Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

Similar documents
Central Waste Water Treatment Plant Capacity Improvements & CSO Reduction A&E

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment

PEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals

Gross Receipts Tax Exemption for Equipment Installed in a Wastewater Treatment Facility Opinion Number

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

LIMITED ENVIRONMENTAL REVIEW

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below:

Request for Proposals

From manual to automatic at Spring Creek

Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015

Role of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN

City of Hudson. Wastewater Treatment Plant Improvements. Columbia County, New York. Facility Plan. Delaware Engineering, P.C.

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION

ONTARIO ROCK ROAD LIFT STATION EQUALIZATION FACILITY

ADDENDUM NO. 5. Project Book Updates, Specifications Updates, Drawing Updates, Questions and Answers and Bid Receipt Date and Opening Date Change

Turning a Negative into a Positive Negotiating a Consent Decree to Develop a Reasonable Endpoint

The alternatives addressed in this EIR were selected in consideration of one or more of the following factors:

Chapter 5: Treatment Assessment Future Condition

Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013

75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT

Walter E. Deuchler Associates, Inc. Consulting Engineers

HIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE

A SIMPLE SOLUTION TO BIG SNAIL PROBLEMS - A CASE STUDY AT VSFCD S RYDER STREET WASTEWATER TREATMENT PLANT

AECOM Amendment 2. Thien Ng Interim Public Works Director. December 13, 2017

Baltimore City Department of Public Works

Watertown Wastewater Facility Plan. August 11, 2015

Treatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E.

Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project

WHEREAS, the Board has previously so adopted a wastewater supply system comprehensive plan, and

Conducting Successful Energy Audits for Both Water and Wastewater Utilities By: Rich Atoulikian, HDR

City of Columbus Wet Weather Management Plan Update. Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage

DELTA WASTEWATER TREATMENT PLANT UPGRADES

Appendix J. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION. Version 3.0

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Operation and Control of Multiple BNR Processes in One WWTP

Wastewater Treatment. Knowledge. Commitment. Excellence.

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

Managing the Largest Extended Wet Weather Event on Record at TRA CRWS

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

WWETCO FlexFilter and Bio-FlexFilter

Clean Water 2020 Program

Hartford WPCF Master Plan Clean Water Project. Executive Summary. February 2010

Allegheny County Sanitary Authority (ALCOSAN)

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

PLAN SHEET INDEX TYPICAL ARCHITECTURAL DETAILS - WINDOW SCHEDULE AND DETAILS

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #52-14 REQUEST FOR PROPOSAL

Environmental Improvements Associated with Springfield WWTP EHRT. Using the Compressed Media Filter Technology

Client: City of Pontiac Project Name: Regional WWTP Feasibility Location: Pontiac, MI Project Number: Issue Date: October 23, 2006

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

City of Gardiner, Maine Wastewater Committee Meeting. CSO Storage Tank & Screening Evaluation

Brightwater: The Design Challenges of a 39 mgd (150 MLD) Membrane Bioreactor

When confronted with increasing peaking. Managing the deluge

Hydraulic Modeling of Deep Tunnel Provides Cost Savings

City of Fairfax, Virginia City Council Regular Meeting. Honorable Mayor and Members of Cfy ;ouncil Robert L. Sisson, City Manager /I.

This page is blank to facilitate double-sided printing.

SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION

LIMITED ENVIRONMENTAL REVIEW (LER) Black River Wastewater Treatment Plant Mechanical Bar Screen Project (aka Traveling Bar Screen Addition)

Peirce Island WWTF Upgrade Construction Public Information Meeting January 17, 2018

Executive Summary. Introduction

MWS Project Number: 11-SC-0116 Last Updated: January 19, 2016

Wet Weather Planning for Wastewater Treatment Plants

Green City, Clean Waters

NJ Future CSO Permittee Meeting

Meadowbrook-Limestone (MBLS) Wastewater Treatment Plant. Wet Weather Operating Plan

Special Report MUB WWTP Expansion and Upgrade Evaluation of Alternatives

Eco-efficient Solids Separation Using Salsnes Technology. Wayne Lem Trojan Technologies July

Capital Improvement Plan Update:

CITY OF EUCLID CONSENT DECREE IMPLEMENTATION

Need-to-Know Criteria Wastewater Treatment Operator Class III

ATTACHMENT A TO THE AGREEMENT FOR ENGINEERING SERVICES. Project: Chloramine Replacement Alternative Evaluation

Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1

Public Information Meeting Wastewater Master Plan

Northfield Township WWTP Capacity Evaluation Report

Chapter 2: Description of Treatment Facilities

City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant

City of Oregon Wastewater Treatment Plant (WWTP) Secondary Treatment Improvement Project Phases 1 & 2 FAQ Sheet

Wastewater Treatment Plant Facilities Plan Update

City of Leadwood Wastewater System Engineering Report

TABLE OF CONTENTS. SECTION 1 INTRODUCTION 1.1 Background Purpose and Scope

Oak Orchard Wastewater Treatment Plant. Wet Weather Operating Plan

Buffalo Sewer Authority. David P. Comerford General Manager

RECOMMENDATION PREVIOUS REPORTS PERTINENT TO THIS MATTER STRATEGIC PLAN

HARTFORD METROPOLITAN DISTRICT (MDC) WET WEATHER EXPANSION PROJECT PHASE 1 NEW 200 HEADWORKS FACILITIES

Integrating Design & Construction Ann Arbor Wastewater Treatment Plant Facilities Renovations Project

The following biological nutrient removal processes were evaluated in detail in the 2016 Liquid Processing Facilities Plan:

Index Number District II Primary Clarifier #2 and #3 Rehabilitation Project Definition FINAL

Lessons Learned from CM-at-Risk and Design Build Projects at Water and Wastewater Treatment Plants. Lawrence H. Hentz Jr., P.E.

Pre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties. September 13, 2018

HAZOP Checklist for Sewage Treatment Plant

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

Meeting CSO Capture Requirements & Local Expectations in an Urban Environment Greening the Gray

BMP FACT SHEET DF-1 HOA Annual Self-Certification Report

Your Guide to the. Budd Inlet Treatment Plant

Transcription:

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 BACKGROUND / PURPOSE Metro Water Services (MWS), in order to comply with the terms of the Consent Decree between MWS, the United States, and the State of Tennessee, developed the Clean Water Nashville Overflow Abatement Program (CWNOAP) to construct infrastructure improvement projects that reduce overflows from both the separate and combined sewer systems and enhance the water quality in the Cumberland River and its tributaries. The largest combined sewer overflow (CSO) in the MWS system is the Kerrigan CSO. The Central Wastewater Treatment Plant (CWWTP) Capacity Improvements and CSO Reduction project will reduce the overflow frequency and volume from the Kerrigan CSO by increasing both the wet weather treatment capacity of the CWWTP and the overall capacity of the Central Pumping Station. The project will also add on-site CSO storage and equalization to assist in managing the dramatic flow rate increases from the combined sewer system during intense rainfall events. The CWWTP was placed into service in 1958. It has been expanded several times to increase both hydraulic and treatment capacity and to enhance residual treatment capability. The existing CWWTP has an average rated capacity of 125 million gallons per day (MGD) with a peak secondary treatment capacity of 250 MGD. Full primary treatment of an additional 80 MGD from the combined sewer system is provided by a supplemental treatment train called the Excess Flow Treatment Unit (EFTU). Including the EFTU, the CWWTP has a total peak primary treatment capacity of 330 MGD. In order to increase the ability of the CWWTP to manage peak wet weather flows without constructing additional primary or secondary aeration tanks and secondary clarifiers, MWS commissioned the Central Wastewater Treatment Plant Optimization Study (Optimization Study). The Optimization Study identified limiting factors in each of the CWWTP s unit processes and confirmed that peak wet weather secondary treatment capacity could be significantly increased through upgrades to the existing headworks, secondary aeration, and final clarification systems without building new tankage. The report is available for review online at: (http://www.cleanwaternashville.org/content/resources/technical-documents.html). PROJECT SCOPE The Central WWTP Capacity Improvements and CSO Reduction project consists of improvements to existing wastewater treatment process units throughout the CWWTP including upgrades to the Central Pumping Station and the Intermediate Pumping Station, construction of approximately 15-20 million gallons (MG) of new CSO equalization storage, installation of fine screens and improvements to the grit removal system for both the CSO and separate system flow trains, replacement of the secondary treatment aeration system, addition of a new ultraviolet (UV) disinfection system for secondary plant effluent, addition of a new Peracetic Acid (PAA) disinfection system for the EFTU, and improvements to the ancillary systems required to provide a complete and functional system (site/civil; electrical; instrumentation and control (I&C) including control system improvements and integration with and upgrades to the Central WWTP Capacity Improvements and CSO Reduction Page 1 of 8

supervisory control and data acquisition (SCADA) system; structural; architectural; heating, ventilating and air conditioning (HVAC); plumbing; fire protection). The project scope includes the evaluation, design, and construction administration tasks as described below. Evaluation Tasks The following items will require investigation by the Designer to make determinations about the overall design approach. The Designer will evaluate the pros and cons of each alternative, along with the life cycle cost/benefit, and provide recommendations to MWS. Evaluation of Central Pumping Station coarse well improvements o Using air to fluidize the coarse well o Building a self-flushing coarse well o Other alternatives developed by the Designer Evaluation of coarse and fine screening alternatives for flow from the Central Pumping Station o Implementing the Optimization Study s screening alternative o Building a new coarse screening facility (with rock trap and bypass) downstream of the Central Pumping Station and upstream of the South Grit Tank and the future equalization storage tank(s). Also, replacing the existing coarse screens with fine screens and bypass channels o Other alternatives developed by the Designer Evaluation of CSO equalization storage systems to achieve a total volume of 15-20 MG o Converting the currently abandoned old south treatment system tankage to equalization storage New equalization storage to obtain the required storage volume Pipe routing for flow to the tanks and from the tanks back into the Central Pumping Station. Use of a two-way pipe should be considered o Constructing a new equalization storage basin of sufficient size to hold the total required volume Pipe routing for flow to the tanks and from the tanks back into the Central Pumping Station Site evaluation to determine the best location (or locations) for storage Evaluation of the South Grit Tank system o Verifying that the vortex type technology is appropriate to maximize grit removal for flow from the combined sewer system and determining the upstream screening requirements to protect grit units o Evaluating the need to modify existing grit pumps, cyclones, or classifiers Evaluation of North Grit Tank system, as follows: o Verifying that the vortex type technology is appropriate for the separate system grit characteristics and determining the upstream screening requirements to protect grit units o Evaluating the need to modify existing grit pumps, cyclones, or classifiers Evaluation of existing return sludge pumps o Determining if they can be used to provide proportional flow o Determining feasibility of usage versus replacement because of age, mechanical condition, etc. Central WWTP Capacity Improvements and CSO Reduction Page 2 of 8

Peracetic Acid (PAA) pilot test for the disinfection of flows from the EFTU o Providing supervision, testing protocols, and assistance as needed for the disinfection of flows from the EFTU o The pilot test will be performed by others. All evaluations required to determine the best design alternative for all design items included in the Design Tasks list o The proposer is reminded that the items listed above require decisions about modifications to the system. o Evaluations may also be required for items in which the design task is clear, but where the design approach may need to be determined. o These evaluations will choose the best ways to modify each known design element based on technical and economic factors and MWS preference. Design Tasks The recommended design improvements are captured in the Executive Summary of the Central Wastewater Treatment Plant Optimization Study (http://www.cleanwaternashville.org/content/resources/technicaldocuments.html). The Designer will design and oversee all aspects of the upgrade project to produce a completed facility with the capability to meet the performance requirements and to operate efficiently with maximum automation. The design responsibilities include all associated disciplines to complete the recommended upgrades (site/civil, electrical, I&C, structural, architectural, HVAC, plumbing, fire protection, odor control) and control system improvements including integration with and upgrades to the supervisory control and data acquisition (SCADA) system. The design will include a specification that emphasizes periodic updates to the electronic Operation and Maintenance (O&M) Manual and Computerized Maintenance Management System (CMMS) and delineates extensive commissioning, startup, and training responsibilities. The upgrade recommendations are summarized below: Design of Central Pumping Station facilities o 2 new 40-MGD pumps with valve and piping systems similar to the existing installation o Rehabilitation and/or replacement of all existing wet well isolation gates/actuators o Addition of a second clamshell to the current clamshell over the Central Pumping Station wet well o Design of recommended improvements to the coarse well, if any (See Evaluation of Central Pumping Station coarse well improvements task) Design of the recommended screening alternative (see Evaluation of coarse and fine screening alternatives task) Design of the recommended CSO equalization storage system alternative and all associated piping and valve modifications (See Evaluation of CSO equalization storage systems task) Design of the conversion of the existing aerated South Grit Tanks to a vortex grit removal system including the replacement or modification of grit pumping, dewatering, and compaction equipment, as needed Design of canopy baffles below the inlet port and the addition of perforated target baffles to the primary settling tanks Design of covers over the south primary settling tank effluent launders and effluent channel for the purpose of odor control. This includes the design of the odor control duct system required to Central WWTP Capacity Improvements and CSO Reduction Page 3 of 8

collect the air and move it to the plant odor control system and the design of the fan or biofilter improvements, as required. Design of the removal of the south primary effluent channel Parshall flume Design of the new north fine screenings facility to screen separate sanitary system flows o Mechanical equipment includes screens, screen bypass, and screenings collection, compaction and disposal equipment. o Complete, interdisciplinary design is required. Design of the conversion of the existing aerated North Grit Tanks to a vortex grit removal system including the replacement or modification of grit pumping, dewatering, and compaction equipment, as needed Design of the new intermediate screw pumps to be located immediately west of the existing Intermediate Pumping Station o The capacity of the new pumps will be such that the pumping station will have the firm capacity to match the peak secondary wet weather treatment capacity. o Design will include the manufacturer-recommended rehabilitation improvements to the existing intermediate screw pumps and an examination of the existing structures and channels at the pumping station to determine if repairs are required. Design of modifications to the inlets of the eight secondary aeration tanks to achieve even flow-splitting in dry and wet weather Design of a new aeration system in the existing aeration tanks o Replacement of draft tube aeration system with a fine bubble aeration system o Revised layout of the existing complete mix aeration basins to achieve a system that includes an anaerobic selector and anoxic/aerobic zones for future biological nutrient removal o New blowers for the aeration system o Structural analysis to determine modifications required, if any, to the existing blowerbuilding floor, equipment pad configuration, and associated electrical system improvements Design of structural components of the aeration system and effluent channels, including, but not limited to, o Baffle walls in the aeration tanks o Raising of the effluent channel walls to improve hydraulic capacity Design of upgraded capacity for the return sludge systems, as needed, along with provisions for equally distributing return sludge flows between the eight aeration basins Design of improvements to all secondary clarifiers to maximize hydraulic capacity Physical inspection of all clarifiers and the design of new clarifier mechanisms and rehabilitation methods and components for any structurally deficient clarifier components, as needed Design of new conveyance piping between the north clarifiers and the new UV disinfection facility and the modification of individual clarifier effluent pipes, as needed, to connect to the new conveyance piping Design of a new UV disinfection facility and all electrical and associated improvements, as required, to disinfect all secondary plant effluent Develop design criteria for a new PAA facility to disinfect EFTU flows o For all existing tankage conversions and all new structures or facilities required for the PAA disinfection system Central WWTP Capacity Improvements and CSO Reduction Page 4 of 8

o It is anticipated that the equipment for the PAA disinfection facility will be furnished and installed by the selected chemical supplier. Design of modifications to the clarifier return sludge system, including replacement or upgrades to the pumping system and piping to achieve proportional return flow during wet weather events Design of upgrades to the CWWTP s supervisory control and data acquisition (SCADA) system to integrate all project improvements into the system o The Designer will utilize the MWS system integrator, Engineering Systems, for SCADA coordination consulting during the design phase. o The fee for Engineering Systems will be paid for under the current MWS contract. o Engineering Systems will not be a sub-consultant to the Designer. o It is anticipated that Engineering Systems will be assigned as a subcontractor to the successful construction contractor for the manufacture and installation of hardware along with the programming and configuration of software for the necessary system upgrades. Prepare specifications that adequately describe all technical requirements of the project equipment, materials, and installation procedures. Specifications will clearly define the contractor s responsibilities for the electronic O&M Manual. Design of any flow meters that may require replacement based on the useful life of the existing flow meters Design of butterfly valve and butterfly gate replacements Determination and design of the ultimate use of the old south aeration tanks and two empty cells of the old secondary clarifiers Design of optimization protocols for existing coarse bubble aeration/mixing systems throughout the CWWTP Demolition design of the following facilities: o Abandoned south grit odor control system o Maintenance office adjacent to the east wall of the South Primary Settling Tanks. Note that a natural gas pipe is present in this vicinity, so coordinate with CWWTP staff to locate this pipe. o Limited demolition of tertiary filter treatment tanks o Tertiary filter backwash screw pumps and filter backwash tanks o Turbine installed adjacent to the filter backwash tanks o Existing plant disinfection facility at the EFTU and at the treated plant effluent chlorination/dechlorination facility o All demolition required for construction of CSO flow equalization storage o All demolition required for construction of north screenings facility Where new work requires stormwater BMP design, perform the design to conform with MWS Stormwater requirements Design of all required site work in accordance with the Scope of Work, Section 4.05 Design of recommended flood mitigation improvements for the Central Biosolids facility and the CWWTP as detailed in the Post-May 2010 Flood Report dated May 2014 Design of recommended process improvements for the Central Biosolids facility as detailed in the Biosolids Facility Assessment by Brown & Caldwell dated October 2014 Design of existing electrical system improvements as detailed in the CWWTP Electrical System Assessment dated December 2014 Central WWTP Capacity Improvements and CSO Reduction Page 5 of 8

Miscellaneous Design Tasks Geotechnical investigations, as needed Preparation of all permits for the proposed work (See below) Preparation of a Maintenance of Plant Operations (MOPO) Plan that provides general guidelines and procedures for maintaining plant treatment capability during construction (See below). Plan must be prepared as a project specification. Construction Administration Services Tasks The Designer will provide construction administration services during the construction cycle of each construction contract. The level of effort will be defined during Phase 2 / Phase 3 contract negotiations. During this negotiation, the division of duties and corresponding work responsibilities for the CWNOAP Construction Management Consultant staff and Designer s staff will be determined. The Designer s work effort may consist of any or all of the following tasks: Respond to contractor requests for information and requests for clarification Administer the contractor submittal and shop drawing review and approval process Conduct construction meetings on behalf of MWS Review contractor Change Order requests and submit written recommendations to MWS Assist with updates to the electronic O&M Manual with data from upgraded and new unit processes. The existing electronic O&M Manual prepared for the Central Biosolids facility may be utilized if it can subsequently be updated by plant staff for future modifications. If this is not feasible or desirable, the Designer may need to develop a new, separate electronic O&M Manual platform. Provide resident engineering staff as appropriate for the work being performed at the site. More than one resident engineer may be necessary at any given time depending on the level of construction being performed. Provide startup, commissioning, and training services, which may include any or all of the following: o Review of contractor startup, commissioning, and training plans o Administer the startup and training schedule, including conducting any required meetings o Witnessing of field startup testing o Preparation of testing reports o Coordination and administration of the resolution of startup and commissioning issues that arise Perform project completion inspections (Substantial Completion, Final Completion, Warranty Inspection) o Coordinate inspection times with contractor and MWS staff and the CWNOAP Project Manager o Perform inspections o Prepare and issue punch list documentation by coordinating with all inspecting parties o Prepare letters of Substantial Completion, Final Completion, Warranty Review Comments, and Warranty Issues Resolution Central WWTP Capacity Improvements and CSO Reduction Page 6 of 8

FEASIBILITY/RISK ASSESSMENT/CRITICAL PATH ITEMS Easement Acquisition: Temporary construction easements may be required, depending on the location of Central Pumping Station improvements, the new CSO equalization storage tanks, or the new north screening facility. The need for temporary construction easements will be determined during design. Additional Site Constraints: Operations at the CWWTP will need to be maintained at full or nearfull capacity during construction. The MOPO Plan must be prepared and approved by MWS (See separate section below). Site Security: In conjunction with MWS staff and in accordance with MWS security protocols, a Site Security Plan will be developed. Elements of this plan may include, but not be limited to, background checks on all people with access to the site or to MWS computers, the installation of additional security cameras, the hiring and scheduling of additional security guards at plant entrances and walking the site, etc. Hazardous Materials: Where construction requires the modification or demolition of any existing facility and/or structure, a review must be performed to determine if the work encounters any hazardous substances (asbestos, waste oil, wastewater, wastewater residue, etc.). A Hazardous Materials Plan will be prepared to account for every known hazardous material that has the potential to be encountered and its subsequent amelioration/mitigation/disposal/safety requirements. Permits: See the permit section below. Archeological: There are no known archaeological issues on this project. All modification work will be performed in previously reviewed and vetted areas. It is noted, however, that an archeological review may be required for the yet-to-be-determined site of new storage tank. Geotechnical: Geotechnical reports and information exist from many prior construction projects and should be referenced to the extent that they are available. Due to variability of soils and rock formations, though, it is understood that additional geotechnical work is required to obtain specific information at new structure locations. It is expected that the Designer will take full responsibility for any new geotechnical work. MAINTENANCE OF PLANT OPERATIONS (MOPO) PLAN The process train improvements described in this document directly impact the ability of the CWWTP to treat wastewater and maintain compliance with effluent water quality standards during construction. Impacts to treatment processes must be minimized at all times. The Designer will develop a MOPO Plan as a specification section within the contract documents. The MOPO Plan will not dictate contractor s means and methods. Its intent is to inform the contractor about constraints that will be encountered during construction and the appropriate responses to these constraints. PERMITTING The following permits/activities were identified as potentially required for this project; however, further evaluation of the need to acquire these permits (and any other permits not listed below) will be conducted by the Designer: NPDES Stormwater Construction Permit (TDEC, MWS) Floodplain Variance (MWS) Central WWTP Capacity Improvements and CSO Reduction Page 7 of 8

Grading Permit (MWS) Building Permit (MWS) Plans and specs approval/authorization for Construction (TDEC) Erosion Prevention and Sediment Control Inspection during Construction (TDEC, MWS) Section 106 Permit (Tennessee Historical Commission), with archaeological review if required REFERENCE MATERIALS The following reference materials are available electronically on the Clean Water Nashville website under the Technical Documents information, unless otherwise noted: Central Wastewater Treatment Plant Optimization Study National Pollutant Discharge Elimination System (NPDES) Permit (in the Central Wastewater Treatment Plant Optimization Study) Consent Decree Long Term Control Plan CWWTP Post-May 2010 Flood Report dated May 2014 CWWTP Biosolids Facility Assessment dated October 2014 CWWTP Electrical System Assessment dated January 2015 CWWTP Electrical Equipment Condition List dated December 2014 Central WWTP Capacity Improvements and CSO Reduction Page 8 of 8