layout instructions provides both left and right hand facilities without the need to specify

Similar documents
Missouri S&T Bullman Showers Date: February 13, 2017 Project No SECTION PLASTIC SHOWER AND DRESSING COMPARTMENTS

SECTION TOILET COMPARTMENTS SPEC WRITER NOTES:

Double Tidy Rail. Assembly Instructions- Please keep for future reference. Important - Please read these instructions fully before starting assembly

Outward Folding Bathscreen Instruction Manual

Important Information

METALWORKS RH215 Faceted Custom Hook-on Panels

Smart Panel System The Health Care Specialist

The frame elements, accessories and additional elements are maintenance-free!

SECTION TOILET COMPARTMENTS

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description

1. Supply, delivery, engineering and installation of new storage equipment.

SECTION SOLID PHENOLIC PLASTIC TOILET PARTITIONS

SECTION TOILET PARTITIONS. A. Section Structural Steel: Supports for ceiling hung compartments.

LEADING IN WELDING SAFETY CATALOGUE 2014 CONSTRUCTION. Version 14/01

Construction Standards PAGE

METALWORKS Torsion Spring

RYLE THERMOSTATIC SHOWER SET INSTALLATION

City of Minot Auditorium Non-Upholstered Arena Seating Specifications

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

LEWIS Miniscaff Folding Tower Assembly Guide

Assembly Instructions

Bi-Folding Door Installation Guide

HydroRail. Shower Column. Pre-Installation Survey For Retrofit To An Existing Installation

Colorado River Aqueduct Pumping Plants 230 kv Disconnect Switches Replacement

EZI FOR A HANDRAIL & BARRIER SOLUTIONS REASON BARRIERS TUBE & FITTINGS HANDRAILS GUARDRAILS

SECTION ORNAMENTAL ALUMINUM RAILING

CORNER ELEMENTS CENTRE SUPPORT ACCESSORY BAG PROJECTION SCREEN BAG. 4 pieces- basic frame 52x52 cm (fig.: including SET UP SUPPORT,optional)

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

Outer Skin Kit & Flue: IB600, IB850, IB1100 Installation Manual

EXIRA EXPOSED PIPE SHOWER INSTALLATION

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

HALLOWELL FORT KNOX Modular Utility Storage and Workbench System Specifications

SECTION SHOWER AND DRESSING COMPARTMENTS

Optima Vector Ultima Vector

All panels can be supplied in a range of styles, to suit the applications pictured below.

Modular Coldroom Installation Manual

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

ROCKFON SYSTEM T24 A/E

SHOWER SCREEN (8mm) Installation / Maintenance Instructions. Rev Rev 02.12

CORNER SLIDE RAIL OPEN PIT INSTALLATION INSTRUCTIONS

SECTION Summit Phenolic Lockers (Solid Phenolic Lockers)

The fire resistance required for doors in this building is 1 (one) hour resistance in compliance with the below general specifications:

Project No: Pakenham Branch Library, Pakenham, Ontario Section

It s time for the curtain to go up...but is your stage adequate for the performance?

ASSEMBLY INSTRUCTIONS

LAHAINA. Lahaina Showerspa Model #1030 Installation Instructions

ROCKFON SYSTEM T24 A/E

USER S GUIDE for HAKITEC 750. TEMPORARY ROOF with HAKI Trak Sheeting ( Hand-Built )

Tower ASSEMBLY GUIDE

QUAD Rectangular Hinged Door Shower Enclosure Installation Instructions

Se incluyen las instrucciones en español

INSTRUCTIONS FOR THE ASSEMBLY AND INSTALLATION OF THE VORTOX LIQUID SAMPLER

ASSEMBLY INSTRUCTIONS

(01) Thermo Bond Buildings Military Service Shelter: DOG KENNEL OPERATING AND SETUP MANUAL MSS-RP-1-20P

assembly and installation guide

Model No. BWTDWFK-TRIFLO.

AXIOM Indirect Field Light Coves

A-0312 ASSEMBLY GUIDE

CEILING MOUNTED ARTICULATING JIB CRANE

TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS. Combisafe International AB

SECTION METAL ATHLETIC LOCKERS

Straight Panel Bath Screen Instruction Manual

SECTION PLASTIC TOILET COMPARTMENTS

SECTION METAL ATHLETIC LOCKERS

AXIOM Building Perimeter System Assembly and Installation Instructions

WALL MOUNTED ARTICULATING JIB CRANE

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

FREESTAND ROOF GUARDRAIL. Lockinex. ea i, ea u i

8mm FRAMELESS CONCEALED HINGE DOOR

Wall Hung WC Pan Model CWC_100 Series

.1 Underwriters' Laboratories of Canada (ULC)..1 CAN/ULC-S102-M88(R2000), Surface Burning Characteristics of Building Materials and Assemblies.

SPECIFICATION FOR TUBULAR STEEL LIGHTING COLUMN. Reference is made in this Specification to the following:

Electrical Services Standard Specification Cable Tray Installation. May For ROYAL HOLLOWAY UNIVERSITY OF LONDON

Keylar Shelving (QLD) Pty Ltd

rondo accessories CONTENTS:

aquapanel InstallatIon GuIde

SQUARE SUN TUNNEL INSTALLATION INSTRUCTION

AFFINITY PRODUCT BROCHURE - V2 TECNA DISPLAY LTD. Designed and Produced by

SECTION ORNAMENTAL ALUMINUM RAILING

ACCESSIBLE REST ROOM Code Requirements

Racking systems RACKING SYSTEMS. IT S EASY TO ORDER sales hotline:

The Safety Solution for Free Standing Roof Edge Protection

PRODUCT SPECIFICATIONS - SERIES 1090

This guide can be used to prepare a specification for incorporating wall bracket jib cranes into a competitively bid construction project.

COASTLINE ALASSIO Swing Door. Installation & Maintenance Instructions. Rev Lakes. Bathrooms

SECTION PREFABRICATED SHOWER COMPARTMENTS

MODULAR ACOUSTIC FENCING INSTALLATION GUIDE

Operating & Maintenance Manual. Glasdon Housings & Cabinets

220 E. General Robinson St. Pittsburgh, PA fax

WD5 (Timber Cavity) Installation Guide Operating Instructions Warranty

Installation Instructions Wood Frame & Foam Rail

Why choose OKI ISOLA?

SECTION FOOD DISPENSING EQUIPMENT- SNEEZE GUARDS AND PARTITION POSTS

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

1. High bay shelving units, fabrication and installation including leveling.

Radiant PV-Solar Tripod System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT

UTLX 800XX CRYOGENIC TANK CAR

Mira Beat Fixed Showerhead and Arm

GV Standard Flushglaze Installation Instruction and Maintenance Manual

Transcription:

DOC M Shower Room Pack Shower Facility for Wheelchair Users layout instructions DIMENSIONS AND EQUIPMENT To comply with Approved Document M of the Building Regulations BS 8300:2001, 2009 a Shower Compartment suitable for wheelchair users should have at least the provides both left and right hand facilities without the need to specify dimensions, equipment and fittings shown in the layout drawing on page 6. 4. LAYOUT If a building contains more than one Shower Compartment for wheelchair users, the oppertunity should be taken to provide both left-hand and right-hand transfer layouts. The Intacare Doc M Shower Pack provides this facility in one standard pack without the need to specify right or left hand assemblies. Note: the drawing on page 64 illustrates a left handed layout, for right handed layouts this must be reversed. LANTAC CERTIFICATE The LANTAC certificate scheme applies throughout England and Wales. In Scotland submission of the certificate may possibly provide Evidence of Compliance with Document M requirements. The LANTAC certificate should be detached and attached to the final approval request documents submitted to the Local Authority building inspectorate. The building inspector may then check that the layout installed is in accordance with the approval drawing as on the back of the certficate. NOTE: The LANTAC certificate on page 35 is only valid if the pack contents are positioned in accordance with the layout drawing number SB/INTA/001 shown on page 4. 6. 1

PACK CONTENTS SHOWER VALVE AND KIT Concealed Shower Valve Diverter Riser Rail, Hose, Handset, Elbow and Short Projection Overhead Shower SHOWER SEAT WITH BACKREST Intacare Doc M Shower Seat RAILS Intacare 600mm Support Rails (x 3) Intacare 765mm Hinged Support Rail (x 2) Intacare 450mm Support Rail (x1) Robe Hook (x1) SHOWER RAIL & CURTAIN 1200mm x 1200mm Angled Shower Rail With Celing Support 1000 x 1200 Shower Curtain (x2) ADDITIONAL MANDATORY ITEMS NOT INCLUDED Alarm Pull Cord With Two Red Bangles, Shelf & Facility for Limb Storage FIXING It is essential that fixing instructions be followed, as the security of all items is vitally important. Walls onto which fittings are to be mounted must be suitable for the intended use of the applicable product. Appropriate fixings should be used which are suitable for the material of the fixing wall. For specialist fixings advise contact Fisher Fixings to ensure the correct fixings are used. SHOWER VALVE KIT & DIVERTER Installation and maintenance instructions are enclosed with the shower valve and diverter. HINGED RAIL Secured to suitable wall using appropriate fixings, not supplied. STRAIGHT RAILS Secured to suitable wall using appropriate fixings, not supplied. 2

SHOWER SEAT It is recommended that the seat be offered to the selected fixing position before drilling walls. Ensure that the wall construction and fixings for the Shower Seat are capable of resisting the horizontal and vertical loads exerted by the users. Fixings are not provided with the shower seat and advice should be sought from a proprietary fixing manufacturer such as Fisher Fixings as to the correct product for your wall construction. With the seat in down position determine the correct height as detailed in the General arrangement drawing on page 6. Mark the fixing hole positions, ensuring the temporary timber brace supplied has kept the wall brackets square. Remove the brace when complete. Once you are sure of the position drill holes to suit. GRAB RAILS 1. Ensure that the wall construction and fixings for the hinged support rails and grab rails are capable of resisting the horizontal and vertical loads exerted on them by the users. 2. Slide the flange cover away from the flange and offer to the wall. 3. Determine the position as detailed in the general arrangement drawing on page 6. Check alignment and mark the screw holes 4. Drill and plug the wall, using appropriate fixings (not supplied) for the wall structure. For specialist fixing advice contact Fisher Fixings to ensure that the correct fixings are used. 5. Secure the Rail into position. 6. Reposition the flange cover to conceal fixing screws. HINGED SUPPORT RAILS Ensure that the wall construction and fixings for the hinged support rails and grab rails are capable of resisting the horizontal and vertical loads exerted on them by the users. Offer the hinged arm to the wall at the correct height and location. Once sure of its position mark the fixing holes. Remove arm and drill and plug holes with appropriate fixings (not supplied) for the wall structure. For specialist fixing advice contact Fisher Fixings to ensure that the correct fixings are used. Secure hinged arm to the wall. HOW TO RAISE THE HINGED SUPPORT RAIL When not in use, the Hinged Support Rail is raised, leaving the facility i.e. shower clear for other users. HOW TO LOWER THE HINGED SUPPORT RAIL To lower the unit from its upward/raised position, the Hinged Support Arm needs to be gently lifted from its locked status and then gently lowered into its horizontal position ready for use. 3

SHOWER CURTAIN AND RAIL The curtain rail is supplied in sub-assembled parts, for final assembly in-situ. Two curtains are provided for each side of the corner rail. Position the rail at such height, as required to suit the curtain, which has a 2m drop. The fixing flanges have metal covers, which when the rail is fastened to the wall, locate in two slots and the cover is then twisted to fix its position. The overall assembled size is 1200mm x 1200mm. The vertical riser tube is supplied at 600mm long and should be cut to length to suit the ceiling height. It is fixed into the ceiling rose and the corner section using 4off grub screws. CARE AND CLEANING INSTRUCTIONS The products are designed to withstand the rigours of regular use provided reasonable care and cleaning is exercised. The steelwork is coated with a baked polyester coating which is a durable, water resistant surface provided due care and attention is exercised. Cleaning should be carried out regularly using a mild detergent, such as washing up liquid, and warm water and dried after cleaning and, or use. IT IS IMPERATIVE THAT NO HARSH, ABRASIVE CLEANERS ARE USED THAT COULD LIKELY BREAK DOWN THE WATER RESISTANT SURFACE FINISH. SIMILARLY, THE USE OF ANY TOOLS OR SHARP INSTRUMENTS FOR THE INSTAL- LATION OF THE PRODUCTS SHOULD BE HANDLED WITH CARE IN ORDER THAT FABRICS OR COATED SURFACES ARE NOT DAMAGED. 4

LANTAC CERTIFICATE HERE 53

inspiring confidence www.intatec.co.uk 05/09 intatec limited Airfield Industrial Mustang Drive, Estate, Stafford Hixon Staffordshire, ST16 ST18 1GW 0PF T: T: 01889 01785 207200 218230 F: 01889 01785 271172 218231 E: E: sales@intatec.co.uk