cu.m 0.00 Sq.m 50.00 Cu.m 650.00 Cu.m 50.00 Cu.m 50.00 Sq.m 605.00 Sq.m 55.00 /7

Project No: 0.0 Project Title: Bamyan MAC Site Services Phase Component:. Site Services Phase Original Issue: April 0, 0 Pos. Description of Work/Items Excavation for Septic tank and pit: the cost includes excavation, disposal of the materials to any location proposed by UNOPS Engineer. Cu.m 70.00 Cu.m.00 Cu.m 8.00 Cu.m 6.00 LS.00 Water service PVC class B water supply pipe D=mm, including fittings and installation. This is for the water line from water tank to accommodations, kitchen, Laundry and GERKA accommodation. Lin.m 0.00 PVC class B water supply pipe D=5mm, including fittings and installation. This is for the water line from well to water tank and as well as for inside the containers. Lin.m 55.00 Water supply PVC Valve D=mm, including fittings and installation. No..00 Water supply PVC Valve D=5mm, including fittings and installation. No..00 5 Construction of RCC manhole having castiron steel cover, at the well location. The cost includes all required works, materials and accessories. No..00 6 Removal of existing water pump and piping system from the well and reinstallation of new submersible Italian water inch pump with PVC water pipe (5mm dia), electrical cabling and pump control box installation. The cost includes all equipment, work, materials and accessories to complete job. LS.00 Making absorption layer at the floors of the septic tank and the pit by backfilling/compaction of the floor using 00mm boulders to the depth shown on the drawings. RCC M50 anywhere shown for the septic tank and pit structures. The cost includes all needed work phases/types/cycles and items used permanently/temporary to the RCC structures. The UNOPS Engineer will approve all jobs steps and the final job. Stone masonry for pit: Locally available stone subject to approval of UNOPS Engineer with cement mortar of M50, plus pointing. There will be certain holes to be put around the pit during masonry to allow filtration of liquids to the ground. The cost includes supplying of materials, work, curing, canalization pipe connection etc. and all needed works and materials to complete the pit. Cost for RCC cover for the pit not included here, and it covered under RCC M50 item above. The UNOPS Engineer will approve all the job. Water Tower Structure Construction of new water tower structure and 000 litter water tank with all needed water connection accessories between well and tower and between tower and main distribution manhole. There will be an over flow system on tank. The cost includes steel structure for tower, GI gauge 8 water storage tank, sandwich panel (insulated with 00mm glass wool) for walls and roof, water pipes and connections, valves, oil painting for all nongalvanized steel surfaces, and any other accessories, materials and works to complete a functional water tower. Canalization Plumbing Construction of canalization trench on ground level. The cost includes trench structure and plastering finishes, top PCC, filling and all other works and materials needed for complete trench that suits 8" or lesser diameter piping system. UNOPS Engineer will approve complete job. Construction of RCC Canalization Manholes. These are manhole made of RCC ring with internal diameters of 700mm, and 60mm wall thickness. See drawing for cover, filling and details of manhole. The cost includes pipe connections, sleeves, and all needed materials, work and accessories for complete job. UNOPS Engineer will approve the job for payment. Supply and installation of 6 inch PVC pipe class B for canalization network. The network slope will be approved by UNOPS Engineer. The cost includes installation in the trenches and all needed fittings and other work and materials. Supply and installation of inch PVC pipe class B for canalization network. The cost includes installation in the trenches and all needed fittings and other work and materials. Lin.m 5.00 No..00 Lin.m 5.00 Lin.m 80.00 5/7

Project No: 0.0 Project Title: Bamyan MAC Site Services Phase Component:. Site Services Phase Original Issue: April 0, 0 ` Pos. 5 6 Description of Work/Items Supply and installation of inch PVC pipe class B for canalization network. The cost includes installation in the trenches and all needed fittings and other work and materials. Lin.m 0.00 PVC eye inspection fitting for each toilet in this contract. The cost includes installation and everything to complete fitting. No..00 Electrical Works All cabling on containers external surfaces will be put into PVC conduits with proper size. The cost for cables includes the conduit costs. Main panel, 00x800x00 mm, powder coated, weatherproof, mounted on pcc foundation. The cost includes mini bus bar PVC insulated x6mm, din rail, copper bus bar 5x5mm, bus bar connector.56mm, supplying, installation, making iron sheet cover on the top of MDP, making 000x00x500mm PCC foundation and any other needed work/material to the complete job. LS.00 Cable PVC/PVC Insulated, x95+x50mm, pulled in conduit. Lin.m 80.00 Cable PVC/PVC Insulated, x0+x50mm, pulled in conduit. Lin.m 650.00 5 Cable PVC/PVC Insulated, x6mm+x0mm, pulled in conduit. Lin.m 00.00 6 Cable PVC/PVC Insulated, x.5mm, pulled in conduit. Lin.m 00.00 7 Circuit breaker, MCCB, x50amps, TypeC No..00 8 9 0 MCB, xamp, Circuit breakers MCB, x0amp, Circuit breakers Single pole/double pole lighting switch. x6w surface mounted fluorescent light fixture, with all accessories. IP56, waterproof for external lighting. Grounding system as mentioned in grounding drawing with electrodes, tape, connectors, clamp and grounding cable, complete job. Electrical Generator Sets, 00 kva. This item and its cost includes all auxiliary equipment and materials needed for functional generators. The cost also includes removal of one wall of existing generator room, relocation of old generator(s), and installation of new generators. Any other repairs to floor, walls and rebuilding of generator wall are all included in the cost. The final job will be approved by UNOPS Engineer. No..00 No. 6.00 No. 7.00 No. 7.00 LS.00 LS.00 Subtotal Accommodation Facility: TOTAL FOR. Site Services Phase Zero 6/7

PROJECT SUMMARY BOQ Project No: 0.0 Project Title: Bamyan MAC Site Services Phase Original Issue: April 0, 0 Original Issue Total for General Project Costs Total for. Site Services Phase No Revision Occurred So far Original Issue is due Total for General Project Costs Total for. Site Services Phase No cost changes occured No cost changes occured No cost changes occured No Revision Applied Original Issue is due Total for General Project Costs Total for. Site Services Phase No revision applied No revision applied No revision applied Name: Agreed on behalf of Contractor Name: Agreed on behalf of UNOPS Position: Position: Address & Phone: Signature: Signature: 7/7