Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013

Size: px
Start display at page:

Download "Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013"

Transcription

1 Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013

2 Background 2 HDR Begins Feasibility Study to Evaluate Construction of a New Wastewater Treatment Plan versus Remaining with KCMO Oct 2011 Jan 2012 Council Approves Feasibility Study May 2012 City Authorizes Antidegradation Report and Facility Plan Aug 2012 Antidegradation Report Approved by MDNR Oct 2012 October 2012 Draft Operating Permit issued for public comment Dec 2012 Comment Period Closed without Public Comment Jan March 2013 Workshops and Site Visits Apr 2013 Draft Facility Plan Complete

3 Feasibility Study Results Feasibility Study Estimate Anaerobic Aerobic Conveyance $22,327,100 $22,327,100 WWTP $53,398,200 $40,513,000 TOTAL $75,725,000 $62,840,000 Feasibility Study Debt Service Cost Which Was Inflated to 2014 Adjustment for a Delayed Start from 2014 to 2015 Adjusted Debt Service Feasibility Cost (2015, 4.6 MGD) $78,130,000 $65,027,000 $1,563,000 $1,301,000 $79,693,000 $66,328,000 3

4 Facility Plan Results Facility Plan Estimate Cost Base Cost $66,880,000 The Base Case Wastewater Treatment Facility will provide functionally reliable, consistent treatment, with capacity for the next 20 years. It will meet the Missouri River discharge limits approved by the Missouri Department of Natural Resources, plus provide biological nutrient removal reducing effluent nitrogen and phosphorus. The estimated construction costs are based on costs for similar facilities constructed in the last 5 years and include inflation to a construction period beginning in Enhancements Recommended by Budget Committee Increase in Capacity 30 years $5,280,000 Modify Headworks for Future Expansion $980,000 Dry Pit versus Submersible Pump Stations $1,240,000 Access road from Highway 210 $340,000 4 Total Recommended Capital Cost ($2015) $74,720,000

5 Advantages of Liberty Wastewater Treatment Facility Lower present value Predictable future rate increases Nutrient removal capacity now; KCMO will need to add later Not dependent on KCMO schedule for upgrades to Birmingham Pump Station Capacity for 30 or more years Liberty controls its wastewater and economic development future 5

6 Public Workshop Public Workshop held November 11, 2012 at the Liberty Community Center Residents heard information about the options and gave feedback on preferences 48% 30% 22% 6

7 Workshops with City Staff January 7, 2013 Collection System Improvements and Plant Flow January 22, 2013 Process Evaluation and Hydraulic Review January 28, 2013 Equipment Selection Review February 4, 2013 Biosolids Disposal Options February 19, 2013 Architectural Theme and Building Design 7

8 Workshop Results Wastewater Treatment Facility $74.7 Million Capital Cost 5.1 Million Gallon per Day Capacity Dry Pit Pump Stations Aerobic Digestion of Solids UV Disinfection Class B Biosolids Solids Storage Laboratory Offices Plant Maintenance Facility 8

9 Workshop Results Collection System KCMO 42 Interceptor West Pump Station Force Main Pumps Excess Flow Pumps West Excess Flow Holding Basin East Pump Station Influent Plant Pumps Excess Flow Pumps East Excess Flow Holding Basin 9

10 Facility Plan Recommendations and Alternatives

11 Facility Plan Recommended Facilities (2015$) CONVEYANCE INTERCEPTOR LIBERTY $230,000 INTERCEPTOR KANSAS CITY $5,500,000 CITY OF KANSAS CITY INTERCEPTOR CREDIT $1,920,000 WEST PUMP STATION $4,356,000 PS BAR SCREEN WEST EFHB $2,490,000 WEST FORCE MAIN $2,320,000 EAST EFHB $3,010,000 CONVEYANCE TOTAL $15,986,000 WWTP INFLUENT PUMP STATION $6,445,000 HEADWORKS $4,488,000 AERATION BASINS $9,545,000 RAS PS AND BLOWERS $5,260,000 SECONDARY CLARIFIERS $7,787,000 DEWATERING BUILDING $8,959,000 DIGESTERS $4,520,000 SOLIDS STORAGE $1,100,000 INTERMEDIATE PUMP STATION $2,520,000 UV DISINFECTION $2,440,000 LAB/OFFICE (OPTION 5) $1,700,000 SUBTOTAL $54,764,000 OUTFALL $3,300,000 ACCESS ROAD $670,000 PLANT TOTAL $58,734,000 PROJECT TOTAL $74,720, CAPITALIZED INTEREST $10,718,750 DEBT SERVICE RESERVE FUND $8,227,268 COST OF ISSUANCE $1,286,250 BOND AMOUNT $94,952,268

12 Site Plan INFLUENT PUMP STATION 16. HEADWORKS 20. AERATION BASIN SPLITTER 22. BLOWER PAD 24. AERATION BASIN 30. SECONDARY CLARIFIER FLOW SPLITTER 32. SECONDARY CLARIFIER 34. INTERMEDIATE PUMP STATION 36. FILTRATION (FUTURE) 38. UV DISINFECTION 40. RAS/WAS LIFT STATION 42. ELECTRICAL ROOM 44. DEWATERING/THICKENING 45. DIGESTION BLOWER PAD 46. AEROBIC DIGESTERS 48. CLASS B SOLIDS STORAGE 60. LAB/OFFICE 62. PLANT MAINTENANCE

13 Facility Plan Enhancements Not Funded Description Enhancements Expanded Lab/Maintenance/C&D $6,217,000 Biosolids Drying $6,400,000 3 Clarifiers in lieu of 2 Clarifiers $2,070,000 Blowers Inside a Building $1,020,000 Alternate Biological Nutrient Removal $4,131,000 Rush Creek Pump Station Screen $467,000 13

14 Net Present Value Feasibility Study Alternative 2 Missouri River Discharge Alternative 3 Missouri River Discharge Alternative 1 Missouri River Discharge Option 5 KCMO, Negotiated Rates Option 4 KCMO Projected Rates Facility Plan $ $50 $100 $150 $200 $250 Millions Liberty Recommended Facilities Scenario 2 Financing KCMO Direct to Plant Rates (6.3% through 2020) KCMO Direct to Plant Rates 10%/8% Increases through $ $50 $100 $150 $200 $250 Millions

15 Comparison of Total Annual Revenue Requirements 15 $25 $20 $15 $10 Millions $5 $ Liberty WWTP Scenario 2 Financing KCMO Direct to Plant KCMO 6.3% Through 2020 Liberty WWTP Level Payment Financing

16 Average Annual Revenue Requirement Increase for Liberty Liberty Recommended Facility (Level Debt Payments) Liberty Recommended Facility (Scenario 2 Financing) KCMO Direct to Plant Rates (10%/8% KCMO Increases through 2020) % 1.8% 0.7% 7.2% 4.5% 1.6% 9.9% 5.4% 2.3% KCMO Retail Rates (6.3% KCMO Increases through 2020) 7.6% 4.7% 2.2% 16

17 Cost per Average Household Based on 4,165 gallons per month Alternative $/Month Current 2013 $43.40 KCMO Direct to Plant (10%/8% KCMO Increases) 2019 $ $92.08 KCMO Direct to Plant (6.3% KCMO Increases) 2019 $ $80.55 Construct Liberty Plant (Level Payment Financing) 2019 $ $76.07 Construct Liberty Plant (Scenario 2 Financing) 2019 $ $

18 Advantages of Liberty Wastewater Treatment Facility Lower present value Predictable future rate increases Nutrient removal capacity now; KCMO will need to add later Not dependent on KCMO schedule for upgrades to Birmingham Pump Station Capacity for up to 30 years Liberty controls its wastewater and economic development future 18

19 19 South Liberty Parkway Development

20 South Liberty Parkway Development Description Cost Cumulative Total Enhancement/Benefit West Liberty Interceptor with Capacity for South Liberty Parkway Area Scenario 2 City Extensions and Increased Capacity $5,949,000 $5,949,000 $7,915,000 $13,864, Adjusted Capital/Debt Costs (in 2015 dollars) $13,864,000 The base cost includes use of the shared interceptor currently used by KCMO and Liberty which has limited long term capacity. Construction of a new West Liberty Interceptor will provide capacity for the full West service area. This provides for the infill sewers in the area around the South Liberty Parkway. Description Additional Cost per Month (2019) West Liberty Interceptor with Capacity for South Liberty Parkway $3.10 Scenario 2 City Extensions and Increased Capacity for Ultimate Buildout $

21 Next Steps May 6, st Council Meeting Presentation of Facility Plan May 2 nd Council Meeting on August Bond Election June/July 2013 Public Meetings on Facility Plan August 6, Bond Election 21

22 22 Questions

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

EXECUTIVE SUMMARY A. INTRODUCTION B. FINDINGS AND CONCLUSIONS. 1. Conveyance System

EXECUTIVE SUMMARY A. INTRODUCTION B. FINDINGS AND CONCLUSIONS. 1. Conveyance System EXECUTIVE SUMMARY A. INTRODUCTION NACA has committed to planning, designing and constructing regional wastewater conveyance and treatment facilities to serve several municipalities in Northwest Arkansas.

More information

Borough of Chambersburg Wastewater Treatment Plant Expansion and Upgrade Project

Borough of Chambersburg Wastewater Treatment Plant Expansion and Upgrade Project Borough of Chambersburg Wastewater Treatment Plant Expansion and Upgrade Project Presented by: G. Bryan Salzmann, Esq. Manny Parada, PE Jake Rainwater, PE Beverley Stinson, PhD Don Lavine February 27,

More information

Treatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E.

Treatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E. Treatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E. Topics Covered Background Challenges and Priorities UV and Filters High Flows Evaluation Aeration Evaluation Aeration Basins

More information

Watertown Wastewater Facility Plan. August 11, 2015

Watertown Wastewater Facility Plan. August 11, 2015 Watertown Wastewater Facility Plan August 11, 2015 Watertown Wastewater Wastewater Treatment Facility History Comprehensive Planning Wastewater Concerns Capacity Condition Permitting Requirements Watertown

More information

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1 APPENDIX A PRELIMINARY TECHNICAL SPECIFICATIONS FOR BIOSOLIDS MANAGEMENT SERVICES JEA Buckman Residuals Management Facility 1. Background JEA is seeking biosolids management services from experienced biosolids

More information

NTMWD REGIONAL WASTEWATER SYSTEM

NTMWD REGIONAL WASTEWATER SYSTEM Regional Service Through Unity Meeting our Region s Needs Today and Tomorrow NTMWD REGIONAL WASTEWATER SYSTEM Tour of South Mesquite Regional Wastewater Treatment Plant November 28, 2017 REGIONAL WASTEWATER

More information

Capital Improvement Plan Update:

Capital Improvement Plan Update: Board of Supervisors Meeting Carson City Public Works Department Capital Improvement Plan Update: Wastewater Collection, Treatment and Reuse March 14, 2013 Topics of Discussion Regionalization Existing

More information

Post-Aerobic Digester with Bioaugmentation Pilot Study City of Meridian, ID WWTP PNCWA 2010

Post-Aerobic Digester with Bioaugmentation Pilot Study City of Meridian, ID WWTP PNCWA 2010 Post-Aerobic Digester with Bioaugmentation Pilot Study City of Meridian, ID WWTP by: William Leaf Adrienne Menniti Bruce Johnson CH2M HILL, Inc. Clint Dolsby Tracy Crane City of Meridian October 26, 21

More information

AGENDA LOVELAND CITY COUNCIL STUDY SESSION TUESDAY, JULY 14, 2015 CITY COUNCIL CHAMBERS 500 EAST THIRD STREET LOVELAND, COLORADO

AGENDA LOVELAND CITY COUNCIL STUDY SESSION TUESDAY, JULY 14, 2015 CITY COUNCIL CHAMBERS 500 EAST THIRD STREET LOVELAND, COLORADO AGENDA LOVELAND CITY COUNCIL STUDY SESSION TUESDAY, JULY 14, 2015 CITY COUNCIL CHAMBERS 500 EAST THIRD STREET LOVELAND, COLORADO The City of Loveland is committed to providing an equal opportunity for

More information

Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015

Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015 Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015 Monthly Utility Bill in $ 100 Combined Average Utility Bill for 2015-2020 5/8 Meter with

More information

City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant

City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant April 7, 2014 Prepared by Jerry Blain, P.E., Project Associate Environmental Finance Center Funding for this Energy Assessment was provided

More information

Emerging Issues in the Water/Wastewater Industry. Austin s Full-Scale Step-BNR Demonstration

Emerging Issues in the Water/Wastewater Industry. Austin s Full-Scale Step-BNR Demonstration Summer Seminar Emerging Issues in the Water/Wastewater Industry Austin s Full-Scale Step-BNR Demonstration Rajendra P. Bhattarai, P.E., DEE Austin Water Utility, City of Austin 625 East 10 th Street, Suite

More information

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Presented by: Jim

More information

Pima County Regional Optimization Master Plan

Pima County Regional Optimization Master Plan Pima County Regional Optimization Master Plan Proposed extent of screen enclosure Existing and Expanded Ina Road WPCF Approximately 160 acres Sports Park Michael Gritzuk, P.E., Director Edward Curley,

More information

Chapter 4 TMACOG Areawide Water Quality Management 208 Plan 4-116

Chapter 4 TMACOG Areawide Water Quality Management 208 Plan 4-116 Fremont Facility Planning Area Designated Management Agency Responsibilities: Fremont: Owns and operates the wastewater treatment plant, and sanitary sewers within its corporate limits. Sandusky Township

More information

Facilities Plan. Volume 2 Wastewater Facilities Assessment Report Executive Summary

Facilities Plan. Volume 2 Wastewater Facilities Assessment Report Executive Summary City of St. Joseph, Missouri Volume 2 Wastewater Facilities Assessment Report Executive Summary By Work Order No. 09-001 B&V Project 163509 October 29, 2010 Table of Contents 1.0 Introduction...1 2.0 TM-WW-1:

More information

UDWQ POTW Nutrient Removal Cost Impact Study: Analysis of Tremonton City Wastewater Treatment Plant

UDWQ POTW Nutrient Removal Cost Impact Study: Analysis of Tremonton City Wastewater Treatment Plant TECHNICAL MEMORANDUM UDWQ POTW Nutrient Removal Cost Impact Study: Analysis of Tremonton City Wastewater Treatment Plant PREPARED FOR: PREPARED BY: COPIES: Utah Division of Water Quality CH2M HILL DATE:

More information

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be: Andelina Farms Wastewater Treatment Plant Preliminary Basis of Design May 2018 Andelina Farms is a proposed Planned Unit Development in Saline Township located along US-12 just west of the City of Saline.

More information

Santa Rita Wastewater Treatment Plant Alternative Site Investigation

Santa Rita Wastewater Treatment Plant Alternative Site Investigation Santa Rita Wastewater Treatment Plant Alternative Site Investigation Durango City Council Work Session August 11, 2015 Hatch Mott MacDonald Renovate Vs. Relocate BNR Study Cost Summary Site Santa Rita

More information

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP Timothy McCann AECOM Keith Bovard Rocky River WWTP WWTP Infrastructure Redundancy Redundancy As NASA Would Say: A Backup Plan for the Backup Plan Nuclear Power Plant Wastewater Treatment Plant Page 3 Infrastructure

More information

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station City of St. Joseph, Missouri Hydraulic Analysis and Effluent Pump Station By Work Order No. 09-001 B&V Project 163509 May 20, 2010 Table of Contents 1.0 Executive Summary...1 2.0 Purpose of Study...2 3.0

More information

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Richard W. Gullick, Ph.D. Director of Operations Timothy Castillo Wastewater Manager Presented to the Albemarle County

More information

Rehoboth Beach Commissioners Meeting Ocean Outfall & Treatment Plant Project Update July 26, Jeff Sturdevant Principal Kelvin George Principal

Rehoboth Beach Commissioners Meeting Ocean Outfall & Treatment Plant Project Update July 26, Jeff Sturdevant Principal Kelvin George Principal Rehoboth Beach Commissioners Meeting Ocean Outfall & Treatment Plant Project Update July 26, 2017 Jeff Sturdevant Principal Kelvin George Principal Rehoboth Beach Ocean Outfall/CIP Project(s) Update Agenda

More information

WHEREAS, the Board has previously so adopted a wastewater supply system comprehensive plan, and

WHEREAS, the Board has previously so adopted a wastewater supply system comprehensive plan, and LAKEHAVEN WATER AND SEWER DISTRICT King County, Washington Resolution No. 2017-1283 A RESOLUTION of the Board of Commissioners of the Lakehaven Water and Sewer District, King County, Washington, adopting

More information

Baltimore City Department of Public Works

Baltimore City Department of Public Works Baltimore City Department of Public Works Back River WWTP Process and Construction Overview Michael F. Gallagher, Chief Wastewater Facilities Division Wastewater Treatment Chesapeake Bay Restoration Water

More information

Pilot Testing a High-Speed Turbo Blower at the City of Plano, Illinois Water Reclamation Facility"

Pilot Testing a High-Speed Turbo Blower at the City of Plano, Illinois Water Reclamation Facility Pilot Testing a High-Speed Turbo Blower at the City of Plano, Illinois Water Reclamation Facility" Presented by: Mark J. Halm, P.E. - Yokhana Alkass, LEED AP EEC, PC Darrin B. Boyer - City of Plano- Illinois

More information

Wastewater Treatment. Where does wastewater go when it leaves your house?

Wastewater Treatment. Where does wastewater go when it leaves your house? Wastewater Treatment Where does wastewater go when it leaves your house? Let s s take a look The process includes: Collection of wastewater Primary Treatment Secondary Treatment Solids Handling Influent

More information

CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA

CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA A. EXISTING FACILITIES 1. Westtown-Chester Creek Plant Westtown Township acquired the Westtown-Chester Creek Treatment Plant (WCC Plant)

More information

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF

More information

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts:

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts: Mission: The mission of the Bentonville Wastewater Treatment Utility and staff is to protect public health and the environment through the effective treatment of wastewater. Effective wastewater treatment

More information

Bitterroot River Nutrient TMDL Technical Report WASTEWATER TREATMENT

Bitterroot River Nutrient TMDL Technical Report WASTEWATER TREATMENT Bitterroot River Nutrient TMDL Technical Report WASTEWATER TREATMENT Prepared By: Watershed Management Section Montana DEQ April 9, 2010 Technical Advisory Group Draft 1.0 INTRODUCTION This is a technical

More information

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION 1.1 Introduction The GWA provides wastewater services for Guam s general population and for Andersen Air Force Base. The wastewater system is made up of seven

More information

Chapter 2: Description of Treatment Facilities

Chapter 2: Description of Treatment Facilities 2020 Facilities Plan Treatment Report 2.1 Introduction Chapter 2: Description of Treatment Facilities This chapter defines the Milwaukee Metropolitan Sewerage District (MMSD) service area. It also describes

More information

Design, Construction and Startup of the First Enhanced Nutrient Removal Plant in Maryland Funded by the Chesapeake Bay Restoration Fund

Design, Construction and Startup of the First Enhanced Nutrient Removal Plant in Maryland Funded by the Chesapeake Bay Restoration Fund Design, Construction and Startup of the First Enhanced Nutrient Removal Plant in Maryland Funded by the Chesapeake Bay Restoration Fund Rip Copithorn, Jeff Sturdevant, Vince Maillard GHD Clients People

More information

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below:

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below: 6.1.3 Environmental Impacts A summary of the impacts of this treatment alternative are listed below: 1. The Matanuska River will receive treated effluent as it currently does. 2. Effluent quality would

More information

RE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System

RE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System 14 th, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Wardsville Wastewater Treatment Plant and Collection System The Ontario Clean Water Agency

More information

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment OWEA 2013 Annual Conference June 19, 2013 Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment Jeff Lamson, Superintendent, WPCC Robert Hrusovsky,

More information

TOWNSHIP OF SPRINGWATER MIDHURST - WATER, WASTEWATER & TRANSPORTATION CLASS ENVIRONMENTAL ASSESSMENT PHASE 3 & 4

TOWNSHIP OF SPRINGWATER MIDHURST - WATER, WASTEWATER & TRANSPORTATION CLASS ENVIRONMENTAL ASSESSMENT PHASE 3 & 4 TOWNSHIP OF SPRINGWATER MIDHURST - WATER, WASTEWATER & TRANSPORTATION CLASS ENVIRONMENTAL ASSESSMENT PHASE 3 & 4 Aug 03, 2016 Status Update to Council 1 Overview of Midhurst Secondary Plan On November

More information

Efficient Design Configurations for Biological Nutrient Removal

Efficient Design Configurations for Biological Nutrient Removal Efficient Design Configurations for Biological Nutrient Removal A Case Study: Upper Blackstone Water Pollution Abatement District Jane E. Madden, P.E., BCEE August 30, 2017 UBWPAD Wastewater Treatment

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 PREPARED: January 2019 2018 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

The alternatives addressed in this EIR were selected in consideration of one or more of the following factors:

The alternatives addressed in this EIR were selected in consideration of one or more of the following factors: CHAPTER 5 Project Alternatives 5.1 Introduction The purpose of the alternatives analysis in an environmental impact report (EIR) is to describe a range of reasonable alternatives to the project that could

More information

Refinement of Nitrogen Removal from Municipal Wastewater Treatment Plants

Refinement of Nitrogen Removal from Municipal Wastewater Treatment Plants Refinement of Nitrogen Removal from Municipal Wastewater Treatment Plants Prepared for Maryland Department of the Environment Presented by: Gannett Fleming, Inc. Stephen B. Gerlach, PE & Carrie DeSimone

More information

Closing the Gap Reaching for Energy Independence in Water Reclamation

Closing the Gap Reaching for Energy Independence in Water Reclamation Closing the Gap Reaching for Independence in Water Reclamation Graham Juby, P.E. July 27, 2012 Power use in POTWs is growing steadily... more than 25 billion kwh in 2015* * Electrical Power Research Institute

More information

2015 Spring Conference

2015 Spring Conference 2015 Spring Conference Meeting Strict Summer Permit Requirements on Day One: Start-up of the Western Wake Regional Water Reclamation Facility Chris White, PE April 13, 2015 Acknowledgements Town of Cary

More information

~~~~ WWTP Master Plan Project

~~~~ WWTP Master Plan Project ~~~~ WWTP Master Plan Project City Council - April 7, 2014 WWTP History and Issues Constructed in 1994 Aging mechanical equipment - Frequent equipment failures - Resulted in TCEQ permit violations - High

More information

A Battle to Be the Best: A Comparison of Two Powerful Sidestream Treatment Technologies: Post Aerobic Digestion and Anammox

A Battle to Be the Best: A Comparison of Two Powerful Sidestream Treatment Technologies: Post Aerobic Digestion and Anammox A Battle to Be the Best: A Comparison of Two Powerful Treatment Technologies: Post Aerobic Digestion and Anammox David Oerke/CH2M Tom Johnson/CH2M Bruce Johnson/CH2M Heidi Bauer/CH2M Steve Graziano/CH2M

More information

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred

More information

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE PLAN SUMMARY AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE The Pennsylvania Sewage Facilities Act (Act 537) was enacted by the Pennsylvania

More information

Engineering Department Wastewater Treatment

Engineering Department Wastewater Treatment Engineering Department Wastewater Treatment Prepared by: Rich Davidson, Director Assisted by: Mary Phelps Verle Holland Steven Tam Andy Yeung Gina De la Torre Serenity Cummings Engineering Department Wastewater

More information

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals City of Elk River Wastewater Treatment Facility Improvements Achieving Wastewater Treatment Goals By Tejpal Bala, P.E. Bolton & Menk, Inc. The City of Elk River received a new NPDES permit and the existing

More information

Technical Memorandum No. 1

Technical Memorandum No. 1 To: From: Steve McGowan, P.E., BCEE Project Manager, Malcolm Pirnie, Inc. Eric Wang, P.E. Project Engineer, Malcolm Pirnie, Inc. Date: Subject: August 11, 28 (Final) Madison MSD Project No. 84251 Malcolm

More information

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update February 24, 2015 Overview Wastewater Collection System Customer Base 16,276 SFR 1,968 MFR 1,364 COM/IND

More information

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 Project Name: Central WWTP Capacity Improvements and CSO Reduction Project MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 BACKGROUND / PURPOSE Metro Water Services (MWS), in order to comply with

More information

Planada Community Services District Municipal Service Review

Planada Community Services District Municipal Service Review Final Report Planada Community Services District Municipal Service Review Prepared for: Merced County Local Agency Formation Commission Prepared by: April 2015 As Approved by LAFCO April 15, 2015 EPS #141037

More information

Wastewater Facility Plan City of Marshall, Minnesota

Wastewater Facility Plan City of Marshall, Minnesota Wastewater Facility Plan City of Marshall, Minnesota Public Hearing March 14, 2017 Bolton & Menk, Inc. Project No. T22.108560 Glossary of General Terms & Abbreviations MPCA - Minnesota Pollution Control

More information

EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT

EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT Township of Bonnechere Valley Water and Sewage Department January 2014 Table of Contents Executive Summary... 3 Introduction... 4 Report Availability...

More information

2017 Annual Performance Report

2017 Annual Performance Report 2017 Annual Performance Report Thornbury Wastewater Treatment Plant and Associated Collection System Prepared by: Wastewater Operations Staff Reporting Period: January 1 December 31, 2017 1 P age Executive

More information

CITY OF YUMA WASTEWATER TREATMENT PLANTS. Cactus Moon Education, LLC.

CITY OF YUMA WASTEWATER TREATMENT PLANTS. Cactus Moon Education, LLC. CITY OF YUMA WASTEWATER TREATMENT PLANTS Wastewater Purify Processes Environment Influent Landfill Bacterial Micro-organism Biological Clarification Residual Anaerobic Methane Bio-Solids Vocabulary All

More information

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins

More information

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Facility / System: Town of Farmville Wastewater Collection System and Treatment Facilities Responsible Entity:

More information

Eco-efficient Solids Separation Using Salsnes Technology. Wayne Lem Trojan Technologies July

Eco-efficient Solids Separation Using Salsnes Technology. Wayne Lem Trojan Technologies July Eco-efficient Solids Separation Using Salsnes Technology Wayne Lem Trojan Technologies July 18 2013 TROJAN TODAY INNOVATIVE WATER TREATMENT SOLUTIONS > 800 associates, operating from 25 locations in 12

More information

Ditches for Energy Efficiency and Improved Nitrogen Removal

Ditches for Energy Efficiency and Improved Nitrogen Removal Upgrade of the Big Gulch WWTP Oxidation Ditches for Energy Efficiency and Improved Nitrogen Removal Thomas G. Authors: Thomas E. Coleman, dtec Systems Bridges, Mukilteo Water & Wastewater District Bend,

More information

Dealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017

Dealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017 Dealing with Unexpected Wastewater Treatment Plant Disruptions February 16, 2017 Location Map WPCP History Original WPCP constructed on this site in 1928 consisting of primary treatment and chlorination;

More information

Texas A&M Wastewater Treatment Plant 9685 Whites Creek Rd., College Station, TX

Texas A&M Wastewater Treatment Plant 9685 Whites Creek Rd., College Station, TX Municipal Wastewater Treatment Plant Site Visit Report Thursday, October 2, 2014 Prepared by: Elora Arana, Environmental Studies student Prepared for: Dr. Heather Wilkinson, Professor BESC 489/411 Texas

More information

Council Meeting Post Point Wastewater Treatment Plant Improvements March 15, By Ted Carlson PW Director

Council Meeting Post Point Wastewater Treatment Plant Improvements March 15, By Ted Carlson PW Director Council Meeting Post Point Wastewater Treatment Plant Improvements March 15, 2010 By Ted Carlson PW Director tcarlson@cob.org Objectives: 1. Update/confirm peak flow management status 2. Update/confirm

More information

The County Board of Arlington, Virginia. Design Contract and Funding for DES Water Pollution Control Plant Master Plan 2001 Update

The County Board of Arlington, Virginia. Design Contract and Funding for DES Water Pollution Control Plant Master Plan 2001 Update January 17, 2003 TO: FROM: SUBJECT: The County Board of Arlington, Virginia Ron Carlee, County Manager Design Contract and Funding for DES Water Pollution Control Plant Master Plan 2001 Update RECOMMENDATION:

More information

Advanced Wastewater Treatment and Disposal Systems. Wastewater Utility Operation and Management for Small Communities

Advanced Wastewater Treatment and Disposal Systems. Wastewater Utility Operation and Management for Small Communities Advanced Wastewater Treatment and Disposal Systems Wastewater Utility Operation and Management for Small Communities Preliminary Treatment Primary Treatment Secondary Treatment Tertiary Treatment Disinfection

More information

Index Number District II Primary Clarifier #2 and #3 Rehabilitation Project Definition FINAL

Index Number District II Primary Clarifier #2 and #3 Rehabilitation Project Definition FINAL T E C H N I C A L M E M O R A N D U M DISTRICT II PRIMARY CLARIFIER #2 AND #3 REHABILITATION PROJECT DEFINITION Index Number 129-15 and #3 Rehabilitation Project Definition FINAL PREPARED FOR: JEA Capital

More information

Palmer Wastewater Treatment Plant 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed

Palmer Wastewater Treatment Plant 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed 6.7.1 Description This alternative considers expanding the capacity of the existing lagoon treatment facility and changing the discharge

More information

Army Base Treatment Plant

Army Base Treatment Plant Treatment Plant Norfolk Berthed at Nauticus, the Battleship Wisconsin is one of the largest and last battleships ever built by the U.S. Navy. 3Q AB010500 3Q Legend Treatment Plant CIP Interceptor Point

More information

City of Medora, ND Wastewater Infrastructure Needs Assessment November 2012

City of Medora, ND Wastewater Infrastructure Needs Assessment November 2012 City of Medora, ND Wastewater Infrastructure Needs Assessment November 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and

More information

Just In Time Treatment Capacity

Just In Time Treatment Capacity Just In Time Treatment Capacity Developers and Utilities Can Partner June 2006 Pima County Wastewater Management Located in Southern Arizona Population Approaching 1 Million 3,300 Miles of Conveyance System

More information

Anderson Water Pollution Control Plant

Anderson Water Pollution Control Plant City of Anderson Wastewater Division Public Works Director Jeff Kiser Chief Plant Operator Plant Supervisor Operator III Operator I Phil DeBlasio Mike Hansen Tony Hinchliff Vacant Collections Supervisor

More information

ReWa Service Area. 8 Water Resource Recovery Facilities 89 MGD Permitted Flow 39 MGD ADF. 343 Miles of Sewer Interceptors and Force Mains

ReWa Service Area. 8 Water Resource Recovery Facilities 89 MGD Permitted Flow 39 MGD ADF. 343 Miles of Sewer Interceptors and Force Mains Large Capital Project Engineering Services RFQ July 14, 2016 8 Water Resource Recovery Facilities 89 MGD Permitted Flow 39 MGD ADF 343 Miles of Sewer Interceptors and Force Mains 59 Pumping Stations Over

More information

Role of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration

Role of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration ROLE OF OTHERS For the design focus of the project, key partners included:»» Mortenson Construction, Contractor»» Jacobs, Contract Plant Operator»» Portland Engineering and Controls, I&C The City of The

More information

2015 HDR, Inc., all rights reserved.

2015 HDR, Inc., all rights reserved. 2015 HDR, Inc., all rights reserved. Hastings Utilities Water Pollution Control Facility Improvements Brian Bakke, HDR ASCE Environmental Conference 4/6/2017 Review Existing Facilities Need for the Project

More information

Addendum I to Request for Qualifications for Large Capital Projects Engineering Services

Addendum I to Request for Qualifications for Large Capital Projects Engineering Services Purchasing Department (O) 864.299.4000 (F) 864.277.5852 561 Mauldin Rd. Greenville, SC 29607 www.rewaonline.org Addendum I to Request for Qualifications for Large Capital Projects Engineering Services

More information

Presentation Outline

Presentation Outline Presentation Outline Nitrification/denitrification refresher Treatment technologies available for nitrification and BNR/ENR What is the problem? BNR/ENR VPDES permitting Causes of reduced BNR performance

More information

The TRA CRWS Master Plan. Past, Present, & Future of CRWS. Kaylee Dusek, EIT, Garver Matt Jalbert, PE, TRA

The TRA CRWS Master Plan. Past, Present, & Future of CRWS. Kaylee Dusek, EIT, Garver Matt Jalbert, PE, TRA The TRA CRWS Master Plan Past, Present, & Future of CRWS Kaylee Dusek, EIT, Garver Matt Jalbert, PE, TRA TRA operates the largest water resource recovery facility in Texas CRWS N Dallas CRWS currently

More information

Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project

Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project Presented August 29 th, 2016 Function of IMKWWTP Treatment Facility History Reasons for Proposed Project Why Now? Modest

More information

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES A range of potential ammonia limits were identified for alternatives evaluation, as discussed in Section 2.2.5. This chapter

More information

MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT

MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT 214 ANNUAL REPORT uary 1 to ember 31, 214 Environmental Compliance Approval # 3-871-88-949 Prepared by: Table of Contents Section 1: Overview...

More information

CITY OF FORT MYERS SOUTH ADVANCED WASTEWATER TREATMENT FACILITY

CITY OF FORT MYERS SOUTH ADVANCED WASTEWATER TREATMENT FACILITY CITY OF FORT MYERS SOUTH ADVANCED WASTEWATER TREATMENT FACILITY RAW SEWAGE Raw sewage is the water that flows into a wastewater treatment facility. It is made up of waste from toilets, sinks, garbage disposals,

More information

2010 UPDATE OF WATER AND WASTEWATER IMPACT FEES FOR THE CITY OF GEORGETOWN

2010 UPDATE OF WATER AND WASTEWATER IMPACT FEES FOR THE CITY OF GEORGETOWN 2010 UPDATE OF WATER AND WASTEWATER IMPACT FEES FOR THE CITY OF GEORGETOWN Prepared for: City of Georgetown P.O. Box 409 Georgetown, Texas 78627-0409 Prepared by: Capital Improvements Advisory Committee

More information

Eco-efficient Solids Separation Using Salsnes Filter Technology. Jonathan Leech Trojan Technologies Nov 2013

Eco-efficient Solids Separation Using Salsnes Filter Technology. Jonathan Leech Trojan Technologies Nov 2013 Eco-efficient Solids Separation Using Salsnes Filter Technology Jonathan Leech Trojan Technologies Nov 2013 Outline Process Description Technology Overview Primary Filtration Applications Full-scale application:

More information

Wastewater Treatment Plant Facilities Plan Update

Wastewater Treatment Plant Facilities Plan Update Newberg City Council Meeting July 16, 2007 3/24/2009 1 Last WWTP Facilities Plan dated 1985 Current WWTP dates from 1987 Various minor improvements and upgrades of the plant have occurred over the last

More information

4 EXISTING FACILITIES EVALUATION

4 EXISTING FACILITIES EVALUATION 4 EXISTING FACILITIES EVALUATION The City is served by a combination of wastewater collection, conveyance, and treatment systems. The City owns and operates the collection system that collects wastewater

More information

WASTEWATER TREATMENT MASTER PLAN SUPPLEMENT EXECUTIVE SUMMARY

WASTEWATER TREATMENT MASTER PLAN SUPPLEMENT EXECUTIVE SUMMARY City of Modesto Wastewater Treatment Master Plan Jennings Road Secondary Treatment Facility WASTEWATER TREATMENT MASTER PLAN SUPPLEMENT EXECUTIVE SUMMARY DRAFT June 2008 2700 YGNACIO VALLEY ROAD, SUITE

More information

Chapter 5: Treatment Assessment Future Condition

Chapter 5: Treatment Assessment Future Condition 2020 Facilities Plan Treatment Report 5.1 Introduction Chapter 5: Treatment Assessment Future Condition The future performance of the Milwaukee Metropolitan Sewerage District (MMSD) wastewater treatment

More information

Energy Efficiency / Conservation Case Studies in Waste Water Treatment Facilities

Energy Efficiency / Conservation Case Studies in Waste Water Treatment Facilities Energy Efficiency / Conservation Case Studies in Waste Water Treatment Facilities Prepared for: Energy Saving Opportunities for Wastewater Treatment Facilities: Energy Efficiency and CHP Workshop May 19

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 PREPARED: January 2015 2014 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

EPA Waste Water Discharge Licence Application

EPA Waste Water Discharge Licence Application Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update

More information

Anaerobic Digestion of High Strength Wastes within a TMDL

Anaerobic Digestion of High Strength Wastes within a TMDL Anaerobic Digestion of High Strength Wastes within a TMDL A POTW s Perspective on cost, benefits and considerations Appleton Wastewater Treatment Plant WWOA LMD Conference 1 Overview Overview of the Appleton

More information

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works This document can be made available in other accessible formats as soon as practicable and upon request Staff Report Infrastructure & Public Works Report To: Committee of the Whole Meeting Date: March

More information

Sewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions

Sewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions Sewer Facilities 102 Hampstead Sewer Service Area Current Conditions Carroll County owns and operates the public sewer system that serves both the Town of Hampstead and adjoining areas in the county. The

More information

Pre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties. September 13, 2018

Pre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties. September 13, 2018 Pre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties September 13, 2018 Agenda Opening remarks Eileen White, Director of Wastewater

More information

City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #52-14 REQUEST FOR PROPOSAL

City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #52-14 REQUEST FOR PROPOSAL City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #52-14 REQUEST FOR PROPOSAL DESIGN ENGINEERING SERVICES PEASE WASTEWATER TREATMENT FACILITY HEADWORKS UPGRADE INVITATION Sealed

More information

Sometimes Being Faced With A Challenge Can Lead To Greater Opportunities

Sometimes Being Faced With A Challenge Can Lead To Greater Opportunities Sometimes Being Faced With A Challenge Can Lead To Greater Opportunities Making the Case for Energy Savings Performance Contracting at the Opequon Water Reclamation Facility Frederick-Winchester Service

More information