KEVIN BURNS HOMES PRACTICAL COMPLETION REPORT VISUAL BUILDING INSPECTION REPORT

Similar documents
KEVIN BURNS BUILDING INSPECTIONS REGISTERED BUILDER PRE-PURCHASE VISUAL STRUCTURAL INSPECTION REPORT No. 822

Property Address: Sample.Prehandover.report

SHS Building Consultants. Ph Job Details. Photograph shows the front elevation of the residence.

Owner Builder Inspection Report

HANDOVER INSPECTION PRE-PURCHASE BUILDING INSPECTION REPORT

Prepared for Sample Page 2 of 28 Report Reference: 4960 PROPERTY DETAILS: Building Type: Residential House Description: Single Storey, Split level, 30

INSPECT DIRECT Pty Ltd

PRACTICAL COMPLETION REPORT

BUILDING REPORT. 123 Anywhere Street Suburb City. Prepared for: Client NON INVASIVE

Home Inclusions $410, HOME & LAND PACKAGE MARCOOLA Land Content $ MARCOOLA. 4 Bedroom 2 Bathroom Multiple living zones Alfresco

INSPECTOR GROUP PTY LTD

Residential Structural Inspection Report

Project Specifications

SCHEDULE OF INCLUSIONS

Powder Coated Merino. Colorbond Dune. Concrete Tiles- Concrete Tiles Slate Grey Finish. Colorbond Paperbark. Concrete Tiles- Concrete Tile -

BUILDING INSPECTION. Mar 16, 2015 PROPERTY ADDRESS Killymoon Drive Hope Island, QLD 4212, Australia. 1 of 44

STANDARD SPECIFICATIONS. Page 1

Visual Property Inspection Report Complies with Australian Standard AS

Residential Pre-handover Inspection Report

INSPECT DIRECT. Web Page: THIS REPORT IS VALID FOR (6) MONTHS FROM THE DATE OF MOST RECENT INSPECTION.

The Express Range. It s your home. The Express 12

Executive Inclusions PRELIMINARIES:

REPORT ON DOMESTIC BUILDING WORK

Handover Inspection Report

DUO Contemporary- Ash 1

THE BEST INCLUSIONS ALTI 202

(Address removed for privacy)

Inclusions FRAMING GARAGE FIXED SITE COSTS & CONNECTIONS EXTERNAL. 90mm pine wall frames with stabilised pine roof trusses

LOT 1331 BRENTWOOD FOREST HOUSE AND LAND PACKAGE PRICE $474,977

Classic Living INCLUSIONS

This report is produced without prejudice.

Residential Handover Inspection Report

BUILDING INSPECTIONS

DESIGNER INCLUSIONS DISPLAY CENTRE LOCATIONS SOUTH WEST NORTH WEST HEAD QUARTERS HOOTHOMES.COM.AU. Hillcroft Estate 28 Dowie Street CLAYMORE NSW 2559

The Pattison. At a Glance m Study m. 17.

The Banksia. At a Glance m Study m. 18.

Inspection Report. Prepared for: Gil Turiel. Property Address: 545 Briar Run Court Loganville, GA Date: July 17, 2011

access INCLUSIONS With our Access range of inclusions, you can move in and just enjoy living.

kitchen excellence $450 With the Largest Stone Kitchen Island bench available in Perth only Fully Ducted Reverse Cycle Air Conditioning

NOBLE S WAY with Schedule of Finishes

BUILDING AND PEST INSPECTION REPORT

Po Box Chartwell 3248 Hamilton Free Ph

Visual Defects (Handover) Property Inspection Report Complies with Australian Standard AS

ROAD CONDITION SURVEY REPORT

PARK FRONTING TOWNHOMES

Bathrooms. Custom cabinetry INCLUDED

essentials INCLUSIONS

Inspect Direct Pty Ltd

Inspect Direct Pty Ltd

VISUAL HANDOVER INSPECTION REPORT

Deluxe Inclusions for

RENDERS ARE INDICATION ONLY. Land. Home size 26sq. 28 Ajay Way, Kurunjang LEGACY 26 $545,500 ACTUAL HOUSE IMAGE PRESENTED BY

160.F1 PROPERTY INSPECTION REPORT 6 Vitoria St, Sebastopol, 3356 INSPECTION DETAILS Registered Practitioners Signature:

Hosies Homes Standard Inclusions:

Structural Defects Report for Existing Dwelling 3 Louie Court, Bright

Whether you re buying or investing, a Buy-Wise Building & Pest Inspection will tell you of everything you need to know about your new property.

LOT 25 Blueleaf Place. Brookfield $511,879 SUMMARY

Building Dilapidations International

Brand new designs... Fabulous new ideas

QUALITY INCLUSIONS. Quality inclusions from your experienced local builder!

SS: Standard. The fundamental inclusions for your dream home

Standard Inclusions for

SUMMARY 1234 Main St.Loudon TN Buyer Name 08/28/2018 9:00AM

PRE-PURCHASE STANDARD BUILDING REPORT

THE WISCONSIN TWO STOREY OPULENCE HOW VERY VENTURA

Schedule C STANDARD Specifications

THE ACACIA TRADITIONAL STYLE HOW VERY VENTURA

Pink Inspection Services B&R A Division of B&R Constructions Pty. Ltd. ABN

PARK FRONTING TOWNHOMES

owner builders construction guide copyright - pdh estimating - june 2004

Verve Inclusions. 3 Corporate Avenue Rowville VIC T 1800 SIENNA E

Arnest Termite Control - Structural Pest Report

Inspection Report. Provided By. Property Services Group WA. 7b Grimsay Road, Ardross, WA, 6153, Australia P psgwa.com.

Inspection Report. Prepared for: Tonia Mann. Property Address: 2557 Briar Valley Way Dacula, GA Date: March 01, 2012

Metriton Standard Inclusions

2/10 Liuzzi St Pialba Hervey Bay Qld

cjd N02 Canon Hill Crescent - Scope Of Refurbishment Works September 2014 External

Helpsheet 35. Repairs response times. The following is a list of response times for different types of repairs.

VISUAL BUILDING INSPECTION REPORT Complies with Australian Standard J Citizen. Inspected Property: 4 John Street, Johnson

the evolution 2015 series

ALTI 202. Details. 4 Bedrooms. 2 Bathrooms + Powder. Double Lock-Up Garage. 2 Living Areas. Min. Block Size: 12.5m x 28m

The following is a list of response times for different types of repairs.

Pest & Building Report

MEKI 125. Details. 3 Bedrooms. 2.5 Bathrooms. Single Carport. 2 Living Areas. Min. Block Size: 8.5m x 28m. Ground Floor: 90.87m 2 9.

Denis Creedon, B.E., MIEI. CONSULTING ENGINEER

CABONNE COUNCIL DEVELOPMENT CONTROL PLAN NO. 15 RELOCATABLE AND TRANSPORTABLE HOMES

Cartwright Street Waterford at The Willows

MAIN & AUX/ASSOCIATED UNIT - Specification

Duplex_Cost Summary_ SAMPLE 43,465 SUM) 19 ELECTRICAL SERVICES (PROVISIONAL 24,820 SUM) 20 MECHANICAL SERVICES (PROVISIONAL

SNAGGING REPORT. Plot 19 Snag Close Unfinished Avenue Oxford OX90 1AB. for. Mr T & Mrs N Sample

HOME & LAND $946,000 LOT 155 THE HILLS ESTATE BOX HILL BRONTE 182

Lot 135, 11 Varsity Crescent, Varsity Park Total Package Price: $445,000

FIX & WATERPROOFING INSPECTION REPORT & DEFECTS LIST. Lot 426 Sample Tce, Mernda

Example Schedule of Condition Report

Home Inclusions or Domainehomes.com.au

Building Report. Report Commissioned By: The Purchaser. Property Address: Sample Street Tempe. Report Number:11121

STANDARD VISUAL PRE-PURCHASE BUILDING AND PEST INSPECTION REPORT

DRMB BUILDING GROUP SPEC INCLUSIONS JOB ADDRESS NO 4 Deborah Court Mt Waverley vic

Standard Inclusions with every G.J. Gardner

KOOKABURRA HOMES BRICK HOMES. Standard Inclusions. kookaburrahomes.com.au

Transcription:

KEVIN BURNS HOMES PRACTICAL COMPLETION REPORT VISUAL BUILDING INSPECTION REPORT No. 764 CLIENT: PROPERTY ADDRESS: Jindalee DATE: 25 November 2016 WEATHER: Fine ARRIVAL TIME: 8.15am DEPARTURE TIME: 10.30am VISUAL BUILDING INSPECTION REPORT PREPARED BY: K.R. BURNS Builders Reg. 6163 16 Swansea Promenade Mindarie W.A. 6030 TEL: 93050811 MOB: O418910743 EMAIL: kevin@kevinburnshomes.com.au

Address As requested an inspection was carried out to assess and report on the PRACTICAL COMPLETION stage of the home at the above address. This report is to be read in conjunction with items requiring attention by the builder submitted by the client. The property has only been inspected at Practical Completion stage. It may become evident that once the building process has completed and the owner has moved in further faulty and incomplete items may be discovered. To compensate a defects liability period has been set aside as stated in the building contract to rectify these items. The builder will also provide a structural guarantee as required under the building act. Confirm with your builder as some builders provide a guarantee above the minimum period. All electrical, gas and solar appliances (including lights and power points) will be tested at handover stage and does not form part of this report. Should the builder disagree with the opinion of the inspector on any structural items listed, advice and clarification may be obtained from a structural engineer. The structural engineers advice will take preference over the inspector. Note:Practical Completion means that the house is brought to the stage where the building work is completed except for any omissions or defects which do not prevent the home building work from being reasonably capable of being used for its intended purpose and becomes fit for occupation in a free and uninterrupted manner. Please refer to Terms and conditions at the rear of this report. Page 2

List of items requiring attention by the builder. External 1) Repair chips on render on both edges of Garage opening. Clean marks of render and repaint under right hand window and right hand corner. 2) Repatch between render and eaves. 3) Complete eaves painting. Page 3

4) Replace chipped roof tiles and remove excess roof tiles from roof. It appears the roof tile company have carried out a final check and marked the tiles to be replaced. 5) Rubble is in the gutters in a number of places. Check the perimeter of the home and remove the rubble. 6) Clean render from brickwork near meter box. 7) Clean vanadium staining from face brickwork. Inside Garage and all external walls. 8) Check all face brickwork. Various stains around house. 9) Cut back termite barrier to external garage wall. 10) Relay face brick on fence. It appears this was damaged when metal fence was installed. 11) Complete sewer I.S. 12) Paint pipes and conduit to N.B.N. meter box and gas H.W.U. 13) Complete painting to fascia returns. Page 4

14) Family Room sliding door is off its track. 15) Complete rear and side fencing. 16) Remove builders rubble from site and level. Inside Garage 17) Clean vanadium staining from face brickwork. 18) Cut metal rod protruding from pier. 19) Repatch and paint Garage ceiling in a number of areas. 20) Remove packer from door sill. 21) Clean Garage floor. Page 5

Internal 22) Touch up internal and external of front door frame. Paint sill. 23) Adjust front door. It appears the door has bowed slightly. 24) Clean all striker plates to internal door frames. 25) Check all doors for rubbing on carpet. Example Bedroom 1. 26) Various door frames have chips and marks. Check all door frames and touch up. 27) Check all window reveals. Plastering is rough in areas. 28) Check all window frames. Marks require cleaning off in areas. 29) Fit grate to Ensuite shower. 30) Remove marks on tiles to Ensuite above power point over vanity and just on left hand side above the shower taps. 31) Clean paint off Ensuite cupboard handles. 32) The Ensuite door hits the towel rail when opened. It may be necessary to fit a stopper on the floor or see if a small clear buffer can be put on towel rail. Discuss with client. 33) Patch chip on wall to Bedroom 1. 34) Left rear gas hot plate not working. 35) Check door lock to Laundry sliding door. 36) The roof area was inspected where possible. Insulation and poor access limited the areas inspected however it was found the roof framing was adequately constructed. Page 6

TERMS AND CONDITIONS 1) The inspection shall comprise of a visual assessment only of the residence. 2) Areas that can be inspected in a safe and reasonable manner shall be inspected. The roof will not be walked on and will be inspected from a 2.00 metre ladder. 3) The Inspector is limited to some areas and will not conduct any invasive inspections. It is difficult to inspect the roof loft area at practical completion stage and a general inspection from the manhole will be carried out to determine the structural adequacy only of the roof. Should a full roof loft report be required it is recommended a structural engineer be consulted. 4) Some defects may only be apparent during certain weather conditions. 5) This report does not make any comment on any area that is concealed. 6) This report does not make any comment outside the inspectors expertise such as plumbing and electrical. 7) No inspection will be made inside walls, between floors, inside skillion roofs, inside eaves areas, behind any stored goods in cupboards and other areas obstructed at the time of the inspection. 8) This is a visual report only and no inspection aids will be used. 9) This inspection will not report on termite or pest activity. A qualified Termite Pest inspector should be consulted. 10) No inspection will be carried out for asbestos. 11) No inspection is carried out for mould. 12) No inspection will be carried out on solar power units. 13) This report is not a structural report. Should you require any advice of a structural nature a Structural Engineer should be consulted. 14) The report is not a certificate that the property complies within the requirements of any act, regulation, ordinance, local law or by-law and is not a warranty against problems that may develop in the future. The report does not include identification of unauthorized building work or work not compliant with building regulations. 15) This report does not give or imply any warranty or guarantee and is merely an opinion of the inspected property. 16) This report is valid for 30 days from inspection.