Work-in-progress report helps monitor and manage cash flow

Similar documents
No. 7: Game-Saving Plays Over/Under Billing and Bonding Reports BY MIKE ODE

PURCHASING AND JOB COSTING FOR CONTRACTORS. Leslie Shiner Owner, Principal of The ShinerGroup

Sage 100 Contractor Intelligence Reporting Standard reports

Business Math Boot Camp. Revenue, Cost, and Profit

COST CONCEPTS Introduction: Cost: Types of cost: Direct cost or explicit cost:

Evaluating Preconditioning Profitability - Projection and Closeout Manual

Margin Erosion: Process Improvements to Help Close the Gap and Deliver a Profitable Project

Understanding Cash Management and Profit Improvement. Washington Small Business Fair September 29, 2018

Job Costing (JC) General Features: Interface with other Systems: System Setup and Maintenance:

KEY SAAS METRICS AND BENCHMARKS

NRV vs. FV NRV is entity-specific value; FV is not. NRV for inventories may not equal FV-CTS.

Accounting for Merchandising Businesses

SARBANES. Compliance with the Sarbanes-Oxley T H E I M P A C T O F F L E E T

CAUSES OF CONSTRUCTION COMPANY COLLAPSE

One of SE s most powerful features is its reporting capabilities and the variety of options offered

Report Guide REPORT AND REFERENCE MANUAL. Copyright All Rights Reserved.

OF A SERVICES COMPANY CFO

AUDITING INVOICES 101

SAP Solutions for Engineering, Construction and Operation industry. Michael Ragozin Noveco Systems Pty Ltd

HOW TO GAIN REPORTING ACCURACY IN THE WORK IN PROCESS SCHEDULE

User Manual: Stocker, Feeder Retained Ownership Profit Projection

CHAPTER 8 LEARNING OBJECTIVES

Grassfed Beef Production Profit Projection and Closeout

BUILDING ENTERPRISE BUDGETS FOR INDIANA SPECIALTY CROP GROWERS

Reading Essentials and Study Guide

ReportPro Training & Reference Guide (Summit V8)

Project Cost Management

Student Name: Student No.: Seat No

Innovations in Business Solutions. Diploma in Accounting and Payroll. Accounting and Payroll I Week 1 to 11

Practice Finances New Concepts for Old Problems Guest Speaker: John Tait, BSc, MS (Fin.) DVM, MBA, CFP

Complete List of QuickBooks Enterprise Solutions Reports

Chapter 2--Financial Reporting: Its Conceptual Framework

The Benefits of Effective Financial & Operational Benchmarking

Appendix I Whole Farm Analysis Procedures and Measures

Computerized Estimating is Really Here

Producing Goods & Services

Cash Flow if you re out of money, you re out of business.

How to best position your construction company to a surety in 2013

EUROPEAN UNION ACCOUNTING RULE 9 INVENTORIES

Job Manager Great Features: All in One Database. Designed for Dynamics NAV 2013

Propane. A game changer for a low-emission Canada now. Affordable and accessible now. Ontario Access to Natural Gas Act, 2018 (Bill 32)

APACHE V4 is the ERP (Enterprise Resource Planning) solution for industrial companies

Relevant Costs and Revenues

CHAPTER 4 ACCOUNTING FOR MERCHANDISING OPERATIONS

Intro & Executive Summary

Allocation of Joint Costs

OWNER / PRESIDENT / CEO

MAXIMIZING FINANCIAL PERFORMANCE: 6 KEY ISSUES FOR PROFESSIONAL SERVICES ORGANIZATIONS

Justifying Simulation. Why use simulation? Accurate Depiction of Reality. Insightful system evaluations

SPONSOR GUIDE. Everything you need to run a successful fundraiser with Empower ONLINE SHOPPING AVAILABLE!

IFRS Training. IAS 2 Inventories. Professional Advisory Services

City Hall VOLUNTEER GUIDE

This Questionnaire/Guide is intended to assist you in decision making, as well as in day-to-day operations. Best Regards,

Accounting for management

Audit of Executive Compensation

Producing Goods & Services

OPEN BOOK INSIGHT. marketing efforts on prospects that match those characteristics, helping you get more impact from your prospecting dollars.

CHAPTER 1 INTRODUCTION

No. 8: Avoid Wild Pitches with Overhead Allocation BY MIKE ODE

Full file at

Of the following manufacturing operations, which is the best suited to the utilization of a job order system?

You can easily view comparative data and drill through for transaction details.

Copyright...4. Overview Configuration Overview...7. Prerequisites and Preparation... 7 Configuration Flow Planning Projects...

Apprenticeship standards funding rules 2016 to 2017

MILK PRODUCTION COSTS in 1998 on Selected WISCONSIN DAIRY FARMS

Internal Audit Report. Miscellaneous Revenue

Paper F5. Performance Management. Monday 9 June Fundamentals Level Skills Module. The Association of Chartered Certified Accountants

Financials Module: Accounts Payable

IND AS 2 IND AS 2: INVENTORIES. Applies To All inventories excepta) Financial Instruments (Ind AS 32/ Ind AS 109)

Chapter 5: Merchandising Operations and the Multiple-Step Income Statement

COMSATS Institute of Information Technology Abbottabad

TIMBER SALE GUIDELINES

Ch.4 Evaluating Requisitions.

The following points should be noted by candidates when reflecting on the paper just taken, and when preparing for future CIMA examinations:

Advertising 133. Nontaxable advertising services

WARNING ARE YOU ONE OF THEM? Contractors are Losing Time & Money by Using Inadequate Time Cards TRACK TIME. MANAGE TIME. REPORT TIME.

OPERATIONAL CASE STUDY February 2019 EXAM ANSWERS

After the Global Financial Crisis: Growth and Ownership Transition Strategies for AE Firms

IAB LEVEL 1 AWARD IN MANUAL AND COMPUTERISED BOOKKEEPING (QCF)

Advertising. Nontaxable advertising services. Creating advertising

The leading Financial and Operational Solution for Professional Services Organisations

Types of Ownership. Creating a Pro Forma. Sole Proprietorship (or Partnership) Corporation. Limited Liability Corporation (LLC)

Understanding the Business of Accounting

October 23, Ms. Margaret R. DeFrancisco Director New York State Division of the Lottery One Broadway Center Schenectady, NY 12301

What High Profiting Pressure Washing Companies Do To Be Successful

The Construction Manager. Reports Catalog

1 Cost Accounting - Basic Concepts & Treatment of Special Items

MANAGERIAL MODELS OF THE FIRM

SAMPLE. FNSACC301 Process financial transactions and extract interim reports

Copyright holder is licensing this under the Creative Commons License, Attribution 3.0.

Table of Contents. Job Deposits Deposit Received Prior to Customer Creation New Job Creation... 22

Advanced Revenue Management

Trend Ratios Liquidity and Profitability

Profitable Transition From Commissions to Fee-Based

Adequate Accounting Systems for Cost-Type Work

Full file at

PJM Finance Committee Financial Review, Reporting and Communications Protocol

East Central College

Job Management Setup

1H18 results and strategic progress update

Transcription:

Page 1 of 5 Email to a Friend Focus Track the WIP by Philip Nimmo, Sam Shabander, Dr. Perry Daneshgari Published: March 2008 Work-in-progress report helps monitor and manage cash flow Construction contracting is one of the few professions that requires massive, up-front investment prior to actual cash inflow. The rule of thumb for any project startup is 30 percent of the total value of the contract has to be available before any billings. In fact, most projects do not become cash-flow positive until the last 5 to 10 percent of the job. The dilemma contractors face in income, cash flow, billings and expenditures requires a constant balancing act. Contractors need a system that allows them to see cash-out, billing and cash-in to manage their daily activities. Unfortunately, neither the accounting nor the estimation data can help create a visible and responsive process to see these. The fact is the sales of a contractor have nothing to do with its billing. This misunderstanding could cost the contractors tens of thousands of dollars in revenues and taxes. What is WIP? Most construction accounting programs have a module dealing with work-in-progress (WIP). The typical elements of a simple and basic WIP are as follows: Contract values (base amount plus approved changes) Contract cost estimates (base amount plus approved changes) Original estimated profit margin (with and without approved changes) Job cost to date Value of completed construction Actual billings Over/underbilling Projected profit margin The WIP calculation relies on a combination of hard numbers (actual job costs, actual billing amounts and revised contract values) and the project managers educated guess at values such as the following: Construction put in place (value of the scope of work completed) Projected cost to complete the remaining work Value of pending changes and extra work When provided with the necessary information and routine updates, most accounting software packages will provide some sort of standard reporting that goes beyond a simple tally of the job costs incurred to date. Often these reports, by various names, will contain calculations of the percent complete (based on the proportion of estimated cost that has been incurred), an estimate of the remaining cost to complete the scope of work, the expected profit margin and whether the project is overbilled or underbilled. A WIP report should be used by core management and outside parties for the assessment of the current financial health of the contracting business. This report is a critical measure of the management s financial accountability in the contracting business, and as such, the accuracy of the WIP report is a key focus area for contractors of all sizes.

Page 2 of 5 Whether a company is small and privately held or a multibillion-dollar holding company seeking compliance with Sarbanes-Oxley reporting requirements, the WIP report is a principal tool for accurately monitoring a project s financial performance. How to create your own WIP Many contractors find the reports in construction accounting software contain information that is either beyond their immediate interest, more than they care to share outside the company, in need of modification and refinement using data that is outside of the accounting system, or simply not formatted the way they want to see it. Often contractors attempt to build a custom WIP report containing the information and the format that provides the most appropriate information for their individual needs. Whether the WIP is created using a pencil and paper, an Excel spreadsheet, a custom report within the accounting system, or within another third-party mechanism, there will be some basic elements that must be included. These basic or fundamental elements are sales, billings and profits. In order to provide accurate reporting, one must understand the elements of each component. One of the most common misconceptions in contracting is that sales and billings are the same. A sale occurs when goods and services are exchanged for an agreed price. In contrast, billings are the amount that the contractor has invoiced to the customer for the work completed. Profitability is simply the difference between the contract price and the costs incurred to complete the job. Given the data described above, the simplest and most basic form of the WIP report can be constructed easily using the following steps. Step 1 Calculating sales The calculation of sales involves the basic estimation and contract data. Listed below is the information needed for the WIP schedule and sales calculation: Original contract value Original estimated costs (labor, material, subcontracts and all other costs including planned allocations to the project) Agreed value for each fully executed change order Estimated costs for each fully executed change order (labor, material, subcontracts and all other costs including planned allocations to the project) Actual job costs incurred and/or allocated to date The WIP report uses the revised contract value and the value of construction put-in-place to calculate sales to date. By summing the original contract value and the agreed value of each fully executed change order, we will arrive at the revised contract value. However, this is not recognized as sales until the agreed scope has been delivered to the customer. The final calculations for the WIP report are the original and revised profit expectations. The original profit expectation is calculated by taking the difference between the original contract value and the original estimated project cost and dividing this by the original contract value. The revised profit expectation is calculated similarly using the revised values the difference between revised contract value and the revised contract cost divided by the revised contract value. These calculations are shown below, and Figure 1 illustrates a common layout for the Contract Values and Costs portion of the WIP report.

Page 3 of 5 Original Estimated Costs + All Estimated Change Order Costs = Revised Contract Costs Original Contract Value + Agreed Value of All Fully -Executed Change Orders = Revised Contract Value (Original Contract Value Original Estimated Costs)/Original Contract Value = Original Profit (%) (Revised Contract Value Revised Estimated Costs)/Revised Contract Value = Revised Profit (%) To calculate the portion of the contract that has been sold (actual sales), as of the report date, a simple two-step formula is used. Step one is to calculate the percent complete (the portion of the total project price that has been delivered to the customer). This is determined by dividing the total job costs incurred to date by the total of all estimated costs (original contract costs plus the sum of all costs for each fully executed change order). Once this value (percent) is determined, step two is to apply it to the total revised contract price. This will result in a value of the construction put-in-place: sales to date. The calculations are shown below, and Figure 2 illustrates a common layout for the earnings section of the basic WIP report. Actual Job Costs to Date/Total Estimated Costs = Percent Complete Revised Contract Value Percent Complete = Earned Value or Actual Sales to Date Step 2 Managing cash flow When it comes to maintaining a healthy business, cash-flow management on construction projects often is more critical than attaining high profit margins. It is common that a job will not achieve positive cash flow until the last 5 to 10 percent of the project. Contractors have come to expect large initial cash investments in their projects to get them started. The failure to monitor and manage cash flow can extend the duration of borrowing to the point that both the project and contractor can be jeopardized. The WIP report can be used to determine two fundamental and critical measures to help monitor and manage cash flow on the project. First, it identifies the amount billed for the scope of work that has been delivered and, secondly,

Page 4 of 5 the monies collected from the customer. Project billings to date (invoice totals) and cash collected to date (payments received against these invoices) are necessary for the WIP schedule: The WIP report also identifies a contractor s billing status in terms of over/under billings. Overbilling occurs when billings are more than the sales recognized to date. Underbilling occurs when billings are less than the sales to date. These amounts are separated so the contractor can evaluate his total overbilled and total underbilled status, as opposed to monitoring only his net over/underbilled status. This distinction is critical because the fact that one job is overbilled does not justify having another job underbilled by the same amount. The cash-flow calculation compares the amount received from the customer to the actual project costs paid to date. When costs to date exceed the amount collected, this is reflected as a negative number (cash short). When received cash exceeds the paid costs, this is a positive number (cash over). These calculations are shown below, and Figure 3 illustrates a common layout for the billings and cash position section of the basic WIP report. If Earned Value > Project Billings to Date, then: Earned Value (Sales) Project Billings to Date = Amount Underbilled If Project Billings to Date > Earned Value, then: Project Billings to Date Earned Value (Sales) = Amount Overbilled Total Cash Received to Date Actual Job Costs Incurred to Date = Cash (Short) Over Going beyond the basics There are no established requirements limiting the content of the WIP report. The WIP may be expanded to include other useful management tools that help create a visible snapshot of the project, department and company financial health and associated risk areas. In future feature articles, we will investigate some additions to the basic WIP. We will expand on the connection between accounting and operations by discussing the financial management information available through a more detailed WIP report designed to help CFOs, accountants and owners accurately project future cash flows and potential write downs (or ups) from data available early in the project life cycle. Further expansion of the WIP can allow for refinement of both profit and cash-flow projections based on actual job productivity experience as well as consideration of estimated, actual and committed costs. A well-designed and regularly maintained WIP report can be one of the most valuable tools for any contractor, regardless of size or specialty. Even a very basic WIP will allow owners and managers to accurately project profitability and better manage cash, improving relationships with employees, creditors, surety providers and customers. For companies with more complicated risk situations, tighter lending covenants or Sarbanes-Oxley reporting requirements, WIP can be expanded to provide the key ingredient in a management information system

Page 5 of 5 solution for financial assurance at the project level and higher. DANESHGARI is president of MCA Inc. He is a consultant for various electrical and general contracting companies. NIMMO is the director of operations for MCA Inc. SHABANDER, M.B.A., has 25 years of experience as a CFO and accounting adviser for various industries, specializing in labor productivity.