KIEWIT FOUNDATIONS GROUP

Similar documents
KIEWIT FOUNDATIONS GROUP

KIEWIT FOUNDATIONS GROUP

KIEWIT FOUNDATIONS CO.

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

Stevens & Associates, Inc. Tunnel Construction Projects. Fact Sheets

Geotechnical Engineering

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

EARTH RETENTION AND DEEP FOUNDATIONS WHYTERRA.COM

ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA

Ironton Russell Bridge Project

DBM Contractors, Inc. Donald B. Murphy Contractors, Inc. 60 Years of Innovation and Customer Satisfaction

> GRouTING systems. The experience and expertise to deliver the right grouting solution for the job. Grouting is the most diverse

Ironton Russell Bridge Project

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS

FOUNDATION & SHORING. Whatever it takes... We build your vision! WORLDWIDE EXPANSION

Construction Technology B (CON4313)

Compaction and Jet Grouting

SHAFT CONSTRUCTION SECANT PILE

Kiewit Approach for Tunnel Stabilization and Sewer Pipeline Replacement Project

Civil Engineering Construction I (CBE5031)

Earth Retention Systems

Misan University - College of Engineering Civil Engineering Department

An Introduction to Keller in the UK COLCRETE EURODRILL GETEC PHI GROUP. Piling and Ground Improvement. Grouting, Soil Nails and Anchors

Sweet Creek Road Retaining Wall Replacement. Mapleton, OR

Steven Dapp, Ph.D., P.E. Steven Dapp, Ph.D., P.E. Dan Brown and Associates

I-74 over the Mississippi River

Our goal is to be the best, not necessarily the biggest, contracting organization on Earth. Peter Kiewit

Geo24h. Buiding Service

The OMO River Bridge/2010

Risk Management of the Restoration of Shanghai Metro Line 4

PIANC Workshop 13-14th September Construction Methods. By Dale E. Miller, PE, SE Tetra Tech INCA United States

* The use of these areas can vary from car park space, where little waterproofing is required through to store rooms or plant rooms where a high


Seattle, WA SHORING * GROUNDWATER CONTROL * ENVIRONMENTAL

COPYRIGHTED MATERIAL. Contents PART ONE: THEORY...1. Preface to the Third Edition xiii. About the Authors xv. Acknowledgements xvii

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER

Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective

Ingenuity Offers a Solution to an Anomaly in a Bridge Support

Replacement of the Existing Water Siphons between Brooklyn and Staten Island Siphon Project

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

Grade Separation Systems. Single-Span Rail Bridge Construction Procedure. An innovation from art engineering inc.

Dimitrios C. Konstantakos, P.E. CEO Deep Excavation LLC. Tel:


Multiple Large Diameter Microtunnels with Limited Ground Cover

TIMES better than the industry average.

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Pump Station Excavation

I-495 HOT LANES PROJECT VIRGINIA CONCRETE CONFERENCE CONCRETE: LEADING THE WAY. Dan Staron, P.E. HNTB Corporation MARCH 4, 2010

Michael R. Lockwood Construction Management National Museum of the Marine Corps Quantico, VA

Ironton Russell Bridge Project

Specialising in Ground Engineering & Slope Stabilisation

Slurry Trench / Diaphragm Walls

June 1, Dear Mr. Simpson:

APRIL 2017 MAMARONECK & SHELDRAKE RIVERS NEW YORK FLOOD RISK MANAGEMENT GENERAL REEVALUATION REPORT FOR THE VILLAGE OF MAMARONECK

Tel: Neil: Tony: Website:

Final Estimates Level 2

Putting Progress into Perspective

Ironton Russell Bridge Project

Recent Advances in the Selection and Use of Drilled Foundations

Alternative No. 1 Total Cost DRAFT

Ironton Russell Bridge Project

The Drainage Basin. From Peaks of Colorado to Mexico 1,400 miles Drains 242,000 square miles of Western US Colored River because of sediments

#47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA)

Halls River Bridge Update

Presentation Outline. Need for Creative Solutions in Technical Construction Problems. creativity, imagination, and innovative skills.

Ground Improvement. Cutter Soil Mixing Multi-Axis Soil Mixing Deep Soil Mixing Jet Grouting Vibro Systems Specialized Geotechnical Grouting

Singapore Safety Day. Keller civil works team for a large petrochemical project, Malaysia

Bridge Manual - Part I - June CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE

IMUA ANNUAL PRESENTATION 2013

UPDATED 04 OCT 07. Following are sample questionnaires to be used to collect information from owners of affected facilities.

John James Audubon Bridge. Introduction

Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT

CC1602 Microtunneling

Lower Mattagami River Project

Ironton Russell Bridge Project

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 6 - RICE COUNTY

Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization

November 15, The Round Valley Reservoir Structures Refurbishment and Resource Preservation Project

Special Committee on Bay-Delta Item 3b January 24, 2017

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

APPENDIX E: RECORD OF NON-APPLICABILITY AND AIR QUALITY DATA

Forensics by Freezing

Natalia Maca. TITAN POLSKA Sp. z o.o Kraków, Miłkowskiego 3/801 Tel Fax

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

Company Profile 1300 SHOTCRETE

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Annex V Concrete Structures Removal Plan

6 Preliminary Assessment of Construction Method and Constructability Issues

Diaphragm wall Construction

MALCOLM. support of excavation. Provides Excavation Support for Miami Tunnel. Introduction

Eglinton Crosstown LRT Construction Liaison Committee

Motto. History CSE CSE

TECHNOLOGY. Graphic Provided by L.B. Foster Company. All Rights Reserved.

Earth Retention Systems And Specialized Foundations

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08

J.F. Brennan Co., Inc. FULL SERVICE MARINE CONTRACTOR Lock and Dam Construction Hydraulic Dredging & Dewatering Specialty Construction and Diving

Chapter 1 INTRODUCTION

TRANSPORTATION RESEARCH FORUM March A State-of-the-Art of Underground Construction In Urban Areas

Transcription:

KIEWIT FOUNDATIONS GROUP

SAFETY FIRST At Kiewit, nothing is more important than safety. Our craft-led safety programs and commitment at all levels of our operations ensure our focus is on what matters most: that nobody gets hurt. This commitment to excellence extends to our quality, environmental and compliance performance which is how we drive successful projects for our clients. NOBODY GETS HURT Our operations begin and end with safety. Kiewit implemented job hazard analysis (JHA) and mandatory personal protective equipment (PPE) years before it was required by law. Led by craft on the front lines, Kiewit s safety focus and engagement are SECOND TO NONE. 2 3

KIEWIT CULTURE With a strong local presence and access to a vast network of industry experts, Kiewit can quickly mobilize and help design OUR VALUES CORE VALUES the best solution and value for any project. From the smallest jobs to the multi-billion dollar projects we build, our resources and experience ensure clients receive the highest-quality, PEOPLE We care for the well-being of our people and help them grow in their ability to be successful. hands-on service they ve come to expect. INTEGRITY We conduct our business and personal affairs with the highest levels of integrity MARKET CAPABILITIES and take responsibility for our actions. Kiewit has the proven experience at every stage of the project development life cycle. The earlier we get involved in project development and design, the more value Kiewit can provide clients. DELIVERY METHODS Construction Design-Build/EPC CM-at-Risk CM-for-Fee Design-Build, Operate, Maintain EXCELLENCE We commit to excellence in all we do with a focus on quality and continuous improvement. PROCUREMENT MODELS Traditional A+B Best Value Negotiated SERVICES Preconstruction General Contracting Building Information Modeling Construction Management Engineering Self-Performed Scopes of Work LEED STEWARDSHIP We preserve Kiewit s unique culture to build a stronger organization for future generations of employees. 4 5

OUR MARKETS OUR SERVICES Keeping safety at the forefront, the Kiewit Foundations Group selfperforms complex geotechnical projects across North America. We deliver creative, cost-efficient solutions that are responsive to each project s specific site conditions. We utilize value engineering T R A N S P O RTAT I O N and constructability reviews, and our depth of expertise to offer constructible solutions that optimize budget and schedule. We POWER perform these operations with our fleet of specialty equipment and the management resources of one of the top builders in the country. WAT E R / WA S T E WAT E R CUT-OFF WALLS STRUCTURAL SLURRY WALLS DRILLED SHAFTS GROUND IMPROVEMENTS WHAT SETS US APART? OIL, GAS & CHEMICAL Safety Record Innovative Solutions Depth of Expertise MINING ISO 9001:2008 Quality Program Specialty Equipment BUILDING 6 Self-Performance Self-performing work results in RELIABLE BUDGET AND SCHEDULE FORECASTS 7

CUT-OFF WALL Cannelton Hydroelectric Cofferdam Cut-off Wall, Owensboro, KY Self-hardening cement bentonite cut-off wall as part of a dewatered and excavated cofferdam Dam Repair Temporary and Permanent Water-Tight Enclosure Metro PAR 1085 Project, Denver, CO Sheet pile and cement bentonite cut-off wall to eliminate deep excavation seepage Gulf Intracoastal Water Way West Closure Project, West Bank, Mississippi River, LA Slurry-trench for 85,000 sf soil bentonite slurry cut-off wall along the WBV levee Lower Mattagami River Project, Kapuskasing, ON 5,050 sf cut-off wall to support construction to repair and replace four hydroelectric generating stations Dry Dock Bund Wall for Gravity Based Structure, Newfoundland, CA 950 LF cut-off wall in the core of the dry dock bund wall for water-tight graving dock. 8 9

STRUCTURAL SLURRY WALL Harbor Siphon Slurry Wall, Brooklyn & Staten Island, NY Excavation, reinforcement, and concrete for a slurry wall as part of two launch shafts for a tunnel Tunnel Shafts Building Foundations Open Cut Excavation Support World Trade Center East Bathtub Slurry Wall, New York, NY 53 slurry wall panels of depths of 75-110 feet to form the basement of the PATH station and new World Trade Center Site Deep Rock Tunnel Connector, Indianapolis, IN Cement bentonite soldier pile application for three open-cut excavations totaling 69,400 sf. Clinton CSO, Syracuse, NY Triple box culvert constructed using slurry wall construction and a jet grout plug with cement bentonite wall for a base groundwater cutoff Metropolitan Transportation Authority, Long Island Rail Road East Side Access Bellmouth, New York, NY 45,000 cubic yard, open-cut excavation supported by a 28,300 sf slurry wall, 51 high-capacity tiebacks, sheet piles, concrete walers and steel bracing. 10 11

DRILLED SHAFTS Farrington Guideway, Honolulu, HI 500 ea 2.2m 2.5m diameter shafts for an elevated railway Metro-North Rail Road Embankment Stabilization, Cortland Manor, NY Installation of 20 48 diamenter drilled shafts to stabilize the railroad embankment along the Hudson River Transmission Lines Bridge Rail Large Diameter Caissons Soundwalls Buildings Tappan Zee Bridge, Tarrytown, NY 24 ea 48 diameter shafts w/ 42 Rock Sockets for the Westchester Abutment and initial pier PSE&G Susquehanna-Roseland Transmission Line, NJ and PA 145 mile transmission line requiring installation of large diameter reinforced concrete drilled shaft foundations Technical experts manage and maintain our Cove Point LNG Export Facility, Lusby, MD 395 ea 60 diameter shafts for 70 tall soundwall, a large piperack and five tower cranes; 283 ea 24 48 diameter shafts for pipe racks in a congested and live LNG plant SPECIALTY EQUIPMENT 12 13

GROUND IMPROVEMENTS Cannelton Hydroelectric Cofferdam Vibroflotation, Owensboro, KY Vibroflotation to densify hydraulically placed sand to ensure stability during excavation of the cut-off trench Grouting Soil Mixing Vibroflotation Cooper Nuclear Station, Brownville, NE Chemical grouting around pipe penetrations through a cofferdam Center Hill Dam, DeKalb County, TN 1,643,000 gallons of cement permeation grouting for groundwater cut-off and pre-treatment for a barrier wall Dry Dock Bund Wall for Gravity Based Structure, Newfoundland, CA Vibroflotation of hydraulically placed material to allow for cut-off wall construction COST- EFFECTIVE SOLUTIONS in challenging soil conditions. Virboflotation operation at Cannelton Hydroelectric Cofferdam 14 15

Kiewit Infrastructure Co. 302 S. 36th Street, Suite 400 Omaha, NE 68131 (402) 346-8535 10/2015