Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( )

Similar documents
Maine Turnpike Authority Ten Year Planning Report

MAINE TURNPIKE AUTHORITY

Maine Turnpike Needs Assessment

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

IMPROVING I 81 IN MARYLAND

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT

EXECUTIVE SUMMARY. Part 1 Introduction

I-91 Viaduct Public Information Briefing

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT AUBURN EXIT 75 TOLL SYSTEM UPGRADES AND STREAM RELOCATION (MM 75.3)

Maine Turnpike Authority

Rapid City, SD HDR Project No RE: Replacement of Existing I-190 Twin Bridges at I-190/Silver Street Interchange, Rapid City, SD

ADDENDUM NO. 1 CONTRACT BRIDGE REPLACEMENT MAXWELL ROAD UNDERPASS MILE 90.0

Highway Construction Program

I-91 Viaduct Public Information Briefing

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities

STATUS REPORT Congestion-Relief Program. Steve Gillen Illinois Asphalt Pavement Association March 12, 2007

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

Northeast Bridge Preservation Partnership Meeting

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Maine Turnpike Authority

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Lehigh Valley Transportation Study

I-64 Capacity Improvements Segment I Financial Plan Annual Update

Riverside County Transportation Commission RFP Number TP ATTACHMENT 4-1 WORK BREAKDOWN STRUCTURE

Riverside County Transportation Commission RFP Number TP ATTACHMENT 4-1 WORK BREAKDOWN STRUCTURE

SCOPE OF WORK. Consultant: An individual or firm, who is contracted to furnish services outlined in this scope of work.

Conceptual Design Report

I-64 Capacity Improvements Segment II Financial Plan Annual Update October 30, 2017

Maine Turnpike Authority

Bridge Preventative Maintenance.Act now before this happens to you! Keith Cooper, P.E. Local Bridge Program Manager

PUBLIC INFORMATION MEETING June 24, 2015

SUPPLEMENTAL ECMS ADVANCED INFORMATION JUNE 5, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Pattullo Bridge Replacement Project. Cost Report

Construction Forecast

STORM WATER PROGRAM MANAGEMENT PLAN (SPMP) ANNUAL SUMMARY REPORT PERMIT YEAR 2 (JUNE 2009 JUNE 2010)

Design-Build and Design-Bid-Build

Highway Construction Program

Plessis Road Twinning and Grade Separation at CN Redditt Subdivision: Design Challenges and Innovative Solutions

Welcome! Route 1 Viaduct Rehabilitation Project Chelsea Project File No

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

STRUCTURE AND BRIDGE DIVISION

Transportation Multi-Modal Meeting

395 Express Lanes Project Design-Build Procurement Industry Outreach. March 23, 2016

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017

Future Programmatic Beyond 01/06/2020 Sorted By District (Subject to Departmental Changes)

Single Concession Arrangement ANAS SpA AUTOSTRADE PER L ITALIA SpA

General Info. Number: PROJECT NO

MICHIGAN DEPARTMENT OF TRANSPORTATION

ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation, Guardrail, Drainage, and Clear Zone Improvements MM 74.9 to MM 80.7

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Nova Scotia s Primary and Secondary Highway Systems: 10-Year Needs

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

ACEC/MaineDOT Bridge Design Subcommittee MEETING MINUTES. April 2, Attendees: Location: MDOT Conference Rm. #317

NJDOT Bridge Preservation and Asset Management Strategies. Gerald P. Oliveto, P.E. Roger Estivalletti

Whittier Bridge/I-95 Improvement Project. Public Information Meeting

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

NEWINGTON-DOVER WELCOME

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

TURNPIKE PLANS PREPARATION AND PRACTICES HANDBOOK (TPPPH) VOLUME 1

Maryland Transportation Authority (MDTA)

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT

Bridge Asset Management City of Battle Creek Planning and Projects

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT

ATTACHMENT 50-1: PERFORMANCE AND MEASUREMENT TABLE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

I-295 Southbound Rehabilitation Project

Zoo Interchange Reconstruction

Feasibility Assessment Study

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2

Florida Department of Transportation District 4. To Design, Build, Finance, Operate and Maintain. The I-595 Corridor Roadway Improvements Project

Re: EX8.12 F.G. Gardiner Expressway Strategic Rehabilitation Plan Procurement Strategy

Introductions Project Updates Summary of Proposed Community Improvements Construction Impacts Management Open House

How to Review SI&A Data

RENTON CONCESSION CULVERT. Site Number COUNTY ROAD 5, WOODHOUSE. 0.4 km S of Highway #3

Performance of Interstate 35 Owatonna, MN January 27, 2003

HEAD STREET BRIDGE (SIMCOE)

ANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019:

Winnipeg River Bridge on PR313 at Lac du Bonnet. June 2014

We gratefully acknowledge the cooperation of the Authority and its staff in this effort and throughout the year.

Grade Separation Inspection and Rating

SECTION 55A1 ROBINSON TOWNSHIP, WASHINGTON COUNTY

Minnesota Statewide Freight Bottlenecks

Exit 73 I-29 Interchange Modification Justification Study

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

Transportation Subcommittee Meeting July 18, 2014

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

ANNUAL INSPECTION REPORT 2017 TABLE OF CONTENTS

CLA /10.54, PID Project Description:

PRESERVING INFRASTRUCTURE & FACILITY TO ENSURE FUNCTIONALITY, SAFETY AND COMFORT FOR USERS PROJEK PENYELENGGARAAN LEBUHRAYA BERHAD

Transcription:

Total preliminary Value for Project shown in initial year is for project duration. Projects have been listed in each year there are major Preliminary 4.8 Beech Ridge Road Underpass Repairs York $410,000 6.2 Cider Hill Road Underpass Repairs York $480,000 Substructure repairs, deck repairs, and snow fence. Traffic will be impacted due to bridge closure for a duration of approximately 4-6 weeks. Substructure repairs, deck repairs, snow fence, membrane, and repave. Traffic will be impacted due to bridge closure for approximately 6-8 weeks. 3 2016 2017 5 2016 2017 1.25 & 6.8 Route 236 & Exit 7 Interchange Bridge Snow Fence Kittery & York $30,000 Snow fence & Miscelleneous repairs at Exit 7 underpass, Route 236 Underpass. 1 2016 2017 8.8 York Toll Plaza Replacement York $40,000,000 32 Exit 32 Toll Plaza Biddeford $4,500,000 Awarded & Funded in 2015 of new 15 lane ORT Plaza (9 cash lanes & 6 ORT lanes), building, parking lot and access road from Chase's Pond Road, and related mitigation work. Demolition/removal of existing plaza, building and access road. Upgrade existing toll system, rehabilitate toll plaza. Contract included Exit 32, 36, and 46 Northbound. 18 2014-2015 2015-2017 33.4 Boom Road Bridge Painting Saco $404,000 Clean and Paint Steel Superstructure 4 2016 2017 36 Exit 36 Interchange Bridge Repair Saco $250,000 Bearing replacements 4 2016 2017 36 Exit 36 Toll Plaza Saco See Exit 32 above Upgrade existing toll system, rehabilitate toll plaza. Contract included Exit 32, 36, and 46 Northbound. 18 2014-2015 2015-2017 42 Two Rod Road bridge painting Scarborough $425,300 Clean and Paint Steel Superstructure 4 2016 2017 44.3 Exit 44 Toll Plaza Scarborough $19,000,000 Funded in 2016 of an 8 lane ORT Plaza (4 cash lanes & 4 ORT lanes). 24 2015-2016 2016-2018 46 Exit 46 Toll Plaza Northbound Portland See Exit 32 above Construct new toll lane, upgrade existing toll system. Contract included Exit 32, 36, and 46 Northbound. 18 2014-2015 2015-2017 46-63 Guide Sign Modifications TBD Exit 36 to Exit 63 $750,000 Phase 2- Guide sign modifications - Locations being reviewed. Final locations may differ. 3 2015-2016 2017 48-53 Clearing Portland, Falmouth $300,000 Clearing adjacent to roadway-being Advertised November 2016. 4 2016 2017 52.6 Leighton Road Falmouth $351,000 Clean and Paint Steel Superstructure. 3 2016 2017 2017 53 Exit 53 Toll Plaza Falmouth $3,600,000 Awarded & Funded 2015 Construct new toll plaza and utility building. Widen roadway approaches to toll plaza. Existing Park and Ride lot to be closed. 24 2014-2015 2015-2017 58.8 Service Plaza Upgrades Cumberland/Gray $2,100,000 Additional truck parking and lengthening acceleration lanes. 5 2016 2017 63.1 Gray Interchange Improvements Gray $10,700,000 Awarded & Funded in 2015-2016 New Southbound on/off ramps on west side, New southbound toll plaza, Reconstruction of northbound toll plaza, Demolish existing Interchange Bridge, Re-pave Route 202. 18 2012-2015 2016-2017 64.4 to 68.5 Mainline Pavement Rehabilitation Gray $3,035,000 Pavement rehabilitation. 4 2016 2017 75.3 Exit 75 Overpass Repairs Auburn $550,000 Substructure repairs, deck repairs, membrane, and repave. 3 2016 2017 76.9 Hackett Road Slip Ramp Auburn $150,000 Southbound slip ramp from Hackett Road for winter maintenance. 2 2016 2017 79.4 River Road Overpass Repairs Northbound and Southbound Lewiston $830,000 Substructure repairs, deck repairs, membrane, and repave. 3 2016 2017 79.6 Goddard Road Overpass Repairs Northbound and Southbound Lewiston $720,000 Substructure repairs, deck repairs, membrane, and repave. 3 2016 2017 80.8 Ferry Road Northbound Overpass Repairs Northbound and Southbound Lewiston $525,000 Substructure repairs, deck repairs, membrane, and repave. 3 2016 2017 80.8 to 88.6 Mainline Pavement Rehabilitation Lewiston, Sabattus $5,700,000 Pavement rehabilitation. 4 2016 2017 86.1 Exit 86 Interchange Pavement Rehabilitation and Toll System improvements Sabattus $1,200,000 Pavement rehabilitation and addition of Toll system slab and sensors. 4 2016 2017 90 Maxwell Road Underpass Rehabilitation Sabattus $2,800,000 New 2 lane bridge. The bridge will be closed for a period of approximately 7-8 months during the construction. 9 2016 2017 103.6 High Street Underpass Repairs West Gardiner $390,000 Substructure repairs, deck repairs, membrane, and repave. Traffic will be impacted due to the bridge closure for 4-6 weeks. 3 2016 2017 108.3 Winthrop Street Underpass Rehabilitation Hallowell $2,200,000 Substructure repairs, new concrete deck. The bridge deck will be replaced using Accelerated Bridge to reduce construction time and traffic impacts. The bridge will be closed for a limited time during construction. 9 2016 2017 F0.60 Auburn Street Underpass Falmouth $375,000 Clean and paint steel superstructure 3 2016 2017

Total preliminary Value for Project shown in initial year is for project duration. Projects have been listed in each year there are major Preliminary F1.60 Falmouth Road Underpass Falmouth $260,000 Clean and paint steel superstructure 3 2016 2017 F0 to F3.4 Clearing Falmouth Included in 48-53 Clearing Clearing adjacent to roadway-being Advertised November 2016. 4 2016 2016-2017 Fuel System Upgrades York to West Gardiner $250,000 Above ground fuel storage tanks at maintenance areas-locations being reviewed. 3 2016 2017 Clear Zone Improvements & Guardrail TBD $325,000 Guardrail and other work to improve clear zone. 4 2016 2017 2017 cont. Road Weather Info System Kittery to Augusta $450,000 Funded in 2015 Installation/implementation of technology in Winter Maintenance operations ($450,000 funded in 2015 being carried forward). 12 2012-2014 2015-2017 Variable Message Signs, CCTV and Communication Center Upgrades TBD $250,000 To be defined. 4 2016 2017 Drainage & Slope Repairs TBD $405,000 To be defined Fall 2016 and winter 2017 for repairs in summer 2017. 4 2016 2017 Pavement Crack Sealing TBD $100,000 To be defined Fall 2016 and winter 2017 for repairs in summer 2017. 4 2016 2017 **2017 Project Engineering & Inspection Annual Budget This amount from 30 yr. plan dated 05/04/16 includes the Planning or funds for projects that list 2017 in column titled Kittery to Augusta $8,361,378 12 2017

Total preliminary Value for Project shown in initial year is for project duration. Projects have been listed in each year there are major Preliminary 0.6 Dennett Road Overpass Repairs Kittery $790,000 Substructure repairs, joints and snow fence. Traffic control to be coordinated with MaineDOT traffic control for Piscataqua River bridge repairs. 5 2017 2018 6.2 Cider Hill Road Underpass York $745,000 Clean and paint steel superstructure 3 2017 2018 14.8 Captain Thomas Road Ogunquit $361,000 Clean and paint steel superstructure - Locations being reviewed. Final locations may differ. 3 2017 2018 8.8 York Toll Plaza Replacement York $40,000,000 (Funded in 2017) of new 15 lane ORT Plaza (9 cash lanes & 6 ORT lanes), building, parking lot and access road from Chase's Pond Road, and related mitigation work. Demolition/removal of existing plaza, building and access road. 18.75 Crediford Brook Culvert Wells $60,000.00 Concrete repairs to box culvert above and below water 4 2016-2017 2018 25-45 Guide Sign Modifications Kennebunk, Arundel, Biddeford, Saco, Scarborough, South Portland $750,000 Phase 3- Guide sign modifications 3 2015-2017 2018 31.3 Route 111 Underpass Repairs Biddeford $550,000 Substructure repairs, deck repairs, membrane, and repave. 3 2017 2018 31.6 Biddeford Interchange Pavement and Underpass Repairs Biddeford $1,400,000 Pavement rehabilitation and bridge repair. 4 2017 2018 35.7 Old Saco Interchange Pavement Rehabilitation Saco $922,500 Pavement rehabilitation. 2 2017 2018 44 Exit 44 On-Ramp Widening Scarborough $1,200,000 Widen and lengthen Exit 44 southbound on-ramp. 5 2017 2018 44.3 Exit 44 Toll Plaza Scarborough $19,000,000 Funded in 2016 of an 8 lane ORT Plaza (4 cash lanes & 4 ORT lanes). 24 2015-2016 2016-2018 45 Exit 45 Toll Plaza Portland $3,500,000 Toll equipment replacement and lane reconfiguration. This scope subject to change pending review of possible complete reconfiguration required to facilitate spur to the west connection to the Gorham By-pass. 18 2017 2018 45.4 Running Hill Road Underpass Repairs South Portland $483,000 Substructure repairs, deck repairs, membrane, and repave. 3 2017 2018 2018 47.3 Rand Road Interchange Pavement Rehabilitation Portland $922,500 Pavement rehabilitation. 2 2017 2018 58.3 Blackstrap Road Underpass Repairs Cumberland $401,006 3 2017 2018 59.9 Dutton Hill Road Gray $1,445,700 Substructure repairs, raise bridge, new concrete deck. Traffic impacts will be 9 2017 2018 66.2 Weymouth Road Underpass Repairs Gray $846,000 Substructure repairs, raise superstructure, deck repairs, membrane, and repave. Traffic impacts & timing of other bridge projects in 6 2017 2018 74.9 to 80.8 Mainline Pavement Rehabilitation Auburn/Lewiston $4,500,000 Pavement rehabilitation 4 2017 2018 75.8 Danville Corner Underpass Repairs Auburn $369,869 76.9 Hackett Road Underpass Repairs Auburn $852,000 Substructure repairs, raise bridge, deck repairs, membrane, and repave. Traffic impacts & timing of other bridge projects in 3 2017 2018 7 2017 2018 78.9 Androscoggin River Overpass Repairs Auburn/Lewiston $1,000,000 Substructure repairs. 6 2017 2018 87.5 Fisher Road Underpass Repairs Sabattus $420,000 91.9 Center Street Underpass Repairs Litchfield $420,000 5 2017 2018 5 2017 2018 98 to 102.6 Mainline Pavement Rehabilitation Litchfield, West Gardiner $3,500,000 Pavement rehabilitation. 4 2017 2018 101.7 Route 126 Underpass West Gardiner $443,000 Clean and paint steel superstructure 3 2017 2018 103 I-295 Southbound Underpass West Gardiner $3,900,000 Widen deck and substructure for new deceleration lane, new concrete deck 7 2017 2018 103.6 High Street Underpass West Gardiner $276,000 Clean and paint steel superstructure 3 2017 2018 Fuel System Upgrades York to West Gardiner $250,000 Above ground fuel storage tanks at maintenance areas. 3 2017 2018 Drainage & Slope Repairs TBD $472,000 To be defined Fall 2017 and winter 2017 for repairs in summer 2018. 4 2017 2018

Total preliminary Value for Project shown in initial year is for project duration. Projects have been listed in each year there are major Preliminary Bridge Preservation Kittery to Augusta $600,000 Application of clear protective coating to concrete surfaces. 4 2017 2018 Clear Zone Improvements & Guardrail TBD $775,000 Guardrail and other work to improve clear zone, including clearing (location TBD). 4 2017 2018 2018 Cont. Variable Message Signs, CCTV and Communication Center Upgrades TBD $250,000 To be defined. 4 2017 2018 Pavement Crack Sealing TBD $100,000 To be defined Fall 2017 and winter 2017 for repairs in summer 2018. 4 2017 2018 **2018 Project Engineering & Inspection Annual Budget This amount from 30 yr. plan dated 05/04/16 includes the Planning or funds for projects that list 2018 in column titled Kittery to Augusta $10,881,794 12 2018

Total preliminary Value for Project shown in initial year is for project duration. Projects have been listed in each year there are major Preliminary 2019 1 to 19 Guide Sign Modifications Kittery, York, Ogunquit, Wells $750,000 Phase 4- Guide sign modifications- Locations being reviewed. Final locations may differ. 3 2015-2018 2019 7.3 & 8.8 York Toll Plaza Replacement York $40,000,000 (Funded in 2017) 10.6 Mountain Road Underpass Repairs York $371,320 13.8 North Berwick Road Underpass Repairs Ogunquit $393,890 of new 15 lane ORT Plaza (9 cash lanes & 6 ORT lanes), building, parking lot and access road from Chase's Pond Road, and related mitigation work. Demolition/removal of existing plaza, building and access road at MM 7.3. 25.5 Exit 25 Interchange Pavement Rehabilitation Kennebunk $950,078 Pavement rehabilitation. 47.9 MCRR Overpass Northbound and Southbound Portland $8,800,000 Widen Bridge and replace deck subject to futher study. 9 2016-2018 2019 44.3 to 51.2 Mainline Pavement Rehabilitation Scarborough / South Portland / Portland $5,400,000 Pavement rehabilitation. 4 2018 2019 45-46 Fiber Optic Infrastructure Portland $510,000 Fiber Optic Infrastructure. 4 2015-2018 2019 64.3 Route 26 Underpass Repairs Gray $563,254 82.7 Webster Road Underpass Repairs Lewiston $320,170 95.6 Plains Road Underpass Repairs Litchfield $476,170 103 West Gardiner I-295 Toll Plaza West Gardiner TBD TBD 18 2016-2018 2019-2021 Roof Replacement TBD $100,000 TBD 4 2018 2019 Bridge Preservation TBD $600,000 Application of clear protective coating to concrete surfaces. 4 2018 2019 Fuel System Replacement TBD $1,500,000 Phase 1 - Replace existing underground fuel tanks at Service Plazas. 4 2018 2019 Clear Zone Improvements & Guardrail TBD $775,000 Guardrail and other work to improve clear zone including clearing. 4 2018 2019 Drainage & Slope Repairs TBD $307,468 To be defined Fall 2018 and winter 2018 for repairs in summer 2019. 4 2018 2019 Pavement Crack Sealing TBD $100,000 To be defined Fall 2018 and winter 2019 for repairs in summer 2019. 4 2018 2019 Miscellaneous Culvert Repairs TBD $400,000 Culvert Repairs. Locations to be defined. 4 2018 2019 Variable Message Signs, CCTV and Communication Center Upgrades TBD $250,000 To be defined. 4 2018 2019 **2019 Project Engineering & Inspection Annual Budget This amount from 30 yr. plan dated 05/04/16 includes the Planning or funds for projects that list 2019 in column titled Kittery to Augusta $8,164,343

Total preliminary Value for Project shown in initial year is for project duration. Projects have been listed in each year there are major Preliminary 7.3 & 8.8 York Toll Plaza Replacement York $40,000,000 (Funded in 2017) 17.3 Littlefield Road Underpass Repairs Wells $410,000 33.4 Boom Road Underpass Repairs Saco $375,000 of new 15 lane ORT Plaza (9 cash lanes & 6 ORT lanes), building, parking lot and access road from Chase's Pond Road, and related mitigation work. Demolition/removal of existing plaza, building and access road at MM 7.3. Bridge Repair, substructure repairs, deck repairs, membrane, and repave. Traffic impacts & timing of other bridge projects in Bridge Repair, substructure repairs, deck repairs, membrane, and repave. Traffic impacts & timing of other bridge projects in 4 2019 2020 4 2019 2020 35.3 to 44.3 Mainline Pavement Rehabilitation Saco, Scarborough $10,700,000 Pavement rehabilitation. 5 2019 2020 42-44 Fiber Optic Infrastructure Scarborough $708,000 Fiber Optic Infrastructure. 6 2015-2019 2020 44-45 Fiber Optic Infrastructure South Portland & Scarborough $520,000 Fiber Optic Infrastructure. 6 2015-2019 2020 46.7 Stroudwater River Overpass Rehabilitation Northbound and Southbound Portland $10,700,000 Widen bridge and replace deck-subject to futher study. 9 2017-2019 2020-2021 2020 45-48 Median Concrete Barrier South Portland/Portland $6,000,000 83.7 Grove Street Underpass Repairs Sabattus $402,000 93.3 99.2 Route 197 Cobbosseecontee Stream Overpass Rehabilitation Northbound and Southbound Litchfield $624,000 Remove grass median and guardrail, upgrade drainage, install median concrete barrier, place bituminous pavement (pending further study and permitting). Bridge Repair, substructure repairs, deck repairs, membrane, and repave. Traffic impacts & timing of other bridge projects in Bridge Repair, substructure repairs, deck repairs, membrane, and repave. Raise bridge. Traffic impacts & timing of other bridge projects in 5 2018-2019 2020-2021 5 2019 2020 5 2019 2020 West Gardiner $8,200,000 Widen sholders only, redeck, substructure repairs. 18 2019 2020-2021 102 Gardiner/Litchfield Interchange Underpass Repairs West Gardiner $680,000 Bridge Repair, substructure repairs, deck repairs, membrane, and repave. Raise bridge. 5 2019 2020 103 West Gardiner I-295 Toll Plaza West Gardiner TBD TBD 18 2016-2018 2019-2021 Electrical/Mechanical Upgrades TBD $250,000 TBD 4 2019 2020 Bridge Preservation TBD $600,000 Application of clear protective coating to concrete surfaces. 4 2019 2020 Variable Message Signs, CCTV and Communication Center Upgrades TBD $250,000 To be defined. 4 2019 2020 Guide Sign Modifications Kennebunk to West Gardiner $350,000 Phase 5- Guide sign modifications - Locations being reviewed. Service Plaza signage to be included. 3 2015-2019 2020 Drainage & Slope Repairs TBD $469,000 To be defined Fall 2019 and winter 2020 for repairs in summer 2020. 4 2019 2020 Pavement Crack Sealing TBD $100,000 To be defined Fall 2019 and winter 2020 for repairs in summer 2020. 4 2019 2020 Clear Zone Improvements & Guardrail TBD $500,000 Guardrail and other work to improve clear zone including clearing. 4 2019 2020 Fuel System Replacement TBD $1,500,000 Phase 2- Replace existing underground fuel tanks at Service Plazas. 4 2019 2020 **2020 Project Engineering & Inspection Annual Budget This amount from 30 yr. plan dated 05/04/16 includes the Planning or funds for projects that list 2020 in column titled Kittery to Augusta $11,297,551