TENDER FOR INTEGRATED FEASIBILITY STUDY AND OBTAINING RAILWAYS APPROVALS FOR THE RAILWAY SIDING AT PROPOSED SITE AT JAMMU

Similar documents
Procedure to be followed for constructing private Railway siding

NOTICE FOR SELECTION OF ARCHITECT FOR ALTERATION / ADDITIONAL CONSTRUCTION WORK ON THE EXISITING BUILDING OF BHUBANESWAR CHAPTER OF ICSI

HSSE / CSMS / /NIT Dated: 15 September, 2016

Memo No. HIDCO/GM(E) II/Civil/1934 Dated Notice Inviting Quotation

Global Invitation for Pre-Qualification of Bidders for the Terminal Automation and Safety PLC related Jobs at Borkhedi Depot,Nagpur

GOVERNMENT OF RAJASTHAN URBAN DEVELOPMENT DEPARTMENT

Pre-Feasibility Report for Construction of Additional Tankage at POL Terminal Partapur, Meerut, M/s IOCL PRE-FEASIBILITY REPORT

Only Feasibility Study has been completed as of now. The selected Consultant has to prepare the DPR.

CHAPTER 1 INTRODUCTION

AGRICULTURAL PRODUCE MARKETING COMMITTEE

DETAILED TERMS OF REFERENCE. 1.0 Terms Of Reference: I.1 The scope of services of a consultant shall include the following categories:

Environmental Planning & Coordination Organization

Annexure-II SCOPE OF WORK

ATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS

TENDER NO. : E&P (W) : PQR : AUTOMATION DATED

Research Initiatives at TxDOT Related to Utilities and Right of Way

Security Deposit in Rs (Lac) to be deducted from R. A. bill.

TENDER DOCUMENT. TENDER No.: BHI/PI(S)/675/1007 FOR

NOTICE INVITING TENDER

UT ADMINISTRATION OF DAMAN & DIU DEPARTMENT OF TOURISM, DAMAN

PROJECT REPORT FOR AMMENDMENT IN ENVIRONMENT CLEARANCE

DELHI METRO RAIL CORPORATION LTD. (A Joint Venture of Govt. of India & Govt. of NCT, Delhi)

Specifications. For. from. 6x660 MW Sasan Ultra Mega Power Project (SUMPP) Sasan, Gram Siddhikhurd, Dist-Singrauli, Madhya Pradesh.

TCN Ref: PSER:SCT:FKK-M717:TCN-01 Date:

GUIDELINES FOR OBTAINING A BUILDING AND LAND USE PERMIT (BLUP)CLEARANCE FROM THE WMA

NAGPUR METRO RAIL CORPORATION LIMITED

NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR & BR

STATE UNIVERSITY CONSTRUCTION FUND

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs)

PROCEDURE FOR GRANT OF DISTRIBUTION OPEN ACCESS PERMISSION AS PER MERC (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2014

SCOPE OF WORK TECHNICAL SPECIFICATIONS

Clarification Number # 2 to Invitation for Prequalification. Haifa-Nazareth Light Rail Project

ANNEXURE. Annexure 1: Production Details. Annexure 2: Site Location Map. Annexure 3: Site Layout Map & Area breakup for Terminal

SCOPE OF WORK FOR ELECTRICAL WORK

JAMSHEDPUR (TATANAGAR)

CORPORATE QUALITY MANUAL ISO 9001:2008 INTRODUCTION

Bharat Petroleum Corporation Limited. Empanelment of Consultants

EXHIBIT A SCOPE OF SERVICES FOR. FINANCIAL PROJECT ID(S). Various Projects DISTRICT 2 VARIOUS COUNTIES

SCHOOL OF PLANNING AND ARCHITECTURE, BHOPAL. (An institution of national importance, Ministry of HRD, Govt. of India)

APPENDIX K APPENDIX K RECORDS MANAGEMENT BY CONSULTANTS ON PROJECTS

Tender No: DAFFPL/MOD/FF/ /06 15 th July, 2015

ENGINEERING SERVICES

Complying with Ohio s. Qualifications-Based Selection Law. (Ohio Revised Code ) A Guide for Public Authorities

EXPRESSION OF INTEREST FOR PROVIDING CONSULTANCY SERVICES FOR PRE-PROJECT ACTIVITIES FOR UPCOMING BREP PROJECT

1.1 Name of the Project : 1.2 Proposed Installed Capacity of the Project : MW

TENDER FOR INSPECTION AND RADIOGRAPHIC TESTING OF WELDING JOINTS

PLANNING AND EVALUATION PRELIMINARY DESIGN

Terms of Reference - Procurement and Contract Implementation Support

INVITATION OF EXPRESSION OF INTEREST FOR EMPANELMENT OF ARCHITECT

Talwandi Sabo Power Limited Tender document for Design & Engineering, Supply and Erection of Slurry pumping system from Plant to Ash Dyke

APPENDIX T.2 SACPCMP The South African Council for the Project and Construction Management Professions

BHARAT PETROLEUM CORPORATION LIMITED (A Public Sector Undertaking under the Government of India)

TANZANIA PETROLEUM DEVELOPMENT CORPORATION TENDER NO. PA/031/ /C/10 FOR

UNRWA. KfW JORDAN FIELD OFFICE DEVELOPMENT BANK INFRASTRUCTURE AND CAMP IMPROVEMENT PROGRAM. Location. Date ROADS REHABILITATION AT JERASH CAMP

No Change. No Change

SINGLE BID TENDER DOCUMENT FOR ARCHITECTURAL SERVICES FOR TAKING UP RENOVATION WORKS OF SBLC, MASULIPATNAM.

a) Hostel 50 Capacity with twin sharing basis b) Common room for Hostel c) Dean s Residence d) Care taker residence

: Supply, Installation, Testing &Commissioning of 2 Nos. Façade cleaning Roof Top Trolleys at SCOPE Minar, Laxmi Nagar, Delhi

Burns & McDonnell will review available project data on-site or on the data website to facilitate its evaluation of the following areas.

KONKAN RAILWAY CORPORATION LIMITED. NOTIFICATION No.CO/P-R/10/2017

Web : Phone No : & Fax : No. MSETCL/EE/EHV/Proj./Div/Tech/AKL/No Date :

No. UPERC/Secy/VCA/ Dated: Public Notice

GAIL (India) Limited CORPORATE OPERATIONS AND MAINTENANCE (O&M) - DEPARTMENT NOIDA

STRUCTURAL ENGINEER S SERVICES SCOPE

NOTICE INVITING E-TENDER Universal Electrification works under Saubhagya Scheme for Gomati Tripura District

Scope of Work and Terms & conditions

ANGLIAN WATER SERVICES LIMITED MISCELLANEOUS CHARGES STATEMENT

TENDER FOR SUPPLY AND INSTALLATION OF CCTV CAMERAS IN LIFTS AT PERMANENT CAMPUS OF THE INSTITUTE AT OKHLA, PHASE-III NEW DELHI

Project Planning and Development Process

Balmer Lawrie & Co. Ltd. Refinery & Oil Field Services

KONKAN RAILWAY CORPORATION LIMITED NOTIFICATION No. CO/P-R/07/2016

Repair/Replacement of Stainless Steel Earth Strips of LAs. Rail Corridor on Main Line in Delhi. Metro Rail Corporation Ltd.

South Bengal State Transport Corporation Dr. B.C. Roy Avenue, Durgapur ,Burdwan. ( A Govt. of West Bengal Undertaking )

Action prior to identification of specific works Action after identification of Work Action after award of work Action after completion of work

1.1 SALIENT FEATURES OF THE PROJECT Pipeline extension from VVSPL Vijayawada to the proposed Dharmapuri Storage Terminal

Dear Sirs. Project Name Appointment of Project Architect

DIRECTIVE 15H-9 Issue date: October 2018 COMMISSIONING

Provision of Anti Bird Nesting PVC Net in Depot and Main Line in Delhi Metro Rail Corporation Limited

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID: DISTRICT TWO

DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA

Highway Surveys and Location

Fixing of PVC Net, Self Fusing High Voltage Insulation Tape & Catenary Sleeve (MVLC) on Main line in Delhi. Metro Rail Corporation Ltd.

Projects & Pipelines Department

REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System

Metro Link Express for Gandhinagar and Ahmedabad (MEGA) Company Limited (50:50 SPV of GOI and GOG)

BHARAT HEAVY ELECTRICALS LIMITED, Jhansi

UNISTAL s Pipeline Information Management Solution (UPIMS)

Units Capacity Location. PRFCCU MMTPA 3 Mumbai Refinery. SRU MT/D 165(note 1) Mumbai Refinery. POLYPROPYLENE UNIT KTPA 450 Rasayani

WORKSHOP ON NATIONAL CAPACITY BUILDING FOR SUSTAINABLE TRANSPORT COLOMBO, SRI LANKA JULY 2015

Appendix A - Technical Specifications Engineering Services For the RiverTown Water Treatment Plant Project

STATE UNIVERSITY CONSTRUCTION FUND

institutions and Public Sector Undertakings for similar works.

SPECIFICATION FOR THE ERECTION AND MAINTENANCE OF TRAFFIC SIGNS, CHEVRONS, MARKERS AND SIGHT RAILS

TENDER DOCUMENTS FOR

VILLAGE OF GLENDALE, OHIO REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING SERVICES JULY 2015

Charging Arrangements for New Connection Services

RAILWAYS IN INDIA 2017 Market Analysis, Outlook and Opportunities

PROJECT FOR CNG & CITY GAS DISTRIBUTION FOR AGARTALA

Expression of Interest (EOI)

Transcription:

TENDER FOR INTEGRATED FEASIBILITY STUDY AND OBTAINING RAILWAYS APPROVALS FOR THE RAILWAY SIDING AT PROPOSED SITE AT JAMMU 1. PREAMBLE Re-sitement of existing Rail fed Petroleum depots of the PSU oil Companies to a new location is to be done on Common User Facility (CUF) basis. BPCL shall be the lead company for this project. It is proposed to construct a new depot at identified site in Jammu with Tank Wagon Decantation siding (Single Spur) on CUF basis. The products that shall be handled in proposed tank wagon decantation siding are High Speed Diesel (HSD) / Motor Spirit (MS) / Superior Kerosene Oil (SKO) through BTPN/BTFLN type Railway wagons. 2. BRIEF DESCRIPTION OF THE LOCATION The identified plot for the above proposed project is situated on the Jammu-Udhampur line, at village Pargalta & Kanna Chargal, which is approximately 200m from the nearest Railway Station, Bajalta. This plot of Land admeasuring approximately 116 acres. The plot has a frontage of approximately 950 metre along the Railway track (Jammu- Udhampur line). 3. SCOPE OF WORK The entire job of the tender are divided into two stages, Stage-1 and Stage-2, depending upon the feasibility of single spur full rake railway siding. Therefore, price bid shall be quoted accordingly against these two stages under Item (Stage-1) & Item no.20 (Stage-2). The job in the Item & Item no.20 are given as below: Item : Preparation and submission of Conceptual plan of feasibility along with the application for RTC (Rail Transport Clearance) and obtaining approvals from Railways for the same. Item no.20: Preparation and submission of DPR (Detailed Project Report), ESP (Engineering Scale Plan), LOP (Lay Out Plan), SIP (Signal Interlocking Plan), etc. and obtaining approvals from Railways; Preparation of general arrangement drawings (GAD) and detailed drawing for concrete Apron, Building and other structures inside the terminal as well as bridges (if any) and diversion/expansion of roads on the rail siding and obtaining Railways in-principle approval for the same. Preparation of BOQ and cost estimate of all civil works (rail hardware, buildings, bridges, culverts, pipeline crossings, pavements),ohe and signalling equipment and obtaining approval of the civil engineering, OHE (if required at station end) from Railways. Preparation of all the drawings required for land licensing approval to be put up by BPCL. The scope of consultancy shall also incl. Liasioning with Railways until the execution of agreement between Railways and BPCL. It is to be noted that Item no.20 shall be taken up by the consultant only after 100% completion of Item no 10 including obtaining the requisite approvals from railways and BPCL s confirmation to proceed with execution of Item no 20. Page 1 of 5

In case of execution of Item, if the proposed site is not found technically feasible due to any reason, whatsoever, to accommodate Railway siding, Item shall not be executed and the contract will be concluded with payment against item only. The scope of work for an integrated techno-economic feasibility study for the rail unloading siding at the above proposed location at village Pargalta & Kanna Chargal, Tehsil & district Jammu shall be as follows which is applicable for the jobs of stage 1 & stage 2 as the case may be: i. Visit of the Proposed Locations for reconnaissance and carry out detailed survey of the site identified by BPCL for constructing the tank wagon unloading siding for handling POL rakes and Based on the results of the survey, recommend the optimal design of the rail infrastructure for development of upcoming unloading siding. Interaction with the client to understand operational/functional objectives and broad requirements and also review of the information provided by the client. Evaluation of site from the point of view of Railway connectivity and rail operation feasibility, access to site through road, availability of required area to accommodate the facilities. Based on our requirement of unloading arrangements and requirements prescribed by the railways, develop train handling facilities/terminals and related infrastructure. v. To assess the volume of traffic in terms of tonnes, wagons and rakes on yearly as well as on daily basis. v v ix. To select an operationally feasible take off from the proposed serving rail head, studying the adequacy of the existing rail facilities at the take off point and Collect the relevant data from the railway authorities and examine the various options for deciding the most suitable take off point in relation to the direction of traffic. Collect the layout and L section of the proposed serving station and the railway section Designing rail layout for the terminal, keeping in mind the number of POL rakes requiring handling at the terminal. Suggest the signalling and telecommunication arrangements for safe movement of POL rakes between the serving station and the proposed rail terminal. x. Preparing concept paper, detailed engineering scale plan (ESP), "L" section and also a schematic diagram of the proposed railway siding. Obtaining approval of conceptual plan along with the ESP for the proposal from the Railways (any fees to be paid to the Railways shall be deposited by the BPCL). xi. x Working out the abstract cost estimates for the suggested facilities. Preparation and Submission of application for RTC (Rail Transport Clearance) and obtaining RTC approval from Railway Board/Zonal Office, as the case may be and provide all assistance to BPCL for obtaining in- principle approval from Railways including attending meetings/liaison with concerned Railway authorities as per requirements. Page 2 of 5

x x xv. x xv xv Preparation and submission of Detailed Feasibility Report and Detailed Project Report and obtaining the approval of the same from railways. Preparation of all the drawings required for land licensing approval to be put up by BPCL. The scope of consultancy shall also include liasioning with Railway Officials until the execution of agreement between Railways and BPCL. Preparation of detailed Lay Out Plan (LOP) as per approved ESP and Railway guidelines and obtaining approval for the same. Preparation and submission of drawings of culverts/bridges/pipe line crossings related to Railway siding. Obtaining the approval of the same from Railways. Any other approval required from Railways not specifically mentioned above but necessary to start the construction activities. Though the land is identified, acquisition process is under process for above proposed site. The pre-feasibility of Railway siding has to be established first by the successful party along with the due approvals from Railways for putting up the siding and submit the Conceptual Plan to the BPCL enabling us to final acquisition of Land. 4. FEASIBILITY STUDY AND DETAILED FEASIBILITY REPORT i. Final location survey of the selected alignments and pegging out the alignment as per railway standards. Picking up the field data for preparation of land plans and longitudinal sections and deciding bridge and culvert locations. The alignment of Track, formation level etc., shall duly take into account the highest flood levels Full supply levels, the anticipated water flows and the direction of such flows. The plan and L- section should indicate the HFL/FSL of nallahs/canals crossing the proposed tracks. The assessment of land requirement by giving details such as private, govt., forest etc. and preparation of land requirement on Sarja map (including schedules & cadastral map) as required for land acquisition purpose if any. Identification of structures required demolition and its cost estimate and compensation (if any) to be paid v. The Centre line of the alignment is to be marked on ground with concrete/stone pillars (size 300mmx300mm minimum) at 200meters regular intervals and closer intervals on curves as per railway standards. All pillars should have reference of GPS coordinates. v v Assessment of electrical (OHE) and S & T requirement over the construction siding and permanent siding. Liaison with Railway authorities and other Govt. authorities for getting clearance for the proposed rail linkages if any, as required. Assessment of locos and workshop facilities, if any, as required. Page 3 of 5

ix. Assessment of manpower as required and infrastructure. 5. PROJECT COST ESTIMATES Based on the above studies, assessment of the project cost of various packages such as civil, electrical, S&T, OHE, work to be executed as deposit works and directly by BPCL through railway approved agencies for both inside the railway station and outside station premises and other equipment etc. The detailed cost estimate shall be prepared by considering the unit rates of the various materials /equipment which are required for the construction, commissioning and operation of the siding including works such as miscellaneous buildings, workshops, tools & plants, fuelling stations, bridges, culverts, ROB/RUB, FOB, General electrification etc. The cost estimate shall also cover the benefits/limitations of Railways Assisted Siding concepts and EOL concepts. 6. GENERAL REQUIREMENTS i. Preparation and submission of Detailed Report incorporating above details to obtain approval from BPCL/Railways. The report should include recommendation clearly based on a techno -economic study by considering an integrated POL Wagon movement study. Complete co-ordination and liaison with Railway, state/central govt including the approval of the scheme from Railways and other agencies as required. Assisting BPCL in Co-ordination with NH/state authorities for ROB, RUB and manned/unmanned crossing and obtaining their clearances. Traffic study, Staffing study for O&M, railway staff to be deployed at BPCL cost, if any. v. All coordination with any other agency whose facilities have interface with the Railway siding system. v v ix. The consultant should have valid enlistment with the concerned Railways till the validity of this contract. The cost estimate shall be worked out based on the detailed market study for availability of materials, source etc. All site related activities such as survey, finalization of location of loading point / rail corridor, preparation of land plans etc. are to be done in the presence of BPCL Engineer at site. Consultant to carry out the health check of the existing rail lines connecting the Proposed Terminal from the nearest station. x. Study of the capacity of the Rail route for taking into account the additional traffic on account of the additional POL wagon movement. Page 4 of 5

7. DELIVERABLES Party shall submit, the following documents to BPCL: i. Preliminary report eight (8) copies. Eight (8) copies of draft feasibility report including drawings and land plan assessment. Twelve copies (12) of final Feasibility report along with the drawings. Two reproducible copy (CD ROM) of preliminary report & final Feasibility report along with the drawings. 8. TIME SCHEDULE Party shall start the work within one week from the date of issue of LOI and should complete the entire job in Eight (08) months of total time period as per the following terms and conditions: Item to be delivered within Three (03) months from the date of LOI. Item to be delivered within next Five (05) months after confirmation given by the BPCL subjected to the successful completion of the job in item (i.e. if Railway siding done feasible). 9. PAYMENT TERMS Payment terms shall remain as per the following schedule of activities. There will be a deduction of 10% towards retention amount from every running account bills, which may be released on completion of all jobs. S. No. Activity Payment Item (Stage-1) 1. Completion of preliminary reconnaissance survey & investigation feasibility. 30% of the agreed rate of item 2. Submission of recommendation along with the Conceptual plan. 40% of the agreed rate of item 3. Preparation and submission of application to railways for approvals. 20% of the agreed rate of item 4. Providing assistance till the conclusion of 10% of the agreed rate of item process for obtaining in-principle approvals from Railways including attending meetings/liaison with concerned Railway authorities as per requirements. Item no.20 (Stage-2) 1. Submission of the Draft report. 60% of the agreed rate of item 2. Submission of Final DPR & ESP. 20% of the agreed rate of item 3. Final approval of DPR & ESP along with all other approvals from Railways 20% of the agreed rate of item Page 5 of 5